Semantic search

Jump to navigation Jump to search
 Start dateSiteTitleSystem
IR 05000333/202301026 October 2023FitzPatrickBiennial Problem Identification and Resolution Inspection Report 05000333/2023010Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Primary Containment Isolation System
Reactor Core Isolation Cooling
Main Turbine
Residual Heat Removal
Main Condenser
IR 05000348/202309119 October 2023FarleyFinal Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091Emergency Diesel Generator
ML23275A17116 October 2023Wolf CreekOctober 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station
NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating13 October 2023FermiResponse to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - OperatingService water
Emergency Diesel Generator
Residual Heat Removal Service Water
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.1212 October 2023FermiResponse to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12Emergency Diesel Generator
Emergency Core Cooling System
ML23272A15510 October 2023FermiLetter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter)
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 19 October 2023FermiInservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1Reactor Coolant System
Feedwater
Secondary containment
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Main Steam Isolation Valve
Reactor Core Isolation Cooling
Primary containment
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Core Spray
Residual Heat Removal
Fuel Pool Cooling and Cleanup
Automatic Depressurization System
Standby Liquid Control
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Low Pressure Cooling Injection
Emergency Core Cooling System
Decay Heat Removal
Main Condenser
Control Rod
Containment Spray
Low Pressure Coolant Injection
ML23278A2406 October 2023River BendRegulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69
ML23272A1565 October 2023FermiFederal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) FRNEmergency Equipment Cooling Water
Residual Heat Removal Service Water
ML23275A1232 October 2023Saint LucieImproved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13Steam Generator
Reactor Coolant System
Auxiliary Feedwater
Shutdown Cooling
Control Room Emergency Ventilation
Emergency Core Cooling System
Decay Heat Removal
ML23275A1222 October 2023Saint LucieImproved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12Steam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Shutdown Cooling
HVAC
Residual Heat Removal
Control Room Emergency Ventilation
Shield Building
Circulating Water System
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Condenser
Control Rod
Main Steam
Containment Spray
ML23275A1192 October 2023Saint LucieImproved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9Steam Generator
Reactor Coolant System
Feedwater
Reactor Protection System
Auxiliary Feedwater
Shutdown Cooling
Residual Heat Removal
Control Room Emergency Ventilation
Steam Bypass Control System
Main Steam Safety Valve
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Main Condenser
ML23275A1182 October 2023Saint LucieImproved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8Steam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Main Turbine
Shutdown Cooling
Control Room Emergency Ventilation
Main Steam Safety Valve
Remote shutdown
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Safety Relief Valve
Main Steam
Containment Spray
ML23275A1132 October 2023Saint LucieImproved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3Steam Generator
Reactor Coolant System
Reactor Protection System
Shield Building
IR 05000317/202305029 September 2023Calvert CliffsSpecial Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent ViolationSteam Generator
Emergency Diesel Generator
Auxiliary Feedwater
L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 328 September 2023Prairie IslandLicense Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3Emergency Diesel Generator
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating28 September 2023FermiExigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - OperatingFeedwater
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Shutdown Cooling
Core Spray
Residual Heat Removal
Standby Gas Treatment System
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Emergency Core Cooling System
1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 421 September 2023Arkansas NuclearSupplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4Steam Generator
Reactor Coolant System
Feedwater
Service water
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Main Turbine
Emergency Core Cooling System
Emergency Feedwater Initiation and Control
Decay Heat Removal
Main Steam Line
Control Rod
Main Steam
ML23243A88518 September 2023FermiIssuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances)Feedwater
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Reactor Core Isolation Cooling
Primary containment
Shutdown Cooling
Reactor Pressure Vessel
Core Spray
Residual Heat Removal
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Decay Heat Removal
CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days14 September 2023Comanche Peak(CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 DaysReactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Main Transformer
HVAC
Residual Heat Removal
ML23241B04011 September 2023Technical Specifications Task ForceFinal Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownEmergency Diesel Generator
ML23241B03911 September 2023Technical Specifications Task ForceFinal Model SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownEmergency Diesel Generator
ML23250A2737 September 2023FermiNRR E-mail Capture - Fermi 2 - Request for Additional Information for License Amendment Request to Revise TS 3.8.1, AC Sources - Operating, Surveillance Requirement 3.8.1.12Emergency Diesel Generator
IR 05000348/202309031 August 2023FarleyNRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent ViolationSteam Generator
Emergency Diesel Generator
Auxiliary Feedwater
NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)25 August 2023FermiResponse to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Feedwater
Service water
Emergency Diesel Generator
Shutdown Cooling
Residual Heat Removal
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Decay Heat Removal
ML23235A18223 August 2023FermiExigent LAR Request for Additional InformationService water
Emergency Diesel Generator
Emergency Equipment Cooling Water
ML23230B16818 August 2023ClintonNRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications
ML23215A16617 August 2023CookSummary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2Emergency Core Cooling System
IR 05000348/202300210 August 2023FarleyIntegrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent ViolationService water
Emergency Diesel Generator
Auxiliary Feedwater
Main Turbine
Residual Heat Removal
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)10 August 2023FermiExigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Feedwater
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Reactor Core Isolation Cooling
Primary containment
Shutdown Cooling
Core Spray
Residual Heat Removal
Standby Gas Treatment System
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Emergency Core Cooling System
Decay Heat Removal
IR 05000338/20230029 August 2023North AnnaIntegrated Inspection Report 05000338/2023002 and 05000339/2023002Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Emergency Core Cooling System
Control Rod
ML23215A1654 August 2023Comanche PeakAugust 8, 2023 Presubmittal Meeting Presentation - Technical Specification 3.8.1 AC Sources - Operating Required Action B.4, 14-hour Completion Time (EPID: L?2023?LRM-0053)Emergency Diesel Generator
IR 05000244/20230023 August 2023GinnaLLC - Integrated Inspection Report 05000244/2023002Steam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Shutdown Cooling
Residual Heat Removal
Main Steam Safety Valve
Containment Spray
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis3 August 2023FitzPatrickLicense Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisReactor Coolant System
Secondary containment
Service water
Emergency Diesel Generator
Primary containment
Main Transformer
Reactor Building Ventilation
ML23208A29231 July 2023CookPre-Application 7/31/2023 Meeting Slides
ML23202A07931 July 2023Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 8, 2023Primary containment
PMNS20230842, Pre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 228 July 2023CookPre-Application Meeting Regarding Potential License Amendment Request Related to Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2
ML23208A21127 July 2023Grand Gulf
Arkansas Nuclear
River Bend
Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related DefinitionsSteam Generator
Reactor Coolant System
Secondary containment
Primary containment
Main Turbine
Reactor Pressure Vessel
Residual Heat Removal
Intermediate Range Monitor
Emergency Core Cooling System
Main Steam Line
Control Rod
Containment Spray
ML23206A12726 July 2023FermiNOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat SinkFeedwater
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Reactor Core Isolation Cooling
Core Spray
Standby Gas Treatment System
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Main Steam
ML23206A05425 July 2023Hatch2A, Exam Administrative Items (Hatch 2021-301)Feedwater
Secondary containment
Service water
Reactor Protection System
Main Steam Isolation Valve
Reactor Core Isolation Cooling
Primary containment
Main Turbine
Shutdown Cooling
HVAC
Core Spray
Residual Heat Removal
Reactor Water Cleanup
Standby Gas Treatment System
Automatic Depressurization System
Standby Liquid Control
Intermediate Range Monitor
Remote shutdown
Safety Relief Valve
Rod Worth Minimizer
Main Condenser
Control Rod
Containment Spray
ML23206A05325 July 2023Hatch2A, Exam Draft Items (Hatch 2021-301)Reactor Coolant System
Feedwater
Secondary containment
Service water
High Pressure Coolant Injection
Reactor Protection System
Emergency Diesel Generator
Main Steam Isolation Valve
Reactor Core Isolation Cooling
Primary containment
Main Turbine
Shutdown Cooling
Reactor Recirculation Pump
Safety Parameter Display System
HVAC
Reactor Pressure Vessel
Core Spray
Reactor Building Ventilation
Residual Heat Removal
Reactor Water Cleanup
Standby Gas Treatment System
Stator Water Cooling
Automatic Depressurization System
Standby Liquid Control
Circulating Water System
Intermediate Range Monitor
Remote shutdown
Emergency Core Cooling System
Main Steam Line
Safety Relief Valve
Rod Worth Minimizer
Main Condenser
Control Rod
Main Steam
Containment Spray
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)24 July 2023FermiRequest for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Feedwater
Service water
High Pressure Coolant Injection
Emergency Diesel Generator
Reactor Core Isolation Cooling
Primary containment
Core Spray
Residual Heat Removal
Standby Gas Treatment System
Emergency Equipment Cooling Water
Residual Heat Removal Service Water
Emergency Core Cooling System
Decay Heat Removal
Main Steam
DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b13 July 2023Diablo CanyonLicense Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSteam Generator
Reactor Coolant System
Feedwater
Emergency Diesel Generator
Main Steam Isolation Valve
Auxiliary Feedwater
Residual Heat Removal
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Control Room Envelope
Main Steam
Containment Spray
ML23191A86710 July 2023Watts BarNRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML23172A1293 July 2023Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: July 11, 2023Reactor Coolant System
Secondary containment
Reactor Protection System
Emergency Diesel Generator
Shutdown Cooling
ML23181A16630 June 2023Palo VerdeEnclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17Steam Generator
Reactor Coolant System
Feedwater
Service water
Emergency Diesel Generator
Auxiliary Feedwater
Primary containment
Main Transformer
Main Turbine
Shutdown Cooling
HVAC
Reactor Pressure Vessel
Residual Heat Removal
Steam Bypass Control System
Fuel Pool Cooling and Cleanup
Circulating Water System
Remote shutdown
Spray Pond
Emergency Core Cooling System
Decay Heat Removal
Main Steam Line
Safety Relief Valve
Main Condenser
Control Rod
Main Steam
Containment Spray
ML23128A35430 June 2023Vallecitos Nuclear CenterGEH Ntr Appendix a, Technical SpecificationsReactor Coolant System
Control Rod
ML23124A22230 June 2023Technical Specifications Task ForceDraft Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownEmergency Diesel Generator
ML23124A22030 June 2023Technical Specifications Task ForceDraft Model SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownEmergency Diesel Generator