 Issue dateTitleTopic
ML17265A7605 October 1999Part 21 Rept Re W2 Switch Supplied by W Drawn from Stock, Did Not Operate Properly After Being Installed on 990409. Switch Returned to W on 990514 for Evaluation & Root Cause Analysis
ML17265A76230 September 1999Monthly Operating Rept for Sept 1999 for Re Ginna Npp.With 991008 Ltr
ML17265A75323 September 1999Part 21 Rept Re Corrective Action & Closeout of 10CFR21 Rept of Noncompliance Re Unacceptable Part for 30-4 Connector. Unacceptable Parts Removed from Stock & Scrapped
ML17265A75422 September 1999LER 99-011-00:on 990823,small Tears Were Discovered in Flexible Duct Work Connector at Inlet of CR HVAC Sys Return Air Fan (AKF08).Caused by in-leakage Greater than That Assumed.Implemented Temporary Mod 99-029.With 990922 LtrTemporary Modification
ML17265A74731 August 1999Monthly Operating Rept for Aug 1999 for Re Ginna Npp.With 990909 Ltr
ML17265A74324 August 1999LER 99-004-01:on 990412,discovered That Containment Recirculation Fan Chevron Separator Vanes Were Installed Backwards.Caused by Improper Assembly by Mfg.Moisture Separator Vanes Were Dismantled & Correctly re-installedTime of Discovery
Past operability
ML17265A73431 July 1999Monthly Operating Rept for July 1999 for Re Ginna Npp.With 990806 Ltr
ML17265A72929 July 1999Interim Part 21 Rept Re safety-related DB-25 Breaker Mechanism Procured from W Did Not Pas Degradatin Checks When Drawn from Stock to Be Installed Into BUS15/03A.Holes Did Not line-up & Tripper Pan Bent
ML17265A71823 July 1999LER 99-007-01:on 990423,reactor Trip Occurred Due to Instrument & Control Technicians Inadvertently Pulling Fuses from Wrong Nuclear Instrument Channel.Setpoint Adjustments Were Completed by Different Crew of TechniciansShutdown Margin
ML17265A70822 July 1999LER 98-003-02:on 980904,actuations of CR Emergency Air Treatment Sys Was Noted Due to Invalid Causes.Caused by Various Degraded Components in CR RM Sys.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored
ML17265A71322 July 1999Special Rept:On 990407,radiation Monitor RM-14A Was Declared Inoperable.Caused by Failed Communication Link from TSC to Plant Process Computer Sys.Communication Link Was re-established & RM-14A Was Declaed Operable on 990521Offsite Dose Calculation Manual
ML17265A70319 July 1999LER 99-S01-00:on 990617,determined That Temporary Unescorted Access Had Been Granted to Contractor Employee.Caused by Incomplete Info Re Circumstances of Individual Military Separation.Individual Access Was Revoked.With 990719 Ltr
ML17265A72119 July 1999ISI Rept for Third Interval (1990-1999) Third Period, Second Outage (1999) at Re Ginna Npp.Boric Acid
Packing leak
Hydrostatic
VT-2
Earthquake
Liquid penetrant
ML17265A70215 July 1999LER 99-010-00:on 990615,ventilation Isolation of Auxiliary Bldg Occurred When Auxiliary Bldg Gas Radiation Monitor R-14 Reached High Alarm Setpoint.Cr Operators Rest Auxiliary Bldg Ventilation Isolation Signal.With 990715 LtrOffsite Dose Calculation Manual
ML17265A76630 June 19991999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With 991020 LtrUltimate heat sink
Tornado Missile
Earthquake
Fuel cladding
ML17265A70130 June 1999Monthly Operating Rept for June 1999 for Re Ginna Npp.With 990712 Ltr
ML17265A68521 June 1999LER 99-001-01:on 990222,deficiencies in NSSS Vendor steam- Line Brake Mass & Energy Release Analysis Results in Plant Being Outside Design Bases Occurred.Caused by Deficiencies in W.Temporary Administrative Replaced.With 990621 LtrBoric Acid
Time of Discovery
Shutdown Margin
Stroke time
ML17265A67616 June 1999Part 21 Rept Re Defects & noncompliances,10CFR21(d)(3)(ii), Which Requires Written Notification to NRC on Identification of Defect or Failure to Comply. Relays Were Returned to Eaton for Evaluation & Root Cause Analysis
ML17265A6662 June 1999LER 99-009-00:on 990503,instrumentation Declared Inoperable in Multiple Channels Resulted in Condition Prohibited by Ts. Caused by Unanticipated High Frequency AC Voltage Ripple. Entered TS LCO 3.0.3.With 990602 Ltr
ML17265A66831 May 1999Monthly Operating Rept for May 1999 for Re Ginna Nuclear Power Plant.With 990608 LtrOffsite Circuit
ML17265A66527 May 1999Interim Rept Re W2 Control Switch,Procured from W,Did Not Operate Satisfactorily When Drawn from Stock to Be Installed in Main Control Board for 1C2 Safety Injection Pump. Estimated That Evaluation Will Be Completed by 991001
ML17309A65427 May 1999LER 99-008-00:on 990427,overtemperature Delta T Reactor Trip Occurred Due to Faulted Bistable During Calibr of Redundant Channel.Plant Was Stabilized in Mode 3 & Faulted Bistable Was Subsequently Replaced.With 990527 Ltr
ML17265A66324 May 1999LER 99-007-00:on 990423,technicians Inadvertently Pulled Fuses from Wrong Nuclear Instrument Cahnnel,Causing Reactor Trip,Due to High Range Flux Trip.Caused by Personnel Error. Labeling Scheme ImprovedShutdown Margin
ML17265A66021 May 1999LER 99-006-00:on 990421,start of turbine-driven Auxiliary Feedwater Pump Was Noted.Caused by MOV Being Left in Open Position.Closed Manual Isolation Valve to Secure Steam to Pump.With 990521 Ltr
ML17265A65917 May 1999Part 21 Rept Re Relay Deficiency Detected During pre-installation Testing.Caused by Incorrectly Wired Relay Coil.Relays Were Returned to Eaton Corp for Investigation. Relays Were Repaired & Retested
ML17265A64413 May 1999LER 99-005-00:on 990413,undervoltage Signal of Safeguards Bus During Testing Resulted in Automatic Start of B Edg. Caused by Personnel Error.Blown Fuse Was Replaced & Offsite Power Was Restored to Safeguards Bus 17.With 990513 Ltr
ML17265A64312 May 1999LER 99-004-00:on 990412,discovered That Containment Recirculation Fan Moisture Separator Vanes Were Incorrectly Installed,Per 10CFR21.Caused by Improper Assembly by Mfg. Subject Vanes Were Dismantled & Correctly re-installedUnanalyzed Condition
Time of Discovery
ML17265A6387 May 1999Part 21 Rept Re Replacement Turbocharger Exhaust Turbine Side Drain Port Not Functioning as Design Intended.Caused by Manufacturing Deficiency.Turbocharger Was Reaasembled & Reinstalled on B EDGCommercial Grade Dedication
ML17265A63930 April 1999Monthly Operating Rept for Apr 1999 for Re Ginna Nuclear Power Plant.With 990510 Ltr
ML17265A63623 April 1999Part 21 Rept Re Power Supply That Did Not Work Properly When Drawn from Stock & Installed in -25 Vdc Slot.Power Supply Will Be Sent to Vendor to Perform Failure Mode Assessment.Evaluation Will Be Completed by 991001
ML17265A63018 April 1999Rev 1 to Cycle 28 COLR for Re Ginna Npp.Shutdown Margin
ML17265A62515 April 1999Special Rept:On 990309,halon Systems Were Removed from Svc & Fire Door F502 Was Blocked Open.Caused by Mods Being Made to CR Emergency Air Treatment Sys.Continuous Fire Watch Was Established with Backup Fire Suppression EquipmentFire Barrier
Continuous fire watch
Fire Watch
ML17265A6559 April 1999Initial Part 21 Rept Re Mfg Deficiency in Replacement Turbocharger for B EDG Supplied by Coltec Industries. Deficiency Consisted of Missing Drain Port in Intermediate Casing.Required Oil Drain Port Machined Open
ML17265A62931 March 1999Rev 0 to Cycle 28 COLR for Re Ginna Npp.Shutdown Margin
ML17265A62431 March 1999Monthly Operating Rept for Mar 1999 for Ginna Station.With 990409 Ltr
ML17265A61431 March 1999LER 99-003-00:on 990301,two Main Steam non-return Check Valves Were Declared Inoperable Due to Exceedance of Acceptance Criteria.Caused by Changes in Methodology & Matls.Packing Gland Torque Will Be Adjusted.With 990331 LtrBreakaway torque
ML17265A61329 March 1999LER 99-002-00:on 990227,discovered That Surveillance Had Not Been Performed at Frequency,Per Ts.Caused by Personnel Error.Procedure O-6.13 Will Be Evaluated for Enhancement Documentation of Completion of ITS Srs.With 990329 LtrTime of Discovery
Missed surveillance
ML17265A60624 March 1999LER 99-001-00:on 990222,plant Was Noted Outside Design Basis.Caused by Deficiencies in NSSS Vendor Slb Mass & Energy Release.Placed Temporary Administrative Restriction 40 Degrees F Max on Screenhouse Bay TempBoric Acid
Time of Discovery
Shutdown Margin
Stroke time
ML17265A5661 March 1999Rev 26 to QA Program for Station Operation.Coatings
Nondestructive Examination
Grace period
ML17265A59628 February 1999Monthly Operating Rept for Feb 1999 for Ginna Nuclear Power Plant.With 990310 Ltr
ML17265A53731 January 1999Monthly Operating Rept for Jan 1999 for Re Ginna Nuclear Power Plant.With 990205 Ltr
ML17265A59531 December 1998Rg&E 1998 Annual Rept.
ML17265A50021 December 1998Rev 26 to QA Program for Station Operation.Safe Shutdown
Non-Destructive Examination
Offsite Dose Calculation Manual
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
Grace period
ML17265A49521 December 1998LER 98-005-00:on 981120,loss of 34.5 Kv Offsite Power Circuit 751,resulted in Automatic Start of B Edg.Caused by Faulted Cable Splice.Performed Appropriate Actions of Abnormal Procedure AP-ELEC.1.With 981221 LtrOffsite Circuit
ML17265A49317 December 1998LER 98-004-00:on 971030,determined That Improperly Performed Surveillance Resulted in Condition Prohibited by Ts.Caused by Procedure non-adherence.Appropriate Calibr Procedures Were Properly Performed with 24 H of Condition DiscoveryTime of Discovery
Missed surveillance
ML17265A47630 November 1998Monthly Operating Rept for Nov 1998 for Re Ginna Nuclear Power Plant.With 981210 Ltr
ML17265A46925 November 1998LER 98-003-01:on 980904,actuations of CR Emergency Air Treatment Systems (Creats) Occurred.Caused by Radon build-up During Temp Inversion.Creats Actuation Signal Was Reset & Normal Ventilation Was Restored to CR
ML17265A45331 October 1998Monthly Operating Rept for Oct 1998 for Re Ginna Nuclear Power Plant.With 981110 Ltr
ML17265A4275 October 1998LER 98-003-00:on 980904,actuations of CR Emergency Air Treatment Sys Occurred.Caused by Radon build-up During Temp Inversion.Air Samples Were Taken & Determined That Source of Radiation Was Naturally Occurring Radon.With 981005 Ltr
ML17265A42930 September 1998Monthly Operating Rept for Sept 1998 for Re Ginna Nuclear Power Plant.With 981009 Ltr