Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000387/20230047 February 2024Integrated Inspection Report 05000387/2023004 and 05000388/2023004
IR 05000387/202301011 December 2023Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010Safe Shutdown
Fire Barrier
Aging Management
Time Critical Operator Action
License Renewal
Fire Protection Program
IR 05000387/20230033 November 2023Integrated Inspection Report 05000387/2023003 and 05000388/2023003Enforcement Discretion
Temporary Modification
Functionality Assessment
Aging Management
Significance Determination Process
Foreign Material Exclusion
Operability Determination
License Renewal
Through-Wall Leak
Offsite Circuit
Fire Protection Program
Exclusive Use
IR 05000387/202330120 September 2023Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301
IR 05000387/202300531 August 2023Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005)Commercial Grade Dedication
Cyber Security
License Renewal
IR 05000387/20230021 August 2023Integrated Inspection Report 05000387/2023002 and 05000388/2023002Shutdown Margin
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Aging Management
Operability Determination
License Renewal
Liquid penetrant
Fire Protection Program
Dissimilar Metal Weld
Power change
IR 05000387/20234017 June 2023Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401Fitness for Duty
Fatigue Rule
IR 05000387/202300112 May 2023Integrated Inspection Report 05000387/2023001 and 05000388/2023001High Radiation Area
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Aging Management
Significance Determination Process
Scram Discharge Volume
Operability Determination
License Renewal
Fire Protection Program
Coast down
Unidentified leakage
IR 05000387/20220061 March 2023Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006)Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000387/20220048 February 2023Integrated Inspection Report 05000387/2022004 and 05000388/2022004Stroke time
Enforcement Discretion
Temporary Modification
Cyber Security
Functionality Assessment
Scram Discharge Volume
Operability Determination
Severe Accident Management Guideline
License Renewal
Through-Wall Leak
Fire Protection Program
Unidentified leakage
IR 07200028/202200115 December 2022Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report No. 07200028/2022001Non-Destructive Examination
Tornado Missile
Hydrostatic
Fire Protection Program
IR 05000387/202240329 November 2022Security Baseline Inspection Report 05000387/2022403 and 05000388/2022403
IR 05000387/202250128 November 2022Emergency Preparedness Biennial Exercise Inspection Report 05000387/2022501 and 05000388/2022501Fuel cladding
IR 05000387/20224049 November 2022Cyber Security Inspection Report 05000387/2022404 and 05000388/2022404 (Cover Letter Only)Cyber Security
Affidavit
IR 05000387/20220038 November 2022Integrated Inspection Report 05000387/2022003 and 05000388/2022003Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Internal Flooding
Past operability
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
Operability Determination
Fire Protection Program
Power change
Unidentified leakage
IR 05000387/202201328 September 2022Design Basis Assurance Inspection (Teams) Inspection Report 05000387/2022013 and 05000388/2022013Stroke time
FLEX
Large early release frequency
Battery sizing
IR 05000387/202200531 August 2022Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2022005 and 05000388/2022005)Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
COVID19
IR 05000387/202201011 August 2022Biennial Problem Identification and Resolution Inspection Report 05000387/2022010 and 05000388/2022010Reactor Vessel Water Level
Half scram
Enforcement Discretion
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Fast acting solenoid valve
Power Uprate
IR 05000387/202240111 August 2022Material Control and Accounting Program Inspection Report 05000387/2022401 and 05000388/2022401 (Cover Letter Only)Affidavit
IR 05000387/20220024 August 2022Integrated Inspection Report 05000387/2022002 and 05000388/2022002High Radiation Area
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
FLEX
Aging Management
Significance Determination Process
Operability Determination
License Renewal
Fire Protection Program
IR 05000387/20220019 May 2022Integrated Inspection Report 05000387/2022001 and 05000388/2022001Safe Shutdown
Past operability
Enforcement Discretion
Emergency Lighting
Functionality Assessment
FLEX
Significance Determination Process
Scram Discharge Volume
Large early release frequency
Operability Determination
Fire Protection Program
Coast down
IR 05000387/20220117 March 2022Post-Approval Site Inspection for License Renewal - Phase 2 Inspection Report 05000387/2022011Aging Management
License Renewal
IR 05000387/20210062 March 2022Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2021006 and 05000388/2021006)Fitness for Duty
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000387/202240216 February 2022Security Baseline Inspection Report 05000387/2022402 and 05000388/2022402Fitness for Duty
IR 05000387/202140311 February 2022Cyber Security Problem Identification and Resolution Inspection Report 05000387/2021403 and 05000388/2021403 (Cover Letter Only)Cyber Security
Affidavit
IR 05000387/202100411 February 2022Integrated Inspection Report 05000387/2021004 and 05000388/2021004Ultimate heat sink
Internal Flooding
Enforcement Discretion
Temporary Modification
Cyber Security
Functionality Assessment
Significance Determination Process
Operability Determination
Through Wall Leak
Fire Protection Program
IR 05000387/202101013 December 2021Design Basis Assurance Inspection (Programs) Inspection Report 05000387/2021010 and 05000388/2021010Ultimate heat sink
Scram Discharge Volume
Power-Operated Valves
Weak link
IR 05000387/20210114 November 2021Temporary Instruction 2515/194 Inspection Report 05000387/2021011 and 05000388/2021011Probabilistic Risk Assessment
Open Phase Condition
Coronavirus
IR 05000387/20210033 November 2021Integrated Inspection Report 05000387/2021003 and 05000388/2021003Safety Limit Minimum Critical Power Ratio
Enforcement Discretion
Functionality Assessment
Significance Determination Process
Operability Determination
License Renewal
Maintenance Rule Program
Pandemic
Coronavirus
COVID-19
Through-Wall Leak
Fire Protection Program
Scaffolding
Power Uprate
IR 05000387/202140125 October 2021Security Baseline Inspection Report 05000387/2021401 and 05000388/2021401Coronavirus
COVID-19
IR 05000387/202140223 September 2021Security Baseline Inspection Report 05000387/2021402 and 05000388/2021402Coronavirus
COVID-19
IR 05000387/202130117 September 2021Initial Operator Licensing Examination Report 05000387/2021301 and 05000388/2021301
IR 05000387/20210051 September 2021Updated Inspection Plan for the Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2021005 and 05000388/2021005)Fitness for Duty
Operator Manual Action
Cyber Security
Open Phase Condition
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
ML21224A24024 August 2021Security Baseline Inspection Report Cover Letter 2021 FOF
IR 05000387/20210024 August 2021Integrated Inspection Report 05000387/2021002 and 05000388/2021002High Radiation Area
Ultimate heat sink
Internal Flooding
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Scram Discharge Volume
Operability Determination
License Renewal
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
IR 05000387/20210015 May 2021Integrated Inspection Report 05000387/2021001 and 05000388/2021001Stroke time
Commercial Grade Dedication
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Test box
Significance Determination Process
Operability Determination
License Renewal
Coronavirus
COVID-19
Fire Protection Program
Power change
Coast down
IR 05000388/20210124 March 2021EA-20-131: Susquehanna Steam Electric Station, Unit 2 - NRC Investigation Report No. 1-2020-001 and NRC Inspection Report No. 05000388/2021012High Radiation Area
Locked High Radiation Area
Significance Determination Process
IR 05000387/20200063 March 2021Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2020006 and 05000388/2020006)Fitness for Duty
Operator Manual Action
Open Phase Condition
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000387/202040310 February 2021Cyber Security Problem Identification and Resolution Inspection Report 05000387/2020403 and 05000388/2020403 (Cover Letter Only)Cyber Security
Affidavit
IR 05000387/20200048 February 2021Integrated Inspection Report 05000387/2020004 and 05000388/2020004Internal Flooding
Past operability
Cyber Security
Emergency Lighting
Functionality Assessment
FLEX
B.5.b
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Through Wall Leak
Fire Protection Program
IR 05000387/202050118 November 2020Emergency Preparedness Biennial Exercise Inspection Report 05000387/2020501 and 05000388/2020501Pandemic
Coronavirus
COVID-19
IR 05000387/20200035 November 2020Integrated Inspection Report 05000387/2020003 and 05000388/2020003High Radiation Area
Internal Flooding
Temporary Modification
Functionality Assessment
Operability Determination
Pandemic
Coronavirus
COVID-19
Fire Protection Program
IR 05000387/202001227 October 2020Triennial Fire Protection Inspection Report 05000387/2020012 and 05000388/2020012Safe Shutdown
Fire Barrier
Operator Manual Action
License Renewal
Coronavirus
COVID-19
Fire Protection Program
Fire Watch
Hourly Fire Watch
IR 05000387/202000531 August 2020Updated Inspection Plan (Inspection Reports 05000387/2020005 and 05000388/2020005)Fitness for Duty
Internal Flooding
Operator Manual Action
Open Phase Condition
License Renewal
Exemption Request
Power-Operated Valves
Power Operated Valves
COVID-19
IR 05000387/202001118 August 2020Biennial Problem Identification and Resolution Inspection Report 05000387/2020011 and 05000388/2020011Enforcement Discretion
Condition Adverse to Quality
Coronavirus
COVID-19
IR 05000387/202000211 August 2020Integrated Inspection Report 05000387/2020002 and 05000388/2020002Internal Flooding
Hydrostatic
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Foreign Material Exclusion
Operability Determination
Coronavirus
COVID-19
EVT-1
Liquid penetrant
Fire Protection Program
Scaffolding
Downpower
IR 05000387/20204012 July 2020Security Baseline Inspection Report 05000387/2020401 and 05000388/2020401Coronavirus
COVID-19
IR 05000387/20200015 May 2020Integrated Inspection Report 05000387/2020001 and 05000388/2020001Reactor Vessel Water Level
High Radiation Area
Enforcement Discretion
Functionality Assessment
Locked High Radiation Area
Scram Discharge Volume
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Power change
Coast down
IR 05000387/20190063 March 2020Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2019006 and 05000388/2019006)Open Phase Condition
License Renewal
Power-Operated Valves
Power Operated Valves
IR 05000387/202001021 February 2020Temporary Instruction 2515/194 Inspection Report 05000387/2020010 and 05000388/2020010Open Phase Condition