IR 05000387/2020401
| ML20184A091 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/02/2020 |
| From: | Fred Bower Plant Support Branch 1 |
| To: | Berryman B Susquehanna |
| Bower F | |
| References | |
| IR 2020401 | |
| Download: ML20184A091 (8) | |
Text
July 2, 2020
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000387/2020401 AND 05000388/2020401
Dear Mr. Berryman:
On June 18, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Mr. Kevin Cimorelli, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, X /RA/
Signed by: Fred L. Bower
Fred L. Bower, III, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000387 and 05000388
License Numbers:
Report Numbers:
05000387/2020401 and 05000388/2020401
Enterprise Identifier: I-2020-401-0017
Licensee:
Susquehanna Nuclear, LLC
Facility:
Susquehanna Steam Electric Station, Units 1 and 2
Location:
Berwick, PA
Inspection Dates:
June 8, 2020 to June 18, 2020
Inspectors:
J. Bream, Senior Physical Security Inspector
K. Hussar, Physical Security Inspector
S. McCarver, Physical Security Inspector
J. Rey, Physical Security Inspector
Approved By:
Fred L. Bower, III, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Publicly available IPs are located at: http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was completed through a combination of remote and on-site inspection.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the licensee's access control program through completion of the
===following inspection elements:
Access Control===
- (1) Tier I: All Requirements Tier II: 7 Requirements (02.06.a - c, 02.08.a, b, d, e)
Tier III: 1 Requirement (02.09)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (1 Sample)
- (1) Tier I: 20 elements (02.01.a - i, k; 02.02.a - f; 02.03.a; 02.04.b, d, e)
Tier II: 13 Requirements (02.06.a - i, m, n; 02.07.a, e)
Tier III: 3 Requirements (02.08; 02.09.a, b)
71130.09 - Security Plan Changes
The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the licensee's Security Target Set Program through completion of the following procedure elements:
Review of Power Reactor Target Sets (1 Sample)
- (1) Requirements: (02.02 (a-e), 02.03, 02.04 (a-b), 02.05)
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
(1)3rd quarter 2019 through 1st quarter
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 18, 2020, the inspectors presented the security baseline inspection results to Mr. Kevin Cimorelli, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2019-01927,
2019-11720,
2019-12774,
20-02148,
20-02242,
20-02538
Procedures
NDAP-QA-0902
Safeguards Information Program and the Protection of
Sensitive Unclassified Non-Safeguards information
Revision 20
NS-SSP-002
Control, Issuance and Assignment Of Security Controlled
Locks And Keys
Revision 20
SI-SO-003
Duties and Responsibilities of The Access Control Officer
Revision 46
SI-SO-008
Emergency Access And Egress
Revision 21
SI-SO-015
Emergency Response In Support of Operations
Revision 8
SI-SO-034
Duties and Responsibilities of The Vehicle Search Officer
Revision 13
SI-SO-035
Duties and Responsibilities of The Escort Officer
Revision 9
SI-SO-036
Searches Conducted Outside the OCA
Revision 9
SI-SO-037
Duties and Responsibilities of The Warehouse Search Officer Revision 8
Corrective Action
Documents
2019-02148,
2019-02165,
2019-04044,
2019-04802,
2019-08619,
2019-09361,
2019-11154,
2019-12273
Corrective Action
Documents
Resulting from
Inspection
20-08672,
20-08679,
20-08774
Engineering
Evaluations
EC-032-1013
Blast Analysis for NRC Security Order
Revision 2
EC-032-1022
Vehicle Barrier System Design
Revision 2
EC-032-1036
Engineering Evaluation Of New PAP-6
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
EC-032-1037
Protective Area Pathway Timing Evaluation
EC-032-1039
Compilation of Information and Data Associated with New
Security Towers
Miscellaneous
Nuclear Intrusion Response Plan
January 22,
20
Procedures
OP-142-001
Circulating Water System and Cooling Tower Operation
Revision 80
SI-SO-020
Response to Indication of Potential Tampering, Vandalism, or
Malicious Mischief
Revision 9
SI-SO-031
Duties and Responsibilities of Mode Dependent Patrols
Revision 13
SI-SO-031
Duties and Responsibilities Mode Dependent Patrols
Revision 13
SI-SSM-002
Security Drills/Exercises and Evaluations
Revision 27
SI-SSM-015
Nuclear Security's Defensive Strategy for The Protection Of
Revision 31
SI-SSM-016
Protected and Vital Area Barriers
Revision 6
Corrective Action
Documents
2017-12909,
2018-13947,
2019-07774
Engineering
Evaluations
EC-032-1015
Target Sets
Revision 12
Procedures
NDAP-00-0911
Development and Maintenance of Target Sets
Revision 3