March 3, 2020

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (REPORT 05000387/2019006 AND 05000388/2019006)

Dear Mr. Berryman:

The NRC has completed its end-of-cycle performance assessment of Susquehanna Steam Electric Station, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2019 through December 31, 2019. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Susquehanna Steam Electric Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2021. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. Furthermore, all the inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to baseline inspections, the NRC will conduct Inspection Procedure (IP) 71003, Post Approval Site Inspection for License Renewal, for Unit 1 in April 2020, and the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01), for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176). Licensees will be individually notified when the NRC schedules these inspections.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at (610) 337-5337 with any questions you have regarding this letter.

Sincerely, X /RA/

Signed by: Jonathan E. Greives

Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22

Enclosure:

Inspection/Activity Plan

cc w/ encl: Distribution via LISTSERV

ML20059L258

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DRP RI/DRP

NAME LCasey JGreives

DATE 3/2/20 3/3/20

Susquehanna 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count HP

1, 2 01/06/2020 01/09/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 01/06/2020 01/10/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 01/06/2020 01/10/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 01/06/2020 01/10/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 01/06/2020 01/10/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation TI-194 Open Phase Condition Inspection-SQ

1, 2 02/03/2020 02/07/2020 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

License Renewal Phase 1 - Unit 1

1 04/05/2020 04/11/2020 IP 71003 000687 Post-Approval Site Inspection for License Renewal ISI - UNIT 1

1 04/05/2020 04/11/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

HP

1, 2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/13/2020 04/17/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Access Control, Protective Strategy, TSR-SUS

1, 2 06/15/2020 06/19/2020 IP 71130.02 000734 Access Control 1, 2 06/15/2020 06/19/2020 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 06/15/2020 06/19/2020 IP 71130.09 001656 Security Plan Changes 1, 2 06/15/2020 06/19/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 06/15/2020 06/19/2020 IP 71151 001338 Performance Indicator Verification HP

1, 2 07/06/2020 07/10/2020 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 07/06/2020 07/10/2020 IP 71151 000746 Performance Indicator Verification 3/2/2020 10:25:12 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report Enclosure

Susquehanna 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count PI&R Biennial Team Inspection - SQ

1, 2 07/13/2020 07/17/2020 IP 71152B 000747 Problem Identification and Resolution 1, 2 07/27/2020 07/31/2020 IP 71152B 000747 Problem Identification and Resolution FIRE PROTECTION-SUSQUEHANNA

1, 2 09/21/2020 09/25/2020 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1, 2 10/05/2020 10/09/2020 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EP EXERCISE INSPECTION - SUSQUEHANNA

1, 2 10/19/2020 10/23/2020 IP 71114.01 000716 Exercise Evaluation 1, 2 10/19/2020 10/23/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/19/2020 10/23/2020 IP 71151 001397 Performance Indicator Verification INSERVICE INSPECTION

2 03/21/2021 03/27/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

HP

1, 2 04/05/2021 04/09/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/05/2021 04/09/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls HEAT SINK INSPECTION - BIENNIAL

1, 2 05/16/2021 05/22/2021 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

FY21 Susquehanna Initial Examination

1, 2 05/23/2021 05/28/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 06/20/2021 07/02/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

REMP

1, 2 05/24/2021 05/28/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program RETS

1, 2 06/21/2021 06/25/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SQ

1, 2 06/28/2021 07/02/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/19/2021 07/23/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 3/2/2020 10:25:12 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report

Susquehanna 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count EP Program Inspection - Susuquehanna

1, 2 07/19/2021 07/23/2021 IP 71114.02 000717 Alert and Notification System Testing 1, 2 07/19/2021 07/23/2021 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 07/19/2021 07/23/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 07/19/2021 07/23/2021 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 07/19/2021 07/23/2021 IP 71151 001397 Performance Indicator Verification HP

1, 2 08/23/2021 08/27/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 08/23/2021 08/27/2021 IP 71124.04 000728 Occupational Dose Assessment 1, 2 08/23/2021 08/27/2021 IP 71151 000746 Performance Indicator Verification Evaluations of Changes, Tests and Experiments

1, 2 09/12/2021 09/18/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments Access Control, Equipment Testing and Maintenance, Training, SPR

1, 2 10/18/2021 10/22/2021 IP 71130.02 000734 Access Control 1, 2 10/18/2021 10/22/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 10/18/2021 10/22/2021 IP 71130.07 000739 Security Training 1, 2 10/18/2021 10/22/2021 IP 71130.09 001656 Security Plan Changes 1, 2 10/18/2021 10/22/2021 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Programs - Power Operated Valves - Susquehanna Units 1 and 2

1, 2 10/25/2021 10/29/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 11/08/2021 11/12/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements SQ Requal Inspection with P/F Results

1, 2 11/15/2021 11/19/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 11/15/2021 11/19/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 3/2/2020 10:25:12 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

IP 22 Inspection Activity Plan Report