October 25, 2021
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000387/2021401 AND 05000388/2021401
Dear Mr. Berryman:
On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2 and discussed the results of this inspection with Mr. Kevin Cimorelli, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Fred L. Bower, III, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000387 and 05000388
License Numbers:
Report Numbers:
05000387/2021401 and 05000388/2021401
Enterprise Identifier: I-2021-401-0093
Licensee:
Susquehanna Nuclear, LLC
Facility:
Susquehanna Steam Electric Station, Units 1 and 2
Location:
Berwick, PA
Inspection Dates:
October 18, 2021 to October 21, 2021
Inspectors:
K. Hussar, Senior Physical Security Inspector
D. Caron, Senior Physical Security Inspector
S. McCarver, Physical Security Inspector
Approved By:
Fred L. Bower, III, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
71130.04 - Equipment Performance, Testing, and Maintenance
The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:
Equipment Performance, Testing, and Maintenance (1 Sample)
(1)
- Tier I: All Requirements
- Tier II: 8 Requirements (02.09 a., b., 02.10, 02.11 a. - e.)
- Tier III: 2 Requirements (02.14, 02.15)
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
===inspection elements:
Security Training===
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following inspection elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
- (1) The opportunity to apply this procedure was not available in accordance with Inspection Manual Chapter 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2)since the last performance of this IP.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) October 1, 2020 through September 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 21, 2021, the inspectors presented the security baseline inspection results to Mr. Kevin Cimorelli, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
NDAP-QA-0902
Safeguards Information Program and the Protection of
Sensitive Unclassified Non-Safeguards Information
Revision 23
NS-SO-004
Reporting/Alerting and Response to Alarms
Revision 13
NS-SSP-002
Control, Issuance and Assignment of Security Controlled
Locks and Keys
Revision 21
SI-SO-002
Duties and Responsibilities of the Alarm Station Operators
Revision 56
SI-SO-003
Duties and Responsibilities of the Access Control Officer
Revision 48
SI-SO-004
Duties and Responsibilities of the Mobile Patrol Officer
Revision 27
SI-SO-005
Duties and Responsibilities of Interior Patrol
Revision 27
SI-SO-006
Duties and Responsibilities of the South Gate House Search
Officer
Revision 74
SI-SO-008
Emergency Access and Egress
Revision 22
SI-SO-013
Personnel Access Control to Manholes/Handholes, Cable
Chase Hatches, Panels and Penetrations
Revision 11
SI-SO-036
Searches Conducted Outside the OCA
Revision 10
SI-SO-038
Vital Area Access During Periods of Site Specific Credible
Threat to Include Insider Threat
Revision 2
SI-SO-21
Compensatory Measures for Components of the
Susquehanna Security Computer System
Revision 41
Corrective Action
Documents
CR-2020-11733
CR-2020-15327
CR-2020-15936
CR-2021-03697
CR-2021-09907
Engineering
Changes
Perform Site Acceptance Test for Fiber Optic Intrusion
Detection System (IDS) Per TD-031-008
Procedures
MT-032-001
Security System Performance Testing
Revision 30
MT-032-002
Security Control Center 0D575 UPS Calibration
Revision 5
MT-032-003
Security Control Center 0D585 UPS Calibration
Revision 3
NS-SO-002
Security Communications
Revision 18
NS-SO-004
Reporting/Alerting and Response to Alarms
Revision 13
NS-SSP-003
Tests, Checks, and Inspections of Security Systems
Revision 56
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NS-SSP-004
Tests, Checks and Inspections of the Susquehanna Security
Computer System
Revision 58
SI-SO-004
Duties and Responsibilities of the Mobile Patrol Officer
Revision 27
SI-SO-005
Duties and Responsibilities of Interior Patrol
Revision 27
SI-SO-006
Duties and Responsibilities of the South Gate House Search
Officer
Revision 74
Corrective Action
Documents
CR-2020-10459
CR-2020-13813
Corrective Action
Documents
Resulting from
Inspection
DI-2021-13011
CR-2021-15075
Miscellaneous
Susquehanna Nuclear, LLC Training and Qualification Plan
Revision 16
LP 22
Comply With Physical Fitness Performance Requirements
Revision 5
Procedures
SI-ST-001
Operation of the Weapons Firing Range
Revision 13
SI-ST-002
Security and Safe Handling of Firearms, Ammunition, and
Associated Equipment
Revision 38
SI-ST-003
Nuclear Security Training Program
Revision 13