Issue date | Title | Topic | |
---|---|---|---|
ML20217G740 | 14 October 1999 | Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 | |
ML20216J806 | 20 September 1999 | Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 | |
ML20212C492 | 15 September 1999 | Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves | |
ML20211N527 | 2 September 1999 | Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 | |
05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl | 26 August 1999 | Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl | |
ML20211F131 | 24 August 1999 | Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements | |
05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel | 23 August 1999 | Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel | Stroke time Enforcement Discretion |
ML20210R030 | 12 August 1999 | Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 | |
ML20210P676 | 10 August 1999 | Requests That Following Changes Be Made to Distribution on NRC Correspondence | |
ML20210K607 | 2 August 1999 | Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results | |
ML20210K381 | 2 August 1999 | Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 | Incorporated by reference Decommissioning Funding Plan Power change |
ML20210G510 | 28 July 1999 | Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) | Fitness for Duty |
05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl | 1 July 1999 | Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl | |
ML20209B785 | 1 July 1999 | Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 | |
05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl | 28 June 1999 | Forwards LER 99-004-01.Commitments Made by Util Are Encl | Corrosion bonding |
ML20209B545 | 28 June 1999 | Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl | |
ML20196H033 | 24 June 1999 | Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant | |
ML20209A722 | 23 June 1999 | Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC | |
ML20196F533 | 22 June 1999 | Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage | |
ML20196B468 | 17 June 1999 | Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl | |
ML20195H889 | 14 June 1999 | Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 | |
ML20195E235 | 8 June 1999 | Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM | |
ML20207A070 | 19 May 1999 | Forwards Rev 3 to CNS Strategy for Achieving Engineering Excellence, Which Provides Effective Tool for Overall Engineering Work Mgt.Commitments Made by Util,Encl | |
ML20206R760 | 17 May 1999 | Forwards Annual Radiological Environ Rept,Radiological Environ Monitoring Program,Jan-Dec 1998,per TS 5.6.2 | Annual Radiological Environmental Operating Report |
ML20206P968 | 13 May 1999 | Forwards Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Safety/Relief Valves | |
ML20206J074 | 4 May 1999 | Forwards Rev 14 to CNS QA Program for Operation, Per 10CFR50.54(p) & 10CFR50.71.None of Changes Represent Reduction of Commitments.Summary of Changes,Encl | |
ML20206J233 | 3 May 1999 | Forwards CNS Annual Radioactive Effluent Release Rept for 1998 & Offsite Dose Assessment Manual | |
ML20206F202 | 30 April 1999 | Informs That NPPD Now Anticipates LAR Committed in Will Be Submitted by 990615.Operability Evaluations Presently in Effect Ensure That ECCS Pumps Are Operable But Nonconforming & Are Capable of Fulfilling Safety Functions | |
ML20206E546 | 29 April 1999 | Forwards Cooper Nuclear Station Occupational Radiation Exposure Rept for 1998. Numbers Reported Reflected Tabulation of All Personnel on Site by Work & Job Function. Repts Will Be Corrected & Resubmitted by 990701 | |
ML20205K115 | 1 April 1999 | Submits Extension of Commitment Date for Rev to Plant Strategy for Achieving Engineering Excellence from 990331 to 990519.Licensee Requires Addl Time to Finalize & Approve Rev 3 to Plant Strategy for Achieving Engineering Excellence | |
ML20205E433 | 31 March 1999 | Forwards First Biennial Rept of Financial Assurance for Decommissioning for Cns,Per 10CFR50.75(f)(1) | |
ML20205A056 | 23 March 1999 | Provides Info Detailing Property Insurance Coverage Maintained by NPPD & Midamerican Energy Co for Cns,In Compliance with 10CFR50.54(w)(3) | |
05000298/LER-1999-001, Forwards LER 99-001-00,including List of NRC Commitments Made by Util | 22 March 1999 | Forwards LER 99-001-00,including List of NRC Commitments Made by Util | |
ML20204G881 | 22 March 1999 | Forwards CNS Inservice Insp Summary Rept,Fall 1998 Refueling Outage (RFO-18), IAW Provisions of 10CFR50.55a. Analytical Evaluation for RPV Shell Weld Indications & Augmented Exam Results of RPV Also Included | |
ML20204J484 | 19 March 1999 | Requests NRC Review & Approval of CNS ISI Relief Request (RR) PR-04,rev 1.ISI RR PR-04,rev 0 Required CNS to Perform Visual Insp of RPV Head Flange Seal Leak Detection Line. Approval Is Required Because Test Methodology Was Changed | Hydrostatic VT-2 |
05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl | 16 March 1999 | Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl | Missed surveillance |
ML20204C964 | 15 March 1999 | Forwards Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Srvs,Per TS 5.6.4 | |
ML20207J581 | 10 March 1999 | Forwards Rev 1 to Calculation Nedc 98-024, APRM - RBM Setpoint Calculation | |
ML20207F966 | 1 March 1999 | Responds to NRC Re Violations Noted in Insp Rept 50-298/98-08.Corrective Actions:Circumstances Surrounding Four Examples Have Been Discussed with Individuals Involved & Counseled,Where Appropriate | Fire Watch |
ML20203C696 | 8 February 1999 | Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 980701-1231,per 10CFR26.71(d) | Fitness for Duty |
ML20202H672 | 2 February 1999 | Informs of Changes in Schedule Affecting Four Commitments in ,By Greater than One Month & Notifies of Plans to Issue Rev 3 to Strategy for Achieving Engineering Excellence | |
ML20202E223 | 28 January 1999 | Forwards Response to NRC 980603 RAI Re NRC Ongoing Review of IPEEE for Cooper Nuclear Station,Submitted 961030 | Hot Short Safe Shutdown High winds Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Seismically rugged Earthquake Fire Protection Program Weak link |
ML20199K672 | 19 January 1999 | Requests Extension of Present Due Date to 980202,as Addl Time Is Required to Resolve Issues Raised on Corrective Actions During Senior Mgt Review of Insp Rept 50-298/98-15 | |
05000298/LER-1998-011, Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl | 19 January 1999 | Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl | |
ML20199E628 | 14 January 1999 | Forwards Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station.Rept Also Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 | |
ML20206P417 | 31 December 1998 | Informs of Extended Completion Due Date of Third Commitment Re EOP Calculations,Per Licensee 980723 Response to Violations Noted in Insp Rept 50-298/98-02.Date Has Been Extended to 990228 | |
ML20199D225 | 30 December 1998 | Forwards 1998 CNS Simulator Certification Rept,As Required by 10CFR55.45.Rept Describes Performance Tests Conducted from 1995-98,discusses Performance Test Discrepancies from 1995-98 & Provides Revised Test Plan for 1999-2002 | |
ML20198K249 | 23 December 1998 | Discusses RAI Re Response to NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps | |
ML20205A441 | 17 December 1998 | Forwards Initial Exam Outline for RO Written Exam to Be Given Week of 990208.Preliminary Copies of License Applications for Candidates Encl | Shutdown Margin |
ML20196C401 | 20 November 1998 | Forwards Rev 1 to Cooper Nuclear Station COLR Cycle 19. Licensee Discovered That COLR Submitted with Contained Incorrect Max Average Planar Linear Heat Generation Rate Curves Specified in Figures 1 to 4 |