Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing ExaminationsML19135A371 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire |
---|
Issue date: |
05/15/2019 |
---|
From: |
Catherine Nolan Duke Energy Progress |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RA-19-0237, RIS 2019-002 |
Download: ML19135A371 (9) |
|
|
---|
Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] Category:License-Operator
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22089A1642022-03-30030 March 2022 301 ADAMS 2B ML22070B0512022-03-11011 March 2022 301 Post Exam Comments IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B 2023-03-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23307A0772023-11-0303 November 2023 301 ADAMS 2B ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments ML23065A0702023-03-0606 March 2023 Bru 2022301 2B Exam Administrative Items IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22347A1512022-12-13013 December 2022 William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22089A1642022-03-30030 March 2022 301 ADAMS 2B IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML22047A1812022-02-0909 February 2022 301 Written Exam Approval Letter ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21062A0762021-03-0303 March 2021 301 Corporate Notification Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21054A1872021-02-23023 February 2021 302 (Normal release)2B Exam Administrative Items ML21054A1342021-02-23023 February 2021 302 Exam Administrative Items 2A-3 (2 Year Delayed Release) ML21054A1272021-02-23023 February 2021 302 Exam Final Items 2A-2 (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6102021-02-0303 February 2021 302 1A Final RO Written Exam & Key (2-Year Delayed Release) ML21034A6142021-02-0303 February 2021 302 1A Final SRO Written Exam & Key (2-Year Delayed Release) ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam 2023-03-06
[Table view] |
Text
M. Christopher Nolan
~ ~ DUKE 526 South Church Street
~ ENERGY~ Charlotte, NC 28202 Mailing Address:
Mai/Code EC07H I P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 Serial: RA-19-0237 May 15, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Brunswick Steam Electric Plant, Units 1 and 2 Docket Nos. 50-325, 50-324 / Renewed License Nos. DPR-71 and DPR-62 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 I Renewed License Nos. NPF-35 and NPF-52 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 / Renewed License No. NPF-63 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 / Renewed License Nos. NPF-9 and NPF-17 Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 / Renewed License Nos. DPR-38, DPR-47, and DPR-55 H. B. Robinson Steam Electric Plant, Unit 2 Docket No. 50-261 / Renewed License No. DPR-23
SUBJECT:
Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations On April 17, 2019, the Nuclear Regulatory Commission issued Regulatory Issue Summary (RIS) 2019-02, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requests the voluntary submittal of licensees to provide updated information on future licensing examinations for operators for the calendar years 2021 through 2024 on Form 536, "Operator Licensing Examination Data."
Attached are the NRC 536 forms for the Brunswick Steam Electric Plant, Catawba Nuclear Station, Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H.B. Robinson Steam Electric Plant.
U.S. Nuclear Regulatory Commission RA-19-0237 Page 2 This submittal contains no new regulatory commitments or changes to previous commitments.
Please direct any questions to Art Zaremba, Director - Fleet Licensing at (980) 373-2062.
Sincerely,
/4-~
M. Christopher Nolan Vice President - Nuclear Regulatory Affairs Attachment( s) 1 - NRC Form 536, Operator Licensing Examination Data, Brunswick Steam Electric Plant 2 - NRC Form 536, Operator Licensing Examination Data, Catawba Nuclear Station 3 - NRC Form 536, Operator Licensing Examination Data, Shearon Harris Nuclear Power Plant 4 - NRC Form 536, Operator Licensing Examination Data, McGuire Nuclear Station 5 - NRC Form 536, Operator Licensing Examination Data, Oconee Nuclear Station 6 - NRC Form 536, Operator Licensing Examination Data, H.B. Robinson Steam Electric Plant
U.S. Nuclear Regulatory Commission RA-19-0237 Page 3 xc (with attachments)
C. Haney, USNRC Region II - Regional Administrator G. A. Hutto, 111, USNRC Senior Resident Inspector- MNS D. Retterer, USN RC Senior Resident Inspector - HNP E.L. Crowe, USN RC Senior Resident Inspector - ONS J. D. Austin, USNRC Senior Resident Inspector- CNS G . Eatmon, USNRC Senior Resident Inspector- RNP G. Smith, USNRC Senior Resident Inspector - BSEP D. Glavin, NRR Project Manager - BSEP A. Klett, NRR Project Manager - ONS M. Mahoney, NRR Project Manager - CNS & MNS M.C. Barillas, NRR Project Manager - HNP N. Jordan, NRR Project Manager - RNP
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 (11-2017)
EXPIRES: 11/30/2020 l¥
~
- ,~""P.ll!Ot,<.t..,
.,,.+.,
l 0
~,$',.
9..,,~
I OPERATOR LICENSING EXAMINATION DATA Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used to plan budgel!; and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov, and lo the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office
.... * ** of MMagement and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NRC REGION Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2 III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 EXAMINATIONS 0 1 ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 1112812022 NIA 11/2512024 ALTERNATE DATE NIA 1210512022 NIA 1210212024 NRC FORM 536 (11-2017)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 (11-2017)
EXPIRES: 11/30/2020 c)J>RIIEQc,t,
~¥\
Estimated burden per response lo comply with this voluntary infonmation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This C 0 OPERATOR LICENSING infonmation collection is used lo plan budgels and resources for operator examinations. Send
- commenls regarding burden estimate lo the Information Services Branch (T-2 F43), U.S. Nuclear
.....-1.
.,, ....... i
~
0~
EXAMINATION DATA Regulatory Commission, Washington, DC20555--000t, or by e-mail lo lnfocollecls.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503. If a means used to impose an infonmation collection does not display a currenlly valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond lo, the infonmation collection.
FACILITY NRCREGION Catawba Nuclear Station (CNS), Unit Nos. 1 & 2 III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 EXAMINATIONS 1 0 ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY202l CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS- UPGRADE 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0912012021 NIA 09/25/2023 NIA ALTERNATE DATE 0912712021 NIA 10/0212023 NIA NRC FORM 536 (11-2017)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020
../¥0~.0 (11-2017)
.;)c.\.t>-VtRQ4,C'f~
Estimated burden per response to comply with this voluntary inrormation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- n OPERATOR LICENSING inrormation collection is used to plan budgets and resources ror operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear
~ C EXAMINATION DATA
~
,:.+.,
...... ~o~
~ Regulatory Commission, Washington, DC2055~001, or by &-mail to tnrocollects.Resource@nn:.gov, and to the Desk Officer, Office ortnrormation and Regulatory Aff'airs, NEOB-10202, (3150-0131), Office or Management and Budge~ Washington. DC 20503. Ir a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond lo, the information collection.
FACILITY NRC REGION Shearon Harris Nuclear Power Plant (HNP), Unit No. 1 III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cv2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 EXAMINATIONS 1
ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 EXAMINATIONS 0
B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 3 0 2 NUMBER OF SENIOR REACTOR OPERATORS-UPG RADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 0911212022 NIA 1210212024 ALTERNATE DATE NIA 09/1912022 NIA 12/09/2024 NRC FORM 536 (11-2017)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
~c,""R Rloc,<-t>.;
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
/~;&t C
~
~
. 0~
n0 OPERATOR LICENSING EXAMINATION DATA information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear Regulatory Commission, Washington. DC20555--0001, or by e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budgel Washington, DC 20503. If a means used to impose an information coOection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required lo respond to, the information collection.
FACILITY NRCREGION McGuire Nuclear Station (MNS) Unit Nos. 1 & 2 III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- UPGRADE 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS
- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 0211412022 NIA 04101/2024 ALTERNATE DATE NIA 0212112022 NIA 0410812024 NRC FORM 536 (11-2017)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11 -2017)
,~~
Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Tois
~ 0 OPERATOR LICENSING information collection SS used to plan budgets and resources for operator examinations. Send
._ . s: comments regarding burden estimate to the Information Services Branch (T-2 F43). U.S. Nuclear
~ rf_,I EXAMINATION DATA
......ofo_,
...... 't-0.f:t Regulatcry Commission, Washington, DC20555-0001, or by e-mail to lnfocollecls.Resource@nrc.gov, and to the Desk Officer, Office of lnforma1ion and Regulatory Affairs, NEOB-10202, (315~131), Office of Management and Budgel Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION OCONEE NUCLEAR STATION (ONS), UNIT NOs. 1, 2 & 3 III I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 CY2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 EXAMINATIONS 1
ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 EXAMINATIONS 0
B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 8 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS
- INSTANT 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-UPG RADE 4 3 4 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/07/2021 05/09/2022 06/05/2023 05/13/2024 ALTERNATE DATE 06/14/2021 05/16/2022 06/12/2023 05/20/2024 NRC FORM 536 (11-2017)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020
(11-2017)
Estimated burden per response to comply with this voluntaJy inrormalion collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This nC OPERATOR LICENSING information collection is used to plan budgets and resoun:llS ror operator examinations. Send
~
~ G
- EXAMINATION DATA comments regarding burden estimate to the Information Services Branch [T-2 F43), U.S. Nuclear Regulalll!)' Commission, Washington, DC20555-0001, or by e-mail to lnfocotlects.Resource@nrc.gov,
.;+. 0...
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office
~ ..... tr.~
of Management and Budge~ Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, 1he inrormation collection.
FACILITY NRC REGION H.B. Robinson Steam Electric Plant (RNP), Unit No. 2 I 11 I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2021 CY 2022 CY 2023 cy2024 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 EXAMINATIONS 0
- 8. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2021 CY2022 CY2023 CY2024 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS-UPG RADE 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0912012021 NIA 09/1812023 NIA ALTERNATE DATE 10118/2021 NIA 1011612023 NIA NRC FORM 536 (11 -2017)