MONTHYEARML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2752015-01-13013 January 2015 Initial Exam 2014-302 General Correspondence ML15013A2712015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative JPMs ML15013A2672015-01-13013 January 2015 Initial Exam 2014-302 Final Sim_IN-Plant JPMs ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A5232015-01-0808 January 2015 December 2014 - Shearon Harris Generic Fundamentals Examination Results IR 05000400/20143022014-12-30030 December 2014 NRC Operator License Examination Report 05000400/2014302 ML14338A0362014-12-0303 December 2014 302 Final RO Written Exam ML14338A0382014-12-0303 December 2014 302 Final SRO Written Exam ML14262A3262014-09-18018 September 2014 Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML14090A4552014-03-31031 March 2014 301 Retake Final Administrative Documents 2022-09-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2752015-01-13013 January 2015 Initial Exam 2014-302 General Correspondence ML15013A2712015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative JPMs ML15013A2672015-01-13013 January 2015 Initial Exam 2014-302 Final Sim_IN-Plant JPMs ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A5232015-01-0808 January 2015 December 2014 - Shearon Harris Generic Fundamentals Examination Results IR 05000400/20143022014-12-30030 December 2014 NRC Operator License Examination Report 05000400/2014302 ML14338A0382014-12-0303 December 2014 302 Final SRO Written Exam ML14338A0362014-12-0303 December 2014 302 Final RO Written Exam ML14262A3262014-09-18018 September 2014 Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML14090A4552014-03-31031 March 2014 301 Retake Final Administrative Documents ML14090A4572014-03-31031 March 2014 301 Retake Final Admin JPMs ML14090A4562014-03-31031 March 2014 301 Retake Final Simulator In-plant JPMs ML14090A4522014-03-31031 March 2014 301 Retake Draft Admin JPMs ML14090A4452014-03-31031 March 2014 301 Retake Draft Sim In-plant JPMs ML14090A4392014-03-31031 March 2014 301 Retake Draft Administrative Documents 2022-09-14
[Table view] |
Text
ML21167A292 ES-201 Examination Preparation Checklist Form ES-201-1 Facility: Harris Date of Examination: April 14, 2021 Developed by: Written: N/A - Scenario retake // Operating: Facility NRC Chief Target Task Description (Reference) Examiners Date*
Initials
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams,
-240 mgd arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
-210 2. NRC examiners and facility contact assigned (C.1.d; C.2.f). mgd
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility
-210 contact submits to the NRC any prescreened K/As for elimination from the written examination mgd outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
-210 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3). mgd
-210 5. Corporate notification letter sent (C.2.e). mgd
- 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or
-195 ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; N/A C.3.d-e).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1,
-150 mgd ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
- 8. Operating test outline(s) reviewed by the NRC and feedback provided to facility licensee (C.2.h;
-136 mgd C.3.d-e).
- 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);
-75 supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, mgd ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d).
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for
-75 N/A facility licensee review (C.1.i; C.2.h; C.3.f-g).
-60 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202). mgd
-50 12. Written exam and operating test reviews completed (C.3.f). N/A
- 13. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l;
-35 mgd C.2.h; C.3.g). The NRC and the facility licensee conduct exam preparatory week.
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due
-30 mgd (C.1.m; C.2.i; ES-202).
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and
-14 mgd Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
-7 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h). mgd
-7 17. Request facility licensee management feedback on the examination (C.2.l). mgd
- 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm
-7 qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; mgd Attachment 5; ES-202, C.3.j; ES-204).
-7 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k). N/A
-7 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i). mgd
- Target dates are based on facility-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.
Digitally signed by Eugene Guthrie Eugene Guthrie Date: 2021.04.07 14:02:50 -04'00'
Digitally signed by Eugene Guthrie Eugene Guthrie Date: 2021.04.07 14:04:26 -04'00'
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Harris Nuclear Plant Date of Exam: April 14, 2021 Operating Test No.: 05000400/2021301 A E Scenarios P V P E 1 T M L N O I I T CREW POSITION CREW POSITION CREW POSITION T N C I A
A T M S A B L U N Y T P R T O M(*)
O C P E R I U RO RX R1 1 0 NOR N1 1 1 SRO-I I/C C2, I3 2 2 SRO-U MAJ M4 1 1 TS T2, T3 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Harris Nuclear Plant Date of Exam: April 14, 2021 Operating Test No.: 05000400/2021301 A E Scenarios P V P E 2 (SPARE) T M L N O I I T CREW POSITION CREW POSITION CREW POSITION T N C I A
A T M S A B L U N Y R T O M(*)
T P O C P E R I U RO RX R1 1 0 NOR N1 1 1 SRO-I I/C C2, C3 2 2 SRO-U MAJ M4 1 1 TS T2, T3 2 2 Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Competencies Checklist Form ES-301-6 Facility: Harris Nuclear Plant Date of Exam: April 14, 2021 Operating Test No.: 05000400/2021301 APPLICANTS RO RO (BOP) SRO-U SCENARIO SCENARIO SCENARIO Competencies 1 1 1 Interpret / Diagnose 2, 3, 4, 5, 6 Events and Conditions Comply With and 1, 2, 3, 4, 5, 6 Use Procedures (1)
Operate Control 0
Boards (2)
Communicate 1, 2, 3, 4, 5, 6 and Interact Demonstrate 1, 2, 3, 4, 5, 6 Supervisory Ability (3)
Comply With and 2, 3 Use Tech. Specs. (3)
Notes:
(1) Includes Technical Specification compliance for an RO.
(2) Optional for an SRO-U.
(3) Only applicable to SROs.
Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Competency Rating factors as described on forms ES-303-1 and ES-303-3.)
ES-301 Competencies Checklist Form ES-301-6 Facility: Harris Nuclear Plant Date of Examination: April 14, 2021 Operating Test No.:05000400/2021301 APPLICANTS RO RO (BOP) SRO-U SCENARIO SCENARIO SCENARIO Competencies 2 2 2 Interpret / Diagnose 2, 3, 4, 5, 6 Events and Conditions Comply With and 1, 2, 3, 4, 5, 6 Use Procedures (1)
Operate Control 0
Boards (2)
Communicate 1, 2, 3, 4, 5, 6 and Interact Demonstrate 1, 2, 3, 4, 5, 6 Supervisory Ability (3)
Comply With and 2, 3 Use Tech. Specs. (3)
Notes:
(1) Includes Technical Specification compliance for an RO.
(2) Optional for an SRO-U.
(3) Only applicable to SROs.
SCENARIO # 2 selected as a SPARE Scenario Instructions:
Check the applicants license type and enter one or more event numbers that will allow the examiners to evaluate every applicable competency for every applicant. (This includes all rating factors for each competency.) (Competency Rating factors as described on forms ES-303-1 and ES-303-3.)