RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks
ML23240A373
Person / Time
Site: Catawba, 07201031  Duke Energy icon.png
Issue date: 08/28/2023
From: Flippin N
Duke Energy Carolinas
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
RA-23-0215
Download: ML23240A373 (1)


Text

Nicole Flippin fa DUKE Vice President

~ ENERGY Catawba Nuclear Station Duke Energy CN01VP I 4800 Concord Road York, SC 29745 o: 803.701.3340 f: 803.701.3221 Nicole.flippin@duke-energy.com RA-23-0215 10 CFR 72.212 August 28, 2023 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Catawba Nuclear Station, Units 1 and 2 Facility Operating License Numbers NPF-35 and NPF-52 Docket Numbers 50-413 and 50-414 Independent Spent Fuel Storage Installation (ISFSI)

ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks Catawba Nuclear Station is currently loading spent nuclear fuel into NAC-MAGNASTOR dry cask storage systems (Model Number MAGNASTOR) as controlled by Certificate of Compliance Number 1031, Amendment Number 7. In accordance with 10 CFR 72.212(b)(2), Duke Energy hereby registers the use of Cask Identification Numbers CN-VCC-125, CN-VCC-122, CN-VCC-129, CN-VCC-118, and CN-VCC-120.

Loading of cask CN-VCC-125 was completed and the cask was placed on the ISFSI pad on July 29, 2023. Loading of cask CN-VCC-122 was completed and the cask was placed on the ISFSI pad on August 4, 2023. Loading of cask CN-VCC-129 was completed and the cask was placed on the ISFSI pad on August 14, 2023. Loading of cask CN-VCC-118 was completed and the cask was placed on the ISFSI pad on August 19, 2023. CN-VCC-120 was completed and placed on the ISFSI pad on August 25, 2023.

www.duke-energy.com

U.S. Nuclear Regulatory Commission RA-23-0215 Page 12 August 28, 2023 There are no NRC commitments contained in this letter. Please direct questions on this matter to Ari Tuckman, Catawba Regulatory Affairs, at (803) 701-3771.

Sincerely,

~~V'Uw Nicole Flippin Vice President, Catawba Nuclear Station

U.S. Nuclear Regulatory Commission RA-23-0215 Page l 3 August 28, 2023 xc:

L. Dudes, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 David Rivard, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station Z. Stone, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mailstop O-8G9A Rockville, MD 20852 L. Garner, Manager S.C. DEHEC Radioactive & Infectious Waste Management garnerld@dhec.sc.gov A. Nair-Gimmi, Director S.C. DEHEC Division of Emergency Response naira@dhec.sc.gov Daemon Hobbs, Manager S.C. DEHEC Nuclear Response hobbsde@dhec.sc.gov