ML21034A610

From kanterella
Jump to navigation Jump to search
302 1A Final RO Written Exam & Key (2-Year Delayed Release)
ML21034A610
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 02/03/2021
From: Gita Samaddar
Division of Reactor Safety II
To:
References
Download: ML21034A610 (78)


Text

ML21034A610 McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 1 (1 point)

Regarding Containment isolation signals:

1) The S/G CF Containment Isolation valves (CF-35, 30, 28, & 26) will close if Containment pressure rises to a MINIMUM of PSIG.
2) A Containment Phase A isolation will occur if NC system pressure lowers to less than a MAXIMUM of PSIG.

Which ONE of the following completes the statements above?

A. 1. 3.0

2. 1845 B. 1. 3.0
2. 1945 C. 1. 1.0
2. 1945 D. 1. 1.0
2. 1845 Page 1 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 2 (1 point)

Given the following on Unit 1:

  • A large break LOCA has occurred
  • The CRS has implemented FR-Z.1 (RESPONSE TO HIGH CONTAINMENT PRESSURE)

Subsequently:

  • 1NS-43A (1A ND HX OUTLET TO NS CONT OUTSIDE ISOL) failed to open Which ONE of the following describes the interlock that prevented 1NS-43A from opening?

A. 1NI-185A (RB SUMP TO TRAIN A ND & NS) was not OPEN B. CPCS signal was not present C. 1NI-173A (1A ND TO A & B COLD LEGS CONT OUTSIDE ISOL) was not CLOSED D. 1ND-58A (TRAIN A ND TO NV & NI PUMPS) was not CLOSED Page 2 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 3 (1 point)

Given the following on Unit 2:

  • Unit is at 100% RTP
  • A malfunction of 2KC-132 (L/D HX OUTLET TEMP CONTROL) has occurred
  • 2AD-7, H2 (LETDN HX OUTLET HI TEMP) is in alarm Based on the conditions above:
1) This event will result in the addition of ________ reactivity.
2) If letdown temperature continues to rise to 138 °F, letdown flow will be automatically aligned to the ________.

Which ONE of the following best completes the statements above?

A. 1. positive

2. VCT B. 1. negative
2. VCT C. 1. positive
2. RHT D. 1. negative
2. RHT Page 3 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 4 (1 point)

Given the following on Unit 1:

  • Unit 1 is at 75% RTP
  • CRD BANK SELECT - AUTO
  • Valve Positions on 1MC10:

Based on the conditions above, the NC SYS M/U CONTROLLER is in the

____(1)____ position.

If operation is continued in this alignment, automatic control rod ____(2)____ will occur.

Which ONE of the following completes the statements above?

A. 1. ALT DILUTE

2. withdrawal B. 1. DILUTE
2. withdrawal C. 1. ALT DILUTE
2. insertion D. 1. DILUTE
2. insertion Page 4 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 5 (1 point)

Given the following on Unit 1:

  • Initial depressurization to S/G pressures of 190 PSIG has been completed
  • All T-Hot temperatures are less than 388°F The crew is currently performing the following:
  • S/G depressurization to atmospheric pressure per FR-C.1 (RESPONSE TO INADEQUATE CORE COOLING)

Per FR-C.1:

1) A RVLIS reading of less than a MAXIMUM of ______ indicates an inadequate core cooling condition.
2) The subsequent S/G depressurization to atmospheric pressure is performed in order to allow injection from the ______.

Which ONE of the following completes the statements above?

A. 1. 39%

2. ND system B. 1. 60%
2. ND system C. 1. 39%
2. Cold Leg accumulators D. 1. 60%
2. Cold Leg accumulators Page 5 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 6 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP
  • There is leak-by on ONE PZR PORV
  • PRT Temperature on 1NCP-5350 is currently 90°F and rising 2°/minute At the current rate, the PRT temperature will reach the PRT high temperature alarm on 1AD-6 within _______ minutes.

Which ONE of the following completes the statements above?

A. 12 B. 20 C. 25 D. 40 Page 6 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 7 (1 point)

Given the following on Unit 2:

Subsequently,

  • ONE (1) PZR PORV fails partially open Based on the conditions above,
1) the PRT will operate to reduce PRT pressure.
2) as Containment pressure rises, the LCO for TS 3.6.4 (CONTAINMENT PRESSURE) will be exceeded when Containment pressure exceeds a MINIMUM of PSIG.

Which ONE of the following completes the statements above?

A. 1. relief valve

2. 0.3 B. 1. rupture disc
2. 0.3 C. 1. relief valve
2. 0.2 D. 1. rupture disc
2. 0.2 Page 7 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 8 (1 point)

Given the following on Unit 2:

  • Unit is at 100% RTP
  • 2A1 KC Pump is in service
  • 2A2 KC Pump is secured
  • The 2B sequencer is in TEST Subsequently:
  • An inadvertent SI signal is received on Unit 2 B Train ONLY Which ONE of the following describes the Unit 2 KC pumps that are in service?

(Assume no operator action)

A. 2A1 KC pump ONLY B. 2A1, 2B1, and 2B2 KC pumps ONLY C. 2A1 and 2A2 KC pumps ONLY D. 2A1, 2A2, 2B1 and 2B2 KC pumps Page 8 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 9 (1 point)

Given the following on Unit 1:

  • The unit is at 100% RTP
  • Pressurizer Pressure is 2235 PSIG Subsequently:
  • Pressurizer Pressure is slowly lowering
  • Pressurizer Pressure Master Controller Error is -15 PSIG
  • Backup Heaters are in AUTO
  • The following is observed on 1AD6:

At the current error signal, all backup heaters are ____(1)____.

1AD6 Annunciators ___ (2) ___ consistent with the given plant conditions.

Which ONE of the following best completes the statements above?

A 1. OFF

2. are NOT B 1. ON
2. are NOT C 1. OFF
2. are D 1. ON
2. are Page 9 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 10 (1 point)

Given the following on Unit 2:

  • The Unit is conducting a startup at 6% RTP
  • The N-35 channel LEVEL TRIP switch is in BYPASS Subsequently:
  • Intermediate Range channel N-35 begins to operate erratically Removal of 2N-35 Instrument Power fuses ____(1)____ result in a reactor trip.

Removal of 2N-35 Control Power fuses ____(2)____ result in a reactor trip.

Which ONE of the following completes the statements above?

A. 1. will

2. will B. 1. will
2. will NOT C. 1. will NOT
2. will D. 1. will NOT
2. will NOT Page 10 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 11 (1 point)

Given the following on Unit 2:

  • A startup is in progress and reactor power is currently 1% RTP Subsequently:
  • 2NC-27C (PRESSURIZER SPRAY CONTROL) fails OPEN
  • The crew enters AP-11 (PRESSURIZER PRESSURE ANOMALIES)
  • The valve will not close from the SLIM on 2MC-10.

Based on the conditions above,

1) The BOP will attempt to stop spray flow by ___________.
2) IF unwarranted spray flow is allowed to continue without operator action an

________ reactor trip would occur.

Which ONE of the following completes the statements above?

A. 1. securing NC Pumps A and B

2. OTT B. 1. securing NC Pumps A and B
2. OPT C. 1. placing emergency close switch to CLOSE.
2. OTT D. 1. placing emergency close switch to CLOSE.
2. OPT Page 11 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 12 (1 point)

Given the following on Unit 1:

  • Containment pressure peaked at 1.3 PSIG and now is 0.9 PSIG and stable
  • The Pressurizer Booster and Pipe Tunnel Booster Fans have shunt tripped OFF Based on the conditions above,
1) The Pressurizer Booster fans ________ swapped to emergency power.
2) The Pipe Tunnel Booster fans ________ remain OFF.

Which ONE of the following completes the statements above?

A. 1. have

2. will B. 1. have
2. will NOT C. 1. have NOT
2. will D. 1. have NOT
2. will NOT Page 12 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 13 (1 point)

Given the following on Unit 2:

  • 13:00 - A LOCA occurred
  • 13:01 - Containment Pressure is 3.5 PSIG and rising At time 13:02, the Containment Air Return Fans (1) be running.

In order to open, Containment Air Return Dampers require differential pressure between lower and upper containment to be less than or equal to a MAXIMUM of

___ (2) ___ PSID.

Which ONE of the following completes the statements above?

A. 1. will

2. 0.35 B. 1. will NOT
2. 0.5 C. 1. will
2. 0.5 D. 1. will NOT
2. 0.35 Page 13 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 14 (1 point)

Given the following on Unit 1:

  • 1AD-9, A/6 (GLYCOL EXPANSION TNK LO-LO LVL) has alarmed Based on the above conditions, 1NF-234A (RB GLYCOL RETURN CONT OUTSIDE ISOL) ____(1)____ close.

A ____(2)____ signal will close all NF isolation valves.

Which ONE of the following completes the statements above?

A. 1. will NOT

2. Phase B B. 1. will NOT
2. Phase A C. 1. will
2. Phase B D. 1. will
2. Phase A Page 14 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 15 (1 point)

Concerning operation of the Containment Spray System (NS):

Aligning suction from the _____(1)_____ with a specific _____(2)_____ limits post-accident Iodine concentration and minimizes stress corrosion.

Which ONE of the following completes the statement above?

A. 1. FWST

2. pH B. 1. containment sump
2. pH C. 1. FWST
2. boron concentration D. 1. containment sump
2. boron concentration Page 15 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 16 (1 point)

Given the following on Unit 2:

  • One train of NS has been aligned for recirc per ES-1.3 (TRANSFER TO COLD LEG RECIRC)

As Containment pressure lowers, the NS Pump will automatically secure at a MAXIMUM Containment pressure of (1) PSIG.

Following this NS Pump shutdown, if Containment pressure rises above the auto-secure setpoint, the NS Pump discharge valves (2) automatically OPEN.

Which ONE of the following completes the statements above?

A. 1. 0.35

2. will NOT B. 1. 0.8
2. will NOT C. 1. 0.35
2. will D. 1. 0.8
2. will Page 16 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 17 (1 point)

Given the following on Unit 1:

  • A reactor trip has occurred due to a secondary system malfunction

Subsequently,

FR-H.3 will NOT allow steam to be released from any S/G if NR level exceeds a MINIMUM of ___(1)___ due to ___(2)___ concerns, without an overfill evaluation being completed.

Which ONE of the following completes the statements above?

A. 1. 82%

2. steamline water hammer B. 1. 82%
2. condenser tube damage C. 1. 92%
2. steamline water hammer D. 1. 92%
2. condenser tube damage Page 17 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 18 (1 point)

Given the following on Unit 1:

  • A shutdown is in progress
  • Turbine Inlet Pressure is 400 PSIG At time 13:00 the following conditions are observed:
  • CF-32 (A S/G CF CNTRL VALVE) 20% OPEN with CF-104 (A S/G CF CNTRL VLV BYPASS) CLOSED
  • CF-23 (B S/G CF CNTRL VALVE) 10% OPEN with CF-105 (B S/G CNTRL VLV BYPASS) 100% OPEN
  • CF-28 (C S/G CF CONT OUTSIDE ISOL) CLOSED
  • CF-26 (D S/G CF CONT OUTSIDE ISOL) CLOSED At time 13:01, based on the above conditions, AMSAC actuation ____(1)____ occur.

Depressing BLOCK on the AMSAC ACTUATION BLOCK/UNBLOCK pushbutton prevents AMSAC ACTUATION if a loss of _____(2)_____ occurs.

(CONSIDER EACH QUESTION SEPARATELY)

Which ONE of the following completes the statements above?

A. 1. will

2. CF pumps B. 1. will
2. CF flow path C. 1. will NOT
2. CF pumps D. 1. will NOT
2. CF flow path Page 18 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 19 (1 point)

Given the following on Unit 2:

  • A small break LOCA has occurred
  • Safety Injection has been initiated
  • The sequencer has not been reset
  • S/G NR levels indicate the following:

S/G 2A 2B 2C 2D NR Level 20 19 16 20

(%)

Subsequently:

  • The normal incoming breaker to 2ETA opens Based on the conditions above, the 2A and 2B SGs are ________.

Which ONE of the following completes the statement above?

A. not being fed B. being fed by the 2A MDCA pump ONLY C. being fed by the U2 TDCA pump ONLY D. being fed by the 2A MDCA pump AND U2 TDCA pump Page 19 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 20 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP

TCC reports low grid voltage is present

  • Both IPB Fans are OFF and will not restart
  • NO fire is present
  • NO lockouts are present Based on the conditions above, an automatic action will occur after a MINIMUM of

__________ minutes. (Assume No operator action)

Which ONE of the following completes the statement above?

A. 3 B. 5 C. 10 D. 30 Page 20 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 21 (1 point)

Given the following on Unit 1:

  • A fault required battery EVCA to be removed from service
  • The crew is aligning charger EVCC and battery EVCC to supply distribution center EVDA per OP/0/A/6350/001A Enclosure 4.13 (REMOVAL OF BATTERY EVCA FROM SERVICE)

Subsequently:

  • 1AD-11 C3 (BATT EVCC GROUND) alarms in the Control Room
  • Relay Board 2EB5 indicates a negative leg ground exists on EVCC Based on the conditions above:
1) The detector lamp on 2EB5 will be ________ to indicate a ground.
2) Per Enclosure 4.13, Limits and Precautions, the alignment of EVCC should NOT occur if a ________ leg ground exists on EVDA.

Which ONE of the following completes the statements above?

A. 1. bright

2. positive B. 1. dim
2. positive C. 1. bright
2. negative D. 1. dim
2. negative Page 21 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 22 (1 point)

Given the following on Unit 2:

  • A Loss of Offsite Power has occurred
  • 2B D/G started but subsequently tripped on overspeed
  • 60 seconds have passed since the Loss of Offsite Power occurred Based on the conditions above:
1) 125 VDC Power Panel Board 2EVDD will be energized from .
2) This can be verified by checking control power available to 4160V pumps powered from .

Which ONE of the following completes the statements above?

A. 1. Battery EVCD

2. 2ETA B. 1. Standby Charger EVCS
2. 2ETA C. 1. Battery EVCD
2. 2ETB D. 1. Standby Charger EVCS
2. 2ETB Page 22 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 23 (1 point)

Given the following on Unit 1:

  • The 1A D/G has been placed in operation to facilitate a power swap on 1ETA from 1ATC to SATA
  • Indicated load is 400 KW and 75 KVARS
  • 1A DG is currently powering 1ETA with the 1ETA Normal Breaker and 1ETA Stdby Breaker OPEN Based on the conditions above,
1) depressing the "1A D/G Gov Cntrl" "Raise" pushbutton will result in raising 1A D/G ________.
2) rotating the "1A D/G Volt Adjust" switch to "Raise," will result in raising 1A D/G ________.

Which ONE (1) of the following completes the statements above?

A. 1. frequency

2. KVARs B. 1. load
2. KVARs C. 1. frequency
2. voltage D. 1. load
2. voltage Page 23 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 24 (1 point)

Given the following on Unit 2:

  • Unit is at 100% RTP
  • Train "A" equipment is in service
  • The power supply to 2EMF-46A (TRAIN A KC) has FAILED Based on the conditions above,
1) 2KC-122 (KC SURGE TANK VENT) ________ receive a signal to auto-close.
2) 2RAD-1/F5 (CABINET 1-2 TROUBLE) alarm ________ be generated.

Which ONE of the following completes the statement above?

A. 1. does

2. will B. 1. does NOT
2. will C. 1. does
2. will NOT D. 1. does NOT
2. will NOT Page 24 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 25 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP
  • 1B DG is running for PT/1/A/4350/002B, Diesel Generator 1B Operability Test.

Subsequently:

  • The BOP operator reports that 1B D/G Room average temperature is 105°F and rising at 2°F per minute Based on the conditions above, the SLC 16.9.16 (AREA TEMPERATURE MONITORING) limit for D/G Room temperature will be exceeded in a MINIMUM of ________ minutes.

Which ONE of the following completes the statement above?

A. 5 B. 7.5 C. 10 D. 12.5 Page 25 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 26 (1 point)

Given the following on Unit 1:

  • The Unit is at 100% RTP
  • Electrical supplies are aligned normally
  • "A" Train KC is in service Subsequently:
  • A Blackout occurs on 1ETA The blackout occurred due to a loss of Unit 1 6900 volt bus ____(1)____.

As a result of the Blackout, "A" Train KC pumps will ____(2)____.

Which ONE of the following completes the statements above?

A. 1. 1TA

2. receive a manual start permissive B. 1. 1TC
2. receive a manual start permissive C. 1. 1TA
2. automatically start D. 1. 1TC
2. automatically start Page 26 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 27 (1 point)

Regarding the Low Pressure Station Air System (VS):

The backup supply to the Low Pressure Air system is the ____(1)____.

When running in automatic, the Low Pressure Station Air compressor will trip on low

____(2)____ flow to the oil cooler.

Which ONE of the following completes the statements above?

A. 1. Low Pressure Station Air compressor

2. RL B. 1. VI system through 1VI-820
2. RL C. 1. Low Pressure Station Air compressor
2. KR D. 1. VI system through 1VI-820
2. KR Page 27 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 28 (1 point)

Given the following conditions:

  • Unit 1 is at 12% RTP
  • Power ascension in progress Subsequently:

____(1)____ setpoint.

Loop C delta-T will stabilize at a ____(2)____ value.

Which ONE of the following completes the statements above?

A. 1. P-7

2. higher B. 1. P-8
2. lower C. 1. P-8
2. higher D. 1. P-7
2. lower Page 28 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 29 (1 point)

Give the following on Unit 1:

  • Unit is in MODE 3
  • Shutdown Banks are being withdrawn in preparation for startup per OP/1/A/6100/003 (CONTROLLING PROCEDURE FOR UNIT OPERATION)

Subsequently:

  • 1AD-2 / D10 (RPI URGENT ALARM) has just alarmed
  • DRPI and OAC RODS position indication for rod D-8 in Shutdown Bank E has been lost What action is required by SLC 16.7.9 (ROD POSITION INDICATION SYSTEM -

SHUTDOWN)?

A. IMMEDIATELY place rods in manual B. IMMEDIATELY open the reactor trip breakers C. IMMEDIATELY insert the shutdown banks D. Restore rod position indication within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Page 29 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 30 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP
  • The SLIM for 1NV-238 (CHARGING FLOW CONTROL) has been placed in MANUAL due to a malfunction of the Pressurizer Level Master Controller
  • 1NV-238 SLIM output is lowered to reduce Pressurizer level
  • Charging Line Flow is lowered to 18 GPM Based on the conditions above:
1) If the 1NV-238 controller output remains constant, pressurizer level will be
2) The crew will use ________ to address pressurizer level.

Which ONE of the following completes the statements above?

PROCEDURE LEGEND:

OP/1/A/6102/003 (DISTRIBUTED CONTROL SYSTEM OPERATION)

AP/1/A/5500/12 (LOSS OF LETDOWN, CHARGING OR SEAL INJECTION)

A. 1. rising

2. AP/1/A/5500/12 B. 1. rising
2. OP/1/A/6102/003 C. 1. lowering
2. AP/1/A/5500/12 D. 1. lowering
2. OP/1/A/6102/003 Page 30 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 31 (1 point)

Given the following initial conditions on Unit 2:

  • A reactor startup is being performed per OP/2/A/6100/003 (CONTROLLING PROCEDURE FOR UNIT OPERATION)
  • Reactor power is 7X10-6 % (IR)

Subsequently:

  • The IR Signal Processor output for detector channel N36 fails low Based on the conditions above:
1) Reactor power indication on ________ has been lost.
2) If the power increase is continued, Permissive P-6 logic ________ be met by the remaining channel.

Which ONE (1) of the following completes the statements above?

A. 1. N36 ONLY

2. will B. 1. N36 ONLY
2. will NOT C. 1. N32 AND N36
2. will D. 1. N32 AND N36
2. will NOT Page 31 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 32 (1 point)

Which ONE of the following sets of indications can be read outside the Main Control Room on BOTH the Auxiliary Shutdown Panel (ASP) AND the Safe Shutdown Facility (SSF) Control Panel?

A. Incore Thermocouples AND S/G WR Levels B. Incore Thermocouples AND Pressurizer Level C. SR Neutron Flux AND S/G WR Levels D. SR Neutron Flux AND Pressurizer Level Page 32 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 33 (1 point)

Given the following on Unit 1:

  • Containment hydrogen concentration is slowly rising.
  • The TSC has recommended placing the H2 Purge Blower in service.

The H2 Purge Blower is placed in service to maintain hydrogen concentration less than a MAXIMUM of ____(1)____ %.

While in operation, the H2 Purge blower return line vents air from containment to the

____(2)____.

Which ONE of the following completes the statement above?

A. 1. 4

2. Auxiliary Building B. 1. 6
2. Auxiliary Building C. 1. 4
2. Annulus D. 1. 6
2. Annulus Page 33 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 34 (1 point)

Given the following on Unit 1:

  • The reactor is stable at approximately 2% RTP
  • NO Reactor Trip or Safety Injection actuation occurs NC system temperature will stabilize at a lower temperature if this event were to occur at ____(1)____.

Reactor power will stabilize at ____(2)____.

(Consider each question separately)

Which ONE of the following completes the statements above?

A. 1. BOL

2. a higher value at BOL than at EOL B. 1. BOL
2. approximately the same value at BOL and EOL C. 1. EOL
2. a higher value at BOL than at EOL D. 1. EOL
2. approximately the same value at BOL and EOL Page 34 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 35 (1 point)

Given the following Unit 1 conditions:

  • The Unit was operating at 100% RTP
  • Reactor Trip breaker 1RTB fails to open on the trip Based on the conditions above with regards to the Steam Dump System:

The ____(1)____ controller will be in service.

Operator action ____(2)____ be required to lower TAVG to 557°F.

Which ONE of the following completes the statements above?

A. 1. Plant Trip

2. will B. 1. Load Rejection
2. will C. 1. Plant Trip
2. will NOT D. 1. Load Rejection
2. will NOT Page 35 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 36 (1 point)

The turbine Overspeed Protection Control (OPC) circuit limits turbine speed to a MAXIMUM of ____(1)____ by closing the ____(2)____.

Which ONE of the following completes the statement above?

A. 1. 103%

2. IVs ONLY B. 1. 110%
2. IVs ONLY C. 1. 103%
2. GVs and IVs D. 1. 110%
2. GVs and IVs Page 36 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 37 (1 point)

Given the following on Unit 2:

  • 2A S/G has developed a 200 GPD tube leak
  • 2EMF-33 (CSAE DISCHARGE) Trip 2 light is illuminated The normal discharge flowpath for the Condenser Steam Jet Air Ejectors (CSAE) is to the ____(1)____.

A Trip 2 condition on 2EMF-33, ____(2)____ isolate the CSAE drains to the turbine building sump.

Which ONE of the following completes the statements above?

A. 1. Turbine Building roof

2. will NOT B. 1. Unit vent
2. will NOT C. 1. Turbine Building roof
2. will D. 1. Unit vent
2. will Page 37 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 38 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP
  • The Unit 1 VUCDT is being released Subsequently:
  • 1WL-320 (VUCDT RAD MONITOR OUTLET) indicates OPEN
  • 1WP-35 (WMT & VUCDT TO RC CNTRL) indicates CLOSED
  • 1WP-37 (LIQUID WASTE TO RC CNTRL) indicates OPEN Based on the conditions above, ________ has/have failed to automatically close.

If VUCDT activity level is too high for a normal "batch" release to RC, the VUCDT would be transferred to the ________.

Which ONE of the following completes the statements above?

A. 1. 1WL-320 ONLY

2. WMT (Waste Monitor tank)

B. 1. 1WL-320 ONLY

2. FDT (Floor Drain tank)

C. 1. 1WL-320 AND 1WP-37

2. WMT (Waste Monitor tank)

D. 1. 1WL-320 AND 1WP-37

2. FDT (Floor Drain tank)

Page 38 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 39 (1 point)

Given the following on Unit 1:

  • The unit has tripped due to a loss of both Feed pumps
  • Rod H12 fails to fully insert into the core

Based on the conditions above and per ES-0.1, emergency boration ____(1) _ _

required.

Per T.S. 3.1.1 (SHUTDOWN MARGIN) if boration is required due to SDM not within the limit, then initiation of boration must occur within ____(2) _ _ minutes Which ONE of the following completes the statement above?

A. 1. is

2. 30 B. 1. is NOT
2. 30 C. 1. is
2. 15 D. 1. is NOT
2. 15 Page 39 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 40 (1 point)

Given the following on Unit 2:

  • Unit 2 is at 100% RTP Subsequently:
  • PORV NC-32B inadvertently lifts and fails to reseat Based on the conditions above:
1) The output (error signal) of the Pressurizer Pressure Master Controller will
2) The transient will cause the setpoint for OPT to ________.

Which ONE of the following completes the statements above?

A. 1. raise

2. remain the same B. 1. lower
2. lower C. 1. raise
2. lower D. 1. lower
2. remain the same Page 40 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 41 (1 point)

Given the following on Unit 1:

  • A Safety Injection due to High Containment pressure has occurred
  • NV pump flow to the NC system Cold Legs is 390 GPM
  • NC system pressure is 1350 PSIG and STABLE
  • SG pressures are 1092 PSIG and STABLE
  • NC system subcooling on the ICCM is 22°F and STABLE Per E-0 Foldout Page, the crew ____(1)____ secure NC pumps.

Upon transition to E-1 (LOSS OF REACTOR OR SECONDARY COOLANT), Steam Generators ____(2)____ be required for heat removal.

Which ONE of the following completes the statements above?

A. 1. will NOT

2. will NOT B. 1. will NOT
2. will C. 1. will
2. will NOT D. 1. will
2. will Page 41 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 42 (1 point)

Given the following on Unit 1:

  • The crew has just transitioned to ES-1.3 (TRANSFER TO COLD LEG RECIRCULATION).
  • CONT SUMP LEVEL GREATER THAN 2.5 FT on 1AD-14 is LIT.
  • CONT SUMP LEVEL GREATER THAN 3.0 FT on 1AD-14 is DARK.

Per ES-1.3:

1) The MINIMUM Containment sump level required to align ND to cold leg recirculation ________ met.
2) When FWST level lowers to a MAXIMUM of ________ INCHES, NV and NI can be aligned to cold leg recirculation.

Which ONE of the following completes the statements above?

A. 1. is

2. 95 B. 1. is NOT
2. 95 C. 1. is
2. 20 D. 1. is NOT
2. 20 Page 42 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 43 (1 point)

Given the following on Unit 2:

  • Unit is in MODE 3 with Shutdown Banks withdrawn
  • 2B, 2C, and 2D NC pumps are in service
  • Bus 2TA is de-energized with its supply breaker racked out for maintenance Subsequently:
  • The 2B NC pump 6.9KV NC pump feeder breaker trips Based on the conditions above:
1) The 2C and 2D NC pumps SAFETY BREAKERS indicate ________.
2) The Unit 2 Reactor Trip breakers ________.

Which ONE of the following completes the statements above?

A. 1. CLOSED

2. remain CLOSED B. 1. CLOSED
2. are TRIPPED C. 1. OPEN
2. remain CLOSED D. 1. OPEN
2. are TRIPPED Page 43 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 44 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP
  • The CRS has implemented AP-12 (LOSS OF LETDOWN, CHARGING OR SEAL INJECTION) following a trip of 1A NV Pump Subsequently:
  • 1B NV Pump has been started When initially restoring seal injection flow, the BOP will slowly throttle ____(1)____ on 1NV-241 (U1 SEAL WATER INJ FLOW CONTROL) to ____(2)____.

Which ONE of the following completes the statement above?

A. 1. OPEN

2. establish 8-10 gpm seal flow per NC pump B. 1. OPEN
2. limit NCP lower bearing cooldown rate to 1°F/min C. 1. CLOSED
2. limit NCP lower bearing cooldown rate to 1°F/min D. 1. CLOSED
2. establish 8-10 gpm seal flow per NC pump Page 44 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 45 (1 point)

Given the following on Unit 2:

  • Unit is in MODE 5 and drained to Mid-loop
  • ND Train 2A is in service
  • ND system flow rate is 3200 GPM
  • NC System level is 7 inches and stable
  • 2A ND pump amps and discharge pressure begin to oscillate
  • The crew has entered AP-19 (LOSS OF ND OR ND SYSTEM LEAKAGE)

Based on the conditions above:

The 2A ND pump is _____(1)_____.

Per AP/19, the crew will FIRST _____(2)_____.

Which ONE of the following completes the statements above?

A. 1. cavitating

2. secure 2A ND Pump B. 1. cavitating
2. reduce ND flow to less than 3000 GPM C. 1. operating at runout condition
2. secure 2A ND Pump D. 1. operating at runout condition
2. reduce ND flow to less than 3000 GPM Page 45 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 46 (1 point)

Given the following on Unit 1:

  • Unit is at 100% RTP, normal temperature and pressure Subsequently:
  • The Pressurizer Pressure Master controller suffers an internal failure resulting in a Pressurizer Pressure Error of +100 PSIG
  • Actual Pressurizer Pressure is 2100 PSIG and lowering Pressurizer Spray valves are currently _____(1)_____.

At the time of the failure, _____(2)_____ received a signal to open.

Which ONE of the following completes the statements above?

A. 1. CLOSED

2. PORV NC-34A ONLY B. 1. CLOSED
2. PORVs NC-32B AND NC-36B C. 1. OPEN
2. PORVs NC-32B AND NC-36B D. 1. OPEN
2. PORV NC-34A ONLY Page 46 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 47 (1 point)

Given the following on Unit 1:

  • Unit was at 100% RTP Subsequently:
  • The CRS has implemented FR-S.1 (RESPONSE TO NUCLEAR POWER GENERATION/ATWS) due to inability to open the trip breakers
  • A Pzr safety lifted and did not reseat
  • Pzr pressure lowered to a pressure of 1600 PSIG and is now slowly trending up
  • The following indications are observed:
1. Which ONE of the following valves is in the CORRECT position?
2. FR-S.1 ________ direct the use of the ESF Monitor Light Panel to check all ESF valve positions.

Which ONE of the following completes the statement above?

A. 1. 1NV-150B

2. will B. 1. 1NV-150B
2. will NOT C. 1. 1NV-245B
2. will D. 1. 1NV-245B
2. will NOT Page 47 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 48 (1 point)

Why does the loss of reactor coolant pumps during a steam generator tube rupture increase the risk of voiding during the subsequent cooldown and depressurization?

A. The NCS hot legs reach saturation temperature during the rapid depressurization from the tube rupture, causing the NCS to flash.

B. More ECCS flow is injected into the ruptured loop cold leg due to the reduced pressure, resulting in less flow to the core and less heat removal.

C. The upper head region becomes inactive and the fluid temperature in that region significantly lags the temperatures in the NCS loop.

D. The isolation of the steam generator in the affected loop causes that loop to stagnate; therefore, insufficient heat removal capacity is available to cool the NCS.

Page 48 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 49 (1 point)

Regarding the operation of the CA system:

1) ONLY the Motor-Driven CA pump(s) will start if a occurs.
2) The CA system is capable of supplying sufficient flow to maintain S/G inventory provided reactor power is less than a MAXIMUM of .

Which ONE of the following completes the statements above?

A. 1. Blackout signal on 1ETA and/or 1ETB

2. 5%

B. 1. Blackout signal on 1ETA and/or 1ETB

2. 3%

C. 1. Trip of both CF pumps

2. 5%

D. 1. Trip of both CF pumps

2. 3%

Page 49 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 50 (1 point)

Given the following conditions:

  • Both units have experienced a Loss of Offsite Power (LOOP)
  • ECA-0.0 (LOSS OF ALL AC POWER) was implemented on Unit 1 and the crew transitioned to ECA-0.1 (LOSS OF ALL AC POWER RECOVERY WITHOUT S/I REQUIRED)

Current conditions:

  • NC Subcooling is greater than 0°F
  • S/G pressures are STABLE at 470 PSIG
  • NC Thots are STABLE
  • Core Exit T/Cs - STABLE
  • NC Tcolds are 500°F and STABLE Consider Each Statement Separately Natural Circulation flow ____(1)____ currently established.

If Natural Circulation flow is NOT established, then ____(2)____ will be used to dump steam.

Which ONE of the following completes the statements above?

REFERENCE PROVIDED A. 1. is

2. Main Steam PORVs B. 1. is
2. Steam Dumps C. 1. is NOT
2. Main Steam PORVs D. 1. is NOT
2. Steam Dumps Page 50 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 51 (1 point)

Given the following:

  • VC/YC Mode Select Switch is in TRAIN A with all A Train equipment in operation, except CR-OAPFT-1
  • VC/YC Train B Mode Select Switch is in OFF with all B Train equipment selected to AUTO
  • No smoke or fire detection alarms, associated with VC/YC, are active Subsequently:
  • A blackout on 1ETB occurs.

Based on the conditions above,

1) The Train B CR-AHU ________ be running.
2) The Train A CR-OAPFT-1 will ________.

Which ONE of the following completes the statement above?

A. 1. will NOT

2. start B. 1. will NOT
2. remain OFF C. 1. will
2. start D. 1. will
2. remain OFF Page 51 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 52 (1 point)

Given the following on Unit 1:

  • A loss of EVDD has occurred
  • The CRS has implemented AP-15 (LOSS OF VITAL OR AUX CONTROL POWER)

Due to the isolation of ____(1)____, the operating crew will be required to respond to rising containment pressure.

To aid in controlling containment pressure, LOWER Containment TEMPERATURE will be maintained less than a MAXIMUM of ____(2)____, as required by TS 3.6.5 (CONTAINMENT AIR TEMPERATURE).

Which ONE of the following completes the statements above?

A. 1. the VQ (Containment Air Addition and Release) system

2. 100°F B. 1. RV (Containment Cooling) to Lower Containment
2. 100°F C. 1. the VQ (Containment Air Addition and Release) system
2. 120°F D. 1. RV (Containment Cooling) to Lower Containment
2. 120°F Page 52 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 53 (1 point)

Given the following initial conditions on Unit 1:

  • The Unit is operating at 100% RTP Subsequently,
  • 1AD8 / D2 (SUMP B GROUNDWATER DRAINAGE HI HI LVL) alarms
  • An AO has been dispatched to investigate reports that the B Groundwater sump is overflowing Which ONE (1) of the following describes the source of the flooding?

A. 2A RN strainer basket shaft seal failure B. 2B RN Pump Suction piping weld failure C. RF piping break in the Unit 1 CA pump Room D. 1B RN strainer automatic backwash valve has failed open Page 53 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 54 (1 point)

Given the following:

  • Both Units at 100% RTP
  • A loss of VI has occurred
  • AP-22 (LOSS OF VI) has been implemented on both units Subsequently:
  • A Loss of Off-Site Power occurs Based on the conditions above, the Auxiliary Bldg Instrument Air headers

____(1)____ be supplied from the D/G Starting Air system (VG).

The air supplied by the Auxiliary Bldg Instrument Air headers will be used to ensure valves essential to safe operation ____(2)____.

Which ONE of the following completes the statements above?

A. 1. can NOT

2. can be used to achieve unit shutdown to COLD Shutdown B. 1. can NOT
2. attain their "fail safe" position C. 1. can
2. can be used to achieve unit shutdown to COLD Shutdown D. 1. can
2. attain their "fail safe" position Page 54 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 55 (1 point)

Given the following on Unit 2:

  • Containment pressure peaked at 3.2 PSIG and is currently 2.5 PSIG
  • NO CA flow is available
  • E-1 (LOSS OF REACTOR OR SECONDARY COOLANT) has been implemented Given the following parameters:

TIME Highest SG 0200 0210 0220 0230 NR Level 2A S/G 35% 25% 15% 10%

2B S/G 31% 24% 15% 9%

2C S/G 34% 25% 12% 8%

2D S/G 32% 23% 10% 7%

Which ONE of the following is the EARLIEST time that the crew is required to implement FR-H.1 (LOSS OF SECONDARY HEAT SINK)?

A. 0200 B. 0210 C. 0220 D. 0230 Page 55 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 56 (1 point)

ECA-2.1 (UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS) contains actions to limit total AFW flow to any S/G with a N/R level less than 11% (32%

ACC).

The basis for the minimum feed flow value is to ________.

Which ONE of the following completes the statement above?

A. prevent Steam Generator dryout B. prevent water hammer in the feed rings C. meet the minimum heat sink flow requirements D. minimize water inventory to prevent a Steam Generator overfill condition Page 56 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 57 (1 point)

Given the following Unit 1 initial conditions:

  • Unit is at 40% RTP and stable
  • Rod Control is in automatic
  • The MW feedback loop is OUT of service
  • NC T-Avg is 567°F Subsequently,
  • Control Bank D Rod M-12 drops fully into the core
  • The crew has implemented AP-14 (ROD CONTROL MALFUNCTION)
  • NC T-Avg is 563°F Turbine power ________ stabilize at a lower value.

Per AP-14, the crew ________ FIRST adjust control rods in order to restore T-Avg to T-Ref.

Which ONE of the following completes the statements above?

A. 1. will

2. will B. 1. will
2. will NOT C. 1. will NOT
2. will D. 1. will NOT
2. will NOT Page 57 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 58 (1 point)

Given the following on Unit 2:

  • The CRS has implemented FR-S.1, (RESPONSE TO NUCLEAR POWER GENERATION - ATWS)
  • The crew is initiating emergency boration
  • 2A NV pump is ON
  • 2NV-244A and 2NV-245B, (CHRG LINE CONT ISOLs) are OPEN Per FR-S.1, the crew is required to start ____(1)____ boric acid transfer pump(s) and to ensure a MINIMUM boric acid flow of ____(2)____.

Which ONE of the following completes the statement above?

A. 1. ONE

2. 30 gpm B. 1. Both
2. 30 gpm C. 1. ONE
2. 50 gpm D. 1. Both
2. 50 gpm Page 58 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 59 (1 point)

Given the following on Unit 2:

  • Unit is in Mode 6
  • The core is being off-loaded
  • It has just been identified (and verified) that the RCS boron concentration is 2650 ppm
  • The refueling boron concentration required by the COLR is 2675 ppm Per TS 3.9.1 (BORON CONCENTRATION), the crew is required to ________.

Which ONE of the following completes the statement above?

A. initiate action to restore boron concentration and suspend core alterations B. initiate action to restore boron concentration and establish containment integrity C. suspend positive reactivity changes and establish containment integrity D. suspend movement of irradiated fuel assemblies within containment and suspend operations that dilute the RCS Page 59 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 60 (1 point)

Given the following on Unit 2:

  • The crew has implemented AP-10 (NC SYSTEM LEAKAGE), Case 1 (S/G TUBE LEAKAGE)
  • Letdown flow is 45 GPM
  • Charging flow is 110 GPM
  • Pressurizer level is stabilized Upon entry into AP-10, the Balance of Plant Operator will establish a (1) GPM mismatch between letdown flow and charging flow per Excellence Criteria.

Based on the conditions above, the estimated leak rate is (2) GPM.

Which ONE of the following completes the statements above?

A. 1. 30

2. 53 B. 1. 30
2. 65 C. 1. 10
2. 53 D. 1. 10
2. 65 Page 60 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 61 (1 point)

Given the following on Unit 1:

  • Unit is at 40% RTP
  • Exhaust Hood temperature is 165°F
  • Condenser vacuum on 1MC-1 indicates 26 inches HG and DEGRADING
  • (1ZJP5000) CSAE steam pressure, is reading 100 PSIG
  • Main Condenser Vacuum has been established as a critical parameter Alternate condenser vacuum indication is available on ___(1)____.

Based on the conditions above, the CRS will direct ___(2)____ to mitigate the event.

Which ONE of the following best completes the statements above?

A. 1. the OAC ONLY

2. dispatching an operator to increase CSAE steam pressure B. 1. the OAC ONLY
2. opening the Exhaust Hood Spray valves C. 1. 1MC-13 and the OAC
2. opening the Exhaust Hood Spray valves D. 1. 1MC-13 and the OAC
2. dispatching an operator to increase CSAE steam pressure Page 61 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 62 (1 point)

Given the following:

  • The Control Room has been evacuated due to toxic gas An adequate heat sink is maintained by controlling S/G levels within the specified range by ________.

Shutdown margin will be maintained by use of the ________.

Which ONE of the following completes the statements above?

A. 1. manually throttling the motor operated isolation valves in the doghouses

2. Standby Makeup Pump B. 1. manually throttling the motor operated isolation valves in the doghouses
2. Boric Acid Transfer Pumps C. 1. adjusting the manual loaders at the local CA pump panels
2. Standby Makeup Pump D. 1. adjusting the manual loaders at the local CA pump panels
2. Boric Acid Transfer Pumps Page 62 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 63 (1 point)

Given the following on Unit 1:

  • Unit was at 100% RTP
  • The CRS is transitioning from E-1 (LOSS OF REACTOR OR SECONDARY COOLANT) to ES-1.2 (POST LOCA COOLDOWN AND DEPRESSURIZATION)

Per ES-1.2:

1) The crew will FIRST attempt to establish an NC system cooldown using the

____(1)____.

2) The crew will cooldown at ____(2)____.

Which ONE of the following completes the statements above?

A. 1. Condenser Dumps

2. a rate not to exceed 100°F in an hour B. 1. Condenser Dumps
2. maximum rate C. 1. SM PORVs
2. a rate not to exceed 100°F in an hour D. 1. SM PORVs
2. maximum rate Page 63 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 64 (1 point)

Given the following on Unit 1:

  • An event has occurred that resulted in a RED condition on the NC Integrity CSF Status Tree
  • The CRS has implemented FR-P.1 (RESPONSE TO IMMINENT PRESSURIZED THERMAL SHOCK)
  • The crew is performing the 60 minute soak per Step 26 of FR-P.1 Which of the following actions is permitted by FR-P.1 during the soak?

A. Energize PZR heaters B. Start an additional NV Pump C. Place Auxiliary Spray in service D. Initiate a cooldown at less than 50°F per hour Page 64 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 65 (1 point)

Given the following on Unit 1:

  • A large break LOCA has occurred
  • At 1215 containment sump level is 10 feet and slowly rising If containment sump level is rising at a constant rate of 0.25 feet per minute, FR-Z.2 (RESPONSE TO CONTAINMENT FLOODING) entry will be REQUIRED at ____(1)____.

The reason that safe plant recovery is not assured for a design-basis Large Break LOCA when Containment water level requires entry into FR Z.2 is because operation of ____(2)____.

Which ONE of the following completes the statements above?

A. 1. 1225

2. the hydrogen skimmer system is compromised by the suction line becoming submerged B. 1. 1229
2. the hydrogen skimmer system is compromised by the suction line becoming submerged C. 1. 1225
2. critical ECCS components needed for safe recovery are endangered by submersion D. 1. 1229
2. critical ECCS components needed for safe recovery are endangered by submersion Page 65 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 66 (1 point)

Per AD-OP-ALL-0107 (MAINTENANCE OF RO AND SRO LICENSES), at a MINIMUM, a Reactor Operator must:

1) Perform ________ 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shifts per calendar quarter as RO or BOP.
2) Complete a doctor's medical exam ________.

Which ONE of the following completes the statements above?

A. 1. four

2. yearly B. 1. four
2. every two years C. 1. five
2. every two years D. 1. five
2. yearly Page 66 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 67 (1 point)

Per AD-OP-ALL-1000 (CONDUCT OF OPERATIONS),

1) Plant announcements are required if starting or stopping plant equipment of greater than or equal to a MINIMUM of ________.
2) The use of cameras ________ an acceptable alternative to verify that plant personnel are clear of equipment prior to starting.

Which ONE of the following completes the statements above?

A. 1. 4 kv

2. is NOT B. 1. 4 kv
2. is C. 1. 6.9 kv
2. is NOT D. 1. 6.9 kv
2. is Page 67 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 68 (1 point)

Given the following on Unit 1:

  • Unit is in Mode 6 with refueling in progress
  • 1B D/G is tagged for maintenance
  • 1ETB is powered by SATB from Unit 2
  • 1A ND pump is in service
  • 1B ND pump is in standby Subsequently:
  • 1B busline is de-energized in preparation for tagging Based on the conditions above:
1) TS 3.8.2 (AC SOURCES - SHUTDOWN) ________ met.
2) TS 3.9.5 (RHR and COOLANT CIRCULATION - HIGH LEVEL) ________

met.

Which ONE of the following completes the statements above?

A. 1. is

2. is NOT B. 1. is
2. is C. 1. is NOT
2. is NOT D. 1. is NOT
2. is Page 68 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 69 (1 point)

Given the following on Unit 1:

  • Unit is in Mode 3
  • NC System pressure is 2750 PSIG Per TS 2.1 (SAFETY LIMITS), NC System pressure is required to be reduced to less than or equal to a MAXIMUM of ____(1)____ PSIG and this is required to be accomplished within a MAXIMUM of ____(2)____.

Which ONE of the following completes the statement above?

A. 1. 2485

2. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B. 1. 2485
2. 5 minutes C. 1. 2735
2. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D. 1. 2735
2. 5 minutes Page 69 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 70 (1 point)

In accordance with AD-HU-ALL-004 (PROCEDURE AND WORK INSTRUCTION USE AND ADHERENCE):

1) A user ________ allowed to perform Information Use procedures without referring to the procedure.
2) For technical procedures, the user shall verify the latest revision of the procedure prior to job start and at least every ________ days while work is being performed.

Which ONE of the following completes the statements above?

A. 1. is

2. 7 B. 1. is
2. 14 C. 1. is NOT
2. 7 D. 1. is NOT
2. 14 Page 70 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 71 (1 point)

Given the following:

  • An operator has been assigned work in the radiologically controlled area
  • The dose rate in the area is 500 mRem/hr
  • The operator has a current yearly dose of 0.5 Rem TEDE Which ONE of the following identifies the MAXIMUM time that the operator can perform work, without receiving an extension, BEFORE reaching the Duke Energy Annual Administrative Dose Limit?

A. 2.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B. 2.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> C. 3.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> D. 5.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Page 71 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 72 (1 point)

An Operator needs to access an area with a general area radiation dose rate of 1100 mREM/hr to hang a clearance tag.

Per CSD-RP-ALL-1013 (RADIATION PROTECTION STANDARD GLOSSARY OF TERMS), the correct radiation posting for this area is a ____(1)____.

Per AD-RP-ALL-2017 (ACCESS CONTROLS TO VERY HIGH RADIATION AREAS AND SUPPLEMENTAL ACCESS CONTROLS FOR HRA AND LHRA), continuous RP coverage ____(2)____ required for this area.

Which ONE of the following completes the statements above?

A. 1. High Radiation Area

2. is NOT B. 1. High Radiation Area
2. is C. 1. Locked High Radiation Area
2. is NOT D. 1. Locked High Radiation Area
2. is Page 72 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 73 (1 point)

E-3 (STEAM GENERATOR TUBE RUPTURE) contains the following statement:

Preference should be given to running 1B NC pump to provide Pzr spray capability. If 1B NC pump is not available, running 1A NC pump along with one or two additional NC pumps may be required for adequate spray.

The statement above ____(1)____ a NOTE because it gives ____(2)____

information.

Which ONE of the following completes the statement above?

A. 1. is

2. advisory B. 1. is
2. critical C. 1. is NOT
2. advisory D. 1. is NOT
2. critical Page 73 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 74 (1 point)

Per AD-OP-ALL-1001 (CONDUCT OF ABNORMAL OPERATIONS), the dispatch of Auxiliary Operators (AOs) to perform tasks outside the control room ____(1)____.

Per OMP 4-3 (USE OF EMERGENCY AND ABNORMAL PROCEDURES AND FLEX SUPPORT GUIDELINES), during an emergency if a dispatched operator cannot operate a manual valve, a valve wrench ____(2)____ be used without supervisor approval.

Which ONE of the following completes the statements above?

A. 1. is performed by the Reactor Operators

2. can B. 1. is performed by the Reactor Operators
2. can NOT C. 1. requires CRS approval
2. can D. 1. requires CRS approval
2. can NOT Page 74 of 75

McGuire Nuclear Station MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Question: 75 (1 point)

Given the following on Unit 1:

  • A Site Area Emergency has been declared
  • A Site Assembly is being conducted in accordance with RP/0/A/5700/011 (CONDUCTING A SITE ASSEMBLY, SITE EVACUATION, OR CONTAINMENT EVACUATION)

Per RP-011,

1) the announcement for the Site Assembly shall be repeated every

________ minutes until notification that the Site Assembly has been completed.

2) the Site Assembly shall be completed within a MAXIMUM of ________ minutes.

Which ONE of the following completes the statements above?

A. 1. 15

2. 30 B. 1. 10
2. 30 C. 1. 15
2. 60 D. 1. 10
2. 60 Page 75 of 75

Reference List for MNS ILT 20-1R NRC Written MNS RO NRC Reta k E i ti Generic Enclosure 33 (page 211)

Printed 9/22/2020 12:57:51 PM Page 1 of 1

MNS GENERIC ENCLOSURES PAGE NO.

EP/1/A/5000/G-1 211 of 211 Enclosure 33 - Page 1 of 1 Rev. 42 UNIT 1 Natural Circulation Parameters

1. The following conditions support or indicate natural circulation flow:
  • NC subcooling - GREATER THAN 0°F
  • S/G pressures - STABLE OR GOING DOWN
  • NC T-Hots - STABLE OR GOING DOWN
  • Core exit T/Cs - STABLE OR GOING DOWN
  • NC T-Colds - AT SATURATION TEMPERATURE FOR S/G PRESSURE (WITHIN THE LIMITS OF THE GRAPH BELOW).
2. IF Natural Circulation flow is not established, THEN raise dumping steam to establish Natural Circulation flow.

Examination KEY MNS ILT 20-1R NRC Written MNS RO NRC Retake Examination Q A Q A Q A Q A 1 D 26 C 51 D 2 A 27 C 52 C 3 B 28 B 53 B 4 D 29 B 54 C 5 A 30 A 55 B 6 A 31 C 56 A 7 B 32 D 57 B 8 B 33 C 58 B 9 A 34 B 59 A 10 C 35 B 60 A 11 C 36 C 61 D 12 A 37 B 62 D 13 B 38 B 63 A 14 D 39 D 64 C 15 B 40 D 65 C 16 A 41 B 66 C 17 C 42 C 67 B 18 B 43 C 68 B 19 B 44 C 69 D 20 C 45 B 70 B 21 A 46 D 71 C 22 C 47 A 72 D 23 C 48 C 73 A 24 A 49 D 74 A 25 C 50 C 75 B Printed 10/29/2020 11:47:00 AM Page 1 of 1