ML23307A077 Form 2.1-1 Examination Preparation Checklist Facility: ____McGuire__________________________ Date of Examination: _Jul/Aug2023___

Developed by: Written: Facility x NRC // Operating: Facility x NRC Chief Target Task Description Examiners Date*

Initials

1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, MB

-240 arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).

-210 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3). MB

3. Facility licensee contact briefed on examination security and other requirements (D.4). As MB applicable, the facility licensee contact submits to the NRC any prescreened K/As for

-210 elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).

-210 4. Reference material due for NRC-prepared examinations (F). MB

-210 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5). MB

6. Written examination outline developed by the NRC and sent to the facility licensee contact MB

-195 (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as MB

-150 applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee MB

-136 (ES-2.3).

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility MB

-100 licensee review (ES-2.3).

10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; MB

-75 quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

-60 11. Preliminary waiver/excusal requests due (ES-2.2 E.1). MB

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors MB

-50 authorization to proceed with the facility review granted (ES-2.3 D).

-50 13. Examination review results discussed between the NRC and the facility licensee (B.14). MB

-35 14. Examination preparatory week conducted by the NRC and the facility licensee (I). MB

-30 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1). MB

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 MB

-14 prepared (ES-2.2 C and E).

-7 17. Written examinations and operating tests approved by the NRC supervisor (C.9) MB

18. Facility licensee management feedback on the examination requested by the NRC MB

-7 supervisor (C.10).

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility MB

-7 (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

-7 20. Written examination administration guidelines reviewed with the facility licensee (D.14). MB

-7 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12). MB

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: McGuire Dates of Examination: Jul/Aug 2023 Date Activity Description Complete

1. *Received postexamination package from facility licensee and 8/23/23 verified complete. (ES-4.4)
2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination 9/19/23 completed. (ES-4.4)
3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. 9/19/23 (ES-3.6)
4. *Completed NRC chief examiner review of operating test and written 9/19/23 examination grading. (ES-3.6 and ES-4.4)
5. Completed licensing official review. 9/20/23
6. Mailed licenses, preliminary results, and pass letters. 9/20/23
7. Notified facility licensee of results. 9/20/23
8. Issued the examination report (refer to Operator Licensing Manual 9/20/23 Chapter (OLMC) 510, Operator Licensing Examination Reports).
9. Returned reference material after final resolution of any informal 10/6/23 NRC staff reviews, hearing demands, or both.
10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 10/10/23 Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

Edward R. Pigott J_DUKE Site Vice President McGuire Nuclear Station ENERGY Duke Energy MG01VP 112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 Edward.Pigott@duke-energy.com deleted RA-23-0220 August 23, 2023 10 CFR 55.5 Laura A. Dudes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257

SUBJECT:

Duke Energy Carolinas, LLC (Duke Energy)

McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers: 50-369, 50-370 Reactor and Senior Reactor Operator Initial Examination 05000369/2023301 and 05000370/2023301 Pursuant to the requirements of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Duke Energy hereby provides submission of post-examination documentation for the McGuire licensed operator examination administered July/August, 2023.

Specific items attached include:

  • Student answer sheets and Exam cover pages
  • Master copy of the RO and SRO examinations and answer keys
  • Student questions/proctor responses during the written examination
  • Student Seating Chart
  • ES-1.3-1, Examination Security Agreement
  • Post Exam Comments Questions or comments should be directed to Steven Mosteller at (980) 875-5981 or Jeff Thomas at (980) 875-4499.

Sincerely, Edward R. Pigott Duke Energy McGuire Nuclear Station Site Vice President

U.S. Nuclear Regulatory Commission RA-23-0220 Page2 Attachment cc: Mr. Thomas A Stephen, Chief Operations Branch 1 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Mark Bates U. S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001