ML21111A342
ML21111A342 | |
Person / Time | |
---|---|
Site: | Oconee ![]() |
Issue date: | 04/16/2021 |
From: | Gerald Mccoy Division of Reactor Safety II |
To: | Burchfield J Duke Energy Carolinas |
References | |
Download: ML21111A342 (2) | |
Similar Documents at Oconee | |
---|---|
Category:Letter
MONTHYEAR05000270/LER-2024-001, Common Cause Inoperability of Both Trains of Control Room Ventilation System Outside Air Booster Fans Due to Supply Breaker Wiring Deficiency Resulted in a Condition That Have Prevented Fulfillment2024-12-19019 December 2024
[Table view]Common Cause Inoperability of Both Trains of Control Room Ventilation System Outside Air Booster Fans Due to Supply Breaker Wiring Deficiency Resulted in a Condition That Have Prevented Fulfillment. 05000269/LER-2024-001, Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications2024-12-19019 December 2024 Standby Shutdown Facility (Ssf) Pressurizer Level Switch Configuration Caused by Legacy Procedure Deficiency Resulted in Condition Prohibited by Technical Specifications 05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24017A0582024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 2024-09-23 Category:License-Operator MONTHYEARML24302A0522024-10-28028 October 2024
[Table view]301 2B File ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations ML23045A1842023-02-14014 February 2023 Post Examination Comment - Revised Simulator JPM B ML23045A1812023-02-14014 February 2023 As Given SRO Written Exam with References and Answer Key ML23045A1752023-02-14014 February 2023 As Given RO Written Exam with References and Answer Key ML22066B0612022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 IR 05000269/20223012022-03-0707 March 2022 Notification of Licensed Operator Initial Examination 05000269/2022301, 05000270/2022301 and 05000287/2022301 ML21218A0952021-08-0606 August 2021 301 ADAMS 2B ML21218A1132021-08-0606 August 2021 301 ADAMS 2A-2 ML21218A1482021-08-0606 August 2021 301 ADAMS 2A-3 IR 05000269/20213012021-07-0606 July 2021 NRC Operator License Examination Report 05000269/2021301, 05000270/2021301, and 05000287/2021301 ML21174A0432021-06-23023 June 2021 301 Exam Report Items - RO as Given Written Exam ML21174A0452021-06-23023 June 2021 301 Exam Report Items - SRO as Given Written Exam ML21111A3422021-04-16016 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20302A4322020-10-28028 October 2020 2A-3 Combined Delayed Release Exam Admin Items.Pdf ML20302A2512020-10-26026 October 2020 File 2A-1 Exam Draft Items Delayed Release ML20302A2662020-10-26026 October 2020 File 2A-2 Exam Final Items Delayed Release ML20233A8092020-08-20020 August 2020 1A (1) Oconee 2020301 as Given RO Written Exam and Key ML20233A8152020-08-20020 August 2020 1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf ML20225A0682020-08-11011 August 2020 301 Exam Corporate Notification Letter RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19291G2262019-10-18018 October 2019 Exam Corporate Notification Letter Aka 210-day Letter ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2522019-04-25025 April 2019 301 ADAMS2B Final Exam Items ML19115A2602019-04-25025 April 2019 301 ADAMS2D Exam Administrative Items ML19115A2552019-04-25025 April 2019 301 ADAMS2C Exam Administrative Items ML19115A2482019-04-25025 April 2019 301 ADAMS2A Draft Exam Items IR 05000269/20193012019-02-21021 February 2019 Operator Licensing Retake Written Examination Approval 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19014A0282019-01-0909 January 2019 Notification of Licensed Operator Retake Initial Examination 05000269/2019301, 05000270/2019301, and 05000287/2019301 ML18242A6932018-08-30030 August 2018 Exam Administrative Items ADAMS-2D ML18155A4602018-06-0101 June 2018 Operator Licensing Written Examination Approval Letter - 05000269/2018301, 05000270/2018301 and 05000287/2018301 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ML17193A3612017-07-12012 July 2017 302 Final Items 2B - Delay Release 2 Yrs ML17193A3592017-07-12012 July 2017 302 Draft Items 2A - Delay Release 2 Yrs ML17193A3632017-07-12012 July 2017 302 Admin Items 2C - Delay Release 2 Yrs ML17181A2192017-06-30030 June 2017 302 Exam Administrative Items for ADAMS 2D ML17181A2022017-06-30030 June 2017 Exam Administrative Items for ADAMS 2C ML17165A5562017-06-28028 June 2017 302 Draft RO Written Exam ML17179A5622017-06-28028 June 2017 302 Exam Final Items for ADAMS 2B ML17179A5062017-06-28028 June 2017 302 Exam Draft Items for ADAMS 2A ML17179A1662017-06-28028 June 2017 302 Exam Administrative Items for ADAMS 2D ML17165A5582017-06-28028 June 2017 302 Draft SRO Written Exam ML17174B2912017-06-23023 June 2017 302 Exam Administrative Items for ADAMS 2C - Delay Release 2 Yrs ML17174B2882017-06-23023 June 2017 302 Exam Draft Items for ADAMS 2A - Delay 2 Years Release 2024-08-08 Category:Generic Fundamental Examination (GFE) MONTHYEARML21111A3422021-04-16016 April 2021
[Table view]March 10, 2021, NRC Generic Fundamentals Examination Results for Oconee Nuclear Station ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE 2021-04-16 |
Text
OFFICIAL USE ONLY-PRIVACY ACT/PERSONALLY IDENTIFIABLE INFORMATION OFFICIAL USE ONLY-PRIVACY ACT/PERSONALLY IDENTIFIABLE INFORMATION April 16, 2021 Oconee Nuclear Station ATTN: Mr. J. Ed Burchfield, Jr.
Site Vice President Duke Energy Carolinas, LLC7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
MARCH 10, 2021, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR OCONEE NUCLEAR STATION
Dear Mr. Burchfield:
On March 10, 2021, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees at your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A Pass in the GRADE column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an Fail indicates that the individual failed the exam.
If you have any questions concerning this examination, please contact Ms. Skylar Cushing at 301-415-1064.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket No. 50-269, 50-270 and 50-287
Enclosures:
- 1. PWR Examination Form with answers to forms A and B
- 2. Examination Results Summary
- 3. Individual Answer Sheets
ML21111A342 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/OB RII/DRS/OB NAME DEgelstad GMcCoy DATE 4/ 15 /2021 4/ 16 /2021