|
---|
Category:Letter
MONTHYEARIR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 05000414/LER-2022-003, Manual Reactor Trip and Auxiliary Feedwater System Actuation2022-12-23023 December 2022 Manual Reactor Trip and Auxiliary Feedwater System Actuation IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 05000414/LER-2022-002, Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination2022-12-0606 December 2022 Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 2024-09-05
[Table view] Category:License-Operator
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given ML19281E0202019-10-0808 October 2019 301 Post Exam Comments IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17241A2282017-08-29029 August 2017 301 ADAMS2D Page 1 Exam Admin Items Immediate Release ML17241A2162017-08-29029 August 2017 301 ADAMS2B Final Exam Items Delay Release ML17241A2232017-08-29029 August 2017 301 ADAMS 2C Exam Admin Items Delay Release IR 05000413/20173012017-08-15015 August 2017 NRC Operator License Examination Report 05000413/2017301 and 05000414/2017301 ML17215A7792017-08-0303 August 2017 301 Post Exam Comments ML17215A7942017-08-0303 August 2017 301 Exam Report Items RO as Given - Delay Release ML17215A8012017-08-0303 August 2017 301 Exam Report Items SRO as Given - Delay Release ML17192A1792017-07-11011 July 2017 301 Exam Final Items 2B - Delay Release 2 Yrs ML17192A1812017-07-11011 July 2017 301 Exam Administrative Items 2C - Delay Release 2 Yrs ML17178A2942017-06-21021 June 2017 Operator Licensing Written Examination Approval 05000413, 414/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 IR 05000413/20163012016-07-13013 July 2016 NRC Operator License Examination Report 05000413/2016301 and 05000414/2016301, May 16 19, 2016 and May 26, 2016 ML16166A1062016-06-13013 June 2016 301 Facility Post Exam Comments ML16166A0992016-06-13013 June 2016 301 as Given RO Written Exam with References and Answer Key ML16166A1022016-06-13013 June 2016 301 as Given SRO Written Exam with References and Answer Key ML16104A4262016-04-0808 April 2016 March 2016 - Catawba NRC Generic Fundamentals Examination Results ML15356A8282015-12-22022 December 2015 Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301 ML15245A3012015-08-31031 August 2015 Initial Exam 2015-301 Draft Sim In-plant JPMs ML15245A3162015-08-31031 August 2015 Initial Exam 2015-301 General Correspondence ML15245A2942015-08-31031 August 2015 Initial Exam 2015-301 Draft RO Written Exam ML15245A3112015-08-31031 August 2015 Initial Exam 2015-301 Post Exam Comments ML15245A3092015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative JPMs ML15245A3072015-08-31031 August 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15245A3052015-08-31031 August 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15245A2962015-08-31031 August 2015 Initial Exam 2015-301 Draft SRO Written Exam ML15245A3032015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative Documents 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML23079A0902023-03-20020 March 2023 1B- Post Exam Comments IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) ML21321A0882021-11-17017 November 2021 301 File 2B Exam Draft Items ML21320A3282021-11-16016 November 2021 301 File 2A2 Exam Draft Items (1).pdf ML21320A3312021-11-16016 November 2021 301 File 2A3 Exam Draft Items ML21286A5252021-10-13013 October 2021 1A Final SRO Exam, Answer Key, References ML21286A3632021-10-13013 October 2021 1A Final RO Exam, Answer Key, References ML21258A3892021-09-15015 September 2021 Operating Licensing Examination Approval 05000413/2021301 and 05000414/2021301 ML21055A6072021-02-23023 February 2021 301 Exam Corporate Notification Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19308A2502019-11-0404 November 2019 301 ADAMS 2D Page 1 Exam Admin Items Normal Release ML19281E0172019-10-0808 October 2019 301 Exam Report Items Delayed Release RO as Given ML19281E0202019-10-0808 October 2019 301 Post Exam Comments IR 05000413/20193012019-09-0303 September 2019 Operator Licensing Written Examination Approval 05000413/2019301 and 05000414/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML17241A2282017-08-29029 August 2017 301 ADAMS2D Page 1 Exam Admin Items Immediate Release ML17241A2162017-08-29029 August 2017 301 ADAMS2B Final Exam Items Delay Release ML17241A2232017-08-29029 August 2017 301 ADAMS 2C Exam Admin Items Delay Release IR 05000413/20173012017-08-15015 August 2017 NRC Operator License Examination Report 05000413/2017301 and 05000414/2017301 ML17215A7792017-08-0303 August 2017 301 Post Exam Comments ML17215A7942017-08-0303 August 2017 301 Exam Report Items RO as Given - Delay Release ML17215A8012017-08-0303 August 2017 301 Exam Report Items SRO as Given - Delay Release ML17192A1792017-07-11011 July 2017 301 Exam Final Items 2B - Delay Release 2 Yrs ML17192A1812017-07-11011 July 2017 301 Exam Administrative Items 2C - Delay Release 2 Yrs ML17178A2942017-06-21021 June 2017 Operator Licensing Written Examination Approval 05000413, 414/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16166A1022016-06-13013 June 2016 301 as Given SRO Written Exam with References and Answer Key ML16166A0992016-06-13013 June 2016 301 as Given RO Written Exam with References and Answer Key ML16166A1062016-06-13013 June 2016 301 Facility Post Exam Comments ML16104A4262016-04-0808 April 2016 March 2016 - Catawba NRC Generic Fundamentals Examination Results ML15356A8282015-12-22022 December 2015 Notification of Licensed Operator Initial Examination 05000413/2016301 and 05000414/2016301 ML15245A3072015-08-31031 August 2015 Initial Exam 2015-301 Final Sim In-Plant JPMs ML15245A3052015-08-31031 August 2015 Initial Exam 2015-301 Final Simulator Scenarios ML15245A3032015-08-31031 August 2015 Initial Exam 2015-301 Final Administrative Documents ML15245A3022015-08-31031 August 2015 Initial Exam 2015-301 Draft Administrative JPMs ML15245A3012015-08-31031 August 2015 Initial Exam 2015-301 Draft Sim In-plant JPMs ML15245A3112015-08-31031 August 2015 Initial Exam 2015-301 Post Exam Comments ML15245A3162015-08-31031 August 2015 Initial Exam 2015-301 General Correspondence ML15245A2932015-08-31031 August 2015 Initial Exam 2015-301 Draft Administrative Documents ML15245A2992015-08-31031 August 2015 Initial Exam 2015-301 Draft Simulator Scenarios ML15245A2942015-08-31031 August 2015 Initial Exam 2015-301 Draft RO Written Exam ML15181A2322015-06-30030 June 2015 Initial Exam 2015-301 Final SRO Written Exam ML15181A2292015-06-30030 June 2015 Initial Exam 2015-301 Final RO Written Exam ML14290A3322014-10-27027 October 2014 301 Post Exam Comments ML14290A3042014-10-27027 October 2014 301 Final Administrative Documents ML14240A6662014-10-27027 October 2014 301 Draft SRO Written Examination 2024-04-02
[Table view] |
See also: IR 05000413/2021301
Text
September 15, 2021
Duke Energy Corporation, LLC
ATTN: Mr. Donald L Griffith
Training Manager Catawba
Nuclear Station 4800 Concord
Road
York, SC 29745-9635
SUBJECT: CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING
EXAMINATION APPROVAL 05000413/2021301 AND 05000414/2021301
Dear Mr. Griffith:
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing
examination at Catawba Nuclear Station.
The U.S. Nuclear Regulatory Commission (NRC) has approved the s ubject examinations, and you may
administer the written examinat ion in accordance with Revision 11 to NUREG-1021, Operator Licensing
Examination Standards for Power Reactors, on September 29, 202 1. The NRC staff will administer the
operating tests during the week of September 20, 2021. The list of the applicants approved to take the
examination has been provided to your office. The examination h as undergone extensive review by my
staff and representatives responsible for licensed operator tra ining at your facility. Based on this review, I
have concluded that the examinations meet the guidelines of NUR EG-1021 for content, operational, and
discrimination validity. By adminis tering this examination, you also agree that it meets NUREG-1021
guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your
facility. If you determine that this examination is not appropr iate for licensing operators at your facility, do
not administer the examination and contact me at (404) 997-4551 .
Please contact the Chief Examiner, Mr. Kevin Kirchbaum, at (404 ) 997-4641, if you have any questions or
identify any errors or changes in license level (RO or SRO) or type of examination (partial or complete
written examination and/or operating test) specified for each a pplicant on the list of approved applicants.
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-413, 50-414
License Nos.: NPF-35, NPF-52
D. Griffith 2
SUBJECT: CATAWBA NUCLEAR POWER PLANT - OPERATOR LICENSING
\\\\\\EXAMINATION APPROVAL 05000413/2021301 AND 05000414/202130
dated September 15, 2021
- See previous page for concurrence
X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE
ADAMS: Yes ACCESSION NUMBER: ML21258A389 X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRS
SIGNATURE DEGELSTAD KKIRCHBAUM GJMCCOY
NAME DEGELSTAD KKIRCHBAUM GMCCOY
DATE 9/13 /21 9/14/21 9/15/21
OFFICIAL FILE COPY