|
---|
Category:Letter
MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:License-Operator
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML22350A4642022-12-16016 December 2022 301 Exam Draft Items (2 Year Delayed release)(ADAMS-2A-1) ML22350A4682022-12-16016 December 2022 301 Exam Final Items (2 Year Delayed release)(ADAMS-2A-2) ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22318A0132022-11-10010 November 2022 301 Final RO Written Exam (2 Year Delayed Release)(ADAMS-1A) ML22318A0142022-11-10010 November 2022 301 Final SRO Written Exam (2 Year Delayed Release)(ADAMS-1A) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML22011A1732022-01-11011 January 2022 File 2A3 Robinson 2021-301 Exam Administrative Items Delayed Release.Pdf ML22011A1712022-01-11011 January 2022 File 2B Robinson 2021-301 Exam Administrative Items Normal Release.Pdf ML22011A1782022-01-11011 January 2022 File 2A2 Robinson 2021-301 Exam Final Items ML22011A2262022-01-11011 January 2022 File 2A1 Robinson 2021-301 Exam Draft Items ML21309A7322021-11-0505 November 2021 File 1A2 Robinson 2021-301 Exam Report Items - SRO Written Exam ML21309A5582021-11-0505 November 2021 File 1A1 Robinson 2021-301 Exam Report Items - RO Written Exam.Pdf ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16209A5732016-07-26026 July 2016 Operator Licensing Operating (Retake) Examination Approval Letter 05000261/2016-302 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 RNP-RA/15-0093, Reactor and Senior Reactor Operator Initial Examination Outlines2015-11-0404 November 2015 Reactor and Senior Reactor Operator Initial Examination Outlines 2024-04-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML22350A4682022-12-16016 December 2022 301 Exam Final Items (2 Year Delayed release)(ADAMS-2A-2) ML22350A1022022-12-16016 December 2022 301 Exam Administrative Items (Normal release)(ADAMS-2B) ML22318A0132022-11-10010 November 2022 301 Final RO Written Exam (2 Year Delayed Release)(ADAMS-1A) ML22318A0142022-11-10010 November 2022 301 Final SRO Written Exam (2 Year Delayed Release)(ADAMS-1A) IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22031A2542022-01-25025 January 2022 301 Corporate Notification Letter ML22011A1732022-01-11011 January 2022 File 2A3 Robinson 2021-301 Exam Administrative Items Delayed Release.Pdf ML22011A1782022-01-11011 January 2022 File 2A2 Robinson 2021-301 Exam Final Items ML22011A2262022-01-11011 January 2022 File 2A1 Robinson 2021-301 Exam Draft Items ML21309A7322021-11-0505 November 2021 File 1A2 Robinson 2021-301 Exam Report Items - SRO Written Exam ML21309A5582021-11-0505 November 2021 File 1A1 Robinson 2021-301 Exam Report Items - RO Written Exam.Pdf ML21260A1402021-09-15015 September 2021 Operator Licensing Examination Approval 05000261/2021301 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML19252A1532019-09-0909 September 2019 Operator Licensing Examination Approval 05000261/2019301 RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19116A1212019-04-26026 April 2019 301 Retake Exam Administrative Items ADAMS-2D - Normal Release ML19115A3112019-04-25025 April 2019 302 Retake ADAMS-2A Submission Normal Release ML19115A3182019-04-25025 April 2019 302 Retake ADAMS-2B Final Exam Items Normal Release ML19115A3322019-04-25025 April 2019 302 Retake ADAMS-2D Submission Normal Release IR 05000261/20183012018-06-0707 June 2018 NRC Operator License Re-Take Examination Report 05000261/2018301 ML18107A2052018-04-12012 April 2018 Retake Examination Approval Letter 05000261/2018301 ML17354B2672017-12-20020 December 2017 05000261/17301 as Given RO Written Exam with References and Key - Delay Release 2 Yrs ML17354B2702017-12-20020 December 2017 05000261/2017301 as Given SRO Written Exam with References and Key - Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16125A0792016-04-27027 April 2016 (14) Robinson 2016-301 General Correspondence ML16125A0352016-04-27027 April 2016 (6) Robinson 2016-301 Draft Administrative JPMs ML16125A0662016-04-27027 April 2016 (11) Robinson 2016-301 Final Simulator and in Plant JPMs ML16125A0812016-04-27027 April 2016 (1) Robinson 2016-301 Draft Administrative Documents ML16124A0872016-04-27027 April 2016 (5) Robinson 2016-301 Draft Simulator and in Plant JPMs ML16124B0592016-04-27027 April 2016 (7) Robinson 2016-301 Final Administrative Documents ML16124A7782016-04-27027 April 2016 (4) Robinson 2016-301 Draft Simulator Scenarios ML16125A0392016-04-27027 April 2016 (10) Robinson 2016-301 Final Simulator Scenarios ML16125A0742016-04-27027 April 2016 (13) Robinson 2016-301 Post Exam Comments ML16125A0752016-04-27027 April 2016 (15) Robinson 2016-301 Other Documents for Retention ML16125A0692016-04-27027 April 2016 (12) Robinson 2016-301 Final Administrative JPMs ML16124A9382016-04-27027 April 2016 (2) Robinson 2016-301 Draft RO Written Exam ML16124A8182016-04-27027 April 2016 (3) Robinson 2016-301 Draft SRO Written Exam ML16061A4532016-03-0101 March 2016 301 RO As-Given Written Exam ML16061A4572016-03-0101 March 2016 301 SRO As-Given Written Exam ML16046A0082016-02-12012 February 2016 Operating Licensing Written Examination Approval 05000261/2016301 ML15258A4712015-09-15015 September 2015 Initial Exam 2011-301 Draft Administrative Documents ML15245A5862015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15245A5512015-09-0202 September 2015 Initial Exam 2011-301 Draft Admin Jpm'S ML15224B4172015-05-21021 May 2015 Initial Exam 2011-301 Draft RO Written Exam ML15245A5612015-05-21021 May 2015 Initial Exam 2011-301 Final Admin Jpm'S ML15224B4192015-05-21021 May 2015 Initial Exam 2011-301 Draft SRO Written Exam ML15223B3262015-05-21021 May 2015 Initial Exam 2011-301 Draft Sim IN-Plant JPMs 2024-04-02
[Table view] |
See also: IR 05000261/2021301
Text
September15, 2021
Duke Energy Progress, Inc.
ATTN: Mr. George Curtis
Training Manager
Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT: H. B. ROBINSON NUCLEAR POWER PLANT - OPERATOR LICENS ING
EXAMINATION APPROVAL 05000261/2021301
Dear Mr. Curtis:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examination at H. B. Robinson Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has approved the s ubject examinations, and
you may administer the written examination in accordance with R evision 11 to NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, during the week of
September 30, 2021. The NRC sta ff will administer the operatin g tests during the weeks of
September 20 & 27, 2021. The list of the applicants approved t o take the examination has been
provided to your office. The exam ination has undergone extensi ve review by my staff and
representatives responsible for licensed operator training at y our facility. Based on this review, I
have concluded that the examination meets the guidelines of NUR EG-1021 for content,
operational, and discrimination validity. By administering thi s examination, you also agree that it
meets NUREG-1021 guidelines and is appropriate for measuring th e qualifications of licensed
operator applicants at your facility. If you determine that th is examination is not appropriate for
licensing operators at your facilit y, do not administer the exa mination and contact me at 404-
997-4551.
Please contact the Chief Examiner, Mr. Michael Meeks, at 404-99 7-4467 if you have any
questions or identify any errors or changes in license level (r eactor operator or senior reactor
operator) or type of examination (partial or complete written e xamination or operating test, or
both) specified for each applicant on the list of approved appl icants.
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operat ions Branch 1
Divis ion of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
ML21260A140
OFFICE RII/DRS/OB:OLA RII/DRS/OB:CE RII/DRS/OB:BC
NAME DEgelstad MMeeks GMcCoy
DATE 09/09/19 9/13/2021 9/15/2021