ML22089A223

From kanterella
Jump to navigation Jump to search
GEH Annual Shutdown Reactor Reports for the Year 2021
ML22089A223
Person / Time
Site: Vallecitos Nuclear Center, Vallecitos
Issue date: 03/25/2022
From: Feyrer M
GE Hitachi Nuclear Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
M220053
Download: ML22089A223 (36)


Text







 GEHitachiNuclearEnergy

 

MattJ.Feyrer

 SiteManager,

VallecitosNuclearCenter



6705VallecitosRd

M220053 Sunol,CA94586

USA



March 25, 2022 T9259186018

Matt.feyrer@ge.cm

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001

Subject:

GEH Annual Shutdown Reactor Reports for the Year 2021

Reference:

License DPR-1, Docket 50-18 (VBWR), License DR-10, Docket 50-183 (EVESR), License TR-1, Docket 50-70 (GETR)

Enclosed are the 2022 Annual Reports for the deactivated Reactors (Vallecitos Boiling Water Reactor (VBWR), ESADA-Vallecitos Experimental Superheat Reactor (EVESR),

and the General Electric Test Reactor (GETR)} located at the GE Hitachi, Vallecitos Nuclear Center near Sunol, California.

If there are any questions or additional information required, please contact me at the number above.

Sincerely, Digitally signed by Matt Feyrer Matt DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Feyrer Reason: Document Approver Location:

Date: 2022-03-28 05:05-07:00 Matt Feyrer, Site Manager Vallecitos Nuclear Center

Enclosures:

VBWR Annual Report No. 57 EVESR Annual Report No. 54 GETR Annual Report No. 63 cc: NRC Region IV Administrator J. Parrott, NRC NMSS MJF 22-001

 

























Enclosures





VBWRAnnualReportNo.57



EVESRAnnualReportNo.54



GETRAnnualReportNo.63





















 

GEHitachiNuclearEnergy



 VallecitosNuclearCenter

 Sunol,California













VALLECITOSBOILINGWATERREACTOR

(DEACTIVATED)













ANNUALREPORTNO.57

FORTHEYEAR2021











LICENSEDPR1

DOCKET5018











MARCH2022



















VBWRAnnualReportNo.57







VallecitosBoilingWaterReactor

(Deactivated)

AnnualReportNo.57

GEHitachiNuclearEnergyhasmaintainedtheVallecitosBoilingWaterReactor(VBWR)ina

deactivatedstatusundertheauthorityofAmendmentNo.21toLicenseDPR1,Docket5018,

issuedOct22,2007.Inthisannualreport,asummaryofthestatusofthefacilityfortheperiod

ofJanuary1,2021,toDecember31,2021,ispresented,asrequiredbyparagraph5.d.2ofthe

license.

1.0

SUMMARY



Allreactorsystemshavebeenremovedfromthecontainmentexceptforthereactorvessel.

Thewaterlevelwithinthereactorvesselwasmonitoredandhasremainedessentiallyconstant

throughoutthereportperiod.

Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.

Environmentaldataismaintainedonsiteandavailableforreview.

2.0STATUSOFFACILITY

Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothecontainment

buildingandgeneralsystems.Thefacilitycontinuestobeindeactivatedstatusinsafestorage

condition.

3.0ROUTINEPATROLS

Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwrittenstation

procedures.

Patrolsidentifiedthefollowing:

x UnchangedEfflorescenceonthebasementwallsandfloor.

x UnchangedSpallingofconcrete,corrosionstainsandrebarcorrosionontheBasement

PumpFoundationpedestal.

x Seepageofwaterintothebasementborelocation.



Theseconditionshavebeenevaluated,posenothreattostructuralintegrity,andarebeing

monitored.Thestructuralconditionofthefacilityisbeingactivelymonitoredandisstructurally

soundtoensuremaximumprotectionforpublichealthandsafety.

Page1of2

VBWRAnnualReportNo.57



4.0RADIATIONANDCONTAMINATION

Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremainlow.

Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsarepresentedin

attachment2.Theradiation/contaminationlevelslistedarerepresentativebutnotnecessarily

maximumvalues.

AnalyticalresultsofgroundwatersamplesareavailableintheannualEnvironmentalReport

submittedonMarch9,2022.

5.0ACTIVITIES

Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.

Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety

significanceduringthereportingperiod.

6.0ORGANIZATION

TheSiteManagerremainsM.J.Feyrer.TheVBWRFacilityManagerremainsK.P.Zanotto.The

Manager,RegulatoryComplianceandEHSremainsJ.Smyly.

7.0CONCLUSION

GEHitachiNuclearEnergyconcludesthatthedeactivatedVBWRisbeingmaintainedinasafe

shutdowncondition.Theinspections,accesscontrol,andadministrativelycontrolledactivities

ensuremaximumprotectionforthepublichealthandsafety.Theprocedureswillbecontinued

tomaintainthishighlevelofprotection.









GEHitachiNuclearEnergy

VallecitosOperations





Digitally signed by Matt Feyrer



Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com

 Reason: Document Approver Location:

Date: 2022-03-28 05:01-07:00

 

M.J.Feyrer,ManagerVallecitosNuclearCenter

Page2of2

VBWRAnnualSurvey



SurveyNumber: D041    

DateSurveyPerformed:September10,2021

DoseRateInstrument: RadEyeS/N33155  

InstrumentCalibrationdate:June14,2021   

ContaminationSmearscountedon:TennelecXLBSystemA

Calibrationdate:May6,2021 









SurveyPerformedby: SignatureonOriginalDocument 

SurveyReviewedby: SignatureonOriginalDocument 

ATTACHMENT1





GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



ATTACHMENT1(surveydata)

VBWRContainmentSmearResults-2021AnnualSurvey



Instrument: TennelecXLBSystemB  AnalyzedBy: 

SignaturesonOriginal 

SerialNo.: 29721  Signature: Documentsonsite

CalibrationDate: 21Mar2021  Reviewed:  

BetaEfficiency: 30.36%  BetaMDA: 22.6DPM/100cm2 

AlphaEfficiency: 33.57%  AlphaMDA: 10.7DPM/100cm2 

SampleDate: 9/10/2021  CountDate: 9/15/2021 



  Alpha Beta

2 No. Location NCPM/100cm  DPM/100cm2 NCPM/100cm  2 DPM/100cm2

0 Blank 0 <MDA 2.42 <MDA

1 MainFloor 0 <MDA 8.42 27.7

2 MainFloor 0 <MDA 65.42 215

3 MainFloor 0 <MDA 38.42 127

4 MainFloor 0 <MDA 48.42 159

5 MainFloor 0.93 <MDA 44.42 146

6 MainFloor 0 <MDA 56.42 186

7 MainFloor 0 <MDA 74.42 245

8 MainFloor 0.93 <MDA 50.42 166

9 MainFloor 0 <MDA 113.42 374

10 MainFloor 0 <MDA 56.42 186

11 MainFloor 0 <MDA 36.42 120

12 Basement 0 <MDA 267.42 881

13 Basement 0 <MDA 1486.42 4900

14 Basement 0 <MDA 1669.42 5500

15 Basement 0 <MDA 527.42 1740

16 Basement 0 <MDA 403.42 1330

17 Basement 0.93 <MDA 423.42 1390

18 Basement 0 <MDA 1123.42 3700



Page1of1



ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%

BetaEfficiency 33.19% BetaEfficiency 30.36%

dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count

Minutes Time Time Decay Decay Minutes Time

Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240

 GEHitachi      GEHitachiNuclearEnergy



 VallecitosNuclearCenter

 VallecitosNuclearCenter

 Sunol,California















ESADAVALLECITOSEXPERIMENTAL

SUPERHEATREACTOR

(DEACTIVATED)













ANNUALREPORTNO.54

FORTHEYEAR2021











LICENSEDR10

DOCKET50183











MARCH2022

EVESRAnnualReportNo.54



ESADAVallecitosExperimentalSuperheatReactor

(Deactivated)



ANNUALREPORTNO.54

GEHitachiNuclearEnergy(GEH)hasmaintainedtheESADAVallecitosExperimental

SuperheatReactor(EVESR)inadeactivatedstatusundertheauthorityofAmendment

No.7toLicenseDR10,Docket50183,issuedDecember1,2008.Inthisannualreport,

asummaryofthestatusofthefacilityfortheperiodofJanuary1,2021,toDecember

31,2021,ispresented,asrequiredbyAmendment7,AppendixA,Technical

Specifications,sectionC.1.

1.0

SUMMARY



Entryintothecontainmentbuildingwasmadeforroutineradiationsurveys,quarterly

patrols,annualstructuralinspections,andageneralexaminationofconditions

throughoutthebuilding.Inaccordancewithwrittenprocedures,theFacilityManager

controlsaccesstothecontainmentbuilding.

Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.Environmental

dataismaintainedonsiteandavailableforreview.



2.0STATUSOFFACILITY

Thefacilitycontinuestobeindeactivatedstatus.Theplugstothereactorvessel,head

storageshield,andthewoodencoveroverthefuelstoragepoolremaininplace.



3.0ROUTINEPATROLS

Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwritten

stationprocedures.



Threeissueswereidentifiedduringtheannualinspection:

1. Loose,falleninsulationwasfoundaroundtheperimeterofthemainfloorof

EVESR.Theinsulationisnotastructuralcomponentanddidnotcontain

asbestos.

2. Corrosionwasidentifiedontheexposedrebarfloortieinextensionsthatare

visibleatmultiplelevelsofthefacility.Theseextensionsarenotstructural

components.

3. Minimalefflorescencewasidentifiedatafewlocations.Thisconditionwas

Page1of2

EVESRAnnualReportNo.54



evaluatedanddoesnotposeastructuralissue.



Thestructuralconditionofthefacilityremainsactivelymonitored,stableand

structurallysoundtoensuremaximumprotectionforpublichealthandsafety

4.0RADIATIONANDCONTAMINATION

Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremain

low.Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsare

presentedinattachment2.Theradiation/contaminationlevelslistedarerepresentative

butnotnecessarilymaximumvalues.



AnalyticalresultsofgroundwatersamplesareavailableintheannualEnvironmental

ReportsubmittedonMarch9,2022.

5.0ACTIVITIES

Routinepatrolsandinspectionswereconductedduringthisreportperiod.

Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety

significanceduringthereportingperiod.



6.0ORGANIZATION

TheSiteManagerremainsM.J.Feyrer.TheEVESRFacilityManagerremainsK.P.

Zanotto.TheManager,RegulatoryComplianceandEHSremainsJ.Smyly.

7.0CONCLUSION

GEHitachiNuclearEnergyconcludesthatthedeactivatedESADAVallecitos

ExperimentalSuperheatReactorisbeingmaintainedinasafeshutdowncondition.The

inspections,accesscontrol,andadministrativelycontrolledactivitiesensuremaximum

protectionforthepublichealthandsafety.Theprocedureswillbecontinuedto

maintainthishighlevelofprotection.

GEHitachiNuclearEnergy

VallecitosOperations



 Digitally signed by Matt Feyrer

Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Reason: Document Approver

 Location:

Date: 2022-03-28 05:02-07:00

 

M.J.Feyrer

ManagerVallecitosNuclearCenter

Page2of2

EVESRAnnualSurvey



SurveyNumber: D042    

DateSurveyPerformed:September10,2021

DoseRateInstrument: RadEyeS/N33155  

InstrumentCalibrationdate:June14,2021   

ContaminationSmearscountedon:TennelecXLBSystemA

Calibrationdate:May6,2021 









SurveyPerformedby: SignatureonOriginalDocument 

SurveyReviewedby: SignatureonOriginalDocument 





 















GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



ATTACHMENT1(surveydata)

EVESRContainmentSmearResults-2021AnnualSurvey



Instrument: TennelecXLBSystemB  AnalyzedBy: 

SignaturesonOriginal 

SerialNo.: 29721  Signature: Documentsonsite

CalibrationDate: 21Mar2021  Reviewed:  

BetaEfficiency: 30.36%  BetaMDA: 22.6DPM/100cm2 

AlphaEfficiency: 33.57%  AlphaMDA: 10.7DPM/100cm2 

SampleDate: 9/10/2021  CountDate: 9/15/2021 



  Alpha Beta

2 No. Location NCPM/100cm  DPM/100cm2 NCPM/100cm  2 DPM/100cm2

0 Blank 0 <MDA 0 <MDA

1 549Level 0 <MDA 2.42 <MDA

2 549Level 0.93 <MDA 8.42 27.7

3 549Level 0 <MDA 6.42 <MDA

4 549Level 0.93 <MDA 35.42 117

5 549Level 0 <MDA 45.42 150

6 549Level 0 <MDA 13.42 44.2

7 549Level 0 <MDA 1.42 <MDA

8 549Level 0.93 <MDA 31.42 103

9 549Level 0 <MDA 53.42 176

10 549Level 1.93 <MDA 39.42 130

11 549Level 0 <MDA 15.42 50.8

12 549Level 0 <MDA 24.42 80.4

13 534Level 0 <MDA 34.42 113

14 534Level 0 <MDA 733.42 2420

15 534Level 0 <MDA 133.42 439

16 534Level 0 <MDA 147.42 486

17 534Level 0 <MDA 207.42 683

18 534Level 0.93 <MDA 83.42 275

19 534Level 0 <MDA 189.42 624

20 534Level 0.93 <MDA 94.42 311

21 519Level 0 <MDA 58.42 192

22 519Level 0 <MDA 22.42 73.8

23 519Level 0 <MDA 62.42 206

24 519Level 0 <MDA 67.42 222

25 519Level 0 <MDA 52.42 173

Page1of2



GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



  Alpha Beta

2 No. Location NCPM/100cm  DPM/100cm2 NCPM/100cm  2 DPM/100cm2

26 519Level 0 <MDA 47.42 156

27 503Level 0 <MDA 246.42 812

28 503Level 0 <MDA 57.42 189

29 503Level 0 <MDA 108.42 357

30 503Level 0 <MDA 51.42 169

31 503Level 0 <MDA 122.42 403

32 503Level 0 <MDA 252.42 831

33 503Level 0.93 <MDA 142.42 469

34 503Level 0 <MDA 1250.42 4120

35 503Level 0.93 <MDA 155.42 512

36 503Level 0 <MDA 109.42 360

37 500Level 0.93 <MDA 1086.42 3580

38 503Level 0 <MDA 261.42 861

39 503Level 0 <MDA 148.42 489

40 487Level 0.93 <MDA 127.42 420

41 487Level 0 <MDA 393.42 1300

42 487Level 0.93 <MDA 76.42 252

43 487Level 0 <MDA 196.42 647

44 487Level 0.93 <MDA 311.42 1030

45 487Level 2.93 <MDA 357.42 1180



Page2of2



ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%

BetaEfficiency 33.19% BetaEfficiency 30.36%

dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count

Minutes Time Time Decay Decay Minutes Time

Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240

  GEHitachiNuclearEnergy



 

 VallecitosNuclearCenter

 Sunol,California

















GENERALELECTRICTESTREACTOR

(DEACTIVATED)













ANNUALREPORTNO.63

FORTHEYEAR2021











LICENSETR1

DOCKET5070









MARCH2022

GETRAnnualReportNo.63  



GeneralElectricTestReactor

(Deactivated)



ANNUALREPORTNO.63

GEHitachi(GEH)hasmaintainedtheGeneralElectricTestReactor(GETR)ina

deactivatedstatusundertheauthorityofAmendmentNo.17toLicenseTR1,Docket

5070,issuedOctober22,2007asspecifiedinTS6.6.1toAmendmentNo.14,issued

February5,1986.Inthisannualreport,asummaryofthestatusofthefacilityforthe

periodofJanuary1,2021toDecember31,2021ispresented.

1.0

SUMMARY



ThefacilityremainsinpredominatelythesameconditiondescribedinAnnualReport

No.62.Entryintothereactorbuildingwasmadeforroutineradiationsurveysanda

generalexaminationofconditionsthroughoutthebuilding.Thecrane,elevator,and

ventilationwereservicedandtestedin2011inanticipationofbeginningremediation

activities.Suchactivitieshavenotbegun.

Structuralconditionsandradiationandcontaminationlevelsremainatacceptable

levels.Environmentaldataismaintainedonsiteandavailableforreview.

2.0STATUSOFFACILITY

Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothe

containmentbuildingandgeneralsystems.Thefacilitycontinuestobeindeactivated

status.TherewerenochangesauthorizedbytheFacilityManagerpursuantto

10CFR50.59(a)in2021.

3.0ROUTINEPATROLS

Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwritten

stationprocedures.

Thepresenceofminimalefflorescencewasidentifiedonfacilitybasementwallsduring

theannualinspection.Thisconditionwasevaluatedanddeterminedtonotposea

structuralissue.

Thestructuralconditionofthefacilityremainsactivelymonitored,stableand

structurallysoundtoensuremaximumprotectionforpublichealthandsafety.

4.0RADIATIONANDCONTAMINATION

Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremain

low.Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsare

presentedinattachment2.Theradiation/contaminationlevelslistedarerepresentative

Page1of2

GETRAnnualReportNo.63  



butnotnecessarilymaximumvalues.

4.1 GETRStack

Althoughmaintenancewasperformedonthestackin2011,andthestackwastested,

therehasbeennoremediationeffortperformedfortheGETRreactor.Theventilation

systemisoperational,butnotcurrentlyinuse.

4.2 GammaRadiation

Theyearlydoseresultsfortheyear2021asdeterminedfromevaluationofsite

perimeterenvironmentalmonitoringdosimetersshowednodeparturefromnormal

stablebackgrounds.

4.3 Vegetation

Noalpha,betaorgammaactivityattributabletoactivitiesattheGETRfacilitywasfound

onorinvegetationinthevicinityofthesite.

4.4 GroundWaterMonitoringWellData

AnalyticalresultsofgroundwatersamplescanbefoundintheannualEnvironmental

ReportsubmittedonMarch9,2022.

5.0ACTIVITIES

Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.

Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety

significanceduringthereportingperiod.

6.0ORGANIZATION

TheSiteManagerremainsM.J.Feyrer.TheGETRFacilityManagerremainsK.P.

Zanotto.TheManager,RegulatoryComplianceandEHSremainsJ.Smyly.

7.0CONCLUSION

GEHitachiNuclearEnergyconcludesthatthedeactivatedGETRisbeingmaintainedina

safeshutdowncondition.Theinspections,accesscontrol,andadministratively

controlledactivitiesensuremaximumprotectionforthepublichealthandsafety.The

procedureswillbecontinuedtomaintainthishighlevelofprotection.





GEHitachiNuclearEnergy

VallecitosOperations

 Digitally signed by Matt Feyrer Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United

 States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Reason: Document Approver Location:

 Date: 2022-03-28 05:03-07:00



M.J.Feyrer,ManagerVallecitosNuclearCenter

Page2of2

GETRAnnualSurvey



SurveyNumber: C024    

DateSurveyPerformed:July28,2021  

DoseRateInstrument: RadEyeS/N33155   

InstrumentCalibrationdate:June14,2021   

ContaminationSmearscountedon:TennelecXLBSystemA

Calibrationdate:May6,2021 









SurveyPerformedby: SignatureonOriginalDocument  

SurveyReviewedby: SignatureonOriginalDocument  



















GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



ATTACHMENT1(surveydata)

GETRContainmentAnnualSurveyDiskSmearResults-2021



Instrument: TennelecXLBSystemB  AnalyzedBy: 

SignaturesonOriginal 

SerialNo.: 29721  Signature: Documentsonsite

CalibrationDate: 21Mar2021  Reviewed:  

BetaEfficiency: 30.36%  BetaMDA: 22.6DPM/100cm2 

AlphaEfficiency: 33.93%  AlphaMDA: 10.6DPM/100cm2 

SampleDate: 7/28/2021  CountDate: 7/29/2021 



  Alpha Beta

No. Location NCPM/100cm  DPM/100cm  NCPM/100cm2 DPM/100cm2

2 2 0 Blank 0 <MDA 0 <MDA

1 Basement#1 0 <MDA 26.42 87.0

2 Basement#2 0 <MDA 347.42 1140

3 Basement#3 0 <MDA 49.42 163

4 Basement#4 0 <MDA 31.42 103

5 Basement#5 0 <MDA 36.42 120

6 Basement#6 0 <MDA 40.42 133

7 Basement#7 0.93 <MDA 69.42 229

8 Basement#8 0 <MDA 79.42 262

9 Basement#9 0 <MDA 20.42 67.3

10 Basement#10 0 <MDA 175.42 578

11 Basement#11 0.93 <MDA 15.42 50.8

12 Basement#12 0 <MDA 52.42 173

13 Basement#13 0 <MDA 32.42 107

14 Basement#14 0 <MDA 59.42 196

15 Basement#15 0 <MDA 52.42 173

16 Basement#16 0 <MDA 246.42 812

17 Basement#17 0 <MDA 13.42 44.2

18 Basement#18 0 <MDA 145.42 479

19 FirstFloor#1 1.93 <MDA 0 <MDA

20 FirstFloor#2 0 <MDA 0.42 <MDA

21 FirstFloor#3 0 <MDA 6.42 <MDA

22 FirstFloor#4 0 <MDA 7.42 24.4

23 FirstFloor#5 0 <MDA 17.42 57.4

24 FirstFloor#6 0 <MDA 4.42 <MDA

25 FirstFloor#7 0 <MDA 2.42 <MDA

Page1of3



GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



  Alpha Beta

No. Location NCPM/100cm  DPM/100cm  NCPM/100cm2 DPM/100cm2

2 2 26 FirstFloor#8 0 <MDA 19.42 64.0

27 FirstFloor#9 0 <MDA 45.42 150

28 FirstFloor#10 0 <MDA 41.42 136

29 FirstFloor#11 0 <MDA 131.42 433

30 FirstFloor#12 0 <MDA 341.42 1120

31 SecondFloor#1 0.93 <MDA 17.42 57.4

32 SecondFloor#2 0.93 <MDA 19.42 64.0

33 SecondFloor#3 0 <MDA 16.42 54.1

34 SecondFloor#4 0 <MDA 24.42 80.4

35 SecondFloor#5 0 <MDA 65.42 215

36 SecondFloor#6 0.93 <MDA 20.42 67.3

37 SecondFloor#7 0 <MDA 17.42 57.4

38 SecondFloor#8 0 <MDA 21.42 70.6

39 SecondFloor#9 0 <MDA 1.42 <MDA

40 SecondFloor#10 0 <MDA 26.42 87.0

41 SecondFloor#11 0 <MDA 184.42 607

42 SecondFloor#12 0 <MDA 26.42 87.0

43 Mezzanine#1 0 <MDA 8.42 27.7

44 Mezzanine#2 0 <MDA 9.42 31.0

45 Mezzanine#3 0 <MDA 11.42 37.6

46 Mezzanine#4 0.93 <MDA 14.42 47.5

47 Mezzanine#5 0.93 <MDA 54.42 179

48 Mezzanine#6 0 <MDA 16.42 54.1

49 ThirdFloor#1 0 <MDA 42.42 140

50 ThirdFloor#2 0 <MDA 67.42 222

51 ThirdFloor#3 0 <MDA 212.42 700

52 ThirdFloor#4 0 <MDA 90.42 298

53 ThirdFloor#5 0.93 <MDA 126.42 416

54 ThirdFloor#6 0.93 <MDA 181.42 598

55 ThirdFloor#7 0.93 <MDA 851.42 2800

56 ThirdFloor#8 0 <MDA 223.42 736

57 ThirdFloor#9 1.93 <MDA 165.42 545

58 ThirdFloor#10 0 <MDA 730.42 2410

59 ThirdFloor#11 0 <MDA 609.42 2010

60 ThirdFloor#12 3.93 11.6 1661.42 5470

61 ThirdFloor#13 1.93 <MDA 64.42 212

62 ThirdFloor#14 0.93 <MDA 64.42 212

Page2of3



GEHitachiVallecitosNuclearCenter

RadiologicalCountingLaboratory



  Alpha Beta

No. Location NCPM/100cm  DPM/100cm  NCPM/100cm2 DPM/100cm2

2 2 63 ThirdFloor#15 0 <MDA 2721.42 8960

64 ThirdFloor#16 0 <MDA 926.42 3050

65 ThirdFloor#17 0 <MDA 164.42 542

66 ThirdFloor#18 1.93 <MDA 437.42 1440

67 ThirdFloor#19 0 <MDA 705.42 2320



Page3of3



ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%

BetaEfficiency 33.19% BetaEfficiency 30.36%

dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count

Minutes Time Time Decay Decay Minutes Time

Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240