September 23, 1998 Mr. M. L. Bowling, Recovery Officer - Technical Services l C/o Ms. P. A. Loftus, Director - Regulatory Affairs for Millstone Station NORTHEAST NUCLEAR ENERGY COMPANY PO Box 128 Waterford, CT 06385

SUBJECT:

REVISION TO NOTICE OF VIOLATION RESPONSE

Dear Mr. Bowling:

This refers to your letter dated June 29,1998 which, in part, revises your previous correspondence dated March 2,1998,in response to our December 10,1997 letter.

Thank you for informing us of your revised corrective and preventive actions documented in your letter. These actions will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, ORIGINAL SIGNED BY:

Jecque P. Durr, Chief

Inspections Branch \

Millstone inspection Directorate Docket Nos. 50-245;50-336;50-423

./

l 9809290223 980923  ?

PDR ADOCK 05000245

G pg 4

l

i Mr. M. L. Bowling 2 l

cc:

B. Kenyon, President and Chief Executive Officer - Nuclear Group M. H. Brothers, Vice President - Operations J. McElwain, Recovery Officer - Millstone Unit 2 J. Streeter, Recovery Officer - Nuclear Oversight P. D. Hinnenkamp, Director - Unit 3 l J. A. Price, Director Unit 2 D. Amerine, Vice President - Human Services E. Harkness, Director, Unit 1 Operations 1

-J. Althouse, Manager - Nuclear Training Assessment Group l F. C. Rothen, Vice President, Work Services J. Cantrell, Director - Nuclear Training (CT) 4 S. J. Sherman, Audits and Evaluation -

cc w/ cv of Licensee Resoonse Ltr:

L. M. Cuoco, Esquire J. R. Egan, Esquire 4 V. Juliano, Waterford Library J. Buckingham, Department of Public Utility Control

' S. B. Comley, We The People i State of Connecticut SLO Designee D. Katz, Citizens Awareness Network (CAN) I R. Bassilakis, CAN .

J. M. Block, Attorney, CAN S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Concannon E. Woollacott, Co-Chairman, NEAC Distribution w/cv of Licensee Resoonse Ltr Region I Docket Room (with rapy of concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

. FILE CENTER, NRR (with Oriainal concurrences)

Millstone inspection Directorate Secretarial File, Region l NRC Resident inspector H. Miller, Regional Administrator, R1 B. Jones, PIMB/ DISP -

W. Lanning, Director, Millstone Inspection Directorate, R1 L D. Screnci, PAO l- DOCUMENT NAME: 1:\ BRANCH 6\REPLYLTRWlOREV.RPY f- To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" =

l Copy with attachment / enclosure "N" = No copy OFFICE - Rl/MID gf7f l 6 Rl/MID l /- l l l NAME' NJBLUMBERG/db JPDURRf4 j-DATE 09tL$ /98 09fM/98 09/ /98 09/ /98 09/ /98 OFFICIAL RECORD COPY i

F , , .

4 :

  • i, N:rthe*si nope Ferry Rd. (Itout,156), waterford, cr 06385 earhem yiii,,,,, y,,,,,, ,,,,, s,,,,,,

Nortimaat Nuclear Energy Company P.O.110 128 Waterford, Cr NG85-0128 (860) 447-1791 l'an (MA)) 444-4277

%c Nortirant Utilitics System h

1 JUN 2 91998 I Docket No. 50-423 I B17338 l

U.S. Nuclear Regulatory Commission i

Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit No. 3 Commitment Revision Response to Notice of Violation 04033 l

The purpose of this letter is to revise the commitments associated with Notice of  !

Violation (NOV) 04033 which were previously submitted to the NRC in " Reply to Notice l of Violation and Proposed imposition of Civil Penalties" (816996), dated March 2, -

1998. The corrective actions for the subject NOV included revising OP 3208, " Plant Cooldown," to provide specific direction to prompt operators to initiate a Condition '

Report (CR) and notify the system engineer when exceeding temperature limits. The  !

corrective actions also included adding a computer priority alarm to alert the operators  !

of a high temperature condition.

The reactor plant closed cooling water (RPCCW) system has been reanalyzed, revising the maximum operating temperature and resulting in a design change. The associated design change included the installation of high temperature alarms that provide a signal for each train to Control Room annunciators (Main Board 2C window 1-4 for train A and 1-5 for train B). Included in the annunciator alarm response procedure OP 3353.MB2C is a requirement to initiate a CR for exceeding RPCCW temperature limits.

The CR process provides notification to the system engineer. This design change eliminated the previous commitments for a computer priority alarm and notification of the system engineer by Operations. Attachment 1 identifies the new commitments which have been implemented. .

o.aw, nn us, gge n cirz 3 8 9PP

U.S. Nucl=r Rrgulatory Commission B17338 \Page 2 Should you have any questions regarding this matter, please contact Mr. D. A. Smith at (860)437-5840.

NORTHEAST NUCLEAR ENERGY COMPANY 5k Martin L. Bowling, Jr. /

Recovery Officer - Technical Services l l

Attachment j l

cc: H. J. Miller, Region 1 Administrator J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, Ph.D, Director, Special Projects Office I

1 e.

4 o

. , [a - ' ,

Docket No. 50-423 817338 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 Regulatory Commitments June 1998

.- - e - , -.. - . - . , . , , . , , ,- -


.a

I , , .

)

U.S. Nucl::r Regulatory Commission B17338\ Attachment 1\Page 1 Attachment 1 List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager - Regulatory Compliance at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Commitment Regulatory Commitment Committed Date or Number Outage .

l B17338-01 The associated design change included the Complete l installation of high temperature alarms that provide a signal for each train to Control Room annunciators (Main Board 2C window 1-4 for train A and 1-5 for train B).

B17338-02 Included in the annunciator alarm response Complete procedure OP 3353.MB2C is a requirement to l initiate a CR for exceeding RPCCW temperature limits. ,

l i

.