ML20050B368
ML20050B368 | |
Person / Time | |
---|---|
Site: | Beaver Valley ![]() |
Issue date: | 03/24/1982 |
From: | Williams H DUQUESNE LIGHT CO. |
To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
Shared Package | |
ML20050B369 | List: |
References | |
Download: ML20050B368 (2) | |
Similar Documents at Beaver Valley | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212K8071999-09-30030 September 1999
[Table view]Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility ML20212M2661999-09-30030 September 1999 Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application ML20212G0601999-09-23023 September 1999 Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212F6341999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212F6841999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML20207H6621999-07-0808 July 1999 Forwards RAI Re Util 981112 Response to IPEEE Evaluations for Plant,Units 1 & 2.RAI Was Discussed During 990628 Telcon in Order to Ensure Clear Consistent Understanding by All Parties of Info Needed ML20209D9471999-07-0707 July 1999 Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6230 ML20209D8191999-07-0707 July 1999 Forwards Insp Repts 50-334/99-03 & 50-412/99-03 on 990502- 0612.No Violations Noted.Program for Maintaining Occupational Exposures as Low as Reasonably Achievable (ALARA) & for Training Personnel,Generally Effective ML20209D3141999-07-0707 July 1999 Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee 981224 Ltr to NRC ML20209B6981999-06-29029 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl ML20209B4141999-06-25025 June 1999 Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5 ML20196G3801999-06-22022 June 1999 Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl ML20196F7331999-06-22022 June 1999 Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal Dtd 990505 ML20196F0081999-06-17017 June 1999 Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195J5221999-06-16016 June 1999 Forwards Answer of Duquesne Light Co to Petition to Intervene of Local 29,International Brotherhood of Electrical Workers in Listed Matter.With Certificate of Svc ML20195H4651999-06-16016 June 1999 Forwards for Filing Answer of Firstenergy Corp in Opposition to Petition for Leave to Intervene of Local 29, Intl Brotherhood of Electrical Workers. Copies of Answer Have Been Served Upon Parties & Petitioner by e-mail ML20195K1901999-06-15015 June 1999 Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys ML20195K1761999-06-15015 June 1999 Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109 ML20212J2621999-06-14014 June 1999 Requests Partial Withdrawal of LAR 120,which Requested Review of USQ Due to Increased Calculated Doses for Locked Rotor Event & Use of Unapproved Methodology for Evaluating Small Break LOCA Doses Involving W Natl Safety Advisory Ltr ML20207G2611999-06-0707 June 1999 Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart ML20195H3731999-06-0303 June 1999 Forwards Petition to Intervene of Local 29,Intl Brotherhood of Electrical Workers in Matter of Firstenergy Nuclear Operating Co,For Filing ML20195C9831999-06-0202 June 1999 Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request ML20195D4361999-05-28028 May 1999 Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1 ML20207E5251999-05-28028 May 1999 Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b) ML20207E2031999-05-27027 May 1999 Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon IR 05000412/19980091999-05-26026 May 1999 Ack Receipt of 990305 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-412/98-09 ML20195C4461999-05-21021 May 1999 Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage ML20207A0591999-05-17017 May 1999 Dockets Licensee Plan for Bvps,Unit 1,safety-related Small Bore Piping Evaluation Project Discussed in NRC 990311 Public Meeting at BVPS ML20206P1241999-05-14014 May 1999 Refers to Proposed Changes Submitted by Dl on 990316 to BVPS QA Program Described in BVPS-2 Ufsar,Chapter 17.2.Forwards RAI Re Proposed QA Program Changes ML20206S4291999-05-12012 May 1999 Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS ML20206K1661999-05-0606 May 1999 Informs of Change in Scheduled Completion Date for Commitments Made in LERs 98-020-00 & 98-020-01.Util Believes That Listed Change Does Not Represent Challenge to Plant Safety ML20206N3161999-05-0606 May 1999 Responds to Ltr to NRC Dtd 990405 on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp ML20206F7401999-05-0505 May 1999 Forwards Application Requesting Consent to Transfer of Dl Ownership Interests in Bvps,Units 1 & 2 to Penn Power & Dl Operating Authority Under FOLs DPR-66 & NPF-73 to Firstenergy Nuclear Operating Co ML20206F8071999-04-30030 April 1999 Forwards Rev 11 to UFSAR for Bvps,Unit 2, Replacement Pages.Submittal Reflects Changes to Facility & Procedures as Described in Ufsar,Completed During Annual Reporting Period Ending 981031 ML20206H7931999-04-30030 April 1999 Ack Receipt of 990426 Request for Enforcement Discretion & 990427 Withdrawal of Request for Enforcement Discretion. Resolution Documented.Enforcement Discretion Not Necessary ML20206G3281999-04-30030 April 1999 Forwards 1998 Annual Environ Rept,Radiological & 1998 Annual Environ Rept,Non-Radiological, to Appropriate NRC Parties,Iaw TS 6.9.1.10 ML20206G2451999-04-30030 April 1999 Forwards Changes to BVPS ERDS Data Point Library,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394, Rev 1,Section 3.6, Administrative Implementation Requirements ML20206F9711999-04-30030 April 1999 Informs of Resignation of J Witter,License SOP-11376,from Employment at Bvps,Unit 2,per 10CFR50.74(b).Util Requests Withdrawal of Subject License ML20206G0231999-04-29029 April 1999 Forwards BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031, Per 10CFR50.59.Determination of Changes,Discussed ML20206D8661999-04-27027 April 1999 Withdraws 990426 Request for Enforcement Discretion from Action Statement TS 3.7.13.1,as No Longer Needed ML20206D8701999-04-26026 April 1999 Requests Enforcement Discretion Re Compliance with TS 3.7.13.1 Action Statement,To Allow for Continued Plant Operation Beyond 7 Day Action Time for Sufficient Time to Complete Required Repairs & Perform Post Maint Testing ML20206D8541999-04-23023 April 1999 Advises That T Mccool (License SOP 11372,docket 40464) No Longer Has Need to Maintain Senior Reactor Operator License, Due to Resignation as of 990421 ML20196F6711999-04-23023 April 1999 Requests That Proprietary Info Re LTOP Sys Setpoint Review for Bvps,Unit 2,15 EFPY Heatup & Cooldown Curves,Be Withheld from Public Disclosure IAW 10CFR2.790 ML20206B2751999-04-22022 April 1999 Forwards Insp Repts 50-334/99-01 & 50-412/99-01 on 990207- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206A8381999-04-20020 April 1999 Forwards Reactor Operator Initial Exam Rept 50-412/99-301 on 990322-25.All Three Reactor Operator Applicants Passed. Initial Written Exam Submittal Was Determined Not to Meet NRC Guidelines in Certain Instances ML20205R9071999-04-20020 April 1999 Forwards Second Request for Addl Info Re Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Beaver Valley Power Station,Units 1 & 2 ML20205Q8311999-04-14014 April 1999 Ack Receipt of 990329 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-11 & 50-412/98-11 Issued on 990225.Actions Will Be Examined During Future Insp of Licensed Program ML20205Q6361999-04-13013 April 1999 Forwards Changes Being Made to Data Point Library (Dpl). Six Dpls Noted Below Have Undergone Changes Which Affect Following Radiation Monitor High Alarm Limit Values ML20205L0341999-04-0909 April 1999 Forwards SER Accepting Util 971209 & 980729 Submittal of Second 10-year Interval ISI Program Plan & Associated Relief Requests for Beaver Valley Power Station,Unit 2.TER Also Encl 1999-09-30 Category:INCOMING CORRESPONDENCE MONTHYEARML20212G0601999-09-23023 September 1999
[Table view]Forwards Answer of Duquesne Light Co to Petition to Waive Time Limits & Suppl Comments of Local 29, Intl Brotherhood of Electrical Workers.Copies of Answer Have Been Served to Parties & Petitioner by e-mail or Facsimile ML20212F6341999-09-20020 September 1999 Forwards NRC Form 536 Which Addresses Util Proposed Operator Licensing Exam Schedule,In Response to Administrative Ltr 99-03 ML20212F6841999-09-15015 September 1999 Provides Addl Info to Support 990617 LAR 127,proposing Mods to Heatup,Cooldown & Overpressure Protection Curves.Info Is Provided to Formally Docket Info Discussed During 990820 Telcon with NRC ML20209D9471999-07-0707 July 1999 Forwards Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999, IAW ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-6230 ML20209D3141999-07-0707 July 1999 Requests Withdrawal of Change Proposed for TS Bases Page B 3/4 2-2 from LARs 1A-262 & 2A-135,originally Submitted by Licensee 981224 Ltr to NRC ML20209B6981999-06-29029 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness at Nuclear Power Plants. Disclosure Rept Encl ML20209B4141999-06-25025 June 1999 Provides Response to RAI on Proposed Change to Operations QA Program Description.Attachment 2 Provides Revised Markup for Proposed Changes to Affected UFSAR Section 17.2.5 ML20196G3801999-06-22022 June 1999 Forwards Typed,Final TS Pages for LARs 259 & 131.Summary of Description of Plant Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages,Encl ML20196F7331999-06-22022 June 1999 Submits Response to NRC Oral RAI Concerning Qualifications for Senior Nuclear Executive Ref in 10CFR50.80 Submittal Dtd 990505 ML20196F0081999-06-17017 June 1999 Forwards Final TS Pages for LARs 262 & 135,including Summary Description of Plants Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages ML20195J5221999-06-16016 June 1999 Forwards Answer of Duquesne Light Co to Petition to Intervene of Local 29,International Brotherhood of Electrical Workers in Listed Matter.With Certificate of Svc ML20195H4651999-06-16016 June 1999 Forwards for Filing Answer of Firstenergy Corp in Opposition to Petition for Leave to Intervene of Local 29, Intl Brotherhood of Electrical Workers. Copies of Answer Have Been Served Upon Parties & Petitioner by e-mail ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195K1901999-06-15015 June 1999 Provides Addl Info to Support LARs 262 & 135,in Response to NRC 990527 Verbal Request.Info Describes Performance of Unit 1 Rod Position Indication Sys & Provides Some Background Info Re Normal Operation of Sys ML20195K1761999-06-15015 June 1999 Forwards Typed,Final TS Pages for LAR 109 Re Rcs.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages Is Provided in Attachment B-109 ML20212J2621999-06-14014 June 1999 Requests Partial Withdrawal of LAR 120,which Requested Review of USQ Due to Increased Calculated Doses for Locked Rotor Event & Use of Unapproved Methodology for Evaluating Small Break LOCA Doses Involving W Natl Safety Advisory Ltr ML20195H3731999-06-0303 June 1999 Forwards Petition to Intervene of Local 29,Intl Brotherhood of Electrical Workers in Matter of Firstenergy Nuclear Operating Co,For Filing ML20195C9831999-06-0202 June 1999 Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request ML20195D4361999-05-28028 May 1999 Forwards Bvps,Unit 2 SG Exam Rept for Aug 1998.Rept Provided to Document Results of SG Eddy Current Exams Performed in Aug 1998.Summary of Insps Provided in Encl 1 ML20207E5251999-05-28028 May 1999 Forwards Annual Financial Repts,Including Certified Financial Statements,Of Dqe,Firstenergy Corp,Ohio Edison Co,Pennsylvania Power Co,Cleveland Electric Illuminating Co & Toledo Edison Co,Iaw 10CFR50.71(b) ML20207E2031999-05-27027 May 1999 Forwards Revised marked-up TS & UFSAR Pages to 990303 LARs 259 & 131 Which Revised Qualifications for Operations Mgt & Incorporated Generic Position Titles in Ts.Encl Pages Incorporate NRC Requested Changes,Per Recent Telcon ML20207A0591999-05-17017 May 1999 Dockets Licensee Plan for Bvps,Unit 1,safety-related Small Bore Piping Evaluation Project Discussed in NRC 990311 Public Meeting at BVPS ML20206S4291999-05-12012 May 1999 Notifies of License Withdrawal for J Scott,License SOP-11481,due to Resignation from Employment at BVPS ML20206K1661999-05-0606 May 1999 Informs of Change in Scheduled Completion Date for Commitments Made in LERs 98-020-00 & 98-020-01.Util Believes That Listed Change Does Not Represent Challenge to Plant Safety ML20206F7401999-05-0505 May 1999 Forwards Application Requesting Consent to Transfer of Dl Ownership Interests in Bvps,Units 1 & 2 to Penn Power & Dl Operating Authority Under FOLs DPR-66 & NPF-73 to Firstenergy Nuclear Operating Co ML20206G3281999-04-30030 April 1999 Forwards 1998 Annual Environ Rept,Radiological & 1998 Annual Environ Rept,Non-Radiological, to Appropriate NRC Parties,Iaw TS 6.9.1.10 ML20206F9711999-04-30030 April 1999 Informs of Resignation of J Witter,License SOP-11376,from Employment at Bvps,Unit 2,per 10CFR50.74(b).Util Requests Withdrawal of Subject License ML20206G2451999-04-30030 April 1999 Forwards Changes to BVPS ERDS Data Point Library,Iaw Requirements of 10CFR50,App E,Section VI.3.a & NUREG-1394, Rev 1,Section 3.6, Administrative Implementation Requirements ML20206F8071999-04-30030 April 1999 Forwards Rev 11 to UFSAR for Bvps,Unit 2, Replacement Pages.Submittal Reflects Changes to Facility & Procedures as Described in Ufsar,Completed During Annual Reporting Period Ending 981031 ML20206G0231999-04-29029 April 1999 Forwards BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031, Per 10CFR50.59.Determination of Changes,Discussed ML20206D8661999-04-27027 April 1999 Withdraws 990426 Request for Enforcement Discretion from Action Statement TS 3.7.13.1,as No Longer Needed ML20206D8701999-04-26026 April 1999 Requests Enforcement Discretion Re Compliance with TS 3.7.13.1 Action Statement,To Allow for Continued Plant Operation Beyond 7 Day Action Time for Sufficient Time to Complete Required Repairs & Perform Post Maint Testing ML20206D8541999-04-23023 April 1999 Advises That T Mccool (License SOP 11372,docket 40464) No Longer Has Need to Maintain Senior Reactor Operator License, Due to Resignation as of 990421 ML20196F6711999-04-23023 April 1999 Requests That Proprietary Info Re LTOP Sys Setpoint Review for Bvps,Unit 2,15 EFPY Heatup & Cooldown Curves,Be Withheld from Public Disclosure IAW 10CFR2.790 ML20205Q6361999-04-13013 April 1999 Forwards Changes Being Made to Data Point Library (Dpl). Six Dpls Noted Below Have Undergone Changes Which Affect Following Radiation Monitor High Alarm Limit Values ML20205P5141999-04-0909 April 1999 Forwards Disk Containing Annual Exposure Rept for 1998. Attachment 1 Is Description of File Structure of Transmitted Data.Without Disk 05000334/LER-1998-015, Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent1999-04-0606 April 1999 Forwards LER 98-015-01, Inadequate Performance of Channel Functional Tests, Per 10CFR50.73(a)(2)(i).Restatement of Corrective Action Provided with Underlined Words to Clarify Intent ML20206N3361999-04-0505 April 1999 Informs NRR of Continued Events Re Transfer of Generation Assets Between Duquesne Light Co & Firstenergy.No Negotiated Settlement Between Firstenergy & Local 270 Pertaining to Generation Asset Swap Has Been Reached ML20205H3691999-03-31031 March 1999 Provides Response to NRC Request to Maintain Change That Was Proposed to Be Deleted in LAR 214 & 81,submitted 980709.New Marked Up TS Pages Are Encl ML20205K1261999-03-30030 March 1999 Forwards Bvps,Unit 1 Facility Changes,Tests & Experiments for 970123-980122, IAW 10CFR50.59.Rept Provides Brief Description of Each Facility & Procedure Change & Summary of SEs ML20205F1121999-03-30030 March 1999 Forwards Info Concerning Dls Decommissioning Planning for Bvps,Units 1 & 2 & Pnpp Unit 1.DL Is Continuing to Utilize External Sinking Funds to Provide Financial Assurance for Nuclear Decommissioning Funding ML20205E0811999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205F1301999-03-29029 March 1999 Responds to NRC 990225 Ltr Re Violations Noted in Insp Repts 50-334/98-11 & 50-412/98-11.Corrective Actions:Cr 990345 Was Written on 990216 to Document Overall Condition in CAP & to Provide Rollup Document Ref Related Corrective Actions ML20205H6171999-03-29029 March 1999 Forwards Util Consolidated Financial Statements for Twelve Month Period Ending 981231 & Internal Cash Flow Projection, Including Actual 1998 Data & Projections for 1999 ML20196K7941999-03-25025 March 1999 Describes Cycle 8 Reload Design & Documents Review IAW 10CFR50.59,including Determination That No Unreviewed Safety Question Involved.Rev 4 to COLR, Changing Figure Numbers Ref on Pages 4.1-1 & 4.1-2,encl ML20205A9351999-03-19019 March 1999 Forwards Response to NRC 990114 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20204H8301999-03-19019 March 1999 Provides 10CFR50.46 Rept of Changes or Errors in ECCS Evaluation Models.Current Schedule for Completion of re- Analyses for Both Large & Small Break LOCA Is June 2000 for Unit 2 & June 2001 for Unit 2 ML20205F6811999-03-19019 March 1999 Forwards Bvps,Units 1 & 2 Annual Radioactive Effluent Release Rept for CY98 & Revs to Offsite Dose Calculation Manual ML20204J6361999-03-17017 March 1999 Forwards Firstenergy Corp Annual Rept for 1998 & 1999 Internal Cash Flow Projection as Evidence of Util Guarantee of Retrospective Premiums Which May Be Served Against Facilities ML20204E9531999-03-16016 March 1999 Forwards Proposed Change to BVPS Units 1 & 2 Operations QA Program Description for NRC Approval,In Accordance with 10CFR50.54(a)(3)(ii) 1999-09-23 Category:UTILITY TO NRC MONTHYEARML20059L4271990-09-0707 September 1990
[Table view]Requests Approval for Use of Steam Generator Tube Plugs for Both Mechanical & Welded Applications ML20059G0821990-09-0404 September 1990 Forwards Application for Amend to License DPR-66,consisting of License Change Request 180,changing Section 3.3.3.2 to Reduce Required Number of Operable Incore Detector Thimbles for Remainder of Cycle 8 ML20059F7551990-08-29029 August 1990 Responds to Unresolved Item 50-334/90-16-01 Noted in Insp Rept 50-334/90-16.Corrective Actions:Initial Training for Maint Group Personnel Responsible for Maintaining Supplied Air Respirators Will Be Supplemented W/Biennial Retraining ML20059F1501990-08-29029 August 1990 Advises That Permanent Replacement Chosen for Plant Independent Safety Evaluation Group.Position Will Be Staffed Effective 900829 ML20028G8731990-08-29029 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71 ML20059D3761990-08-24024 August 1990 Describes Cycle 3 Reload Design,Documents Util Review Per 10CFR50.59 & Provides Determination That No Tech Spec Changes or Unreviewed Safety Questions Involved.Reload Core Design Will Not Adversely Affect Safety of Plant ML20028G8881990-08-24024 August 1990 Withdraws Operator License SOP-10731 (55-60749) Issued to K Gilbert,Who Resigned 05000412/LER-1990-007, Responds to NRC 900724 Ltr Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued1990-08-23023 August 1990 Responds to NRC 900724 Ltr Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued ML20058P7651990-08-14014 August 1990 Provides Info on Acceptability of Rescheduling Response to Reg Guide 1.97 Ser,Item 4b, Neutron Flux Monitoring Instrumentation. Rescheduling of Util Response Will Be Determined on or Shortly After Meeting W/Nrc ML20059E0571990-08-10010 August 1990 Forwards Suppl 3 to Nonproprietary WCAP-12094 & Proprietary WCAP-12093, Evaluation of Pressurizer Surge Line Transients Exceeding 320 F for Beaver Valley Unit 2, for Review by 900901.Proprietary Rept Withheld (Ref 10CFR2.790(b)(4)) ML20059B8141990-08-0101 August 1990 Requests Exemption from 10CFR26 Re Fitness for Duty Program & 10CFR73 Re Physical Protection of Plants & Matls Concerning Unescorted Access Requirements for Nuclear Generating Stations ML20059E7631990-08-0101 August 1990 Provides Results of Util Evaluation of Licensed Operator Requalification Exam Conducted During Wks of 900709 & 16. Crew That Failed to Meet Expected Performance Level Has Been Successfully Upgraded & re-evaluated to Be Satisfactory ML20056A3471990-07-31031 July 1990 Responds to NRC Bulletin 90-001.Items 1 Through 5 of Requested Actions for Operating Reactors Completed ML20056A1841990-07-27027 July 1990 Forwards Revised Methodology for Achieving Alternate Ac for Plant,Per 900720 Telcon ML20055H2581990-07-25025 July 1990 Forwards Decommissioning Rept, Per 10CFR50.33(K) & 50.75(b) ML20055F7061990-07-0909 July 1990 Responds to NRC 900531 Ltr Re Dcrdr Requirements as Specified in Suppl 1 to NUREG-0737.DCRDR Corrective Actions Implemented & Mods Determined to Be Operational Prior to Startup Following Seventh Plant Refueling Outage ML20055D3871990-07-0202 July 1990 Provides Info Re long-term Solution to Action Item 3 of NRC Bulletin 88-008,per 890714 & 900207 Ltrs.Util Will Continue to Monitor Temp in Affected Lines & Evaluate Results ML20058K5031990-06-29029 June 1990 Discusses Use of Emergency Diesel Generators as Alternate Ac Source at multi-unit Sites,Per Licensee 900330 Ltr.Emergency Diesel Generator Load Mgt Methodology Evaluated to Meet Listed Criteria ML20044A3661990-06-21021 June 1990 Forwards Application for Amend to License NPF-73,consisting of Tech Spec Change Request 44,changing Stroke Time to 60 for Inside Containment Letdown Isolation Valves.Change Determined Safe & Involves No Unreviewed Safety Issue ML20043H9341990-06-14014 June 1990 Forwards Issue 1 to Rev 4 to Inservice Testing Program for Pumps & Valves. Issue 1 Removes Relief Requests Requiring Prior NRC Approval & Adds Certain Program Changes Permitted by ASME XI & Generic Ltr 89-04 ML20043G6811990-06-14014 June 1990 Forwards Application for Amends to Licenses DPR-66 & NPF-73, Revising Tech Specs Re Electrical Power Sys - Shutdown & Ac & Dc Distribution - Shutdown ML20043G5981990-06-12012 June 1990 Forwards Monthly Operating Repts for May 1990 for Beaver Valley Units 1 & 2 & Revised Rept for Apr 1990 for Beaver Valley Unit 1 ML20043G7941990-06-12012 June 1990 Responds to NRC 900524 Request for Addl Info Re Proposed Operating License Change Request 156.Clarification of Magnitude of Confidence Level of Westinghouse Setpoint Methodology,As Specified in WCAP-11419,encl ML20043G6851990-06-12012 June 1990 Forwards Application for Amend to License DPR-66,consisting of Proposed OL Change Request 176,revising Tech Specs to Replace Current Single Overpressure Protection Setpoint W/ Curve Based on Temp ML20043H0291990-06-11011 June 1990 Forwards Application for Amend to License NPF-73,consisting of Proposed OL Change Request 40,modifying Heatup & Cooldown Curves Applicable to 10 EFPYs Per WCAP-12406 Re Analysis of Capsule U from Radiation Surveillance Program ML20043G8001990-06-11011 June 1990 Forwards Application for Amend to License NPF-73,consisting of Proposed Operating License Change Request 41.Amend Deletes Surveillance Requirement 4.4.9.3.1.d ML20043F5251990-06-0707 June 1990 Requests Temporary Waiver of Compliance from Tech Spec Limiting Condition for Operation Re Operability of Containment Isolation Valves During Quarterly Slave Relay Testing.Evaluation to Support Request Encl ML20043F1361990-06-0404 June 1990 Advises That Chemistry Manual Chapter 5P1, Enhanced Primary to Secondary Leakrate Monitoring Program for Unit 1,per 880328 Request to Recommit to Item C.1 of NRC Bulletin 88-002 ML20043B5971990-05-18018 May 1990 Advises of Delay in Hiring Independent Safety Evaluation Group Replacement to Maintain Five Permanent Personnel Onsite,Per Tech Spec 6.2.3.2.Replacement Will Be Provided within 30 Days of Retirement of Engineer on 900531 ML20043B0511990-05-15015 May 1990 Responds to Telcon Request for Addl Info Re Elimination of Snubbers on Primary Component Supports.Probability of Case B/G Event Extremely Small & Does Not Represent Realisitic Scenario ML20043B1921990-05-11011 May 1990 Forwards Cycle 8 & Cycle 2 Core Operating Limits Rept,Per Tech Spec 6.9.1.14 ML20042G9761990-05-0808 May 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Repts 50-334/89-80 & 50-412/89-80.Corrective Action:Maint Work Request Program Being Upgraded to Include Responsibilities of Nuclear Const Dept & Will Be Issued by 900601 ML20042G8541990-05-0303 May 1990 Forwards Technical Review,Audit Summary & Operability Assessments Re Potentially Invalid Leak Detection Tests Used as Alternative for Amse Section XI Hydrostatic Tests ML20042G9071990-05-0101 May 1990 Forwards Annual Financial Repts for Duquense Light Co,Ohio Edison Co,Pennsylvania Power Co,Centerior Energy Corp & Toledo Edison Co,Per 10CFR50-71(b) ML20042F1381990-04-30030 April 1990 Advises That Final SER for Implementation of USI A-46 Will Be Delayed Until Late 1990 ML20042F0991990-04-20020 April 1990 Forwards Response to Request for Addl Info Re Second 10 Yr ISI Program ML20012F5951990-04-10010 April 1990 Forwards Monthly Operating Repts for Mar 1990 & Revised Operating Data Rept & Unit Shutdown & Power Reductions Sheets for Jan 1990 ML20042E1471990-04-0404 April 1990 Forwards Application for Amends to Licenses DPR-66 & NPF-73, Consisting of License Change Request 174/36,updating Staff Titles to Reflect Nuclear Group Organization ML20012F6021990-03-30030 March 1990 Submits Supplemental Response to Station Blackout Rule for Plant,Per NUMARC 900104 Ltr.Summary of Changes to Condensate Inventory of Dhr,Effects of Loss of Ventilation, Control Room HVAC & Reactor Coolant Inventory Listed ML20012E3451990-03-23023 March 1990 Submits Addl Info for Exemption from General Design Criteria GDC-57,including Background Info Describing Sys Operation & Addl Bases for Exemption Request.Simplified Recirculation Spray Sys Drawings Encl ML20012E3091990-03-23023 March 1990 Forwards Response to 900308 Request for Addl Info on Reg Guide 1.97 Re Variable for Steam Generator wide-range Level Instrumentation ML20012D6491990-03-19019 March 1990 Requests Retroactive NRC Approval of Temporary Waiver of Compliance Re Tech Spec Limiting Condition for Operation 3.8.2.1 on Ac Vital Bus Operability.Sts Will Be Followed When Inverters Not Providing Power to Vital Bus ML20012E4091990-03-16016 March 1990 Forwards Inservice Insp 90-Day Rept,Beaver Valley Power Station Unit 1,Outage 7, for 880227-891221,per Section XI of ASME Boiler & Pressure Vessel Code 1983 Edition Through Summer 1983 Addenda,Section XI ML20012D6181990-03-15015 March 1990 Responds to NRC 900215 Ltr Re Violations Noted in Insp Repts 50-334/89-23 & 50-412/89-22.Corrective Actions:Safety Injection Signal Reset & Plant Returned to Presafety Injection Conditions & Crew Members Counseled ML20042D7401990-03-14014 March 1990 Forwards Corrected Annual Rept of Number of Personnel Receiving Greater than 100 Mrem & Associated Exposure by Work Function at Plant for CY89. ML20012D5801990-03-13013 March 1990 Forwards Correction to First 10-yr Inservice Insp Program, Rev 2 to Relief Request BV2-C6.10-1 Re Recirculation Spray Pump - Pump Casing Welds & Relief Request Index ML20012D6221990-03-13013 March 1990 Forwards Response to Generic Ltr 89-19, Resolution to USI A-47. Recommends All Westinghouse Plant Designs Provide Automatic Steam Generator Overfill Protection to Mitigate Main Feedwater Overfeed Events ML20012C1791990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Deviations Noted in Insp Repts 50-334/89-25 & 50-412/89-23.Corrective Actions:Written Request Initiated to Identify Unit 2 post-accident Monitoring Recorders in Control Room & Recorders Labeled ML20012E0911990-03-0505 March 1990 Lists Max Primary Property Damage Insurance Coverages for Plant,Per 10CFR50.54(w)(2) ML20012B7051990-03-0202 March 1990 Responds to NRC 900131 Ltr Re Violations Noted in Insp Repts 50-334/90-05 & 50-412/90-04.Requests Withdrawal of Violation Re Stated Transport Problem & Reclassification as Noncompliance,Per 10CFR2,App C,Section G 1990-09-07 |
Text
4 .
$'VL
'A@
ouquesneuct C,*'"* DUQUESNE LICTIT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 March 24, 1982 NDISS1: g
@\ 4, y'(I\
Beave r Valley Power Stat ion, Unit No. I s q Docket No. 50-334, License No. DPR-66 -
App - j-I.ER 82-009/03L t i; , G /fggz j'-
Q' : ll . [ y~ ,
ll Mr. R. C. linynes, Regional Administrator \
lin ed States Nuclear Regulatory Commission 631 Park Avenue Eing of Prussia, Pennsylvania 19406
Dear Mr. Ilaynes:
In accordance with Appendix A, Beaver Valley Technical Specifications, the foilowing Licensee Event Report is submitted:
LER 82-009/03L, Technical Specification 3.8.z.4, Electrical Power Systems, D.C. Distribution - Shutdown.
Ve ry t ru ly you rs ,
l ftpt) i II . P. Williams Superintendent Attachnent f 204050257 820324 PDR ADOCK 05000334 9
${lkl l
"r. fr . C. l'a v n e a
" arch ?!. , 1932 "fil !;::1 : 5 '19 Pa ge :'
cc: Director Of Management & Progran Analysis l'nited States Nuclear Regulatory Connission Washington, D. C. 20555 J. Ilultz, Ohio Edison I Director, Of fice of Inspection and Enforcement IIcadquarters -
United States Nuclear Regulatory Connission Washington, D. C. 20555 D. A. Chaney, BVPS 1.icensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Becknan, Nuclear Regulatory Commission, BVPS Site Inspector ffr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison Records Center, Institute of Nuc1 car Power Operations, Atlanta, Georgia C. E. Muckle, Factory Mutual Engineering, Pittsburgh Arthur Alford, Stone & Uebster/ Boston 9