ML20043H085

From kanterella
Jump to navigation Jump to search
Forwards Reload 9/Cycle 10 Core Operating Limits Rept.
ML20043H085
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/11/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043H086 List:
References
GL-88-16, JPN-90-045, JPN-90-45, NUDOCS 9006210560
Download: ML20043H085 (2)


Text

_ - _ . . _ _ _

1

~~

y 173 Main Strret White Plains. New York *iO601

e8' 914 681 0240 -

-- n'

[ John C. Drons 4# Authority C O lf f ""'  ;

June 11, 1990 L JPN-90-045 l l l U.S. Nuclear Regulatory Commission I 1

ATTN: Document Control Desk Mail Station P1 137 l Washington, D.C. 20555 l

. \

I

SUBJECT:

James A. FitzPatrick Nuclear Power Plant J Docket No. 50333 - 1 Core Operating Umits Report (COLR)

]

REFERENCES:

1. NYPA letter, J.C. Brons to NRC, (JPN-90-006), dated January 12,1990, proposed changes to the Technical Specifications regarding the removal of cycle-specific parameter limits.

l-l 2. NRC Generic Letter 8816, " Removal of Cycle-Specific Parameter Umits from Technical Specifications," dated October 4,1988.

[ 3. NYPA letter, J.C. Brons to NRC, (JPN 90-032), dated April 20, 1990, regarding the removal of cycle-specific parameter, i

Dear Sir:

In Reference 1, the Authority proposed changes to the James A. FitzPatrick Technical Specifications to replace the cycle-specific core operating limits in the Technical Specifications with references to a Core Operating Umits Report (COLR).

These changes were proposed in accordance with the guidance contained in the NRC Generic Letter 8816 (Reference 2).

In Reference 3, the Authority revised the initial application to conform to the NRC staff's interpretation of the Generic Letter, in this letter the Authority committed to submit the Reload 9/ Cycle 10 COLR to the NRC prior to startup from the Reload I: 9/ Cycle 10 refueling outage. Attachment I is the Reload 9/ Cycle 10 COLR.

Should you or your staff have any questions regarding this report, please contact Mr. J. B. Ellmers of my staff.

l l

Very truly yours, l

Jbn C. Brons .

Executive Vice President Nuclear Generation gp2{j@gQg$80 3

- t'\

i

. 1 i

j- .1

  • ) .- oc: Regional Administrator-U.S. Nuclear Regulatory Commission -

475 Allendale Road King of Prussia, PA 19406  ;

Office of the Resident inspector U.S. Nuclear Regulatory Commission i P.O. Box 136 Lycoming,NY 13093 Mr. David E. LaBarge Project Directorate I 1 Division of Reactor Projects l/ll U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, D.C. 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16thFloor i, Albany, NY 12223

}'

1 -

f .}'-