ML20012C982

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement
ML20012C982
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/13/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20012C983 List:
References
JPN-90-023, JPN-90-23, NUDOCS 9003260243
Download: ML20012C982 (2)


Text

{{#Wiki_filter:I-l- 123 Main Street

      $   e        White Plains. NewWrk10501
    *
  • 914 681.6240 s

an,i h [ John C. Brons' Executive Vice President UUB Nuclear Generation March 13, 1990-JPN-90-023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mall Station P1 137 Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Proposed Change to the Technical Specifications Regarding LPCI MOV q Independent Power Supply (JPTS-85-010) {

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical , Specifications proposes a change to Section 4.9.F, "LPCI MOV Independent Power Supplies," (IPS) on page 222a. This change is purely editorial in nature and revises I Surveillance Requirement 4.9.F.6 to clearly identify the circuit breakers used for determining IPS operabi'ity. These circuit breakers are on the input side of the battery chargers, not the output side as currently indicated. Enclosed for filing is the signed original of a document entitled " Application for Amendment to Operating License," with Attachments I and ll thereto, comprising a  : statement of the proposed change to the Technical Specifications and the associated Safety Evaluation. In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to tho designated New York State official. 4 Should you or your staff have any questions regarding the proposed changes, please contact Ms. S. M. Toth of my staff. 9003260243 900313 D '

            -{DR      ADOCK 05000333             !?

e / Pnr: j g i hohn . rons Executive Vice President  ! Nuclear Generation

cc: - U.S. Nuclear Regulatory Commission 475 Allendale Road

         ' King of Prussia, PA 19406 Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. David E. LaBarge Project Directorate I 1 Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York State Energy Office 2 Empire State Plaza .                                               i 16th Floor                                                             '

Albany, NY 12223 i

                                                                                  )

i i i i i

                                                                               ,4 e
                                                /
                                                                               'l
                                                                                  ,}}