Notifies Second 10-yr Inservice Insp Interval Scheduled to End in Jul 1995 & Valve Insp During 1990,91 & 93 Refueling Outages
ML20006E332
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/08/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JPN-90-014, JPN-90-14, NUDOCS 9002220685
Download: ML20006E332 (2)


Text

^ ~ ~

}.

, n, _

~'

'p' " 1 .

' 123 M:in Strset . . ..

White Plains,NewWrk 10601 '

s 914 CB1.rJ40 '

7

  • Mhk *

[ '

John C. Brons Executive Vice President .

Nucicar Generation 1%bruary 8,1990.

JPN-90-014

- U. S. Nuclear Regulatory Commission Mall Station P1137 Washington, D.C. 20555

' ATTENTION: Document Control Desk

SUBJECT:

James. A. FitzPatrick Nuclear Power Plant Docket No. 50-333 l Responseto ist10 YearInservice l

' Inspection interval Relief Request

Reference:

1. NRC letter, R. A. Capra to J. C. Brons, dated December 26,1989, "1st

, 10 year Interval Inservice Inspection Relief Requests."

i

Dear Sir:

- In_ Reference 1, the NRC informed the Authority that two relief requeMs, R5 and R7, were denied for the 1st 10 year Inservice inspection (ISI) Interval. The NRC roquested a schedule for completion of the activities discussed in the relief requests. These involve the 100%

-)

visual examination of retalning bolting less than 2 inches in diameter. Request R5 is associated with Class 1 piping pressure retaining bolting in flanges A, B, C and D of the i Residual Heat Removal System head spray line. Request R7 is associated with valve l pressure retaining bolting, Examination Category B-G-2, item B6.9.

The Authority has scheduled the required inspections to be completed during the 2nd 10 -

year ISI interval for the James'A. FitzPatrick Nuclear Power Plant as part of the normally ,

scheduled code required inspections. The 2nd 10 year ISI interval is scheduled to end in 1 July 1995. The valve inspections will be completed during the 1990,1991 and 1993 i refueling outages, j Should you or your staff have any questions regarding this matter, please contact {

g , - Ms. S. M.-Toth of my staff. ;j u

Very truly yours, -

g 2 )

w -

ohn .Brons i ecutive Vice President Nuclear Generation i cc: See next page.

Ok '

now.rosu n e ow -

4 ppg. t6 odo Tt 3 P p c.

6l

,<  % Q > ,

+ r  ; [,

m. ,

, a

.,f~f,. .

p

'~

cc: U.S. Nuclear Regulatory Commission Region 1-475 Allendale Road  ;

. King of Piussia, PA 19406 .,

Office of the Resident inspector

~ U.S. Nuclear Regulatory Commission ,

P.O. Box 136 Lycoming, NY 13093 .

r Mr. David LaBarge .

Project Directorate 11: y Division of Reactor Projects 1/II U.S. Nuclear Regulatory Commission Mail Stop 14 B2 ~

Washington, D.C. 00555 r

-i

)

o x

.j

.i j

f

?

' O. * .y

,