Forwards Second 10-yr ISI Interval Relief Requests for Review by 931101 to Allow Scheduling of Appropriate Insp Requirements for Unit 1.Test & Insp Intervals Scheduled to End in Oct 1993 & May 1994 for Units 1 & 2,respectively
ML18151A669
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/26/1993
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-002, 93-2, NUDOCS 9302020142
Download: ML18151A669 (51)


Text

l '

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 26, 1993 United States Nuclear Regulatory Commission Serial No.93-002 Attention: Document Control Desk SPS/ETS Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 SECOND TEN VEAR INSERVICE INSPECTION INTERVAL RELIEF REQUESTS Surry Power Station Units 1 and 2 are currently in the third periods of their second ten year intervals. The test and inspection intervals are scheduled to end in October 1993 and May 1994 for Surry Units 1 and 2, respectively. The Code of reference for both units is the 1980 Edition, Winter 1980 Addendum of ASME Section XI. Several Code requirements have been identified as impractical and need to be addressed to close out the second interval test and inspection requirements. Thus, pursuant to 10 CFR 50.55a(g)(5), we are requesting relief from specific Code requirements for Surry Units 1 and 2. The basis for each relief request is provided in Attachment 1 of this letter.

As permitted by Paragraph IWA-2400(c) of the Code, Units 1 and 2 will be extending their inspection intervals by one year to complete remaining examinations. The required examinations will be completed in the 1994 refueling outage for both Units 1 and 2. The Unit 1 refueling outage is currently scheduled to begin in February 1994. Therefore, your review is requested by November 1, 1993 to allow scheduling of the appropriate inspection requirements for Unit 1.

These requests have been reviewed by the Station Nuclear Safety and Operating Committee.

If you have questions regarding this information, please contact us.

Very tru1,-~ours, J. \L.::y\Jl,:"IJ '\*-----*

d-r_:_,

W. L. Stewart

. ~--

Senior Vice President - Nuclear Attachment

1. Unit 1 and 2 Relief Requests

,-** 9302020142 930.i°26- --- ..

!;PR. ADOCK 05000280 yt' PDR

t '

cc:

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station

/,

Attachment 1 Surry Units 1 and 2 ISi Relief Requests

'I l

,(

  • Relief Request SR-015 I. Identification of Components System: Reactor Coolant System components: Reactor Coolant Pump casing internal surfaces Component Item Class 1-RC-P-lA casing 1 1-RC-P-lB Casing 1 1-RC-P-lC Casing 1 (Drawings attached)

II. Impractical Code Requirements category B-L-2, Pump Casings, Item number B12.20 requires a visual, VT-3, examination be conducted on the pump casing internal surfaces of one pump performing similar functions.

III. Basis For Relief Performance of the Code required visual examination requires that the pump be disassembled to allow access to the pumps internal surfaces. Previously this examination was scheduled in conjunction with the Code required volumetric examination on the pump casing weld, which also required pump disassembly. Code Case N-481, Alternate Examination Requirements for Cast Austenitic Pump Casings Section XI, Division 1, will be used in lieu of the volumetric examination required by Table IWB 2500-1, Category B-L-1, Item B12.10. Requiring pump disassembly for the Code visual examination is impractical considering the cost and dose required to perform this action *

. IV. Alternate requirements A technical evaluation addressing the safety and serviceability of the pump casing has been performed and separately submitted to the NRC on October 26, 1992 (Serial#

92-671) as required by Code Case N-481. The alternate inspection requirements will be implemented, which includes the performance of a VT-3 visual examination of the internal surfaces, whenever the pump is disassembled for maintenance.

This requirement is similar to the provisions of the 1989 Edition of ASME Section XI in Table IWB-2500-1, Category B-L-2.

l 8 7 6 5 4 3 2 l.f'PER SEAL HOUSJNr. BOLTS F ' A 1 S E E IJUB-WMKS-RC-P*JA.21 F

  • SEAL HOUSIIIG ASSEMBLY -

LOWER SEAL HOUSING B O L T S ~

MAIN FLANGE BOLTS 24 BOLTS 4.5" OJA Sl.f'PORT COLUMN LOCATION HAIN FLANGE SEE DETAIL I ITTPI E E COE*51 INTEGRAL! T CAST SUPPORT FOOT ITYP. OF 41 CSEE SECTION A-A 11449-WMKS*RC*P*JA.2 FOR PUMP DETAILS!

CDB-31 D D TO 11449

  • WMKS*lllllllAZ*J CDE*61 LOOP I COLOLEG HAIN HANGER STUD C ASSEHBL Y CTYPJ C PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME B B

~ VIRGINIA POWER DETAIL 1 ~ NORTH CAROLINA POWER POWER Er<<lll:EERIIIJ SERVICES TYPICAL SUPPORT Alocotl, YlllllltlA CROSSECTIDNAL VIEW COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:1-RC-P-lA A SURRY POWErt STATION UNIT 1 A INIT JAL ISSUE VIRGINIA POWER D!DI SI.PY II' ACPlllllHAJ

" D!DI IJMI MES /CLW Dl!O'l. [IOI 'J!.-1 t_

C"II 1111.

IJIIIWIICI IC!, R[Y.

rlrCT:":r-T'."T"."T-r--Y-~--Y-F:.:..:..=~::.-i:Ll:.:oo:..:..:~=~=-l 11"1"18-WMKS-RC-P-IA.I 0 WILE NONE lll.[SS OJ~RIIISE ICJtED SM I ~ 2

___________;'---------------------------------------~-----------'----*-------'---------------------

12-JAN* Jqqe gq, 15

.,,.. "",. r ,r.£: 19,.. r ~nr-rcwcwr-1111 rir*1 2

~-------------------------------:---------------------------

B 7 6 5 4 3 2 UPPER SEAL HOUSING 80\. TS ,./'

F ' AISEE 11448-WMKS*RC*P*IB.21 *F SUPPORT COLUHH LOCATION HAIN FLANGE SEE DETAIL I ITYPJ E E HOHOBAlL ASSEMBLY INTEGRALLY CAST SUPPORT FOOT iTYP. OF 41 ISEE SECTIOH A*A 11448-WMKS*RC*P*IB.2 FOR PU1P DETAILS>

laB-31 D D MOHOBAlL ASSEHBLY HAIN HANGER STUD LOOP 2 COI.DI.EG ASSEHBL Y CTYPI C C

LOWER LEG PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME B B VIRGINIA POWER NORTH CAROLINA POWER DETAIL I - A ENGIIEEAIICI SEAYICES TYPICAL SUPPORT All>>OCI. YIAOIIUA CROSSECllDNAL VIEW COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:1-RC-P-18 A

SURRY POWER STATION UNIT 1 A INITIAL ISSUE VIRGINIA POWER e RCPBlll!IIBI lllMI MES /CLW DI...,_ (IOI a>-.,11:.. IJMIICI Ill. REY, lr.r.::T::-r:;r:r.:-r.-r1'!1'-rt--........:.......:...+L£c::..,....:.....:,'°'-...c..=.:..:.:...--i 114-18-WMICS*RC-P* IB.1 0 SC<II.£ NONE lM.[S'I 01tA11SE ICf[D !iH I rF 1 L.:.L.l_ _ ___;__ ___:'...___ _ _ _ _......:....._ _ _ _ _ _....c__ _ _ _ _ _ _ _ _ _ _ _- - ' ,_ _ _ _ _ _ _ _ _ _ _ _ _ 2_ _ _ _ _ _ _ _ _ _ _ *- -

12*JAN* lqqe B8155 QSA31 I 355, ee I JRCP00B 18 I. OGN

8 7 6 5 4 3 2 Lf'PER SEAL HOUSING 80L TS

' A I S E E 11448-WM<S-RC-P-IC.21 F F SEAL HOUSING ASSEMBLY -

LOWER SEAL t<<lUSINGBOLTS~

MAIN FLANGE BOLT 5 24 .BOLTS 4.!1" DIA SUPPORT COLUMN LOCATION MAIN FLANGE SEE DETAIL I ITTPI E E HONOIIALL ASSEMBLY INTEGRALLY CAST SUPPORT FOOT llYP. OF 41 ISEE SECTION A-A 11448-WMKS-RC-P-IC.2 FOR PUMP DETAILS>

IGB-31 D D MAIN HANGER STUD C ASSEHBL T ITTPI C PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME B B Ii. SUCTION ~ VIRGINIA POWER DETAIL I ~ NORTH CAROLINA POWER POWER ENOIIEERIIG 6ERYICES TYPICAL SUPPORT RIDffNJ,VIRIIIIWI CROSSECTIONAL VJEW COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:1-RC-P-lC A SURRY POWER STATION UNIT 1 A INITIAL ISSUE VIRGINIA POWER e ll50I IJ5IJI QI'¥ Jl1' c,o ICI, RCP1!001CI DIMI MES/CLW DI""'- t- Q,..\lt_ ,....,ICI ICI. IW:Y.

lrT.::-rr,-crr-r-t<<r-r-t---'-::.::.!-==.+Lt:.:ooc::...:r_=~::u:-J 11448-WMKS-RC-P-IC.I 0

'-"LE NONE IN.ESI 0flRIIS£ ICJf(O SH I CF 2 2

12-JAN- Jqqe 0qr07 QSAJ1 [ 355. ee J IRCP00BJC J. [11;11

  • r ... .I
  • Relief Request SR-016 I. Identification of Components system: Reactor Coolant, -Safety Injection, and Residual Heat Removal Component: Class 1 valves greater than 4 inches in diameter (4 NFS)

II. Impractical Code Requirements Table IWB-2500, Category B-M-2, item B12.40 requires that a visual, VT-3 examination be performed on the valves internal surfaces. As an alternative to this Code requirement we proposed, by previous relief request SR-001, that valves not disassembled for maintenance during the interval would have a ultrasonic (UT) wall thickness measurement performed in lieu of the visual examination and valve disassembly. This relief request was approved by letter, serial# 91-189, dated March 14, 1991.

III. Basis for Relief The provision to perform an ultrasonic thickness examination on valves not disassembled for maintenance, in lieu of the required visual examination, was suggested by the NRC during initial discussions held concerning relief request SR-001.

The extent and acceptance criteria of these alternative examinations were not discussed. Valves typically have an irregular interior and exterior surface by design.

Correlating measurements with manufacturers drawings and then determining the acceptability of the measurement could only be described as "best effort." The meaningfulness of the examinations and the resultant exposure has called into question the practicality of performing these ultrasonic thickness examinations. The 1989 Edition of ASME Section XI has eliminated the requirement to disassemble valves for examination only. As such under the provisions of 10 CFR 50.55a(g)4(iv), we request the use of the 1989 Edition of ASME Section XI for examinations identified in category B-M-2, item B12.50, for valve bodies exceeding NPS 4, and withdraw our previous relief request SR-001.

IV. Alternate Requirements The 1989 Edition of ASME Section XI Category B-M-2, item B12.50 and corresponding notes 2 and 3 within the category shall be followed. This will allow the visual examinations to coincide with valve disassembly required by maintenance, repair, or other required valve openings.

    • l
  • Relief Request SR-017 I ~* Identification of Components systems: outside Recirculation Spray and Safety Injection components: Pump casing welds identified below component Weld Class 1-RS-P-2A 2-01 2 1-RS-P-2A 2-02 2 1-RS-P-2A 2-03 2 1-RS-P-2A 2-04 2 1-RS-P-2B 2-01 2 1-RS-P-2B 2-02 2 1-RS-P-2B 2-03 2 1-RS-P-2B 2-04 2 1-SI-P-lA 2-01 2 1-SI-P-lA 2-02 2 1-SI-P-lA 2-03 2 1-SI-P-lA 2-04 2 1-SI-P-lB 2-01 2 1-SI-P-lB 2-02 2 1-SI-P-lB 2-03 2 1-SI-P-lB 2-04 2 (Drawings attached)

II. Impractical Code Requirements category c-G, Item C6.10, Pump Casing Welds, requires that a surface examination be performed on 100% of the welds each interval. The examination can be limited to one pump in the case of multiple pumps of similar design, size, function, and service in a system.

III. Basis For Relief These pumps are vertical, two-stage, centrifugal pumps, with an extended shaft and casing to allow suction from the containment sump. The motor and mechanical seals of the pumps are located at about the 12 foot elevation and the bottom of the casing at about the -30 foot elevation. The welds identified are at the bottom of the pump casing, and are embedded within the concrete building structure. This makes the welds inaccessible from the outside. The small diameter of the casing (24 inch. O.D.) and the pump shaft prevent examination from the inside diameter.

IV. Alternate Requirements A remote visual examination (VT-1) of the accessible portions of the I.D. of the pump casing welds will be performed only if the pump is disassembled and the pump shaft removed for maintenance.

8 7 6 5 4 3 2 l LONGITl.OIHAl WELD .

~

F F Ar~

D OUTSIDE RECIRC


*~

SPRAY PUMP DET A D D E E TO 11448

- Vl<<S* 8123N I glJL CeE-21 IB"-RS-~- lmi B l2'SCH 485 PIPE

  • I I* 3,4*

I D CAN DRAIN D ll'PIPEI DET B SECT A-A SEE 1'448*FY*5A CDET El FOR VIBRATION PLATE DETAIL

'I "I 1, Mr C C

~4 DET C DET E B B

.).._ DETAIL A 21!1 - I 3,e* DIA HOLES a~ VIRGINIA POWER

~TH CAROLINA POWER PO!IEII EICIIIEEIIIICI SEIIYICES RIDNJCJ, VIIIIIIIIA SECT B-B INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:1-RS-P-2A A SURRY POWER STATION UNIT 1 A INITIAL ISSUE VIRGINIA POWER

"'° ICI. RSPBBB2AI IIUn OTKR'IIE IClrtD 1>t I or 2 2

F F D OUTSIDE RECIRC SPRAY PUMP DET A D D E E IZ'SCH TO 11448 41lS PIPE

  • IMCS*lll123N2

,...,,,,..IIIE.,,.,,..-..,.,",....,.,,~~B

I

/'

D CAN DRAIN D ll'PIPE>

SECT A-A OET B

'I

  • 1 1* 3/8' .

C C BOWL BASE LUBE LINES ~4 DET C DET E B' 8

)__ DETAIL A 2ll - I 3/8' DIA HOLES DETAIL B 4 VIROINIA POWER V tmTH CARQ..INA POWER POIEll EIGIIEERIIG GERYICH RIDMNJ, V11111111A SECT B-B INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:1-RS-P-28 A SURRY POWER STATION UNIT 1 fl INITIAL ISSlE VIRGINIA POWER

&N.EC11 OfKR'WUE IICJT[D CiH I CF 2 B 7 2 JJ-JAN- Jq'!ll re,eq


==-====~==----- --

8 7 6 5 4 3 2 F F LOWHEAO SAFETY INJECll ON PUMP HOTOR E E TO 11448 COVER

-IIHKS-11127CI IIF-21 EL 15'-'I' 12'SCH 415 PIPE IB'-Sl-84-152-

'\

D 'I D

SECT A-A 2'Xl/2'TII< RING IIELOEO TO CASIIG ACCESSIBLE . EL 12'-r


------ INACCESSIBLE DET B C C 3/9" WALL THICICIESS DET E B ) - SE£ DETAIL A B 2-112 DET C

- VIRGINIA POWER V NORTH CAROLINA POWER l'OIIEII EIIIIIIEEIIIIII SERVICES RIDNNJ,YIIIIINIA INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMP:1-SI-P-lA AL...-------.--T-------,-,------T""T"-------,-r-------.-,-------; SURRY POWER STATION UNIT 1 A INITIAL ISSUE VIRGINIA POWER SIPellBIAI

..: :-;~

..:JM.1:....11*:.,--.*n

~-*-*u

.,.._ ., .. -M****~-- I ... ---- . b ......... I ..... *.****-***!I ~"'!.*-~-.. 3. ~.: .

  • ,;t.*:":;(f',1<1 . ,..... : .... **=i.-:~

~- . . *.: *.:{:i<'**. _:,.-rt.

..~

. ~

  • F

~

. *~* : ;~. F r:, .. ~*

ICJTDA

\*

. \

~

i::

E TD 114411

\

, E

-11M<S*ll27C2 I,** C IID-JI

n. 1!1'*"' 12"SCH 415 PIPE 1r-s1-11J-t!IZ*

~-

D 'I I D I

SEE 11448-FV*!SA IDET El FDR YIBRATION Pl.ATE DETAIL SECT A-A 2'Xl/2'TltC RING WELDED TD CASIIG


_______ ACCESSIIILE ___ n. 12'-F __

INACCESSIBI..E

[

C 3/B' VALL THICIOESS DEY E laA*!II B

DEY C A

U, VIRGINIA POWER NmTH CM!l.lNA POWER PIIIIEli EIGINmlllG CEA'lltEI IIIDIINJ, '11111NIA INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMPd-SI-P-18 AL..------.-,..-------,-,-------ri..-------,,------.-,r------t SURRY POWER STATION UNIT 1 INIT IAL ISSUE VIRGINIA POWER OIIII 1111. S1Pllla1BI lkDI lll>OIIIE 11111D .. I 17 Z

....,.,.... ,.,,"Ir.

  • J
  • Relief Request 24 I. Identification of Components system: Auxiliary Feedwater (AFW) component: Piping and components between the following valves:

Valves Line Valves Class 1-FW-145 1-WAPD-15-601 1-FW-149 3 1-FW-146 3 1-FW-609 3 1-FW-160 1-WAPD-17-601 1-FW-164 3 1-FW-161 3 1-FW-608 3 1-FW-175 1-WAPD-20-601 1-FW-179 3 1-FW-176 3 1-FW-607 3 (Drawing Attached)

II. Impractical Code Requirements ISI Class 3 System Hydrostatic Test required in IWD-5223 of ASME Section XI, where design pressure is 1432 psig and the resultant test pressure is 1576 psig.

III. Basis For Relief Three pressure reducing orifices 1-FW-RO-lOOA, 1-FW-RO-lOOB, and 1-FW-RO-lOOC provide during normal operation a pressure drop from approximately 1200 psig to 110 psig. The system design takes advantage of this pressure drop by incorporating lower pressure rated piping downstream of the orifices. However the higher pressure rated piping continues beyond the orifices for some distance. The actual pipe design pressure class change occurs at downstream check valves 1-FW-148, 1-FW-163, and 1-FW-178 and manual valves, 1-FW-146, 1-FW-161, and 1-FW-176. The check valve operation, however, does not allow separation of the lower pressure class system, when testing the higher class piping in accordance with IWD-5223. IWD-5223 would require a test pressure of 1576 psig on the higher pressure class components in question. The downstream connecting piping has a design pressure of 150 psig and a corresponding test pressure of only 165 psig. As such, the connecting components would be overpressurized during the required Section XI test. The test boundary could be backed up to manual isolation valves 1-FW-147, 1-FW-162, and 1-FW-177, however hydrostatically testing this test boundary would also pressurize the auxiliary feedwater pumps and their suction connection. These pumps have welded discharge connections and cannot be isolated from the test boundary due to the absence of a drain or vent valve in the area

,,

  • J identified above. There is a flange connection on the suction side of each pump, however using this flange for isolation purposes is considered difficult due to the piping arrangement, and susceptibility to cold spring misalignment problems. Typically centrifugal pumps are hydrostatically tested at a pressure based on the suction side of the pump as described in IWA-5224(d) of the Code, which prevents any potential overpressurization concerns, or the need to use pump flanges as isolation points. The basis for relief then is two-fold. The first impracticality is the overpressurization of piping and components downstream of the pressure reducing orifice and the design pressure class rating change. The second impracticality is the incorporation of the auxiliary feedwater pumps into the test boundary due to the lack of vent, drain, and manual isolation valves.

IV. Alternate Testing The identified components will be tested in accordance with IWD-5222, Functional test requirements, in conjunction with the associated auxiliary feedwater pump at normal operating pressure.

TL._. _______ -*-*- -*-*- _-*- ______ -*-*- _~ ~~£~0- w~-l~- _____________ _.! . ___________ /_~~~~I-~£ -P~~~t~-r~:.-*-*-*-*-*-*-*-*-*-*-*-*-*-*-

- * - - **** * *** - - * * - * - I i!

i!

~

LPt11111r11,m1<<111WN1CIMlrlle.

.:,L

-.... ..,nara, ro IMT*I CDMCI (11.-H* .......... S2 t*WO*dEPI*

n.

11..,........

"'uu1-n... 111 ft. U ~ . . _

a*t111C1111---.~~m11GflWTICICNa'IICI.

a. un*-nt*hl ,a.a,,..~T11r1tt*

trru

"-9,0 . . . . . ~ CE&Mnllll *l'!Wall C'CIIIII

~~*N11tr:crD11tn1D1

"--lllncar ---...UO.lbl Hll"tfl D D IIIQ.at,U'Ul _ __..l:MlrN hllTlflll"IUUillflllN~

C CD::.:..n:i: =.,r.~=~'.t'"a.~~~~c:,,:c..=,1:t'!D l.K,MIICI.IU.-.

,-i *-*-*- *-*-*-* -.-*-* <!) ::::~J::.~_:.,:'"'ltt ~m... n *11e rtmi **

8 i

!~

li i

!*i I

! §~ . tU,.l"flllOlflolll'IIIQIICI. Cr, ll44e*rH *0GOA JR

!f iii '

e.. = I ... ICI" *

,"".!\ VIRGINIA POWER
\.JI NORTH CAROi. lNA POWER

! JrUUM (1Gllr[*1HD S[lty,C[I

  • rCNOG.Yl"OllflA ISi CLASSIFICATIOll BOUNDARY DRAWmG.-.

Ff.EDWAlrR SYSIFH '

sunnv POW[R STATIOFJ UIJII I VIRGINIA POWER

--- DIOl ....... "4 tllft tfrOII - -

~r-,r,~-r-.--,---,--r--.-,--+.,.,.-c:---t,cc,.,~,~--,,-,,---

CIII0110.l1*1a****1

_ ; j ~ - - - **.

11441!1*(8),f 061!A J".;

  • Relief Request 25 I. Identification of Components System: circulating and Service Water Component: Piping and components between the following valves:

Valves Line#/Component Valves Class 1-SW-499 8"-WS-480-21X/ 1-SW-311/ 3 and 6 11 -WS-483-21X/ 1-SW-321/ 3 2-SW-476 6 11 -WS-484-21X 2-SW-331 3 1-SW-317/ 1-VS-S-lA 1-SW-346 3 1-SW-327/ and and 2-SW-337 1-VS-S-lB 2-SW-344 3 (Drawing Attached)

II. Impractical Code Requirements ISI Class 3 System Hydrostatic test required by IWD-5223 of ASME Section XI, where the design pressure is listed as 50 psig and test pressure is 55 psig.

III. Basis For Relief Technical Specifications 3.14C requires, "There shall be an operating service water flow path to and from one operating main control and emergency switchgear rooms air conditioning condenser and at least one operable service water flow path to and from at least one operable main control and emergency switchgear rooms air conditioning condenser whenever fuel is loaded in reactor core." By design there are only two supply headers and strainers associated with this common unit air conditioning system. This Specification requires that the components identified always be operating or operable, while either of our two units have fuel in the reactor core. A technical Specification change was submitted September 4, 1992 (Serial No.92-579), to provide a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> action statement for the service water headers. If this is approved, routine maintenance could be performed within the action statement guidelines. However, challenging the proposed action statement with a hydrostatic test (ten-year or post maintenance) is seen as excessive, potentiaily forcing a dual unit outage should problems occur, and impractical when compared to the proposed alternative in this low pressure system.

IV. Alternate Testing The lines and components in question are gravity fed from the in-take canal from lines providing water to both units main condensers. In lieu of the Code required hydrostatic test it is requested that a system inservice test, IWD-5221 be performed in conjunction with a visual (VT-2) examination of the accessible areas.

L a z L ""'

  • _a naNJ r1 IDD9CIICIID ,111 ~ anoaTD KN 9Urlll>

~

l*VS*

c0t1r:1~ tJa,1f~

a a. .....,..

ti, IH.......79

12. UH* ....,.,.,.

... u,q--,,-

PUlll/191~1-* ...U *Tlllfflftlll fL.alfWOif ilUQIIIIIUlllaU19Q & . - U *TIii l'l'l!DI ft.GI a I O I ~ "llffCTDI I CDClhC *TOI CHILLER CONQ£NSEA

"'11,._..,. fl.Ol/'llll~fNIIISll'l'ltl*TP I\.Ol/'llll~t-*...n*l'UI D

lff'IIIIU:10MWIIJI L~II&& .e&.,IIUU1DIDIOll'tC.0C

(!U.at;.~'!'; I" 'I ':'tt":":'T'!'":C,.~

~

. ©5.. ~,i:1.n-a:=-i~=~

= =~.~~=-IUCJllnlDOCINJff CD:rn:~,='C::.mia.a-:,':f1~1rr1111ca.n,111~

C CD.= :':oai:r-: t=~""'~-"t'7.":C::m:.r.-m1

'1Drl'IOl"Olilll'IIIIICI, 11449-FH *8710

~4

("~ VIROINIA PDVER

\J NORTH CAROL I NA PD VER JU3.!lfll (JGIICUUJIG 1Dtua,

~IDKNl*,IIIOINIA ISi CLASSIFICATION BOUNDARY DRAWING ClllCULATING & SERVICE WATER SYSlfM SURllY POWER SIATION UNIT I VIRGINIA POWER Dll'lllltllC DIU\.lldlll--ll"IIIIIGllll, u., 10 " 11449-CBM*l71D 7

/:

1DS,1m.11111111ui1"'.9'11

. . .. I

- Relief Request 26 I. Identification of Components System: Circulating and Service Water Component: Piping and components between the following valves:

Valves Lines Valves Class 1-SW-MOV-102A 42"-WS-13-10 1-SW-37 3 and and 1-SW-33 3 1-SW-MOV-102B 42"-WS-12-10 1-SW-29 3 1-SW-25 3 (Drawing Attached)

II. Impractical Code Requirements ISI Class 3 System Hydrostatic Test as required by IWD-5223 of ASME Section XI, where the design pressure is 25 psig and the corresponding test pressure is 28 psig.

III. Basis For Relief Technical Specification 3.14 requires service water flow to and from the component cooling water heat exchangers. One unit operation requires two component cooling water heat exchangers, while two unit operation requires three component cooling water heat exchangers. Additionally Technical Specifications 3.5 and 3.10 provide requirements associated with component cooling operability for core residual heat removal in both unit operation and refueling modes. The identified supply header to the component cooling water_heat exchangers is the only source of cooling water to these components. Conducting the Code required hydrostatic test would require isolation of all four component cooling water heat exchangers, placing the unit(s) in conflict with Technical Specifications as previously discussed.

IV. Alternate Testing The lines and components identified are gravity fed from the in-take canal from lines providing water to the main condensers. As an alternative, a system inservice test to the requirements of IWD-5221 and the corresponding visual (VT-2) examination of the accessible areas will be conducted in lieu of the Code hydrostatic test.

j iJ i.. ... ..... .....

..*., tJlllO*W9:)-9ttll 8 8 r' - - ---*-*-*- - -*-*- - - - - - - - - - - - - - - - - - * - - - - - - - - - - - - - - - * - - - - * - * * * * - - - - - - - - * - - * - - - - - - - - - - --- i L~1C1rt\.ma,ar1c, naiaowtc..

!!!!!! *I"*.

I r - - * - - * - -*- - - - - j ~ I

~.IIIIOII

~

L 1-<Y-U*C I *<*-U*lft LCIUTm 111 ICJIII* ..,, I I O *Mcr1,n,,.,111:u

.,.,. . . . . , l ' - . ... IIIQ.

11Ut4"' .. ,IO..._I 110,-., ...... J

~------4 "*fih:&i* t-<1100- ..., , .... ,

F~ .::4* -N!',~J

~

11141 ....... ,,.......

ii'- flll lGllf.._ lVPIJIICI IRMdCLIU IIGT lrll f"CI laiWNl.

a. u1q4t1. .,1 n . c . . , o ~ r a ,.,,..

n uu.4}t-,X PlOll/'fOII O&IOlllluKILIIMI . . . . a *mi STIIOI

... 11 ... ..,...,., L'LOlll'IOI ~ I N i I IPltCl *l'DI ITIIO-ft. 11,.,_.,.,,. now, 1'111 ~ - cm.JC *rt* ,u,p,i au,.,..,,...,.,.. P1.0111101~*,au,.~1,11D1 11UIQ4't-1PI PUllllOl~hlilf'OllllloTl::IIIIYllltJI

  • u*q..,...,,c PUll/'fOll~-rpt,Ll'MTDlll"flN

... ll..a4t*IWJ11 FUJI I IOI ~ I N ! llt. . I. cum..ra

.. IMl-nHIJIFll71 '1.Cill I tQI ~COCJDUT( I \ L ~ l.,t'N ILII... .......,. PUllnQll~rbTICMl'llrlrDI U. uo,_l141 '1.Clll10I ~ T I M m.<<MTIII * ~ 11'1 IS.11111.f'lt-l- FUllf'10IIIO~IDIGlllllll*lttM n, l<t-C*Mii 110, ....... ,14.""-*

D f'IDll-<<1'**

uu,.--.... ,.-..0..,

L11,.. -cai. ....... 9LI 1.11,.. -..na.*1

s. 11, ... ...,....,"' .... ,

IIIQ.-sllf'IC.HIQlll~DIIIIWNI n1lftOJIOl11,~1,c ~ rnr~

t111,11c* """1U111 11111te c.wPC Dlllr.,...

~

C <D~,smL~~~t.ru:ao.....J.:.ra~MMI-! ::.-:'.;: .:,v.::,t.-*"

. ~a~:'IU

. 1

'CI)=!':'~t:'1&2.:""1.11.-:r~~M"tlDIIICLAII J I i i ~

f'IOll<:t"l*IC 1101411 ..7111,MI fDl-<<"l*IC u.., ........,14, . . . . CD n*41-<8'1-VPC n . , 111 ,....,. ICDN r, - .

CD !:1 :~a'":l-4:li lfi:l~~=* t..~'.:C.."t~l!'ftN CD~::ri: m":l,L~~r::~-!i~..~m~~** ..,"....

!;!-:;sri::~r.~~z~~:7:r;:::cli.'"'l- r.

no.

~~-.. . .

l<t-C*IO fD l<t"l*IO CAUTION,

....,.......,~I",* ,....IM,, *

~e~~~t*~~a.~1~~

11 ...........

B e

.,.., 11111111!JIDl:'IClll"IICIII

,u,wrfflll~IIIGIIID, ll44B*FH *071A 0 YIROINIA POWER NORTH CAROL I NA POWER tl.Q[M fHGIJ<<(IIINJ ltllWICU IIIC>NlfCJ,t'l,-,INIIIII ISi CLASSIFICATION BOUNDARY DRAWING CIRCULATING AND SERVICE WATEH SYSlfM SIJRRY POWER STATION UNIT I VIRGINIA POWER Dl9'1. 1111)111 - - l*l'UCl ICJ.

114 HH-l--t-t..+/-..ls;;t,,ri.,d-+.-ct..t-PIH"-'t*"'f.a;;t.;;;f,;ct.;;;i;.t-:-t;:;ct..-t::-r"t-EHr...1"°";;;.t;;;;taf.t'=t;c.t..t::t~:t:t-:'t-.1..r-lwi~H:..!..t-::-f"'l::+/-'+"l;a.la.t;;+/-.aF.;;F+.,;t;;-t-Ft::-IH-"l;;i;;\a.t;;tc,;t~',;:;+.;,+~-"-.::...-E"='°,:.'"".::......;**_*---'----

ICII.I ,oc

-'-**_c_e"_._97_**~--1 IN.Ill Of>C . . lll lClllD "", a,

  • 18
    • -*1"'11""

M,l~.1111111r1aJn1.1*1

t . . . . ******************************* **************************************************************************************************************************************************************************************************************************************************************** ............................... t.

... Wltl-WS)-IIUII

. . .,..o LIUIIIClfll. . . Nl11fJ/lr-11~

F I

,~

IiI'.

Iijj

-- "'" Ii D

I.MT I I 2 COMPON'ENT COOllNr*

VAIER H(Af P:CHANQ[R cuu,.,,. *.* ,n,

'i ,I*I L llt-~911,t IIICUIP'IUfDI....,.. l*l,NI I

g*

I (l)

        • ~fOIGlnicl...

nc rQ..LOIIIG *u*ncai 01.,..

  • L01/l'GIIC..1maa. .. ,.

I UNIT I I 2 COMPONENJ Cotl.lNG 1---11*_*_0_-*_"_*_*_>1_*~-* os j WAfCR HE:Al UCHANGER ........J mu,,..,..,,a

~'\, VIRGINIA POWER I V NORTH CAROLINA POWER I 11.CL[M IJGIHElltll<<J lllllf IQI IIIIOIOO.Yl"l>llrflA I

ISi CLASSIFICATION BOUNDARY DRAWING I.

CIRCULATING ANO SERVICE WATER SYSTFM St;~cy SOWER s;ATIOl'I UNIT I YIR~INIA POwER ICILI... IN..IHOllof .. llllCIIID"'4*t:I*

    • . ,...~ *. 1, m,im.111111,,,-*. ,,1

1./ * '

Relief Request 27 I. Identification of Components System: Main Steam, Auxiliary Feedwater, and Feedwater components: Piping and valves listed:

Component Mark# Line# SIG Class Valve 1-MS-86 4"-SHP-37-601. A 2 Valve 1-MS-119 4 11 -SHP-38-601 B 2 Valve 1-MS-117 6"-SHP-46-601 B 2 Valve 1-MS-157 4 11 -SHP-39-601 C 2 Pipe 14 11 -WFPD-9-601 C 2 Valve l-FW-92 Jl'-WAPD-13-601 C 2 (Drawings attached)

II. -Impractical Code Requirements Surry Unit 1 utilized Code Case N-416, Alternate Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping Section XI, Division 1, on the components identified above. This Code Case defers the hydrostatic test required by IWA-4400 of ASME Section XI until the next regularly scheduled system hydrostatic test (IWC-5000) for that system.

III. Basis of Relief The identified components were replaced under the rules of ASME Section XI. IWA-4400 of the Code requires that a hydrostatic test be conducted on certain welded repairs or replacements. These replacements cannot be hydrostatically tested without also hydrostatically testing the connecting steam generator, as no intermediate isolation exists. Valve l-MS-117 appears to have intermediate isolation, however the main steam trip valve, 1-MS-TV-lOlB, acts like a check valve, and would open during pressurization to the steam generator.

Prior to NRC and Code approval of Code Case N-416, relief requests were routinely written and approved for these type situations. The relief requests were based upon the difficulties associated with steam generator hydrostatic testing. The test cannot be conducted at ambient conditions due to fracture prevention concerns associated with the Surry steam generators. The Surry steam generators are required to be a minimum of 150 degrees F. on the secondary side and a minimum of 180 degrees F. on the primary side, which results in difficult monitoring and controlling requirements. Additionally normal-problems, such as test boundary isolation, internal boundary leakage, placing spring hanger stops for dead weight loading concerns, and test pump size requirements further increase the difficulties associated with this particular test. The test

pressure of 1356 psig also requires gaging or removal of the Main Steam Safety valves, which initially lift at 1085 psig.

Some examples of previous correspondence requesting relief and approval follow:

VEPCO Letter/ Date NRC Letter/ Date Serial# 90-504/ 9/10/90 Serial# 92-474/7/14/92 Serial# 88-725/ 1/9/89 Serial# 89-278/4/7/89 Serial# 87-630/ 10/6/87 Serial# 88-473/7/8/88 When Code Case N-416 was incorporated into Regulatory guide 1.147, "Inservice Inspection Code Case Acceptability-ASME Section XI Division 1, relief requests were no longer needed, since the hydrostatic test was deferred to the end of the interval hydrostatic test described in table IWC-2500-1. This appeared to be the minimum hydrostatic testing that could be achieved for the steam generators. Recently in Revision 9 of Regulatory Guide 1.147, you approved Code Case N-498, Alternative Rules for 10-Year Hydrostatic Pressure Testing for Class 1 and 2 Systems Section XI, Division 1.

This Code Case allows testing of the class 2 steam generators at nominal operating pressure. As a result, no hydrostatic test is now required by ASME Section XI on these components under normal circumstances, when incorporating Code Case N-498. The hydrostatic test of Code Case N-416 is still required to be performed, however. As described before, the components identified above can only be hydrostatically tested by additionally testing the connecting steam generator. Requiring a full steam generator test only for these replacement activities is considered impractical, due to the difficulties of the test described previously.

IV. Alternate testing The alternative requirements described in Code case N-416, a volumetric examination of the full penetration welds and a visual examination (VT-2) at nominal operating pressure was previously performed and deemed acceptable.

____....._ --, ****************************************************************************************************************************************************************************************************************************.*'********1 C

I tn*9'1*M8J*lilt*II "Cll . . 1-.0 i

l I

( L .I

  • q

,,......._ I I* I* Ci)

  • =*

i I

'IL.- SHIELD ........ "'"

.j E i i

WALL tOJl"*111

  • ,.. . -.i,cu, n.

~

II.IIHl41fo~

uu,-.-,

... 11,. . . . . ,m,,m PLOl'flDII IIIIOllfUn.i DDPaTClt llflaP COIi f\.D11l,Ull~hlll(1tflllllllll1UTJIII

'1.Dll't!Jf C l ~ lri-,1 I A111 ."°'._

now I l ' I J l ~ u r r i a a 1 r 1 1 1..

lrtlPI i

I uu,.,......... pi., l!l. IIOl4't-,...,7-N. UHl.f'IIHIUII FLDllll'Oll~~--toc:llillr"L.rr A.D11lffJll~11GITIT1J11 i

i t'I.IIHl.,....1~11,a f'L.DrnDll~NIIT11'tM f\.Dlf'ffllr CIICMUDIT. . . . . . . . .y 1'11'111

'1.0II' I IOI ~ I \ N I I C Ill._, I f !

  • 1'11ll'I i  :: g:::::~"' CO'~~~~; ;":;'II' ..~'"

r

~

"~

I D Ci) r.~


\

~

C!:) ~.,~~-r,.*:~=.-,,:T~~c.i~"'J..*Df

- - - - - INSIDE REACTOR CONTAINMENT----~ Ct:? ~ ri1~-=- 1q CP (11()1 ll'IM "9Clllllf~ ff,_, r, hC ~

""' ISi Clatltflt*I~ IQJCWIT ouwrc llCOII..., l1Cll,,WI uu,,c .. 111.

9 11,r Ci) i f

i;

=!

A DSOII"" J ..

D1PI.IICJll--:9'Yfl-'IOOCI, b>===-:-r====n:=+/-=c:==--f,::-,..:::'::,,..':::-'-::-~-c-,---j l1*48*CBM*C,&,4A

""' \N.IH OhC . . IW 'ClllD

\~:~~,:::...,..*..

I

..... \. *t P,,.=*...~.... ~

runu I

I

  • E EI Q.Al5(D I

~SHIELD WALL i

i I

I I

oj

,~==:: -*-

..-:c::,

I l*RC*

_k_!L

~

STEAM CENtlralDR C!:>:_::-mr..,~...-.*::c==.-:ini'TC:.~lll"rn:.~IDII

  • TJtU U...

c/

! - - - - - - V A L L OF REACJOR CONlAINHENl----- a:, ::t :=i.::=:-z." na ca.-flll n,....

  • nc"""'

lflM I I

I I

. . . """. . . . --.. . . . . . .-............... I

='='=w.!::c:r=+:~:~""-.

ke§~~1.a.~~!5ffl='c- B CAUTION.

lll[ffSIOIIMICJ:l"flOII I

I

.Tta U:llltOJF 1,111(110 '411.ffl I-Wl*US.11* t'NII ~ f U. lbaD NI

':1~1::.:,~..:;~~KII NCI *'l'I M: f&I.CIII* PL.,_. 01-

~Cllliat,eao.

ll4*8*FM *064A 35

.. u,.

( ) VIRDINIA l'OVER

-TH CAR!I..INA POWER lil.Q.EM PGllPIICJ lllJIWlal tllCMCNJ,WUIIINIA 1--IS"'I_C_L_A..,.SS-~-FA-lf"'t"'\c:lr"'~"'A"'~o=~:.;;.':°::os-~-:~-O-R-A-WI_N_G---1 A I

SuRRY POWER STATION UNIT DIQII.., M VIRGiNIA POWER c,a-,_ .,._,,,*"'1 I

I DIPL POI - - tlllsllllO 1G. -**

1144!*CIH*164'A 9 111.1*1hClll1*1Ctm . . . r,

  • 2

. Wto90-W9J*9UII

'lll "CIIOllll....:I

? , I L*ca Clfl&. . . 9'11111a,l'IICICIIIIOdCI.

  • ,*1.

-1

©

!I.

=1

© LI

a. 11*.._,N-94 a, 'GIGIIIIMll.1111PPC1 ........ m N t 1 1 f l ' h e ~

r\.Dll'AOI OIIIIIIIIIIIUl't#I m:..-,,111 ..f'IIOIZII CG11 I

I Elia sH1ELo wALL--*=rr

  • I*

i/

  • I Ii D D I-RC-

....!:.!£_

OE~Cq

~

CD~:-mr"~:r,.*:~-:TN":~""~~~...

INSIDE REACfoq CONTAIP<fMf.Nf r

1

©

. . . . I II Allll*l"lll,I' l'C';'t,IJY,llllfl*W.Jl'*,l*I

0

" ._r If I!!al IiiBl ii

. H n

i h

i

.i

~:

-*-*-*-*-*-*-*-*-*-*-*-*-*-*-* ---*---*-*-*-*-*-*-*-*-*-*-*-*- -* -*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-j i' ~

~ ii

...!*..1.;*
;..~:.J.....----~----"'----,-~w--,--....:.----0--------u----..;..._----m----,--r-r,-T"Tc-r-r-r-r-r"T""T-r-' !l

....rt~

N

' I Relief Request SR-016 I. Identification of Components System: Reactor Coolant System components: Reactor Coolant Pump Casing internal surfaces Component Item Class 2-RC-P-lA casing 1 2-RC-P-lB Casing 1 2-RC-P-lC Casing 1 (Drawings attached)

II. Impractical Code Requirements category B-L-2, Pump Casings, Item number B12.20 requires a visual, VT-3, examination be conducted on the pump casing internal surfaces of one pump performing similar functions.

III. Basis For Relief Performance of the Code required visual examination requires that the pump be disassembled to allow access to the pumps internal surfaces. Previously this examination was scheduled in conjunction with the Code required volumetric examination on the pump casing weld, which also required pump disassembly. Code Case N-481, Alternate Examination Requirements for cast Austenitic Pump Casings Section XI, Division 1, will be used in lieu of the volumetric examination required by Table IWB 2500-1, category B-L-1, Item B12.10. Requiring pump disassembly for the Code visual examination is impractical considering the cost and dose required to perform this action.

IV. Alternate requirements A technical evaluation addressing the safety and serviceability of the pump casing has been performed and separately submitted to the NRC on October 26, 1992 (Serial#

92-671) as required by Code Case N-481. The alternate inspection requirements will be implemented, which includes the performance of a VT-3 visual examination of the internal surfaces, whenever the pump is disassembled for maintenance.

This inspection is similar to the provisions of the 1989 Edition of ASME Section XI in Table IWB-2500-1, Category B-L-2.

8 7 6 5 4 3 2 UPPER SEAL PUMP TO F

HOUSING BOLTS

+

MOTOR COUPLING A*sEE 11s*e-wM*s-*c-P-1A.21 F LOWER SEAL HOUSING BOL I S ~

HAIN FLANGE BO'. TS 24 BOLTS 4,5' DIA SUPPORT COLUMN LOCATION MAIN FLANGE SEE DETAIL I ITYPI E E MONOBALL ASSEMBLY EW NS VC INTEGRALLY CAST SUPPORT FOOT ITYP, OF 41

!SEE SECTION A-A 11548-WMKS*RC*P*IA,2 FOR PUMP DETAILS!

IDB-JI D D LOOP I COLDLEG MAIN HANGER STUD C ASSEHBL Y !TYPI C e

LOWER LEG PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME '

B B DETAIL l C) VIRGINIA POWER NORTH CAROLINA POWER LOOP I CROSSOVER LEG POWER ENGll£ERll<<i SERVICES TYPICAL SUPPORT RICHOCJ,YIROINIA CROSSECTIONAL VIEW COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:2-RC-P-lA SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA POWER

""'""* RCP0001AI lN.ESS OftRl1S[ ICU[O 5H I [F 2

7 6 5 4 3 8

t UPl'ER SEAL HOUSING BOI. TS F

  • AcsEE 11548-WMKS-RC-P-JB.21 F Ar LOWER SEAL HOUSING BOI. TS

~. "-' *~"

24 BOC.. TS 4.5' OJA ~

MAIN FLANGE E E HONOBALL ASSEMBLY I

ei I

INTEGRALLY CAST SUPPORT FOOT CTYP. OF 41 ISEE SECTION A*A 11548-WMKS-RC*P*IB.2 FOR PlJ'1P OETAILSI 108*31 D D HONOBALL ASSEMBLY HAIN HANGER ST~

C ASSEMBLY ITYPI C LOWER LEG PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME B B CGE-61 Ii. SUCTION ~ VIRGINIA POWER Jl'-RC*J05*250JR- ~ NORTH CAROLINA POWER LooP 2 CROSSOVER LEG DETAIL 1 POIER EfCIIIEERIICI SEIIYICES TYPICAL SUPPORT RIOIOCJ. YIRIJINIA CROSSECTIONAL VIE\-/ COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:2-RC-P-18 A

SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA POWER

=ND. RCP1le01BI C""- POI ~ -IIICI ND. RE,.

1:W;;r.;r.r:;r.:r-r-rTJ,J-rt-.,,--...,:....:C:,--fL£.:.:..,::.:_;E'°':.:=.:c...£e._=---J 11548-WMKS-RC-P-IB.I 0

~ NONE IN.£SS 0TJ£R'11SE JrlJTEO 94 I CF '1 8 2 31-JAN- Jqqe 201 JB QSAJ1 I 355, 002JRCP0001B I. OGN

8 7 6 5 4 3 2 F

uPPER SEAL HOUSING BOL IS Pl/HP 10 HOTOR COUPLING

'A ISEE JJS*B*WMl<S*RC*P*JC.21 LOWER SEAL HOUSING B O L T S ~


rn[E OI' TOIL I ON J1~4B*WM>S*RC*P*JC.2

~

108* 71 HAIN FLANGE BOLTS 24 BOLTS 4.5' OJA SUPPORT COLUMN LOCATION SEE DETAIL I JTYPI E E HONOBALL ASSEHBL Y EW NS YC INTEGRALLY CAST SUPPORT FOOT JTYP, OF 41

<SEE SECTION A-A NOTE 2 1154B-WMKS-RC-P*IC.2 FOR PUMP OETAILSI IDB-JI D D MAIN HANGER STUD C ASSEMBLY CTYPI C PLAN VIEW REACTOR COOLANT PUMP 2-RC- SUPPORT FRAME P-lC REACTOR COOLANT B PUMP B

~ VIRGINIA POWER DETAIL l V NORTH CAROLINA POWER POWER EPCJINEERII(; SERVICES TYPICAL SUPPORT RICHU(),VIR'JIIUA CROSSECTIONAL VIEW COLUMN INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP REACTOR COOLANT PUMP:2-RC-P-lC A SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA POWER 1-oso,-----+----=--~,_CAO_..,_._

ISPL EJrOI (1)..1.f.l...

l--r-,-,rr:=irr.-,--.-.f.--.;;::.--,1=.::_:::::.:...=."'---1 [Jh'l,WlfCi NJ.

RCP0001CI 11548-WMKS-RC-P* IC. I J""*!.

\N..EH OTHCRl'ISE N)fEO SH I rs 'l 2

,._,. ii .Al e

Relief Request SR-017 I~*Identification of components system: Reactor Coolant, Safety Injection, and Residual Heat Removal Component: Class 1 valves greater than 4 inches in diameter (4 NPS)

II. Impractical Code Requirements Table IWB-2500, Category B-M-2, item B12.40 requires that a visual, VT-3 examination be performed on the valves internal surfaces. As an alternative to this Code requirement we proposed, by previous relief request SR-001, that valves not disassembled for maintenance during the interval would have a ultrasonic {UT) wall thickness measurement performed in lieu of the visual examination and valve disassembly. This relief request was approved by letter, serial# 91-189, dated March 14, 1991.

III. Basis for Relief The provision to perform an ultrasonic thickness examination on*valves not disassembled for maintenance, in lieu of the required visual examination, was suggested by the NRC during initial discussions held concerning relief request SR-001.

The extent and acceptance criteria of these alternative examinations were not discussed. Valves typically have an irregular interior and exterior surface by design.

Correlating measurements with manufacturers drawings and then determining the acceptability of the measurement could only be described *as "best effort." The meaningfulness of the examinations and the resultant exposure has called into question the practicality of performing these ultrasonic thickness examination. The 1989 Edition of ASME Section XI has eliminated the requirement to disassemble valves for examination only. As such under the provisions of 10 CFR 50.55a{g)4{iv), we request the use of the 1989 Edition of ASME Section XI for examinations identified in Category B-M-2, item B12.50, for valve bodies exceeding NPS 4, and withdraw our previous relief request SR-001.

IV. Alternate Requirements The 1989 Edition of ASME Section XI Category B-M-2, item B12.50 and corresponding notes 2 and 3 within the Category shall be followed. This will allow the visual examinations to coincide with valve disassembly required by maintenance, repair, or other required valve openings.

  • Relief Request SR-018 I. *Identification of Components system: Chemical and Volume Control (CH)

Component: Regenerative Heat Exchanger (2-CH-E-3)

Welds/Components Description Class 1-06 nozzle-to-vessel 1 NIR-06 nozzle inside radius 1 1-08 nozzle-to-vessel 1 NIR-08 nozzle inside radius 1 1-09 nozzle-to-vessel 1 NIR-09 nozzle inside radius 1 1-11 nozzle-to-vessel 1 NIR-11 nozzle inside radius 1 1-13 nozzle-to-vessel 1 NIR-13 nozzle inside radius 1 1-15 nozzle-to-vessel 1 NIR-15 nozzle inside radius 1 II. Impractical Code Requirements Examination Category B-D (Inspection Program B) requires in item numbers B3.150 and B3.160 a volumetric examination of the nozzle-to-vessel weld and nozzle inside radius section.

III. Basis For Relief The joint design of the above nozzle welds specifies a 3" schedule 160 weldolet joined to a 9.25" O.D. X .875" thick vessel. These welds were not designed to be volumetrically examined from the outside diameter. The configuration of the weldolet precludes axial ultrasonic examination from the nozzle .side .. and circumferential examination in. either direction. This limits volumetric examination to a single axial scan from the vessel side of the nozzle. It is our opinion that a meaningful ultrasonic examination cannot be performed on the weld or inner radius with a single axial scan from the vessel side. This is due to the small diameter of the vessel and weldolet, the change in dihedral around the joint results in a corresponding change in the ultrasonic beam angle. This makes position measurements unreliable. It would also be necessary to extend the beam path to at least two full Vee paths, which will further complicate this examination. These limitations would substantially limit our ability to discriminate flaw indications from geometry existing around the joint. The configuration also precludes placement of film on the outside diameter for radiography, and the inside surfaces are inaccessible. It is our opinion that the gain in assurance of component integrity from this limited examination is not commensurate with the anticipated dose expenditure. Figures 1,2,3,and 4 are provided to support

. .~

this request.

IV. Alternate Requirements The outside surface of the nozzle-to-vessel welds shall receive a surface (liquid penetrant) examination. In addition a visual (VT-2) examination shall be performed in conjunction with the pressure testing required by IWB-5000.

B 3 2 I RE GENE RAT IVE A HEAT EXCHANGER

.-, 2-CH-F *-~ ___ I TUSESHEET E-3 SHELL '7

'1.25' DIA X 0.875' THICK A21J TP 304 SS CTYP OF JI E

3' SCH 80 PIPE CTYP 2 PLACES!

S1£LL '8 D

C ELEVATION LOOKING WEST TD 11548 SECTION '8' SECTION 'A'

-WMKS*CH-8 laF-41 B B 0.. VIROINIA POWER NORTH CAROLINA POWER IUJ.EAR EIIJl-11<<1 SEIIYICES RIOOINl,VIRIIIIIIA INSERVICE INSPECTION DETAIL DRAWING REGENERATIVE HEAT EXCHANGER:2-CH-E-3 A SURRY PO\'IER STATION UNIT 2 A VIRGINIA POWER DS0t s,r, AAF CM! Ill.

OISPL DOI WFH DRAIIIG fC>.

tr.r,-,,-,-,-,--,,-,,-..-.-----11-LEAD-~----_-_-_-1 115-48-WMl<S-CH-E-3 SCALI: NONE IJUSS OflEJIIIS£ ICJJEO 2

22-JUN* 1'1'12 0'1156 ZG51 C355, llll2JCHE00000J. DGN

SR-018 FIGURE 2 TYPICAL NOZZLE TO HT. XCHANGER WELD 9.25" 0.0. X .875" VESSEL NOZZLE TO VESSEL WELD 3" S160 PIPING INNER RADIUS~

1 O" x 3" S160 WELDOLET

.0 /'??£ 7 I

I I

1 eo. !3145: ff°' fblhE

'*- ~"71"'/?.. ,-_,. ..

. .......: :-?-- ,;.;;-= l

,* :.;**:.....,..:......;._c__ __

  • , '""1 ,.  :.L'!'2 ,~.... ;!9._
  • 1-=?C-. IZ t:S7 ___ _
  • \

I

~ l'IS-A.3*8  ;

1. ~

,.. I

    • c N,S.ll3?1J .,I J

i l .=:;;. /~ /1S._*-* /'

I 1

t* w*- -*-----~\

... ,..., "?

.-..... ;._<1'

'87 ..... \\

.- *, g p,:; :;o 1 \ ~.,__..._

4 *-

t.;*

--L_____ _

Figure 3

/ --

j_

.,

  • l
  • :":':'" **::-:;-* - **.* \(

!.,;:*; ..:i....

t: *. ;:.~\~**'

__,',; ->* *.**o::-, .. _.a

...,..,..I!: ...

Ill, . . .

- - ** ..a

~.:LL . ~

\I I

...Z::..~/ ~;.;.<w;,-

..""""" *- ,uu.i.. c~ ...... , .,. _ )

._, .*..O i a.,. .or *-'~"'"' .. C~,e 10 x ;a !er ~.:!:e:.iule lLlO ~i;pe tu l.827

-~*-

(4 copieft cned.eal. and pb:raical test rep,rt.o ~ )

\.

~ S/6/(;e. - T.~: Al :/4

~'"'Cd 6/15/58 (:wt bc.1'01"9) 'l'}.G: .\) tiS

~ 'l/8/f:iJ (not. au'Ol"C) T,'\G: .V. i}2 Co:iri..~ phl;no an!er to ~  !-io:mi DO !fJT OOPLic:a::

TAG: a/c S54 AD4l95 Figure 4

<. 1.._ ',-., '°I- \

  • L
  • Relief*Request SR-019 I. Identification of Components Systems: Outside Recirculation Spray and Safety Injection Components: Pump casing welds identified below Component Weld Class 2-RS-P-2A 2-01 2 2-RS-P-2A 2-02 2 2-RS-P-2A 2-03 2 2-RS-P-2A 2-04 2 2-RS-P-2B 2-01 2 2-RS-P-2B 2-02 2 2-RS-P-2B 2-03 2 2-RS-P-2B 2-04 2 2-SI-P-lA 2-01 2 2-SI-P-lA 2-02 2 2-SI-P-lA 2-03 2 2-SI-P-lA 2-04 2 2-SI-P-lB 2-01 2 2-SI-P-lB 2-02 2 2-SI-P-lB 2-03 2 2-SI-P-lB 2-04 2 (Drawings attached)

II. Impractical Code Requirements category C-G, Item CG.10, Pump Casing Welds, requires that a surface examination be performed on 100% of the welds each interval. The examination can be limited to one pump in the case of multiple pumps of similar design, size, function, and service in a system.

III. Basis For Relief These pumps are vertical, two-stage, centrifugal pumps, with an extended shaft and casing to allow suction from the containment sump. The motor and mechanical seals of the pumps are located at about the 12 foot elevation and the bottom of the casing at about the -30 foot elevation. The welds identified are at the bottom of the pump casing, and are embedded within the concrete building structure. This makes the welds inaccessible from the outside. The small diameter of the casing (24 inch. O.D.) and the pump shaft prevent examination from the inside diameter.

IV. Alternate Requirements A remote visual examination (VT-1) of the accessible portions of the r:o. of the pump casing welds will be performed only if the pump is disassembled and the pump shaft removed for maintenance.

___e___--1._ _ _ _, _ _ _--1._ _ _ _s___ ---1,_ _ _ _ 5 _ _ _~ _ _ _ _ 4 _ _ _....&.,.._ _ _ _3_ _ ___.__ _ _ _2_ _ __,__ _ _ _ ___,..,.-

r

/ LONGITUDINAL WELD F

D OUTSIDE RECIRC SPRAY PUMP DET A D D E E TO 11548

-WH1(S*11123NI CD!J-71 12'SCH 8 4BS PIPE 1111'-RS-1111'1-15~

D CAN DRAIN D Cl'PIP£1 VS LC OET B SECT A-A 1

...--;JE~1~~!~1~vi,i'!r fJt~!1L 2'll/2'THK RING WELDED TO CASING ACCESSIBLE EL 12'-111' "I I" 3/B' .

.....__~~_, - - - - - INACCESSIBLE

~~

C C FROM 11548 DET C DET E

-WHKS-B123NIZ CaB-71 B B I.

  • -'--DETAIL A 2111 - I 3/8' DIA HOI.ES

~

2-1112 VIRGINIA POWER

~ NORTH CAROLINA POWER POIER ENDINEERIND SERY ICES RIOMHJ,¥1ROIIIIA SECT B-B INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:2-RS-P-2A A SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA POWER c,o Ill, RSPIIH2AI I.N..ESS OTKRIISE Nlf(O 5H I IY" l

8 7 6 5 4 3 2 . ~

.I LONGITUOINAL WELD F

2-RS-Ar~ I*

F D P-2B OUTS IDE REC l RC SPRAY PUMP DET A D D E E TO 11548

-WHKS-111123N2 12'SCH 41115 PIPE CeE-61 llll'-RS-11111-153;-iB I

I D

GAUGE COIMCTION CAN MAIN Cl'PIPEI

\ D VS LC H01111 SECT A-A DET B

- - - ___.r:::::, _____ /::'

__.-:: SEE 11448-FV-SA <OET El FOR VIBRATION PLATE DETAIL ,,

2'Xl/2'THX RING WELOEO TO CASING ACCESSIBLE El 12'*0'

.......___...._., **** - - INACCESSIBLE -

C C DET C DET E B IIDE-21 B 2111

  • I 3/8' DIA HOLES 2-1112

~ VIROINIA POVER 32' DIA FLANGE ~ NORTH CAROLINA POVER CAN DRAIN POIEA ENOIIEEAINO SEIYICH AIIMOCl,VIAIIINIIII Cl'PIPEI SECT B-B INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:2-RS-P-28 A SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA . POWER tit.CS'S Olt<<:Rwll( NllfO ~ I CJ' ~*

8 7 6 5 4 3 2 I( ,.

i'"

~

F ..,. F P- A LOWHEAO SAFETY INJECTION PUMP MOTOR DET A E CSEE NOTE 41 E

-~S~~.~~CI COVER laD-71

~_:l:,:c5'_-'l'"--H---f-------+- 12"SCH 4115 PIPE (8'-51-284-152-

I D I I D vs 1.C '

SECT A-A DET B C C 3/8' WALL THICKNESS

\,-/SEE DETAIL D

....L~WE:!!iLJIL., ~

  • 1 ,. 318' B

FROM 11548

-IIHKS-51-1 laC-61

.,:--- SEE DETAIL A ~4 B DET C SEE DETAIL c-........,,. \ ~ VIRGINIA POWER .

I I ~ NORTH CAROLINA POWER IIULEM EIIOl*ERlltll IIERYICE!I Rl~,YIIIOIIUA INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMP:2-SI-P-lA Ah----"'----.,.....-------.-~-------,-.-------T"T-------r-r-------1 INITIAL ISSUE SURRY POWER STATION UNIT 2 VIRGINIA POWER CHI Ill,

(\

S1Pll811AI IN.EU OftCRllst Mlf[D SH I DJ 'l es-FEB-1qq1 13116 1r.1vi: r:,i;r;. ""'71~ rPriP"' rn, .nr.N

8 7 6 5 4 3 2 F LONGITUDINAL WELD F HOTOR DET A lSEE NOTE 41 E E TO 11548

  • IIHKS*B127C2 COYER ICIE-71 12'SCH 41!5 PIPE D

VS LC

'\

\ D SEE ll448*fY*5A 'IDET El FOR VIBRATION PLATE DETAIL SECT A-A 2"Xl/2"TIIC RING WELDED TD CASING ACCESSIBLE EL 12'*11"

'--~~ .J *

  • INACCESSIBLE * * * *
  • DET B C C J/8' WALL THICKNESS.

28'00 FROH 11548 2-12 DET E

  • WHKS*Sl*I

\

B  ; ,.._ SEE DETAIL A B DET C SEE DETt.lL c-.......,* ', ~ VIRGINIA POWER I ~ NORTH CAROLINA POWER IU:LEAII EIClll&llllll IIEIIVICEII IIICNOll,YIIIDINIA INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMP:2-SI-P-IB A SURRY POWER STATION UNIT 2 A INITIAL ISSUE VIRGINIA POWER CAD IG, SIPHIIBI I

\II.EU o,..:.. 1sr: IIGflD SH I DF 2

e Relief Request 23

~- Identification of Components System: Auxiliary Feedwater (AFW)

Component: Piping and components between the following valves:

Valves Line Valves Class 2-FW-145 1-WAPD-115-601 2-FW-149 3 2-FW-146 3 2-FW-629 3 2-FW-160 1-WAPD-117-601 2-FW-164 3 2-FW-161 3 2-FW-628 3 2-FW-175 1-WAPD-120-601 2-FW-179 3 2-FW-176 3 2-FW-627 3 (Drawing Attached)

II. Impractical Code Requirements ISI Class 3 System Hydrostatic Test required in IWD-5223 of ASME Section XI, where design pressure is 1432 psig and the resultant test pressure is 1576 psig.

III. Basis For Relief Three pressure reducing orifices 2-FW-R0-200A, 2-FW-R0-200B, and 2-FW-R0-200C provide during normal operation a pressure drop from approximately 1200 psig to 110 psig. The system design takes advantage of this pressure drop by incorporating lower pressure rated piping d~wnstream of the orifices. However the higher pressure rated piping continues beyond the orifices for some distance. The actual pipe design pressure class change occurs at downstream check valves 2-FW-148, 2-FW-163, and 2-FW-178 and manual valves, 2-FW-146, 2-FW-161, and 2~FW-176. The check valve operation, however, does not allow separation of the lower pressure class system, when testing the higher class piping in accordance with IWD-5223. IWD-5223 would require a test pressure of 1576 psig on the higher pressure class components in question. The downstream connecting piping has a design pressure of 150 psig and a corresponding test pressure of only 165 psig. As such, the connecting components would be overpressurized during the required Section XI test. The test boundary could be backed up to manual isolation valves 2-FW-147, 2-FW-162, and 2-FW-177, however hydrostatically testing this test boundary would also pressurize the auxiliary feedwater pumps and their suction connection. These pumps have welded discharge connections and cannot be isolated from the test boundary due to _the absence of a drain or vent valve in the area

- I. .. ~"" ** y ....

e identified above. There is a flange connection on the suction side of each pump, however using this flange for isolation purposes is considered.difficult due to the piping arrangement, and susceptibility to cold spring misalignment problems. Typically centrifugal pumps are hydrostatically tested at a pressure based on the suction side of the pump as described in IWA-5224{d) of the Code, which prevents any potential overpressurization concerns, or the need to use pump flanges as isolation points. The basis for relief is then two-*fold. The first impracticality is the overpressurization of piping and components downstream of the pressure reducing orifice and the design pressure class rating change. The second impracticality is the incorporation of the auxiliary feedwater pumps into the test boundary due to the lack of vent, drain, and manual isolation valves.

IV. Alternate Testing The identified components will be tested in accordance with IWD-5222, Functional test requirements, in conjunction with the associated auxiliary feedwater pump at normal operating pressure.

.... **************************-**********---------*----------------------------------------------------------------'---'t-----

WV.-HIIJ-lilKII "All 2

rr SHIELD Vllt.l~ LHlSSILE PROTECTION L,.IGll'l,lda,afl*ftlll--.

,. ____ *-*{.!..:::: :-.: :-..::-..::-..::-.::-..::-..::--..: :-..: :-..::-..::-..::-..::-..: :-..::-..: :-..:-..::-..: :-..: :-..: :-..::-..::-..: :-..: :-..::-..::-..::-..::-..::-..: :-..: :-.: :-.: :-.: :-..: ::: :-..:-..: :-..: :-..: - -..: :--..: -.:-_ -..: :-..: -..: :-.: -.: :-..:- . :-..: :-..::-..: :-..: :- -~. - . - . - *-. - . - . - *- *-. - *-* - *- . - . - . -*-. - . -* -* - . - . -*- *-*-. - . - *- *-* -* - *-*-*-. -*-*-

...." Z i I.NIT I E

........ - E D D

'I i

2-CH* L~~

  • cu...ura ...... _

I i

. . . . . . . . . . . ..., *-falEl'ieM111: ftUIIM ,nns-TIC*I no ... ~,ilf"NSATE . . . . . . . . . . . . 91.J *"°'....,.m,111-...

C r-*-*-*-*-*---*-*-*-*-

i .

I i

i iI i

i I

i B e llh i SI f ....

nD1rta11ICIIIIIIIIGII).

1154!1-F"H *868A 37

!!H1 i

i i

i 0 VIRGINIA POWER NORTH CAROLINA POWER IUUM UGINEPIMJ IPV'lal 111oeom.,,,.,11111111 i

! ISi CLASSIFICATION BOUNDARY DRAWING A

FEEOWATER SYSTEM SURRY POWER STATION UNIT 2 VIRGINIA FOWER 019'.PIII ... .

CIIDl9, tn&M**ATI ll!Mll*C8M*H8A a,,,..1'"11*,11 ra,,(Jell,1111~-"I

                      • ********-***********---.-**********.-********-.-***********************r*********r***************

i . I . I

.... ,,' ') '1-c**' .r ~

C '

V Relief Request 24 I. Identification of Components system: Main Steam Components: Valve listed:

Component Mark# Line# S/G Class Valve 2-MS-119 4"-SHP-138-601 B 2 (Drawing attached)

II. Impractical Code Requirements Surry Unit 2 utilized Code Case N-416, Alternate Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping Section XI, Division 1, on the components identified above. This Code Case defers the hydrostatic test required by IWA-4400 of ASME Section XI until the next regularly scheduled system hydrostatic test (IWC-5000) for that system.

III. Basis of Relief The identified component was replaced under the rules of ASME Section XI. IWA-4400 of the Code requires that a hydrostatic test be conducted on certain welded repairs or replacements. This replacement cannot be hydrostatically tested without hydrostatically testing the connecting steam generator, as no intermediate isolation exists.

Prior to NRC and Code approval of Code Case N-416, relief requests were routinely written and approved for this type situation. The relief requests were based upon the difficulties associated with steam generator hydrostatic testing. The test cannot be conducted at ambient conditions due to fracture prevention concerns associated with the Surry steam generators, which results in difficult monitoring and controlling requirements. The Surry steam generators are required to be a minimum of 150 degrees F. on the secondary side and a minimum of 180 degrees F. on the primary side. Additionally normal problems, such as test boundary isolation, internal boundary leakage, placing spring hanger stops for dead weight loading concerns, and test pump size requirements further increase the difficulties associated with this particular test. The test pressure of 1356 psig also requires gaging or removal of the Main Steam Safety valves, which initially lift at 1085 psig.

Some examples of previous correspondence requesting relief and approval follow:

VEPCO Letter/ Date NRC Letter/ Date Serial# 88-725/ 1/9/89 Serial# 89-278/ 4/7/89 Serial# 89-636/ 8/29/89 Serial# 89-734/10/2/89 Serial# 87-056/ 2/13/87 Serial# 88-419/6/17/88

1.)- 1l 1

\) ""' ..~)~;" I J..-

This Code Case allows testing of the class 2 steam generators at nominal operating pressure. As a result, no hydrostatic test is now required by ASME Section XI on these components under normal circumstances, when incorporating Code case N-498. The hydrostatic test of Code Case N-416 is still required to be performed, however. As described before, the component identified above can only be hydrostatically tested by additionally testing the connecting steam generator. Requiring a full steam generator test only for this replacement activity is considered impractical, due to the difficulties of the test described previously.

IV. Alternate testing The alternative requirements described in Code Case N-416, a volumetric examination of the full penetration welds and a visual examination (VT-2) at nominal operating pressure was previously performed and deemed acceptable.

~-

1'

                          • -~----*
              • - ""l'li,i ... ******************* r-*

.... I

,.*-.i!

I

  • -. h F

<D I I I I I

e. e, e. e. e p

l'

a. ,.. . .,-.11Ptma.....-.mlla'l1*na~

a.~ ....,,..~Tla-llllll'tnz:aCllalff!DI B.

D D

. ~ . . .GMIP&I,........,_

a.DM........_au a.~9'1

  • lfl9alal~nt-...rnraa-mffllDINt-m**--

C C

CD~.:.,';1..:','~-:~ia""":r-.,.....

MIIQ.lc.1.£ VALL (F REACTrfl CONTAINMENT .... ...

CD,.. na: ...., l a . . . lrta IZICMIDIII ni ~ . ,.. aa..

e Ei!:1c:°iiir~~iii:~~~ca:."L..

CAUTION!

e ~'35~~.l.~'e.t~~r.:~._ B llt1"111Qlllll:KJta'I~

"'" ~ * . . 1-.cD ...

ftCFILLCIIIIG'LOll'l'OIDIIGIIM

'1..0lnmlllllllll'IIGIIG.

11549-fH *lt64A JI

.. n,

I*_, -' ISi CLASSIFICATION BOUNDARY DRAWING MAIN STEAM SYSTEM SURRY POWER STATION UNIT 2 VIRGINIA POWER

...... CIIIOIID.~*~

.~