l VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 26, 1993 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 SECOND TEN VEAR INSERVICE INSPECTION INTERVAL RELIEF REQUESTS Serial No.
SPS/ETS Docket Nos.
License Nos.93-002 50-280 50-281 DPR-32 DPR-37 Surry Power Station Units 1 and 2 are currently in the third periods of their second ten year intervals. The test and inspection intervals are scheduled to end in October 1993 and May 1994 for Surry Units 1 and 2, respectively. The Code of reference for both units is the 1980 Edition, Winter 1980 Addendum of ASME Section XI. Several Code requirements have been identified as impractical and need to be addressed to close out the second interval test and inspection requirements. Thus, pursuant to 1 O CFR 50.55a(g)(5), we are requesting relief from specific Code requirements for Surry Units 1 and 2. The basis for each relief request is provided in Attachment 1 of this letter.
As permitted by Paragraph IWA-2400(c) of the Code, Units 1 and 2 will be extending their inspection intervals by one year to complete remaining examinations. The required examinations will be completed in the 1994 refueling outage for both Units 1 and 2. The Unit 1 refueling outage is currently scheduled to begin in February 1994. Therefore, your review is requested by November 1, 1993 to allow scheduling of the appropriate inspection requirements for Unit 1.
These requests have been reviewed by the Station Nuclear Safety and Operating Committee.
If you have questions regarding this information, please contact us.
Very tru1,-~ours, J
d-r_:_, ~--
. \\ L.::y\\Jl,:"IJ '\\*-----*
W. L. Stewart Senior Vice President - Nuclear Attachment
- 1. Unit 1 and 2 Relief Requests
,-** 9302020142 930.i°26 -
!;PR. ADOCK 05000280 yt' PDR
t cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station
/,
Surry Units 1 and 2 ISi Relief Requests
'I
l
,(
Relief Request SR-015 I. Identification of Components System: Reactor Coolant System components: Reactor Coolant Pump casing internal surfaces Component 1-RC-P-lA 1-RC-P-lB 1-RC-P-lC (Drawings attached)
Item casing Casing Casing II. Impractical Code Requirements Class 1
1 1
category B-L-2, Pump Casings, Item number B12.20 requires a visual, VT-3, examination be conducted on the pump casing internal surfaces of one pump performing similar functions.
III. Basis For Relief Performance of the Code required visual examination requires that the pump be disassembled to allow access to the pumps internal surfaces. Previously this examination was scheduled in conjunction with the Code required volumetric examination on the pump casing weld, which also required pump disassembly. Code Case N-481, Alternate Examination Requirements for Cast Austenitic Pump CasingsSection XI, Division 1, will be used in lieu of the volumetric examination required by Table IWB 2500-1, Category B-L-1, Item B12.10. Requiring pump disassembly for the Code visual examination is impractical considering the cost and dose required to perform this action *
. IV.
Alternate requirements A technical evaluation addressing the safety and serviceability of the pump casing has been performed and separately submitted to the NRC on October 26, 1992 (Serial#
92-671) as required by Code Case N-481. The alternate inspection requirements will be implemented, which includes the performance of a VT-3 visual examination of the internal surfaces, whenever the pump is disassembled for maintenance.
This requirement is similar to the provisions of the 1989 Edition of ASME Section XI in Table IWB-2500-1, Category B-L-2.
F E
D C
B A
8 l.f'PER SEAL HOUSJNr. BOLTS SEAL HOUSIIIG ASSEMBLY -
LOWER SEAL MAIN FLANGE BOLTS 24 BOLTS 4.5" OJA HOUSING BOLTS~
COE*51 TO 11449
- WMKS*lllllllAZ*J CDE*61 LOOP I COLOLEG 7
6 CROSSECTIDNAL VIEW REACTOR COOLANT PUMP 5
'A1SEE IJUB-WMKS-RC-P*JA.21 HAIN FLANGE INTEGRAL! T CAST SUPPORT FOOT ITYP. OF 41 CSEE SECTION A-A 11449-WMKS*RC*P*JA.2 FOR PUMP DETAILS!
CDB-31 4
DETAIL 1 TYPICAL SUPPORT COLUMN 3
INIT JAL ISSUE 2
Sl.f'PORT COLUMN LOCATION SEE DETAIL I ITTPI HAIN HANGER STUD ASSEHBL Y CTYPJ PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME
~
VIRGINIA POWER
~
NORTH CAROLINA POWER POWER Er<<lll:EERIIIJ SERVICES Alocotl, YlllllltlA INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP:1-RC-P-lA SURRY POWErt STATION UNIT 1 VIRGINIA POWER D!DI D!DI SI.PY II' C"II 1111.
ACPlllllHAJ IJMI MES /CLW Dl!O'l. [IOI 'J!.-1 t_
IJIIIWIICI IC!,
rlrCT:":r-T'."T"."T-r--Y-~--Y-F:.:..:..=~::.-i:Ll:.:oo:..:..:~=~=-l 11"1"18-WMKS-RC-P-IA.I R[Y.
0 WILE NONE lll.[SS OJ~RIIISE ICJtED SM I ~ 2 2
>- l F
- E D
C B
A
_________ __;'---------------------------------------~-----------'----*-------'---------------------
12-JAN* Jqqe gq, 15
.,,.. "",. r,r.£: 19,.. r ~nr-rcwcwr-1111 rir*1
~-------------------------------:---------------------------
F E
D C
B A
B UPPER SEAL HOUSING 80\\. TS LOOP 2 COI.DI.EG 7
6 CROSSECllDNAL VIEW REACTOR COOLANT PUMP 5
A ISEE 11448-WMKS*RC*P*IB.21 HAIN FLANGE HOHOBAlL ASSEMBLY INTEGRALLY CAST SUPPORT FOOT iTYP. OF 41 ISEE SECTIOH A*A 11448-WMKS*RC*P*IB.2 FOR PU1P DETAILS>
laB-31 MOHOBAlL ASSEHBLY 4
LOWER LEG DETAIL I TYPICAL SUPPORT COLUMN e
INITIAL ISSUE 3
2
,./'
SUPPORT COLUHH LOCATION SEE DETAIL I ITYPJ HAIN HANGER STUD ASSEHBL Y CTYPI PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME VIRGINIA POWER NORTH CAROLINA POWER
-A ENGIIEEAIICI SEAYICES All>>OCI. YIAOIIUA INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP:1-RC-P-18 SURRY POWER STATION UNIT 1 VIRGINIA POWER RCPBlll!IIBI
- F E
D C
B A
lllMI MES /CLW DI...,_ (IOI a>-.,11:..
IJMIICI Ill.
- REY, lr.r.::T::-r:;r:r.:-r.-r1'!1'-rt--........:.......:...+L£c::..,....:.....:,'°'-...c..=.:..:.:...--i 114-18-WMICS*RC-P* IB.1 0
SC<II.£ NONE lM.[S'I 01tA11SE ICf[D !iH I rF 1 2
L.:.L.l ___
....c_ ____________
12*JAN* lqqe B8155 QSA31 I 355, ee I JRCP00B 18 I. OGN
F E
D C
B A
8 Lf'PER SEAL HOUSING 80L TS SEAL HOUSING ASSEMBLY -
7 LOWER SEAL t<<lUSINGBOLTS~
MAIN FLANGE BOLT 5 24.BOLTS 4.!1" DIA 12-JAN-Jqqe 0qr07 QSAJ1 [ 355. ee J IRCP00BJC J. [11;11 6
Ii. SUCTION CROSSECTIONAL VJEW REACTOR COOLANT PUMP 5
'AISEE 11448-WM<S-RC-P-IC.21 MAIN FLANGE HONOIIALL ASSEMBLY INTEGRALLY CAST SUPPORT FOOT llYP. OF 41 ISEE SECTION A-A 11448-WMKS-RC-P-IC.2 FOR PUMP DETAILS>
IGB-31 4
DETAIL I TYPICAL SUPPORT COLUMN e
3 INITIAL ISSUE 2
SUPPORT COLUMN LOCATION SEE DETAIL I ITTPI MAIN HANGER STUD ASSEHBL T ITTPI PLAN VIEW REACTOR COOLANT PUMP SUPPORT FRAME
~
VIRGINIA POWER
~
NORTH CAROLINA POWER POWER ENOIIEERIIG 6ERYICES RIDffNJ,VIRIIIIWI INSERVICE INSPECTION DETAIL DRAWING REACTOR COOLANT PUMP:1-RC-P-lC SURRY POWER STATION UNIT 1 VIRGINIA POWER ll50I IJ5IJI QI'¥ Jl1' c,o ICI, RCP1!001CI DIMI MES/CLW DI""'- t-Q,..\\lt_
,....,ICI ICI.
lrT.::-rr,-crr-r-t<<r-r-t---'-::.::.!-==.+Lt:.:ooc::...:r_=~::u:-J 11448-WMKS-RC-P-IC.I IW:Y.
0
'-"LE NONE IN.ESI 0flRIIS£ ICJf(O SH I CF 2 2 -----*------ --*-
F E
D C
B A
- r
....I Relief Request SR-016 I. Identification of Components system: Reactor Coolant, -Safety Injection, and Residual Heat Removal Component: Class 1 valves greater than 4 inches in diameter (4 NFS)
II. Impractical Code Requirements Table IWB-2500, Category B-M-2, item B12.40 requires that a visual, VT-3 examination be performed on the valves internal surfaces. As an alternative to this Code requirement we proposed, by previous relief request SR-001, that valves not disassembled for maintenance during the interval would have a ultrasonic (UT) wall thickness measurement performed in lieu of the visual examination and valve disassembly. This relief request was approved by letter, serial# 91-189, dated March 14, 1991.
III. Basis for Relief The provision to perform an ultrasonic thickness examination on valves not disassembled for maintenance, in lieu of the required visual examination, was suggested by the NRC during initial discussions held concerning relief request SR-001.
The extent and acceptance criteria of these alternative examinations were not discussed. Valves typically have an irregular interior and exterior surface by design.
Correlating measurements with manufacturers drawings and then determining the acceptability of the measurement could only be described as "best effort." The meaningfulness of the examinations and the resultant exposure has called into question the practicality of performing these ultrasonic thickness examinations. The 1989 Edition of ASME Section XI has eliminated the requirement to disassemble valves for examination only. As such under the provisions of 10 CFR 50.55a(g)4(iv), we request the use of the 1989 Edition of ASME Section XI for examinations identified in category B-M-2, item B12.50, for valve bodies exceeding NPS 4, and withdraw our previous relief request SR-001.
IV.
Alternate Requirements The 1989 Edition of ASME Section XI Category B-M-2, item B12.50 and corresponding notes 2 and 3 within the category shall be followed. This will allow the visual examinations to coincide with valve disassembly required by maintenance, repair, or other required valve openings.
l Relief Request SR-017 I ~* Identification of Components systems: outside Recirculation Spray and Safety Injection components: Pump casing welds identified below component 1-RS-P-2A 1-RS-P-2A 1-RS-P-2A 1-RS-P-2A 1-RS-P-2B 1-RS-P-2B 1-RS-P-2B 1-RS-P-2B 1-SI-P-lA 1-SI-P-lA 1-SI-P-lA 1-SI-P-lA 1-SI-P-lB 1-SI-P-lB 1-SI-P-lB 1-SI-P-lB (Drawings attached)
Weld 2-01 2-02 2-03 2-04 2-01 2-02 2-03 2-04 2-01 2-02 2-03 2-04 2-01 2-02 2-03 2-04 II. Impractical Code Requirements Class 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 category c-G, Item C6.10, Pump Casing Welds, requires that a surface examination be performed on 100% of the welds each interval. The examination can be limited to one pump in the case of multiple pumps of similar design, size, function, and service in a system.
III. Basis For Relief These pumps are vertical, two-stage, centrifugal pumps, with an extended shaft and casing to allow suction from the containment sump. The motor and mechanical seals of the pumps are located at about the 12 foot elevation and the bottom of the casing at about the -30 foot elevation.
The welds identified are at the bottom of the pump casing, and are embedded within the concrete building structure. This makes the welds inaccessible from the outside. The small diameter of the casing (24 inch. O.D.) and the pump shaft prevent examination from the inside diameter.
IV. Alternate Requirements A remote visual examination (VT-1) of the accessible portions of the I.D. of the pump casing welds will be performed only if the pump is disassembled and the pump shaft removed for maintenance.
8 7
6 5
4 F
D OUTSIDE RECIRC SPRAY PUMP D
D E
TO 11448
- Vl<<S* 8123N I CeE-21 l2'SCH IB"-RS-~-lmi B 485 PIPE D
CAN DRAIN ll'PIPEI SEE 1'448*FY*5A CDET El FOR VIBRATION PLATE DETAIL C
B
.).._ DETAIL A 21!1 - I 3,e* DIA HOLES SECT B-B A
3 2
l LONGITl.OIHAl WELD Ar~
~
*~
DET A glJL
- I I* 3,4*
I DET B SECT A-A
'I "I
1, Mr
~4 DET C INITIAL ISSUE DET E a
VIRGINIA POWER
~
~TH CAROLINA POWER PO!IEII EICIIIEEIIIICI SEIIYICES RIDNJCJ, VIIIIIIIIA INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:1-RS-P-2A SURRY POWER STATION UNIT 1 VIRGINIA POWER
"'° ICI.
RSPBBB2AI IIUn OTKR'IIE IClrtD 1>t I or 2 2
F E
D C
B A
F D
D E
D C
B' DETAIL B A
B 7
JJ-JAN-Jq'!ll re,eq D
OUTSIDE RECIRC SPRAY PUMP TO 11448
- IMCS*lll123N2
,...,,,,..IIIE.,,.,,..-..,.,",....,.,,~~B CAN DRAIN ll'PIPE>
)__ DETAIL A BOWL BASE LUBE LINES 2ll - I 3/8' DIA HOLES IZ'SCH 41lS PIPE SECT B-B DET A OET B I
' /
F E
D SECT A-A
'I
- 1 1* 3/8'
~4 C
DET C INITIAL ISSlE DET E 4
VIROINIA POWER V
tmTH CARQ..INA POWER POIEll EIGIIEERIIG GERYICH RIDMNJ, V 11111111A INSERVICE INSPECTION DETAIL DRAWING OUTSIDE RECIRC SPRAY PUMP:1-RS-P-28 8
SURRY POWER STATION UNIT 1 fl VIRGINIA POWER
&N.EC11 OfKR'WUE IICJT[D CiH I CF 2 2
==-====~==----- --
F E
D C
B 8
TO 11448
-IIHKS-11127CI IIF-21 EL 15'-'I' IB'-Sl-84-152-7 HOTOR COVER 6
LOWHEAO SAFETY INJECll ON PUMP 2'Xl/2'TII< RING IIELOEO TO CASIIG ACCESSIBLE.
EL 12'-r
------ INACCESSIBLE 3/9" WALL THICICIESS
)- SE£ DETAIL A 2-112 5
12'SCH 415 PIPE 4
DET B DET C
' \\
I 3
AL...-------.--T-------,-,------T""T"-------,-r-------.-,-------;
INITIAL ISSUE 2
SECT A-A DET E VIRGINIA POWER V
NORTH CAROLINA POWER l'OIIEII EIIIIIIEEIIIIII SERVICES RIDNNJ,YIIIIINIA INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMP:1-SI-P-lA SURRY POWER STATION UNIT 1 VIRGINIA POWER SIPellBIAI F
E D
C B
A
.. : :-;~.. :JM.1:....11*:.,--.*n
~-*-*u
~..
~
F E
D C
B TD 114411
-11M<S*ll27C2 IID-JI
- n. 1!1'*"'
1r-s1-11J-t!IZ*
laA*!II I
.,.._.,.. -M****~--
ICJTDA
... ----. b
......... I..... *.****-***!I
~-
SEE 11448-FV*!SA IDET El FDR YIBRATION Pl.ATE DETAIL 2'Xl/2'TltC RING WELDED TD CASIIG
_______ ACCESSIIILE ___ n. 12'-F __
INACCESSIBI..E 3/B' VALL THICIOESS 12"SCH 415 PIPE DEY C I*
I I
I
~"'!.*-~-.. 3.
\\
~.: *..
,;t.*:":;(f',1<1.,..... :.... **=i.-:~
.... *.: *.:{:i<'**. _:,.-rt.
r:,.. ~*
\\*
- ~
C SECT A-A DEY E A
VIRGINIA POWER U, NmTH CM!l.lNA POWER
~-
PIIIIEli EIGINmlllG CEA'lltEI IIIDIINJ, '11111NIA i::
. ~ *..
. *~**: ;~.
F
, E
\\,,
D
[
AL..------.-,..-------,-,-------ri..-------,,------.-,r------t INSERVICE INSPECTION DETAIL DRAWING SAFETY INJECTION PUMPd-SI-P-18 SURRY POWER STATION UNIT 1 VIRGINIA POWER INIT IAL ISSUE OIIII 1111.
S1Pllla1BI lkDI lll>OIIIE 11111D.. I 17 Z
....,.,....,.,,"Ir.
J Relief Request 24 I. Identification of Components system: Auxiliary Feedwater (AFW) component: Piping and components between the following valves:
Valves 1-FW-145 1-FW-160 1-FW-175 Line 1-WAPD-15-601 1-WAPD-17-601 1-WAPD-20-601 (Drawing Attached)
II. Impractical Code Requirements Valves 1-FW-149 1-FW-146 1-FW-609 1-FW-164 1-FW-161 1-FW-608 1-FW-179 1-FW-176 1-FW-607 Class 3
3 3
3 3
3 3
3 3
ISI Class 3 System Hydrostatic Test required in IWD-5223 of ASME Section XI, where design pressure is 1432 psig and the resultant test pressure is 1576 psig.
III. Basis For Relief Three pressure reducing orifices 1-FW-RO-lOOA, 1-FW-RO-lOOB, and 1-FW-RO-lOOC provide during normal operation a pressure drop from approximately 1200 psig to 110 psig. The system design takes advantage of this pressure drop by incorporating lower pressure rated piping downstream of the orifices. However the higher pressure rated piping continues beyond the orifices for some distance. The actual pipe design pressure class change occurs at downstream check valves 1-FW-148, 1-FW-163, and 1-FW-178 and manual valves, 1-FW-146, 1-FW-161, and 1-FW-176. The check valve operation, however, does not allow separation of the lower pressure class system, when testing the higher class piping in accordance with IWD-5223. IWD-5223 would require a test pressure of 1576 psig on the higher pressure class components in question. The downstream connecting piping has a design pressure of 150 psig and a corresponding test pressure of only 165 psig. As such, the connecting components would be overpressurized during the required Section XI test. The test boundary could be backed up to manual isolation valves 1-FW-147, 1-FW-162, and 1-FW-177, however hydrostatically testing this test boundary would also pressurize the auxiliary feedwater pumps and their suction connection. These pumps have welded discharge connections and cannot be isolated from the test boundary due to the absence of a drain or vent valve in the area
J identified above. There is a flange connection on the suction side of each pump, however using this flange for isolation purposes is considered difficult due to the piping arrangement, and susceptibility to cold spring misalignment problems. Typically centrifugal pumps are hydrostatically tested at a pressure based on the suction side of the pump as described in IWA-5224(d) of the Code, which prevents any potential overpressurization concerns, or the need to use pump flanges as isolation points. The basis for relief then is two-fold. The first impracticality is the overpressurization of piping and components downstream of the pressure reducing orifice and the design pressure class rating change. The second impracticality is the incorporation of the auxiliary feedwater pumps into the test boundary due to the lack of vent, drain, and manual isolation valves.
IV. Alternate Testing The identified components will be tested in accordance with IWD-5222, Functional test requirements, in conjunction with the associated auxiliary feedwater pump at normal operating pressure.
TL._. _______ -*-*- -*-*- _ -*- ______ -*-*- _ ~
~~£~0-w~-l~- _____________ _.. ___________ /_~~~~I-~£ -P~~~t~-r~:.-*-*-*-*-*-*-*-*-*-*-*-*-*-*-
D C
8
-......,nara, CDMCI ro IMT*I (11.-H*..........
S2 t*WO*dEPI*
- - I !
~
i!
i!
.:,L i
i
!~ li i
! *i I
! §~.
f iii '
! e.. = I LPt11111r11,m1<<111WN1CIMlrlle.
trru a*t111C1111---.~~m11GflWTICICNa'IICI.
- a. un*-nt*hl
,a.a,,..~T11r1tt*
- n. 11..,........
"-9,0..... ~
CE&Mnllll *l'!Wall C'CIIIII
"'uu1-n... 111
~~*N11tr:crD11tn1D1 ft. U~.._
"--lllncar ---...UO.lbl Hll"tfl IIIQ.at,U'Ul _ __..l:MlrN hllTlflll"IUUillflllN~
CD::.:..n:i: =.,r.~=~'.t'"a.~~~ ~c:,,:c..=,1:t'!D l.K,MIICI.IU.-.
<!) ::::~J::.~_:.,:'"'ltt ~m... n *11e rtmi **
tU,.l"flllOlflolll'IIIQIICI.
Cr, ll44e*rH *0GOA JR
,"".!\\ VIRGINIA POWER
\\.JI NORTH CAROi. lNA POWER JrUUM (1Gllr[*1HD S[lty,C[I
- rCNOG.Yl"OllflA
... ICI"
- ISi CLASSIFICATIOll BOUNDARY DRAWmG.-.
D Ff.EDWAlrR SYSIFH sunnv POW[R STATIOFJ UIJII I VIRGINIA POWER DIOl....... "4 CIII0110.l1*1a****1 tllft tfrOII -- ;_;j~--- **. J".;
~r-,r,~-r-.--,---,--r--.-,--+.,.,.-c:---t,cc,.,~,~--,,-,,---
11441!1*(8),f 061!A
Relief Request 25 I. Identification of Components System: circulating and Service Water Component: Piping and components between the following valves:
Valves 1-SW-499 Line#/Component 8"-WS-480-21X/
6 11-WS-483-21X/
6 11-WS-484-21X Valves Class and 2-SW-476 1-SW-317/
1-SW-327/
2-SW-337 (Drawing Attached) 1-VS-S-lA and 1-VS-S-lB II. Impractical Code Requirements 1-SW-311/
3 1-SW-321/
3 2-SW-331 3
1-SW-346 3
and 2-SW-344 3
ISI Class 3 System Hydrostatic test required by IWD-5223 of ASME Section XI, where the design pressure is listed as 50 psig and test pressure is 55 psig.
III. Basis For Relief Technical Specifications 3.14C requires, "There shall be an operating service water flow path to and from one operating main control and emergency switchgear rooms air conditioning condenser and at least one operable service water flow path to and from at least one operable main control and emergency switchgear rooms air conditioning condenser whenever fuel is loaded in reactor core." By design there are only two supply headers and strainers associated with this common unit air conditioning system. This Specification requires that the components identified always be operating or operable, while either of our two units have fuel in the reactor core. A technical Specification change was submitted September 4, 1992 (Serial No.92-579), to provide a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> action statement for the service water headers. If this is approved, routine maintenance could be performed within the action statement guidelines. However, challenging the proposed action statement with a hydrostatic test (ten-year or post maintenance) is seen as excessive, potentiaily forcing a dual unit outage should problems occur, and impractical when compared to the proposed alternative in this low pressure system.
IV. Alternate Testing The lines and components in question are gravity fed from the in-take canal from lines providing water to both units main condensers. In lieu of the Code required hydrostatic test it is requested that a system inservice test, IWD-5221 be performed in conjunction with a visual (VT-2) examination of the accessible areas.
L...
1DS,1m.11111111ui1"'.9'11 a
l*VS*
~
c0t1r:1~ tJa,1f~
CHILLER CONQ£NSEA I
z L ""'
- a naNJ r1 IDD9CIICIID,111 ~
anoaTD KN 9Urlll>
a a......,..
ti, IH....... 79
- 12. UH *....,.,.,.
... u,q--,,-
"'11,._..,. --
PUlll/191~1-*...U *Tlllfflftlll fL.alfWOif ilUQIIIIIUlllaU19Q &.-U *TIii l'l'l!DI ft.GI a IOI~ "llffCTDI I CDClhC *TOI fl.Ol/'llll~fNIIISll'l'ltl*TP I\\.Ol/'llll~t-*...n*l'UI lff'IIIIU:10MWIIJI L~II&&
.e&.,IIUU1DIDIOll'tC.0C
(!U.at;.~'!'; I"
'I ':'tt":":'T'!'":C,.~
~
D
. ©5..
~,i:1.n-a:=-i~=~
C
=
=~.~~=-IUCJllnlDOCINJff CD:rn:~,='C::.mia.a-:,':f1~1rr1111ca.n,111~
CD.= :':oai:r-: t=~""'~-"t'7.":C::m:.r.-m1
'1Drl'IOl"Olilll'IIIIICI, 11449-FH *8710
("~ VIROINIA PDVER
\\J NORTH CAROL I NA PD VER JU3.!lfll (JGIICUUJIG 1Dtua,
~IDKNl*,IIIOINIA ISi CLASSIFICATION BOUNDARY DRAWING ClllCULATING & SERVICE WATER SYSlfM SURllY POWER SIATION UNIT I VIRGINIA POWER Dll'lllltllC DIU\\.lldlll--ll"IIIIIGllll, u., 10 "
11449-CBM*l71D
~4 7
/:
Relief Request 26 I. Identification of Components System: Circulating and Service Water Component: Piping and components between the following valves:
Valves 1-SW-MOV-102A and 1-SW-MOV-102B (Drawing Attached)
Lines 42"-WS-13-10 and 42"-WS-12-10 II. Impractical Code Requirements Valves 1-SW-37 1-SW-33 1-SW-29 1-SW-25 Class 3
3 3
3 ISI Class 3 System Hydrostatic Test as required by IWD-5223 of ASME Section XI, where the design pressure is 25 psig and the corresponding test pressure is 28 psig.
III. Basis For Relief Technical Specification 3.14 requires service water flow to and from the component cooling water heat exchangers. One unit operation requires two component cooling water heat exchangers, while two unit operation requires three component cooling water heat exchangers. Additionally Technical Specifications 3.5 and 3.10 provide requirements associated with component cooling operability for core residual heat removal in both unit operation and refueling modes. The identified supply header to the component cooling water_heat exchangers is the only source of cooling water to these components. Conducting the Code required hydrostatic test would require isolation of all four component cooling water heat exchangers, placing the unit(s) in conflict with Technical Specifications as previously discussed.
IV. Alternate Testing The lines and components identified are gravity fed from the in-take canal from lines providing water to the main condensers. As an alternative, a system inservice test to the requirements of IWD-5221 and the corresponding visual (VT-2) examination of the accessible areas will be conducted in lieu of the Code hydrostatic test.
j iJ i..
C tJlllO*W9:)-9ttll 8
8
~
r -----*-*-*- --*-*- -----------------* ---------------* ----* -* * * * --------* --* ------------- i I
r -
- j I
........ ~
~.IIIIOII 11Ut4"'..,IO..._I 110,-.,...... J
~------4 "*fih:&i* t-<1100-...,,....,
f'IDll-<<1'**
uu,.--....,.-..0..,
f'IOll<:t"l*IC 1101411.. 7111,MI no. l<t-C*IO F~
.::4* -N!',~J
~
11141.......,,.......
n, l<t-C*Mii 110,.......,14.""-*
fDl-<<"l*IC u..,........,14,....
fD l<t"l*IO L~1C1rt\\.ma,ar1c, naiaowtc..
L 1-<Y-U*C I *<*-U*lft LCIUTm 111 ICJIII*..,, I I O *Mcr1,n,,.,111:u
.,.,.....,l'-.... IIIQ.
ii'-
flll lGllf.._ lVPIJIICI IRMdCLIU IIGT lrll f"CI laiWNl.
- a. u1q4t1..,1 n.c..,o~ra,.,,..
n uu.4}t-,X PlOll/'fOII O&IOlllluKILIIMI.... a *mi STIIOI
... 11.....,...,.,
L'LOlll'IOI ~INi I IPltCl *l'DI ITIIO-ft. 11,.,_.,.,,.
now, 1'111 ~- cm.JC *rt*,u,p,i au,.,..,,...,.,..
P1.0111101~*,au,.~1,11D1 11UIQ4't-1PI PUllllOl~hlilf'OllllloTl::IIIIYllltJI
- u*q..,...,,c PUll/'fOll~-rpt,Ll'MTDlll"flN
... ll..a4t*IWJ11 FUJI I IOI ~IN! llt.. I. cum..ra
.. IMl-nHIJIFll71
'1.Cill I tQI ~COCJDUT( I\\L~ l.,t'N ILII..........,.
PUllnQll~rbTICMl'llrlrDI U. uo,_l141
'1.Clll10I ~TIM m.<<MTIII *~
11'1 IS.11111.f'lt-l-FUllf'10IIIO~IDIGlllllll*lttM L11,.. -cai........ 9LI IIIQ.-sllf'IC.HIQlll~DIIIIWNI 1.11,.. -..na.*1 n1lftOJIOl11,~1,c ~
rnr~ Dlllr.,...
- s. 11,......,....,"'....,
t111,11c* """1U111 11111te c.wPC
~
<D~,smL~~~... ~a~:'IU t.ru:ao.....J.:.ra~MMI-! ::.-:'.;:1.:,v.::,t.-*"
'CI)=!':'~t:'1&2.:""1.11.-:r~~M"tlDIIICLAII JIii~
CD n*41-<8'1-VPC n., 111,....,. ICDN r, -.
CD !:1 :~a'":l-4:li lfi:l~~=* t..~'.:C.. "t~l!'ftN CD~::ri: m":l,L~~r::~-!i~.. ~m~~**..,"....
!;!-:;sri::~r.~~z~~:7:r;:::cli.'"'l-r.
- CAUTION, D
B
....,.......,~I",*
11...........,....IM,, *
~e~~~t*~~a.~1~~ ~~-......
e 11111111!JIDl:'IClll"IICIII
,u,wrfflll~IIIGIIID, ll44B*FH *071A 0
YIROINIA POWER NORTH CAROL I NA POWER tl.Q[M fHGIJ<<(IIINJ ltllWICU IIIC>NlfCJ,t'l,-,INIIIII ISi CLASSIFICATION BOUNDARY DRAWING CIRCULATING AND SERVICE WATEH SYSlfM SIJRRY POWER STATION UNIT I VIRGINIA POWER Dl9'1. 1111)111 --
l*l'UCl ICJ.
HH-l--t-t..+/-..ls;;t,,ri.,d-+.-ct..t-PIH"-'t*"'f.a;;t.;;;f,;ct.;;;i;.t-:-t;:;ct..-t::-r"t-EHr...1"°";;;.t;;;;taf.t'=t;c.t..t::t~:t:t-:'t-.1..r-lwi~H:..!..t-::-f"'l::+/-'+"l;a.la.t;;+/-.aF.;;F+.,;t;;-t-Ft::-IH-"l;;i;;\\a.t;;tc,;t~',;:;+.;,+~-"-.::...-E"='°,:.'"".::......;**_* ---'---
1 14-'-**_c_e"_._
97_**~--1 18 ICII.I,oc IN.Ill Of>C.. lll lClllD "", a, *
- -*1"'11""
M,l~.1111111r1aJn1.1*1
- I "*.
......... ******************************* ****************************************************************************************************************************************************************************************************************************************************************............................... t.
t....
Wltl-WS)-IIUII D
- .,...~ *. 1, m,im.111111,,,-*.,,1
...,..o I.MT I I 2 COMPON'ENT COOllNr*
VAIER H(Af P:CHANQ[R cuu,.,,. *.*,n, (l)
UNIT I I 2 COMPONENJ Cotl.lNG WAfCR HE:Al UCHANGER mu,,..,..,,a LIUIIIClfll... Nl11fJ/lr-11~
L llt-~911,t IIICUIP'IUfDI....,.. l*l,NI F I
,~
Ii I'.
Ii jj Ii
' i
,I I
g*
I
- I
- ~fOIGlnicl... I nc rQ..LOIIIG *u*ncai 01.,..
- L01/l'GIIC..1maa.
1---11*_*_0_-*_"_*_*_>1_*~-* os j
........ J
~'\\, VIRGINIA POWER V
NORTH CAROLINA POWER 11.CL[M IJGIHElltll<<J lllllf IQI IIIIOIOO.Yl"l>llrflA ISi CLASSIFICATION BOUNDARY DRAWING CIRCULATING ANO SERVICE WATER SYSTFM St;~cy SOWER s;ATIOl'I UNIT I YIR~INIA POwER ICILI...
IN..IHOllof.. llllCIIID"'4*t:I*
I I
I I.
1./
Relief Request 27 I. Identification of Components System: Main Steam, Auxiliary Feedwater, and Feedwater components: Piping and valves listed:
Component Valve Valve Valve Valve Pipe Valve (Drawings attached)
Mark#
1-MS-86 1-MS-119 1-MS-117 1-MS-157 l-FW-92 II. -Impractical Code Requirements Line#
4"-SHP-37-601.
4 11-SHP-38-601 6"-SHP-46-601 4 11-SHP-39-601 14 11-WFPD-9-601 Jl'-WAPD-13-601 SIG A
B B
C C
C Class 2
2 2
2 2
2 Surry Unit 1 utilized Code Case N-416, Alternate Rules for Hydrostatic Testing of Repair or Replacement of Class 2 Piping Section XI, Division 1, on the components identified above. This Code Case defers the hydrostatic test required by IWA-4400 of ASME Section XI until the next regularly scheduled system hydrostatic test (IWC-5000) for that system.
III. Basis of Relief The identified components were replaced under the rules of ASME Section XI. IWA-4400 of the Code requires that a hydrostatic test be conducted on certain welded repairs or replacements. These replacements cannot be hydrostatically tested without also hydrostatically testing the connecting steam generator, as no intermediate isolation exists. Valve l-MS-117 appears to have intermediate isolation, however the main steam trip valve, 1-MS-TV-lOlB, acts like a check valve, and would open during pressurization to the steam generator.
Prior to NRC and Code approval of Code Case N-416, relief requests were routinely written and approved for these type situations. The relief requests were based upon the difficulties associated with steam generator hydrostatic testing. The test cannot be conducted at ambient conditions due to fracture prevention concerns associated with the Surry steam generators. The Surry steam generators are required to be a minimum of 150 degrees F. on the secondary side and a minimum of 180 degrees F. on the primary side, which results in difficult monitoring and controlling requirements. Additionally normal-problems, such as test boundary isolation, internal boundary leakage, placing spring hanger stops for dead weight loading concerns, and test pump size requirements further increase the difficulties associated with this particular test. The test
pressure of 1356 psig also requires gaging or removal of the Main Steam Safety valves, which initially lift at 1085 psig.
Some examples of previous correspondence requesting relief and approval follow:
VEPCO Letter/ Date Serial# 90-504/ 9/10/90 Serial# 88-725/ 1/9/89 Serial# 87-630/ 10/6/87 NRC Letter/ Date Serial# 92-474/7/14/92 Serial# 89-278/4/7/89 Serial# 88-473/7/8/88 When Code Case N-416 was incorporated into Regulatory guide 1.147, "Inservice Inspection Code Case Acceptability-ASME Section XI Division 1, relief requests were no longer needed, since the hydrostatic test was deferred to the end of the interval hydrostatic test described in table IWC-2500-1. This appeared to be the minimum hydrostatic testing that could be achieved for the steam generators. Recently in Revision 9 of Regulatory Guide 1.147, you approved Code Case N-498, Alternative Rules for 10-Year Hydrostatic Pressure Testing for Class 1 and 2 SystemsSection XI, Division 1.
This Code Case allows testing of the class 2 steam generators at nominal operating pressure. As a result, no hydrostatic test is now required by ASME Section XI on these components under normal circumstances, when incorporating Code Case N-498. The hydrostatic test of Code Case N-416 is still required to be performed, however. As described before, the components identified above can only be hydrostatically tested by additionally testing the connecting steam generator. Requiring a full steam generator test only for these replacement activities is considered impractical, due to the difficulties of the test described previously.
IV. Alternate testing The alternative requirements described in Code case N-416, a volumetric examination of the full penetration welds and a visual examination (VT-2) at nominal operating pressure was previously performed and deemed acceptable.
tn*9'1*M8J*lilt*II "Cll.. 1-.0 I
- =*
.j E r
"~
I D
INSIDE REACTOR CONTAINMENT----~
9 A
\\~:~~,:::...,..*..
C