MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 ML18066A4401999-03-25025 March 1999 Forwards Revised Best Estimate Fluence Evaluation Using Industry Data, Providing Justification for Using Industry Data to Determine Best Estimate Fluence.Review of Info & SE Requested ML18066A4191999-03-23023 March 1999 Forwards 1998 Annual Radioactive Effluent Release & Disposal Rept, for Palisades Plant,Providing Summary of Quantities of Radioactive Liquid & Gaseous Effluent Releases & Solid Radioactive Waste Processed During 1998 ML18066A4231999-03-22022 March 1999 Forwards Answers to 990311 Telcon Request for Addl Clarification & Revs Re ITS Section 3.4.Markups of Previously Submitted TS Pages & Revised Pages for Section 3.4 Also Encl ML20204F2091999-03-18018 March 1999 Requests That Listed TS Change Requests (Tscrs) Be Issued with Allowance That Tscrs Be Fully Implemented within Sixty Days of Issuance.Request Will Allow Time for Completion of Final Training & Procedure Changes Associated with Amend ML18066A4141999-03-18018 March 1999 Forwards Rev 4 to COLR, Containing Limits for Fuel Cycle 14 & Future Cycles ML18066A4121999-03-18018 March 1999 Concludes That Mod to Provide Automatic Switchover of Control Room Heating,Ventilation & Air Conditioning (CRHVAC) Sys to Emergency Mode Is Not Needed to Meet Regulatory Requirements.Mod Commitment Cancelled ML20204E5861999-03-16016 March 1999 Submits Current Limits of Property Insurance Maintained at Consumers Energy Co Operating Nuclear Power Plants ML18066A4131999-03-11011 March 1999 Responds to NRC 990210 Ltr Re Violations Noted in Insp Rept 50-255/98-22.Corrective Actions:Analytical Evaluation, EA-C-PAL-98-1067-01, P-50A Case to Cover Stud Evaluation, Was Submitted to NRC on 981220 ML18068A5241999-02-12012 February 1999 Resubmits Relief Request 12,with Addl Info That Includes Specific Locations Where Relief Request Would Be Applied,Per 10CFR50.55a(g)(5)(iii) ML18068A5211999-02-11011 February 1999 Informs NRC That Implementation of Formal Industry Position on Severe Accident Mgt at Palisades Plant Was Completed on 981217 ML18066A4051999-02-10010 February 1999 Requests Copy of Consumers Energy (Palisades) Formal Response to RAI Dtd 990512 (USI A-46) ML18066A3921999-01-29029 January 1999 Forwards Licensee Interpretation of TS Requirements for Performance of SRs as Applied to Instrumentation Channel Calibr.Ltr Established No New Commitments ML18066A3891999-01-28028 January 1999 Submits Response to Concern Expressed in Insp Rept 50-255/98-06 Re Whether Palisades ISI Program Was Being Conducted IAW Applicable Requirements 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML18057A4811990-09-17017 September 1990 Confirms 900718 Telcon Notification Re Westinghouse Agreement to Join Utils as Equity Investor in Plant ML18057A4551990-09-0606 September 1990 Forwards Proprietary Info Re Dept of Labor Decision on Discharge of Former Employee of Util,Per NRC 900809 Request. No 10CFR50.7 Violation Occurred Since Job Performance Was Reason for Discharge.Encl Withheld (Ref 10CFR2.790(a)(6)) ML18057A4521990-09-0404 September 1990 Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated IR 05000255/19900101990-09-0404 September 1990 Submits Addl Info Re Circuit & Raceway Schedule Enhancement Project,Per Insp Rept 50-255/90-10.Electrical Cable Separation & Channelization Anomalies Identified During Review of Physical Raceway Installations Will Be Evaluated ML18057A4371990-08-31031 August 1990 Forwards Analysis Concluding That Plant Reactor Beltline Matl Upper Shelf Energy Will Remain Greater than 50ft-lbs Until Yr 2032,per 900716 Commitment ML18057A4381990-08-31031 August 1990 Forwards Info Re Contamination of South Radwaste Area,Per 10CFR20.302,in Response to NRC 900112 Request.Approval Requested to Dispose of Low Level Radwaste in Place ML20059E0001990-08-29029 August 1990 Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990 ML18057A4201990-08-24024 August 1990 Forwards Revised Application for Amend to License DPR-20, Changing Tech Specs Re Incore Analysis Program.Request Revised Per NRC Comments During 900709 Meeting ML18057A4021990-08-22022 August 1990 Forwards Missing Pages from Decommissioning Funding Rept, Consisting of Pages 25 & 26 of Attachment a to Exhibit E ML18057A4241990-08-21021 August 1990 Forwards Application for Amend to License DPR-20,changing Tech Spec 4.5.1 Re Statement on Integrated Leak Rate Test ML18057A4071990-08-21021 August 1990 Forwards Tech Specs Change Request to License DPR-20,to Remove Redundant Requirements & Change Basis Statements No Longer Applicable ML18057A4121990-08-21021 August 1990 Forwards Application for Amend to License DPR-20,changing Tech Specs to Revise Wording for Reactor Protective Sys Trip Setting Limits for Steam Generator Low Water Level ML18057A4181990-08-21021 August 1990 Forwards Description of Changes Being Made to Plant Site Emergency Plan & Emergency Plan Changes.Change Allows Reduction in Shift Staffing During Cold Shutdown for Stated Staff ML18057A3911990-08-17017 August 1990 Forwards Replacement Pages,To Palisades Second 10-Yr Interval Inservice Insp Program. ML18057A3851990-08-17017 August 1990 Forwards Addl Info in Support of NRC Development of SER for full-term OL for Plant,Including Date of SER Providing Provisional OL to Plant & Summary of Valid Exemptions from 10CFR Regulations,Per Telcon ML18057A3841990-08-17017 August 1990 Provides Addl Info Re Transfer of Plant Ownership to Palisades Generating Co,Per NRC 900725 Ltr ML18057A3821990-08-14014 August 1990 Requests That Bechtel-KWU Rept 128901/MJS, Full Flow Testing of Motor-Operated Valve MO-1042A, Be Withheld (Ref 10CFR2.790(b)(1)) ML18057A3721990-08-0808 August 1990 Forwards Addl Info Re Util Request for Exemption from Separation Criteria of 10CFR50,App R,Section III.G.2 Re Containment Air Room ML20055J1421990-07-26026 July 1990 Responds to Commitment Oversight Issue Resulting from Insp Rept 50-255/90-08.Commitment Mgt Seminar Training Will Be Complete Prior to 901001 ML18057A3561990-07-26026 July 1990 Forwards Certification of Financial Assurance for Decommissioning ML18057A3411990-07-18018 July 1990 Forwards Revised Proposed Tech Spec Page 6-3,now Designated as Page 6-1b,adding Section 6.3.4,now Designated as Section 6.3.5 to Remove Organization Charts,Per Generic Ltr 88-06 ML18057A3381990-07-16016 July 1990 Advises That Util Does Not Foresee Need to Rely on Section V.C of App G to Remain in Compliance W/Upper Shelf Energy (Use) Requirements Re Use of Matl in Reactor Beltline ML18057A3281990-07-13013 July 1990 Responds to Request for Addl Info Re Second 10-yr Interval Insp Program,Per 900418 Telcon.Util 900329 Response Revised to Reflect That Certain Components in Class 2 Sys Should Not Be Exempted,Per IWC-1220 of 1974 ASME Code Section XI ML18057A3191990-07-0909 July 1990 Forwards Performance Indicator Trend Graphs for Jan 1989 - May 1990 ML18057A3201990-07-0606 July 1990 Discusses Reassessment of Control Room Temp Following Station Blackout Event.Results of Analysis Indicate That Control Room Temp Will Remain Below 112 F for 4 H After Onset of Blackout ML18057A3171990-07-0303 July 1990 Provides Summary of Upgrades Made to Plant Electrical Distribution Sys,Per 870714 Loss of Offsite Power Event When Inadvertent Actuation of Water Deluge Spray Sys for 1-2 Startup Transformer Resulted in Bus to Ground Fault ML20058K3771990-07-0202 July 1990 Forwards Rev 26 to Security Plan.Rev Withheld (Ref 10CFR73.21(c)) ML18057A3111990-06-25025 June 1990 Forwards Endorsements 116 & 117 to Nelia Policy NF-179 & Endorsements 102 & 103 to Maelu Policy MF-50 ML18057A3101990-06-25025 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements on Corrective Actions. ML18057A3031990-06-22022 June 1990 Provides Addl Info Re Environ Qualification of Instrument Circuit Associated W/Steam Generator Pressure Channel PT-0752D,per Insp Rept 50-255/90-05.Circuits Spliced Directly to Pigtail from Electrical Penetration Connector ML18057A3001990-06-21021 June 1990 Concurs W/Nrc Change in Terminology & Submits Revised Proposed Section 4.14 of Tech Specs ML18057A2771990-06-15015 June 1990 Forwards Corrected NRC Form 474 Re Simulation Facility Certification,Indicating Exceptions to Ansi/Ans 3.5 ML18057A2901990-06-13013 June 1990 Forwards Application for Amend to License DPR-20,revising Tech Spec 3.3.1.b Re Safety Injection Tank Min Level ML18057A2941990-06-12012 June 1990 Advises That Submittal of Second Interval Inservice Insp Program Delayed from 900615 to 900715,per 900418 Telcon ML18057A2711990-06-11011 June 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i in Order to Maintain Plant in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Request Based on 900608 Failure of Heater Transformer 15 ML18057A2641990-06-11011 June 1990 Provides Response to NRC Requalification Exam Rept Dtd 900410 on NRC Concerns Re Facility & Training Ctr Staffing. Adequate Staffing Will Be Maintained to Ensure Operator Requalification Program Successful ML18057A2591990-06-11011 June 1990 Forwards Palisades Simulator Certification Submittal. ML18057A2631990-06-10010 June 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.1.1i to Enable Plant to Be Maintained in Hot Shutdown While Repair Made to Pressurizer Heater Power Supply.Waiver Requested for 900611-18 ML18057A2571990-06-0808 June 1990 Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-255/90-12.Corrective Actions:Continuing Training Program Will Be Developed for Supervisors That Will Discuss Fire Protection Program Implementation Topics ML20043D0601990-06-0404 June 1990 Forwards Rev 25 to Security Plan,Including Changes to Security Plan Drawings to Clarify Protected Area Boundary within Plant Security Bldg & Vital Area Boundaries in Other Specific Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML18057A2581990-06-0101 June 1990 Forwards Revised Response to Violations Noted in Insp Rept 50-255/89-26.Concurs That Tests Performed Using Instrumented Insp Technique During 1988 Refueling Outage Considered Invalid ML18057A2561990-05-31031 May 1990 Advises That No NPDES Notifications Required Nor Any Repts of Oil or Salt Occurred During Nov 1989 - Apr 1990 ML18057A2541990-05-30030 May 1990 Forwards Response to Technical Evaluation Rept EGG-NTA-8333 Which Evaluated Plant Compliance w/NUREG-0737,Item II.D.1 & Requested Addl Info Re New PORVs & Block Valves No Later than Jan 1990 ML18057A2511990-05-30030 May 1990 Forwards Final Response to Concerns Re Porv/Block Valve Mod, Per 900308 Meeting.Bechtel Technical Rept Withheld ML18057A2501990-05-29029 May 1990 Forwards Investigation Rept Re Unsatisfactory Performance Testing of Fitness for Duty Program Blind Performance Test Samples ML18057A2411990-05-24024 May 1990 Forwards Revised Application to Amend License DPR-20, Consisting of Revised Attachments 1 & 5 to 890227 Amend Request,Reflecting Transfer of Plant Ownership ML18057A2311990-05-17017 May 1990 Forwards Analysis of Reactor Pressure Vessel Fast Neutron Fluence & PTS Ref Temps for Palisades Nuclear Plant. Rept Concludes That PTS Screening Criteria Will Be Exceeded at Axial Welds in Sept 2001 as Opposed to Mar 2002 ML18054B5861990-05-0707 May 1990 Forwards Monthly Trend Graph Rept for Jan 1989 - Mar 1990 Covering Safety Status Performance Indicators for HPSI, Auxiliary Feedwater,Emergency Ac Power,Lpsi,Containment Spray & Svc Water Sys ML18054B5801990-04-30030 April 1990 Responds to Request for Addl Info on Proposed Administrative Changes to Tech Spec Section 3.0.4,per Generic Ltr 87-09. Licensee Will Implement Program to Assure Appropriate Level of Mgt Approval Required When Operating Conditions Changed ML18054B5741990-04-25025 April 1990 Requests That Correspondence Re 890227 Application for Amend to License DPR-20 to Permit Transfer of Ownership of Plant Be Sent to Listed Address 1990-09-06
[Table view] |
Text
consumers Power Kenneth W Berry Director PDWERINli Nuclear licensing NtlCHlliAN'S PROGRESS General Offices: 1945 West Parnall Road, Jackson, Ml 49201 o (517) 788-1636 April 23, 1990 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
RESPONSE TO INSPECTION REPORT 90005; NOTICE OF VIOLATION Nuclear Regulatory Commission (NRC) Inspection Report 255/90005, dated March 22, 1990 documented the results of an_examination of previously iden-
- tified environmental qualification (EQ) inspection findings and resulted in the issuance of two violations. As was noted in the Inspection Report, we had implemented corrective actions to resolve all findings and concerns with one exception, the electrical penetration connector. In accordance with 10CFR2.201, our response to each of the identified examples of noncompliance follows:
Violation 50-255/90005-03 (DRS):
10CFR50, Appendix B, Criterion XVI, "Corrective Action" requires that measures be established to assure that conditions-adverse to quality, including noncon-formances, are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action is taken to preclude repetition.
The corrective action taken shall be documented and reported to approp~iate levels of management.
Contrary to the above, Consumers Power Company failed to assure that the corrective action taken in response to a previously identified EQ Severity Level IV violation was adequate in that the licensee failed to demons*trate the qualification of potted connectors used on Viking electrical penetrations.
Insulation resistance (IR) measurements were not taken during the accident portion of the EQ test. These measurements are necessary to ensure that instrument accuracy requirements are met and that low voltage control circuits will perform their safety function during accident conditions.
Reason For Violation
- It was previously identified in NRC In~pection Report 255/86032 that the EQ file for potted connectors used on containment electrica] penetrations did not OC0490-0330-NL04
- g~L'Vi
- rgggi~
i::i
Nuclear Regulatory Commission 2
- Palisades Plant Response to Inspection Report 9005; Notice of Violation April 23, 1990 adequately address the effects of IR breakdown on the accuracy of associated instruments under the environmental conditions that could be expected during a loss of coolant accident (LOCA). The basis for this conclusion was that neither insulation resistance nor leakage current test data had been collected during simulated LOCA conditions. Although test data was not available to demonstrate the adequacy of potted _connectors during a LOCA transient, test data was available to demonstrate that connector IR values are acceptable both before and after a LOCA, and that the potted connectors which serve EQ cir-cuits will not fail catastrophically during an accident.
In response to this observation, Consumers Power Company elected to qualify the potted connectors to the "Guidelines for Evaluating Environmental Qualifi-cation of Class lE Electrical Equipment in Operating Reactors", November 1979 (DOR Guidelines) by demonstrating that the connectors were manufactured and tested to Military Specification (MIL SPEC) C-5015G, "General Specification for Electrical Connectors, Circular Threaded, AN Type". The intended purpose of demonstrating that the connectors were manufactured and tested to the MIL SPEC was to allow the use of MIL SPEC C-5015G IR breakdown data as a qualifi-cation basis. At the time that this qualification method was chosen, we believed that it satisfied DOR guidelines.
Although the information contained in our EQ files provides reasonable assur-ance that our potted connectors meet MIL SPEC requirements, we are unable to provide documentation that conclusively proves they were manufactured and tested to MIL SPEC C-5015G. As a result, it was concluded by the NRC Inspec-tors that our use of MIL SPEC IR Breakdown data did not satisfy DOR guide-lines, and that the qualification of our potted connectors remained undemonstrated. This lack of conclusive proof has resulted in a decision to replace the potted connectors.
Corrective Action Taken And Results Achieved We have performed an operability determination for the EQ instrument circuits and control circuits associated with the potted connectors. The results of this operability determination indicate that these connectors are acceptable for use until they can be replaced. This operability determination was transmitted in our letters dated February 6, 1990 and February 7, 1990 and considered the impact of IR breakdown on circuit operation during a LOCA transient. A follow-up response to NRC questions regarding the operability determinations was transmitted in our letter dated February 16, 1990~
Corrective Actions Taken To Avoid Further Non-Compliance We are currently in the process of replacing the potted connectors that serve EQ circuits with qualified connectors and will update our EQ files to reflect the proper qualification requirements for these connectors.
Date When Full Compliance Will Be Achieved_
- Replacement of potted connectors and update of the EQ file for these connec-tors is scheduled to be complete by the end of the 1990 Fall Refueling Outage.
OC0490-0330-NL04
Nu~lear Regulatory Commission 3 Palisades Plant Response to Inspection Report 9005; Notice of Violation April 23, 1990 This outage is currently scheduled to begin in September 1990. A detailed sunnnary of our current replacement schedule for the potted connectors was provided in our letter dated March 1, 1990.
Violation 50-255/90005-04 (DRS):
10CFR50.49, Paragraph f, requires each item of electrical equipment important to safety be qualified by testing, or testing and analysis.
Contrary to the above, the licensee identified auxiliary feedwater (AFW) control circuit relays R/0727 and R/07.49, located in a harsh environment, that were omitted from the EQ Master Equipment List and consequently not qualified by testing or testing and analysis.
Reason For Violation We identified that relays R/0727 and R/0749 were installed in junction boxes JL-263 and JL-264 during a walkdown of junction boxes located outside of containment that was being performed in order to identify junction boxes that were susceptible to flooding. The affected relays are installed in safety-related flow indication and flow control circuits for one train of the AFW system. Junction boxes JL-263 and JL-264 are both located in the component cooling water (CCW) pump room, which is classified as a harsh environment, and each contained one relay.
Relays R/0727 and R/0749 were installed in 1982 as an Appendix R modification under Facility Change FC-407-14A. The purpose of this modification was to allow transfer of one train of AFW flow indication and flow control to the auxiliary hot shutdown control panel (C-150) following a fire in the Control Room. Although these relays are located in a harsh environment, they were not added to the EQ list during modification package preparation.
Exclusion of these relays from the EQ list resulted from inadequate administ-rative control of the modification process, and inadequate communications between the personnel responsible for defining the EQ list and the personnel who prepared the AFW relay modification package. At the time when engineering and field implementation of the Facility Change were being performed, the EQ list for Palisades was in the process of being finalized. Also, Plant modifi-cation procedures did not require evaluation of new equipment for potential addition to the EQ list. We concur with the NRC evaluation of this deficiency as an example of noncompliance.
Corrective Action Taken And Results Achieved An engineering analysis (EA-PAL-90-014-1) has been performed for relays R/0727 and R/0749 in order to determine the potential effects of a harsh operating environment. This analysis reached the following conclusions:
- 1. Relays R/0727 and R/0749 are normally de-energized and are only energized when AFW flow control and indication are transferred to the auxiliary hot shutdown panel following a fire in the Control Room. A OC0490-0330-NL04
Nuclear Regulatory Commission 4 Palisades Plant Response to Inspection Report 9005; Notice of Violation
" April 23, 1990 harsh environment is not postulated in the CCW pump room during this event.
- 2. A credible failure mechanism could not be identified which would cause relays R/0727 and R/0749 to energize as a result of an adverse operat-ing environmental, and thereby affect Control Room indication and control of AFW flow.
- 3. The redundant AFW train is fully qualified and does not contain a similar transfer relay installation in its control circuitry.
- 4. The contacts on relays R/0727 and R/0749 are only used for AFW flow indication and control circuits and could only affect operation of these circuits if the post-to-post or post-to-ground resistance decreased significantly. A comparison of the electrical resistance for these relays and a States terminal block has been performed. The results of this comparative evaluation indicate that the expected decrease in electrical resistance for relays R/0727 and R/0749 under harsh environmental conditions would not result in a significant flow indication or flow control error. The States terminal block was chosen for this comparison because it has been tested and it has a similar base material composition and terminal post configuration as the affected relays.
Based on the results of this engineering analysis, it can be determined that although relays R/0727 and R/0749 are not qualified, their ability to transfer AFW flow indication and flow control to the auxiliary hot shutdown panel following a fire in the Control Room is not adversely affected. This con-clusion is primarily based on the fact that harsh environmental conditions would not be expected in the CCW pump room during this event. Additionally, since the relays are de-energized except when AFW flow indication and flow control have been transferred to the auxiliary hot shutdown panel, it is not considered likely that subjecting the relays to a harsh environment would result in any abnormal operability affects during operations when AFW flow control and indication have not been transferred.
We have also performed an evaluation of other circuits that are required to transfer indication and control from the Control Room to the auxiliary hot shutdown panel. The purpose of this evaluation was to determine if there were any other transfer circuitry components that should have been designated as EQ equipment and that were not included on the EQ list. No other transfer circuitry components were identified during the evaluation that should have been designated as EQ equipment.
Corrective Actions To Avoid Further Non-Compliance We are reviewing our current modification process to determine if it has adequate controls to ensure that new EQ equipment is added to the EQ list.
Procedural controls added since the 1982 AFW relay modification require that an EQ evaluation is performed for each modification. This EQ evaluation is reviewed by an individual who is familiar with EQ requirements and provides OC0490-0330-NL04
I I '
I
- Nuclear Regulatory Commission 5 Palisades Plant Response to Inspection Report 9005; Notice of Violation April 23, 1990 assurance that new EQ equipment is added to the EQ list. Additionally, a review is being performed to identify whether other equipment nee.ds to be added to the EQ list as a result of modifications that were performed by outside organizations and installed during the approximate 1981 to 1986 time frame.
We will also perform testing in order to qualify the relay contacts for R/0727 and R/0749 to the requirements of 10CFR50.49(k). This testing will include an evaluation of relay insulation resistance under harsh environmental conditions.
Date When Full Compliance Will Be Achieved During discussions with NRC Inspectors, we had previously stated that we would complete qualification of relays R/0727 and R/0749 by June 1, 1990. This schedule was predicated on our ability to obtain test data for these relays from other sources. We have been unable to obtain this data and must there-fore perform testing in order to obtain the necessary qualification data. As a result, final environmental testing and qualification of AFW relays R/0727 and R/0749 and incorporation of the EQ data into EQ files is now expected to be complete by September 1, 1990. Review of the adequacy of our current modification program EQ controls and of modifications prepared by outside organizations are expected .to be complete by June .1, 1990.
Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades OC0490-0330-NL04