MONTHYEARIR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 05000317/LER-2024-001, Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed2024-07-0202 July 2024 Submittal of LER 2024-001-01 for Calvert Cliffs Nuclear Power Plant, Unit 1, Condition Prohibited by Technical Specifications Due to Safety Injection Check Valve Not Full Closed ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation 2024-08-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23086C0672023-04-24024 April 2023 Issuance of Amendment Nos. 345 and 323 Deletion of License Conditions Related to Decommissioning Trust ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22066B3112022-03-31031 March 2022 Correction of License Amendment Nos. 334 and 312 to Revise Instrument Testing and Calibration Definitions ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21347A8642022-01-13013 January 2022 Issuance of Amendment Nos. 342 and 320 Modifying the Licensing Basis to Allow for Full Core Offload with No Shutdown Cooling Loop Available During Certain Refueling Outages ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21299A0052021-12-14014 December 2021 Issuance of Amendments No. 340 and 318 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20363A2422021-01-26026 January 2021 Issuance of Amendment Nos. 339 and 317 Regarding Accident Tolerant Fuel Lead Test Assemblies (EPID L-2019-LLA-0282) - (Non-Proprietary) ML20273A0882020-11-0909 November 2020 Issuance of Amendment Nos. 338 and 316 Revise Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20182A1942020-08-13013 August 2020 Issuance of Amendment Nos. 336 and 314 Concerning Reactor Coolant Pump Flywheel Inspection Program ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19337D0352020-02-28028 February 2020 Issuance of Amendment Nos. 333 and 311 Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML19330D9092020-02-28028 February 2020 Issuance of Amendment Nos. 332 and 310 Risk-Informed Categorization and Treatment of Systems, Structures, and Components ML19352F1242019-12-23023 December 2019 Correction of License Amendment Nos. 327 and 305 for the Elimination of the Nuclear Advisory Committee Requirements ML19204A0632019-09-13013 September 2019 Independent Spent Fuel Storage Installation, James A. FitzPatrick, and Nine Mile Point - Issuance of Amendments to Revise the Emergency Response Organization Staff ML19165A2472019-08-26026 August 2019 Issuance of Amendment Nos 330 and 308 Relocation and Consolidation the Emergency Operations Facility and Joint Information Center for the Calvert Cliffs Nuclear Power Plant ML19053A5882019-04-19019 April 2019 Plants, Units 1 and 2 - Issuance of Amendment Nos. 329 and 307 Removal of an Exception to the Minimum Education Requirements for Shift Technical Advisors ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days ML18318A0142018-11-30030 November 2018 Correction to Amendment Nos. 326 and 304 Add Risk-Informed Completion Time Program ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements ML18270A1302018-10-30030 October 2018 Issuance of Amendment Nos. 326 and 304 to Add Risk-Informed Completion Time Program ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18137A6142018-06-26026 June 2018 Calvert Cliffs Independent Spent Fuel Storage Installation; Nine Mile Point Nuclear Station; and R. E. Ginna Nuclear Power Plant - Issuance of Amendments Revising Emergency Action Level Schemes ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17209A6202017-08-30030 August 2017 Issuance of Amendments Control Room Recirculation Signal and Control Room Emergency Ventilation System Technical Specifications ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) ML16263A0012016-10-0707 October 2016 Issuance of Amendments Change to Surveillance Requirement 3.5.3.1 ML16175A3592016-08-30030 August 2016 Issuance of Amendments to Transition to Fire Protection Program NFPA-805. ML16060A4012016-04-11011 April 2016 Issuance of Amendments Relocation of Specific Surveillance Requirement Frequencies ML15352A1642016-03-17017 March 2016 Calvert Cliffs, Units 1 & 2 and Independent Spent Fuel Storage Installation; Nine Mile, Units 1 & 2 and R. E. Ginna - Issuance of Amendments Regarding the Emergency Plan Requalification Training Frequency for Emergency Response Organization Personnel ML15279A1912015-12-30030 December 2015 Issuance of Amendment Revision to Pressurizer Safety Valve Technical Specifications ML15211A0052015-08-17017 August 2015 Amendment Adoption of TSTF-425, Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15223B2502015-08-14014 August 2015 and Nine Mile Point Nuclear Station, Unit No. 2- Copy of License Amendment Nos. 313, 291, 118, and 150 ML15161A3802015-07-30030 July 2015 R. E. Ginna and Nine Mile Point, Unit 2 - Issuance of Amendments Regarding Implementation of Technical Specification Task Force Traveler 523, Generic Letter 2008-01, Managing Gas Accumulation (TAC Nos. MF4405 - MF4409) ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15133A1442015-07-23023 July 2015 Amendment Regarding New Technical Specification 3.7.18 for Atmospheric Dump Valves ML15154A6612015-07-16016 July 2015 Amendment License Amendment Request to Extend Containment Leakage Rate Test Frequency ML14307A8422015-01-14014 January 2015 Issuance of Amendment Regarding the Adoption of Technical Specification Task Force (TSTF) 426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO (Limiting Condition of Operation) 3.0.3 ML14288A1022014-10-29029 October 2014 Amendment Adoption for Technical Specification Improvement to Adopt TSTF-510-A Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection. ML14280A5222014-10-21021 October 2014 Amendment Enhancements to Diesel Generator Surveillance Requirements (Tac Nos. ME9832 and ME9833) ML14239A4912014-10-21021 October 2014 Issuance of Amendments Regarding the Adoption of Technical Specification Task Force 501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (TAC Nos. ME9794-95) 2024-05-23
[Table view] Category:Safety Evaluation
MONTHYEARML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23086C0672023-04-24024 April 2023 Issuance of Amendment Nos. 345 and 323 Deletion of License Conditions Related to Decommissioning Trust ML22195A0252023-01-0303 January 2023 Authorization and Safety Evaluation for Alternative Request No. ISI-05-016 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22202A5142022-07-28028 July 2022 Authorization of Relief Request No. RR-ISI-05-20 Regarding Mitigation of Buried Saltwater System Piping Degradation ML22105A4052022-05-0202 May 2022 Authorization and Safety Evaluation for Proposed Alternative No. ISI-05-019 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21347A8642022-01-13013 January 2022 Issuance of Amendment Nos. 342 and 320 Modifying the Licensing Basis to Allow for Full Core Offload with No Shutdown Cooling Loop Available During Certain Refueling Outages ML21299A0052021-12-14014 December 2021 Issuance of Amendments No. 340 and 318 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21190A0042021-09-0202 September 2021 Proposed Alternative to the Requirements of the ASME Section XI, Subsection Iwl Concerning Unbound Post-Tensioning Systems ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20363A2422021-01-26026 January 2021 Issuance of Amendment Nos. 339 and 317 Regarding Accident Tolerant Fuel Lead Test Assemblies (EPID L-2019-LLA-0282) - (Non-Proprietary) ML20356A1212021-01-15015 January 2021 Relief from the Requirements of the ASME Code ML20273A0882020-11-0909 November 2020 Issuance of Amendment Nos. 338 and 316 Revise Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20275A1022020-11-0404 November 2020 Proposed Alternative I4r-07 to the Requirements of the American Society of Mechanical Engineers Code ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20182A1942020-08-13013 August 2020 Issuance of Amendment Nos. 336 and 314 Concerning Reactor Coolant Pump Flywheel Inspection Program ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19330D9092020-02-28028 February 2020 Issuance of Amendment Nos. 332 and 310 Risk-Informed Categorization and Treatment of Systems, Structures, and Components ML19337D0352020-02-28028 February 2020 Issuance of Amendment Nos. 333 and 311 Deletion of E-Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19298C9722019-10-31031 October 2019 50.69 Apla SE Input L-2018-LLA-0482 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19165A2472019-08-26026 August 2019 Issuance of Amendment Nos 330 and 308 Relocation and Consolidation the Emergency Operations Facility and Joint Information Center for the Calvert Cliffs Nuclear Power Plant ML19168A1172019-07-29029 July 2019 Issuance of Relief Request 15R-03 Use of ASME Code N-513-4 ML19196A1232019-07-19019 July 2019 Issuance of Relief Request 15R-04 Use of Encoded Phased Array Ultrasonic Examination Techniques ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19134A3732019-05-30030 May 2019 Issuance of Relief Request I5R-05 Relief from the Requirements of the ASME Code ML19136A2162019-05-30030 May 2019 Use of a Provision in a Later Edition of the ASME Code ML19053A5882019-04-19019 April 2019 Plants, Units 1 and 2 - Issuance of Amendment Nos. 329 and 307 Removal of an Exception to the Minimum Education Requirements for Shift Technical Advisors ML19046A0432019-02-25025 February 2019 Plants, Units 1 and 2 - Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule ML18365A3732019-01-22022 January 2019 Issuance of Amendment Nos. 328 and 306 to Extend Completion Time of Required Action D.3 of Technical Specification 3.8.1 to 14 Days ML18318A0142018-11-30030 November 2018 Correction to Amendment Nos. 326 and 304 Add Risk-Informed Completion Time Program ML18309A3012018-11-15015 November 2018 R. E. Ginna - Issuance of Amendment Nos. 327, 305, 232, 173, and 133, Respectively, Eliminating the Nuclear Advisory Committee Requirements 2024-03-15
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 7, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1AND2 -
ISSUANCE OF AMENDMENT RE: CHANGE TO SURVEILLANCE REQUIREMENT 3.5.3.1 (CAC NOS. MF7349 and MF7350)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 319 to Renewed Facility Operating License No. DPR-53, and Amendment No. 297 to Renewed Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, respectively. These amendments consist of changes to the technical specifications (TSs) in response to your application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A227).
These amendments revise surveillance requirement (SR) 3.5.3.1. The proposed change is to include SR 3.5.2.10 in the list of applicable surveillances in SR 3.5.3.1 as part of the implementation of TS Task Force (TSTF) Standard TS Change Traveler TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation."
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, Richard V. Guzman, Sr. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosures:
- 1. Amendment No. 319 to DPR-53
- 2. Amendment No. 297 to DPR-69
- 3. Safety Evaluation cc w/encls: Distribution via Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 CALVERT CLIFFS NUCLEAR POWER PLANT. LLC EXELON GENERATION COMPANY. LLC DOCKET NO. 50-317 Amendment No. 319 Renewed License No. DPR-53
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee), dated February 4, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-53 is hereby amended to read as follows:
Enclosure 1
(2) Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 319, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days following approval of this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION Travis Tate, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: October 7, 2o1 6
- UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 2 CALVERT CLIFFS NUCLEAR POWER PLANT. LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-318 Amendment No. 297 Renewed License No. DPR-69
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (Exelon, the licensee), dated February 4, 2016, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. DPR-69 is hereby amended to read as follows:
Enclosure 2
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 297, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 60 days following approval of this amendment.
FOR THE NUCLEAR REGULATORY COMMISSION Travis Tate, Chief Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the License and Technical Specifications Date of Issuance: October 7, 201 6
ATTACHMENT TO LICENSE AMENDMENTS CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT NO. 319 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 2 AMENDMENT NO. 297 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 DOCKET NOS. 50-317 AND 50-318 Replace the following page of the Renewed Facility Operating Licenses with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Pages Insert Pages 3 3 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by amendment number and contains marginal lines indicating the areas of change.
Remove Pages Insert Pages 3.5.3-2 3.5.3-2
(4) Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now or hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1) Maximum Power Level Exelon Generation is authorized to operate the facility at steady-state reactor core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 319, are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Technical Specifications.
(a) For Surveillance Requirements (SRs) that are new, in Amendment 227 to Facility Operating License No. DPR-53, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 227. For SRs that existed prior to Amendment 227, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 227.
(3) Additional Conditions The Additional Conditions contained in Appendix C as revised through Amendment No. 318 are hereby incorporated into this license. Exelon Generation shall operate the facility in accordance with the Additional Conditions.
(4) Secondary Water Chemistry Monitoring Program Exelon Generation shall implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
Amendment No. 319
(4) Exelon Generation pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use, in amounts as required, any byproduct, source, and special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Exelon Generation pursuant to the Act and 10 CFR Parts 30 and 70 to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license is deemed to contain and is subject to the conditions set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act, and the rules, regulations, and orders of the Commission, now and hereafter applicable; and is subject to the additional conditions specified and incorporated below:
(1) Maximum Power Level Exelon Generation is authorized to operate the facility at reactor steady-state core power levels not in excess of 2737 megawatts-thermal in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 297 are hereby incorporated into this license.
The licensee shall operate the facility in accordance with the Technical Specifications.
(a) For Surveillance Requirements (SRs) that are new, in Amendment 201 to Facility Operating License No. DPR-69, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 201. For SRs that existed prior to Amendment 201, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 201.
(3) Less Than Four Pump Operation The licensee shall not operate the reactor at power levels in excess of five (5) percent of rated thermal power with less than four (4) reactor coolant pumps in operation. This condition shall remain in effect until the licensee has submitted safety analyses for less than four pump operation, and approval for such operation has been granted by the Commission by amendment of this license.
(4) Environmental Monitoring Program If harmful effects or evidence of irreversible damage are detected by the biological monitoring program, hydrological monitoring program, and the Amendment No. 297
ECCS - Shutdown 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 The HPSI train related portions of the train In accordance following Surveillance Requirements are with applicable applicable: Surveillance Requirements SR 3.5.2.1 SR 3.5.2.5 SR 3.5.2.10 SR 3.5.2.2 SR 3.5.2.6 SR 3.5.2.3 SR 3.5.2.8 CALVERT CLIFFS - UNIT 1 3.5.3-2 Amendment No. 319 CALVERT CLIFFS - UNIT 2 Amendment No. 297
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO CHANGE TO SURVEILLANCE REQUIREMENT 3.5.3.1 AMENDMENT NO. 319 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-53 AMENDMENT NO. 297 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-69 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 EXELON GENERATION COMPANY, LLC DOCKET NOS. 50-317 AND 50-318
1.0 INTRODUCTION
By application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A227), Exelon Generation Company, LLC (the licensee) requested an amendment to the licenses for Calvert Cliffs Nuclear Power Plant (CCNPP), Unit Nos. 1 and 2, DPR-53 and DPR-69, to revise the technical specifications (TSs) to change surveillance requirement (SR) 3.5.3.1.
The proposed change would include SR 3.5.2.10 in the list of applicable SRs shown in SR 3.5.3.1. This SR is applicable to the U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-523, Revision 2, "Generic Letter [GL] 2008-01, Managing Gas Accumulation,"
(ADAMS Accession No. ML13053A075) dated February 21, 2013. The NRC issued Amendment Nos. 313 and 291 dated July 30, 2015 (ADAMS Accession No. ML15161A380) which approved the implementation of TSTF-523 for CCNPP, Unit Nos. 1 and 2, respectively.
Subsequent to the issuance of these amendments, the licensee identified that inclusion of SR 3.5.2.10 should have also resulted in a change to SR 3.5.3.1.
2.0 REGULATORY EVALUATION
2.1 Regulatory Requirements The regulatory requirements and guidance documents which the NRC staff used in the review of the application are listed below:
- In Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR), the NRC established its regulatory requirements related to the content of TSs. Pursuant to 10 Enclosure 3
CFR 50.36, TSs are required to include items in the following five specific categories related to station operation: (1) Safety limits, limiting safety system settings, and limiting control settings; (2) Limiting conditions for operation (LCO); (3) Surveillance requirements; (4) Design features; and (5) Administrative controls.
2.2 Regulatory Guidance
- The NRC's guidance for the format and content of licensee TSs can be found in NUREG-1432, "Standard Technical Specifications, Combustion Engineering Plants,"
Revision 4.0, April 2012 (ADAMS Accession Nos. ML12102A165 and ML12102A169).
- The model SE for plant-specific adoption of TSTF STS Change Traveler TSTF-523, Revision 2 "Generic Letter 2008-01, Managing Gas Accumulation," dated December 23, 2013, can be found in ADAMS Accession No. ML13255A169. The availability of this TS improvement was announced in the Federal Register on January 15, 2014 (79 FR 2700).
3.0 TECHNICAL EVALUATION
3.1 Background By letter dated July 30, 2015, the NRC issued license amendments that revised the CCNPP TSs by implementing TSTF-523. These amendments added new SRs related to gas accumulation for the shutdown cooling system, the emergency core cooling system (ECCS),
and the containment spray system to the CCNPP TSs. Specifically, SR 3.5.2.10 was added to the CCNPP TSs because there was not an existing SR related to gas accumulation. The licensee did not identify, and subsequently did not request a change to the TSs, that adding the new SR 3.5.2.10 should have resulted in a change to SR 3.5.3.1 as well.
The licensee has implemented administrative controls as per Administrative Letter 98-10 "Dispositioning of Technical Specifications that are Insufficient to Assure Plant Safety," dated December 29, 1998, to include SR 3.5.2.1 O into the list of applicable SRs shown in SR 3.5.3.1 while the NRC evaluates this LAR.
3.2 Licensee's Proposed Changes In its LAR dated February 4, 2016, the licensee proposed to add SR 3.5.2.10 to the list of applicable SRs shown in SR 3.5.3.1.
3.3 NRC Staff Evaluation As noted in the discussion above, the licensee previously received license amendments that incorporated the SRs listed in TSTF-523 into the CCNPP TSs. The staff's review of the amendments established that addition of the SRs in TSTF-523 met the regulatory requirements of 10 CFR 50.36 because the changes provided assurance that the necessary quality of
systems and components will be maintained and that the LCO will be met, and therefore, were acceptable to the staff.
Specifically, TSTF-523 modified CCNPP LCO 3.5.2, "ECCS - Operating," by adding an SR.
The new SR requires that ECCS locations susceptible to gas accumulations be verified [to be]
sufficiently filled with water.
Prior to receiving approval of the TSTF-523 amendment, the CCNPP TSs did not contain a SR requiring the licensee's verification that ECCS locations susceptible to gas accumulation be sufficiently filled with water. The Combustion Engineering (CE) STS contains an existing SR (SR 3.5.2.3) to verify that the ECCS piping is full of water. In the CE STS, this SR is included in the list of applicable SRs in SR 3.5.3.1. When the model SE for TSTF-523 was developed it was based, in part, on the CE STS. Therefore, TSTF-523 didn't explicitly require the modification of the list of applicable SRs in SR 3.5.3.1 to add the SR to verify ECCS piping is full of water. As stated in its application, the licensee failed to identify that the addition of a new SR should result in a change to SR 3.5.3.1 to capture the new SR.
The NRC staff has reviewed the proposed change and determined that the existing SR 3.5.2.10 in the CCNPP TSs should have been included as one of the applicable SRs listed in SR 3.5.3.1.
The staff has determined that this change is acceptable as it had previously approved the implementation of TSTF-523 into the CCNPP TSs which covers the licensee's proposed change.
3.4 Technical Evaluation Conclusions The NRC staff has found that the change described above is consistent with TSTF-523 and satisfies the requirements for TSs in 10 CFR 50.36. Therefore, the NRC staff has concluded that the change to SR 3.5.3.1 as described above is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Maryland State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding published in the FR on May 24, 2016 (81 FR 32806). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to
10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: Alexander N. Chereskin Richard V. Guzman Date: October 7, 2016
October 7, 2016 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1AND2-ISSUANCE OF AMENDMENT RE: CHANGE TO SURVEILLANCE REQUIREMENT 3.5.3.1 (CAC NOS. MF7349 and MF7350)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 319 to Renewed Facility Operating License No. DPR-53, and Amendment No. 297 to Renewed Facility Operating License No. DPR-69 for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, respectively. These amendments consist of changes to the technical specifications (TSs) in response to your application dated February 4, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16035A227).
These amendments revise surveillance requirement (SR) 3.5.3.1. The proposed change is to include SR 3.5.2.10 in the list of applicable surveillances in SR 3.5.3.1 as part of the implementation of TS Task Force (TSTF) Standard TS Change Traveler TSTF-523, Revision 2, "Generic Letter 2008-01, Managing Gas Accumulation."
A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely, IRA/
Richard V. Guzman, Sr. Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosures:
- 1. Amendment No. 319 to DPR-53
- 2. Amendment No. 297 to DPR-69
- 3. Safety Evaluation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsRgn1 MailCenter RidsNrrPMCalvertCliffs RidsNrrLAKGoldstein RidsNrrDorlDpr Resource RidsAcrs_MailCenter Resource RidsNrrDssStsb Resource RidsNrrDorllpl 1-1 Resource RidsRgn1 MailCenter W. Satterfield, NRR M. Hamm, NRR ADAMS Accession No. ML16263A001 OFFICE LPLl-1/PM LPLl-1/LA DSS/STSB/BC OGC LPLl-1/BC LPLl-1/PM NAME RGuzman KGoldstein AKlein DRoth TT ate RGuzman DATE 9/21/16 09/21/16 9/21/16 9/30/16 10/7/16 10/7/16 u r-1(.;IAL Kc(.;Ul'(U vUt'Y