ML16078A170

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System
ML16078A170
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/18/2016
From: Andrew Hon
Plant Licensing Branch II
To: Hess T, James Shea
Tennessee Valley Authority
References
MF7450, MF7451
Download: ML16078A170 (2)


Text

NRR-PMDAPEm Resource From: Hon, Andrew Sent: Friday, March 18, 2016 9:12 AM To: Shea, Joseph W; Hess, Thomas A (tahess@tva.gov)

Cc: Beasley, Benjamin; Casto, Greg; Wheeler, Larry

Subject:

Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451)

By letter dated March 11, 2016 (ADAMS NO. ML16071A333), TVA submitted the subject license amendment request for Sequoyah Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Andy Hon, PE Project Manager (Sequoyah Nuclear Nuclear)

Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-8480 OWFN 08H19 Mail Stop O8G-9a andrew.hon@nrc.gov 1

Hearing Identifier: NRR_PMDA Email Number: 2717 Mail Envelope Properties (Andrew.Hon@nrc.gov20160318091100)

Subject:

Accepted for Review - Sequoyah Nuclear Plant License Amendment Request to Extend Allowable Completion Time to Restore Essential Raw Cooling Water System (CAC MF7450 and MF7451)

Sent Date: 3/18/2016 9:11:39 AM Received Date: 3/18/2016 9:11:00 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:

"Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov>

Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov>

Tracking Status: None "Shea, Joseph W" <jwshea@tva.gov>

Tracking Status: None "Hess, Thomas A (tahess@tva.gov)" <tahess@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1859 3/18/2016 9:11:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: