IR 05000286-11-004; 7/1/11 - 9/30/11; Indian Point Nuclear Generating (Indian Point) Unit 3; Resident Integrated Inspection Report
ML11311A222
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 11/07/2011
From: Mel Gray
Reactor Projects Branch 2
To: Joseph E Pollock
Entergy Nuclear Operations
Mel Gray
References
IR-11-004
Download: ML11311A222 (34)


See also: IR 05000286/2011004

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

W

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA. PENNSYLVANIA 19406-1415

November 7 , 2OLI

Mr. Joseph E. Pollock

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

Buchanan, NY 1051 1-0249

INDIAN POINT NUCLEAR GENERATING UNIT 3 - NRC INTEGRATED

TNSPECTTON REPORT 05000286/201 1 004

Dear Mr.

On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at Indian Point Nuclear Generating Unit 3. The enclosed integiated inspection report

documents the inspection results, which were discussed on October 24,2011, with you and

other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commission's rules and regulations and with the conditions of youi license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

91clo1ure, and your response (if any) will be available electronically for pubtic inspection in the

NRC Public Document Room of from the Publicly Available Records component of the NRC's

document system (ADAMS). ADAMS is accessible from the NRC website at

htto://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

%/'{r{

Mel Gray, Chidf

Reactor Projects Branch 2

Division of Reactor Projects

Docket No. 50-286

License No. DPR-26

Enclosure: lnspectionReport05000286/2011004

w/Attachment: Supplementary lnformation

cc Wencl: Distribution via ListServ

November 7,2011

Mr. Joseph E. Pollock

Site Vice President

Entergy Nuclear Operations, Inc.

Indian Point Energy Center

450 Broadway, GSB

Buchanan, NY 1051 1-0249

INDIAN POINT NUCLEAR GENERATING UNIT 3 - NRC INTEGRATED

I NSPECTTON REPORT 05000286/201 1 004

Dear Mr. Pollock:

On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an

inspection at Indian Point Nuclear Generating Unit 3. The enclosed integrated inspection report

documents the inspection results, which were discussed on October 24,2011, with you and

other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room of from the Publicly Available Records component of the NRC's

document system (ADAMS). ADAMS is accessible from the NRC website at

http://www.nrc.oov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mel Gray, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Docket No. 50-286

License No. DPR-26

Distribution: (see attached

SUNSI Review Complete: SCM (Reviewer's Initials) ML113114222

DOCUMENT NAME: G:\DRP\BRANCH2\a - Indian Point 3\lnspection Reports\2011\2011-004\lP3 2011.004.r5.docx

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenUenclosure "E" = Copy

with attachmenUenclosure "N" = No

11t07t11

2

Distribution: (via email)

W. Dean, RA

D. Lew, DFIA

D. Roberts, DRP

D. Ayres, DRP

C. Miller, DRS

P. Wilson, DRS

M. Franke, Rl OEDO

M. Gray, DRP

B. Bickett, DRP

S. McCarver, DRP

M. Jennerich, DRP

P. Cataldo, SRI

M. Halter, Rl

D. Hochmuth, DRP

RidsNrrPMlndianPoint Resource

RidsNrrDorlLpl 1 -1 Resource

ROPreport Resource@nrc. gov

1

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

License No.: DPR-26

Report No.: 05000286/2011004

Licensee: Entergy Nuclear Northeast (Entergy)

Facility: lndian Point Nuclear Generating Unit 3

Location: 450 Broadway, GSB

Buchanan, NY 1051 1-0249

Dates: July 1 ,2011through September 30,2011

Inspectors: P. Cataldo, Senior Resident Inspector - Indian Point 3

M. Halter, Resident Inspector - Indian Point 3

S. Barr, Senior Emergency Preparedness Specialist - Region I

S. McCarver, Project Engineer - Region I

J. Noggle, Senior Health Physicist - Region I

T. O'Hara, Reactor Inspector - Region I

Approved By: Mel Gray, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure

2

TABLE OF CONTENTS

1. REACTOR SAFETY .....................,.4

1R01 Adverse Weather Protection ..................4

1R04 Equipment Alignment ...........5

1 R05 Fire Protection........... ...........5

1 R07 Heat Sink Performance.............. ...........6

1R1 1 Licensed Operator Requalification Program.............. ..............6

1R12 Maintenance Effectiveness.......... ..........7

1R13 Maintenance Risk Assessments and Emergent Work Control ..................7

1R15 Operability Determinations and Functionality Assessments.......... ............8

1R18 Plant Modifications ...............9

1R19 Post-Maintenance Testing .....................9

1R22 Surveillance Testing ........... 10

1EP2 Alert and Notification System (ANS) Evaluation. ....................10

1 EP3 Emergency Response Organization (ERO) Staffing and Augmentation System ......11

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes...............................11

1 EP5 Correction of Emergency Preparedness Weaknesses............. ...............12

1 EP6 Drill Evaluation.......... .........12

2. RADIATTON SAFETY ................... 13

2RSO Radioactive Gaseous and Liquid Effluent Treatment ............. 13

4. OTHER ACTlVlTlES............... ......16

4OA1 Performance Indicator Verification .......16

4OA2 Problem ldentification and Resolution ..................17

4OA3 Follow-Up of Events and Notices of Enforcement Discretion ..................18

4OAO Meetings, Including Exit........... ............20

ATTACHMENT: SUPPLEMENTARY INFORMATION ..........20

SUPPLEMENTARY INFORMATION .......... ........ A-1

KEY POTNTS OF CONTACT ............. A-1

LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED ................... A-2

LIST OF DOCUMENTS REVIEWED ........... ....... A-2

LtsT oF ACRONYMS............... ....... A-11

Enclosure

3

SUMMARY OF FINDINGS

f R 0500028612011004; 711111

-9130111; Indian Point Nuclear Generating (lndian Point) Unit 3;

Resident Integrated Inspection Report.

This report covered a three-month period of inspection by resident inspectors and announced

inspections performed by region inspectors. No findings of significance were identified. The

NRC's program for overseeing the safe operation of commercial nuclear power reactors is

described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

Enclosure

4

REPORT DETAILS

Summarv of Plant Status

fndian Point Unit 3 began the inspection period at 100 percent power. On August 19,2011, Unit

3 experienced a loss of normal offsite power (138kV feeder 95331) during severe weather. This

condition resulted in the loss of three circulating water pumps and subsequent degraded main

condenser vacuum conditions that necessitated a load reduction by operators to approximately

74 percent power. Operators returned the unit to full power on August 20, following recovery of

appropriate plant systems and equipment which were impacted by the loss of the 138kV normal

offsite power. The unit remained at or near 100 percent power for the remainder of the

inspection period.

1. REACTOR SAFEW

Gornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection (71111.01 - 1 sample)

lmpendino Adverse Weather

a. Inspection Scope

Hurricane lrene was forecast in the vicinity of the facility forAugust 27-28,2011. The

inspectors reviewed Entergy staff's overall preparations/protection for the expected

severe weather conditions. The inspectors walked down systems required for normal

operation and shutdown conditions because their safety-related functions could be

aifected, or required, as a result of flooding. The inspectors evaluated the plant staff's

preparations in accordance with site procedures to determine if actions were adequate.

The inspectors focused on plant-specific design features and station procedures used to

respond to adverse weather conditions. The inspectors also toured the site to determine

whether Entergy staff had identified and secured loose debris that could become

projectiles during the high winds usually associated with hurricanes. The inspectors

evaluated the operator staffing plan and the accessibility of controls and indications for

those systems required to controlthe plant. Additionally, the inspectors reviewed the

Updated Final Safety Analysis Report (UFSAR) and performance requirements for the

systems selected for inspection, and reviewed whether operator actions were

appropriate as specified by plant specific procedures. The inspectors also reviewed a

sample of corrective action program (CAP) items to verify whether Entergy personnel

identified adverse weather impact issues at an appropriate threshold and dispositioned

them through the CAP in accordance with station corrective action procedures.

Documents reviewed for each section of this inspection report are listed in the

Attachment.

b. Findings

No findings were identified.

Enclosure

5

1R04 EquipmentAliqnment

Partial Svstem Walkdowns (71111.04Q - 4 samples)

a. Inspection Scope

The inspectors performed partial walkdowns of the following systems:

. 31 control room air conditioner (CCRAC) during 32 CCRAC out of service on

August 3

o 31133 emergency diesel generators (EDGs) during 32 EDG outage on

August I - 10

. 32133 auxiliary boiler feed pumps (ABFPS) during 31 ABFP maintenance on

September 1

. 31/32 EDGs during 33 EDG outage on September 7 - 9

The inspectors selected these systems based on their risk-significance relative to the

reactor safety cornerstones at the time they were inspected. The inspectors reviewed

applicable operating procedures, system diagrams, the UFSAR, technical specifications

(TS), work orders, condition reports (CRs), and the impact of ongoing work activities on

redundant trains of equipment, to identify conditions that could have impacted system

performance of their intended safety functions. The inspectors also performed field

walkdowns of accessible portions of the systems to verify system components and

support equipment were aligned correctly and were operable. The inspectors examined

the material condition of the components and observed operating parameters of

equipment to verify that there were no deficiencies. The inspectors also reviewed

whether Entergy staff had properly identified equipment issues and entered them into

the corrective action program for resolution with the appropriate significance

characterization.

b. Findinos

No findings were identified.

1R05 Fire Protection

Resident Inspector Quarterlv Walkdowns (71111.05Q - 6 samples)

a. Inspection Scope

The inspectors conducted tours of the areas listed below to assess the material

condition and operational status of fire protection features. The inspectors verified that

Entergy staff controlled combustible materials and ignition sources in accordance with

administrative procedures. The inspectors verified that fire protection and suppression

equipment was available for use as specified in the area pre-fire plan, and passive fire

barriers were maintained in good material condition. The inspectors also verified that

station personnel implemented compensatory measures for out of service, degraded, or

inoperable fire protection equipment, as applicable, in accordance with procedures.

Enclosure

6

a 31 EDG cubicle (FZ-10) in September 2011

a 32 EDG cubicle FZ-101A) in September 2011

a 33 EDG cubicle (FZ-102A) in September 2011

a Control Building (CB) exhaust fan room (FZ-34A) in September 2011

a Atmospheric steam dumps (FZ-574) on September 21,2011

a Auxiliary feedwater building (FZ-23) on September 21,2011

b. Findinqs

No findings were identified.

1 R07 Heat Sink Performance (71111.07 - 1 sample)

a. Inspection Scope

The inspectors evaluated the 32 EDG jacket water heat exchanger to determine its

readiness and availability to perform its required safety function. The inspectors

reviewed the design basis for the component and verified Entergy's commitments to

NRC Generic Letter 89-13. The inspectors reviewed the results of the most recent

inspection, which was conducted on August 9. The inspectors discussed the results with

engineering staff and reviewed pictures of the as-found and as-left conditions. The

inspectors verified that Entergy personnel initiated appropriate corrective actions for

identified deficiencies. The inspectors also verified that the number of tubes plugged

within the heat exchanger did not exceed the maximum amount allowed.

Findinqs

No findings were identified.

1R11 Licensed Operator Requalification Proqram (71111.11Q- 1 sample)

a. Inspection Scope

The inspectors observed licensed-operator simulator training on July 26, which included

the loss of both main boiler feed pumps and a failure of the main turbine to auto trip, as

well as other component failures, plant transients and upsets. The scenario ultimately

required implementation of emergency operating procedures and the emergency plan.

The inspectors evaluated operator performance during the simulated event and verified

completion of risk significant operator actions, including the use of abnormal and

emergency operating procedures. The inspectors assessed the clarity and effectiveness

of communications, implementation of actions in response to alarms and degrading plant

conditions, and the oversight and direction provided by the control room supervisor. The

inspectors verified the accuracy and timeliness of the emergency classification made by

the shift manager and the technical specification action statements entered by the shift

technical advisor. Additionally, the inspectors assessed the ability of the crew and

training staff to identify and document crew performance problems.

Enclosure

7

b. Findinqs

No findings were identified.

1R12 Maintenance Effectiveness (71111.12Q - 2 samples)

a. Inspection Scope

The inspectors reviewed the samples listed below to assess the effectiveness of

maintenance activities on structure, system, and component (SSC) performance and

reliability. The inspectors reviewed system health reports, corrective action program

documents, maintenance work orders, and maintenance rule basis documents to ensure

that Entergy personnelwere identifying and properly evaluating performance problems

within the scope of the maintenance rule. For each sample selected, the inspectors

verified that the SSC was properly scoped into the maintenance rule in accordance with

10 CFR 50.65 and verified that the (aXz) performance criteria established by Entergy

staff was reasonable. As applicable, for SSCs classified as (aX1), the inspectors

assessed the adequacy of goals and corrective actions to return these SSCs to (a)(2).

Additionally, the inspectors ensured that Entergy staff was identifying and addressing

common cause failures that occurred within and across maintenance rule system

boundaries.

. Appendix R Diesel Generator in August 2011

. Nuclear Instrumentation System in August 2011

b. Findinos

No findings were identified.

1R13 Maintenance Risk Assessments and Emerqent Work Control (71111 .13 - 5 samples)

a. Inspection Scope

The inspectors reviewed station evaluation and management of plant risk for the

maintenance and emergent work activities listed below to verify that Entergy personnel

performed the appropriate risk assessments prior to removing equipment for work. The

inspectors selected these activities based on potential risk significance relative to the

reactor safety cornerstones. As applicable for each activity, the inspectors verified that

Entergy personnel performed risk assessments as required by 10 CFR 50.65(a)(a) and

that the assessments were accurate and complete. When Entergy personnel performed

emergent work, the inspectors verified that operations personnel promptly assessed and

managed plant risk. The inspectors reviewed the scope of maintenance work and

discussed the results of the assessment with the station's probabilistic risk analyst to

verify plant conditions were consistent with the risk assessment. The inspectors also

reviewed the technical specification requirements and inspected portions of redundant

safety systems, when applicable, to verify risk analysis assumptions were valid and

applicable requirements were met.

Enclosure

I

Elevated risk due to 31 EDG, 13.8kV feeder 13W92, and MS-PCV-1135 out of

service on July 14

Elevated risk due to planned 22A reactor protection system (RPS) relay

replacement on July 21

Elevated risk as a result of solar flare activity on August 5 - 6,

Elevated risk during 3-PT-M13A1 and Consolidated Edison activities in the

138kV switchyard on August 15

Elevated risk during 32 ABFP maintenance as a result of solar flares on

September 27

b. Findinqs

No findings were identified.

1R15 OperabilitvDeterminationsand FunctionalitvAssessments (71111.15-2samples)

a. lnspection Scope

The inspectors reviewed operability determinations for the following degraded or non-

conforming conditions:

r Loss of coolant accident calculation errors on July 26

r External corrosion on the 10-inch service water (SW) supply piping to EDGs on

August 4

The inspectors selected these issues based on the risk significance of the associated

components and systems. The inspectors evaluated the technical adequacy of the

operability determinations to assess whether technical specification operability was

properly justified and the subject component or system remained available such that no

unrecognized increase in risk occurred. The inspectors compared the operability and

design criteria in the appropriate sections of the technical specifications and UFSAR to

Entergy's evaluations to determine whether the components or systems were operable.

Where compensatory measures were required to maintain operability, the inspectors

determined whether the measures in place would function as intended and were

properly controlled by Entergy personnel. The inspectors determined, where

appropriate, compliance with bounding limitations associated with the evaluations.

b. Findinos

No findings were identified.

Enclosure

I

1R18 Plant Modifications (71111.18 - 1 sample)

Permanent Modification

a. Inspection Scope

The inspectors evaluated a modification to the 31 and 32 CCRAC units implemented by

engineering change package 26365. The inspectors verified that the design bases,

licensing bases, and performance capability of the affected systems were not degraded

by the modification. In addition, the inspectors reviewed modification documents

associated with design change, including the removal of zinc anode plates from the

reversing heads of the CCRAC condensers. The inspectors also reviewed the CCRAC

preventative maintenance procedure to verify the procedure was appropriately revised to

reflect the new equipment configuration.

b. Findinqs

No findings were identified.

1R19 Post-Maintenance Testino (71111.19 - 6 samples)

a. Inspection Scope

The inspectors reviewed the postmaintenance tests for the maintenance activities listed

below to verify that procedures and test activities ensured system operability and

functional capability. The inspectors reviewed the test procedure to verify that the

procedure adequately tested the safety functions that may have been affected by the

maintenance activity, that the acceptance criteria in the procedure was consistent with

the information in the applicable licensing basis and/or design basis documents, and that

the procedure had been properly reviewed and approved. The inspectors also

witnessed the test or reviewed test data to verify that the test results adequately

demonstrated restoration of the affected safety functions.

. 31 EDG maintenance outage on July 14

. 33 steam generator low level mismatch bistable replacement on July 15

. RPS relay 22Areplacement on July 21

. 32 EDG maintenance outage on August 10

. 32 CCRAC SW inlet strainer replacement on August 12

o RPS relay 214 replacement on August 25

b. Findinqs

No findings were identified.

Enclosure

10

1R22 Surveillance Testinq (71111.22- 4 samples)

a. Inspection Scope

The inspectors observed performance of surveillance tests and/or reviewed test data of

selected risk-significant SSCs to assess whether test results satisfied technical

specifications, the UFSAR, and Entergy procedure requirements. The inspectors

verified that test acceptance criteria were clear, tests demonstrated operational

readiness and were consistent with design documentation, test instrumentation had

current calibrations and the range and accuracy for the application, tests were performed

as written, and applicable test prerequisites were satisfied. Upon test completion, the

inspectors considered whether the test results supported that equipment was capable of

performing the required safety functions. The inspectors reviewed the following

surveillance tests:

. 3-PT-Q1 168, 32 safety injection pump on July 12 (in-service test)

. 3-PT-Q83, refueling water storage tank level instrument check and calibration

(LlC-921) on August 1 1

. 3-PT-Q94A, pressurizer level functional test - channel 1 on August 17

. 0-SOP-LEAKRATE-001, RCS leakrate surveillance, evaluation, and leak

identification on September 11 (reactor coolant system)

b. Findinqs

No findings were identified.

Cornerstone: Emergency Preparedness (EP)

1EP2 Alert and Notification Svstem (ANS) Evaluation (71114.02 - 1 sample)

a. Inspection Scope

An onsite review was conducted to assess the maintenance and testing of the Indian

Point Energy Center (IPEC) ANS. During this inspection, the inspectors interviewed

Entergy and contractor staff responsible for implementation of the ANS testing and

maintenance, and reviewed CRs pertaining to the ANS for causes, trends, and

corrective actions. The inspectors reviewed the ANS procedures and the ANS design

report to ensure Entergy's compliance with design report commitments for system

maintenance and testing. The inspection was conducted in accordance with Inspection

Procedure (lP) 71 1 14, Attachment 02. Planning Standard, 10 CFR 50.47(b) (5) and the

related requirements of 10 CFR 50, Appendix E, were used as reference criteria.

b. Findinqs

No findings were identified.

Enclosure

11

1EP3 Emerqencv Response Orqanization (ERO) Staffino and Auqmentation System

(71114.03 - 1 sample)

a. Inspection Scope

The inspectors conducted a review of the IPEC ERO augmentation staffing requirements

and the process for notifying and augmenting the ERO. This was performed to ensure

the readiness of key Entergy staff to respond to an emergency event and to ensure

Entergy staff's ability to activate their emergency facilities in a timely manner, The

inspectors reviewed the IPEC ERO roster, training records, applicable procedures, drill

reports for augmentation, quarterly EP drill reports, and CRs related to the ERO staffing

augmentation system. The inspection was conducted in accordance with lP 71114,

Attachment 03. Planning Standard, 10 CFR 50.47(bX2) and related requirements of

10 CFR 50, Appendix E, were used as reference criteria.

b. Findinqs

No findings were identified.

1EP4 Emersencv Action Level (EAL) and Emerqencv Plan Chanqes (71114.04 - 1 sample)

a. Inspection Scope

Since the last NRC inspection of this program area in September 2010, Entergy staff

have implemented various revisions of the different sections of the Indian Point

Emergency Plan. Entergy staff had determined that, in accordance with 10 CFR

50.54(q), any change made to the Plan, and its lower{ier implementing procedures, had

not resulted in any decrease in effectiveness of the Plan, and that the revised Plan

continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part

50. The inspectors reviewed EAL changes that had been made since September 2010,

and conducted a sampling review of other Emergency Plan changes, including the

changes to lower-tier emergency plan implementing procedures and EP-related

equipment, to evaluate for any potential decreases in effectiveness of the Emergency

Plan. However, this review was not documented in an NRC Safety Evaluation Report

and does not constitute formal NRC approval of the changes. Therefore, these changes

remain subject to future NRC inspection in their entirety. The inspection was conducted

in accordance with lP 71114, Attachment 04. The requirements in 10 CFR 50.54(q)

were used as reference criteria.

b. Findinos

No findings were identified.

Enclosure

12

1EPs Correction of Emerqencv Preparedness Weaknesses (71114.05 - 1 sample)

a. Inspection Scope

The inspectors reviewed a sample of self-assessment procedures and reports to assess

Entergy staff's ability to evaluate IPEC EP performance and programs. The inspectors

reviewed a sample of CRs from October 2Q10 through August 2011, initiated by Entergy

staff from drills, self-assessments, audits, and the November 7,2010, Unit 2 transformer

explosion which had resulted in an actual Alert declaration at Unit 2. Additionally, the

inspectors reviewed Quality Assurance audits, including 10 CFR 50.54(t) audits, and

several self-assessment reports. This inspection was conducted in accordance with lP

71114, Attachment 05. Planning Standard, 10 CFR 50.47(b) (14) and the related

requirements of 10 CFR 50 Appendix E were used as reference criteria.

b. Findinqs

No findings were identified.

lEPO Drill Evaluation (71114.06 - 1 sample)

Traininq Observations

a. lnspection Scope

The inspectors observed a simulator training evaluation for Unit 3 licensed operators on

July 26, which required emergency plan implementation by an operations crew. Entergy

planned for this evolution to be evaluated and included in performance indicator data

regarding drill and exercise performance. The inspectors observed event classification

and notification activities performed by the crew. The inspectors also attended the post-

evolution critique for the scenario. The focus of the inspectors' activities was to note any

weaknesses and deficiencies in the crew's performance and ensure that Entergy

evaluators noted the same issues and entered them into the corrective action program.

b. Findinqs

No findings were identified.

Enclosure

13

RADIATION SAFETY

Gornerstone: Occupational/Public Radiation Safety

2RS6 Radioactive Gaseous and Liquid Effluent Treatment (71124.06 - 1 sample)

a. Inspection Scope

Entergy's program was evaluated against the requirement to provide adequate

protection of the public from effluent releases resulting from normal operations of the

plant by maintaining the dose to the maximally exposed member of the public as far

below the dose limits in 10 CFR Part 20 and 40 CFR Part 190, as is reasonably

achievable (ALARA). General Design Criterion 60 in 10 CFR 50 Appendix A requires

the control and appropriate mitigation of radioactive materials released as plant

effluents. In addition, Paragraph 50.34a (and the associated Appendix l) to 10 CFR Part

50 provide dose based design criteria to ensure the effectiveness of plant effluent

processing systems in maintaining effluent releases to the plant environs ALARA.

Event Report and Effluent Report Reviews

The inspectors reviewed the IPEC 2009 and 2010 Annual Radiological Effluent Release

Reports. Both of these reports included documentation of groundwater effluent releases

to the Hudson River and commensurate doses to the maximally exposed member of the

public with comparison to regulatory limits. The inspectors determined that the reports

were submitted as required by the Off-site Dose Calculation Manual (ODCM)/Technical

Specifications. The inspectors identified radioactive effluent monitor operability issues

reported by the licensee as provided in effluent release reports, and determined that the

issues were entered into the corrective action program and adequately resolved.

ODCM and FSAR Reviews

The inspectors reviewed changes to the ODCM made by the licensee since the last

Inspection, against the guidance in NUREG-1301 ,1302 and 0133, and Regulatory

Guides 1 .1 09, 1 .21 and 4.1 . The inspectors determined that Entergy staff had not

identified any non-radioactive systems that had become contaminated as disclosed

either through an event report or are documented in the ODCM since the last inspection.

Groundwater Protection Initiative (GPl) Proqram

The inspectors reviewed the reported groundwater monitoring results, and changes to

the licensee's written program for identifying and controlling contaminated spills/leaks to

groundwater.

Walkdowns and Observations

The inspectors walked down selected components of the gaseous and liquid discharge

systems to verify that equipment configuration and flow paths align with the UFSAR

documented descriptions, and reviewed and assessed equipment material conditions.

For equipment or areas associated with the systems cited above that were not readily

accessible due to radiological conditions, the inspectors reviewed Entergy's material

Enclosure

14

condition surveillance records. The inspectors walked down those filtered ventilation

systems whose test results were reviewed during the inspection. The inspectors verified

that there were no conditions, such as degraded high efficiency particulate air

(HEPA)/charcoal banks, improper alignment, or system installation issues that would

impact the performance, or the effluent monitoring capability of the effluent system. The

inspectors determined that Entergy staff had not made any significant changes to their

effluent release points.

The inspectors observed the routine processing and discharge of effluents (including

sample collection and analysis). The inspectors verified that appropriate effluent

treatment equipment was being used and that untreated groundwater effluent was

designated as an abnormal liquid effluent, and its discharge into the Hudson River was

appropriately calculated and reported in accordance with ODCM specifications, and in

accordance with 10 CFR 50, Appendix I regulatory limits.

Samplinq and Analyses

The inspectors selected effluent sampling activities and verified that adequate controls

had been implemented to ensure representative samples are obtained (e.9., provisions

for sample line flushing, vessel recirculation, composite samplers, etc.). The inspectors

reviewed Entergy staff's use of compensatory sampling, in lieu of adequate system

maintenance, based on the frequency of compensatory sampling since the last

inspection.

The inspectors reviewed the results of the inter-laboratory comparison program to verify

the quality of the radioactive effluent sample analyses. The inspectors verified that the

inter-laboratory comparison program include hard{o-detect radioisotopes as

appropriate.

lnstrumentation and Equipment

Effluent Flow Measuring Instruments

The inspectors reviewed the methodology that Entergy personnel use to determine the

effluent stack and vent flow rates. The inspectors verified that the flow rates were

consistent with radiological effluents technical specifications (RETSyODCM or FSAR

values, and that differences between assumed and actual stack and vent flow rates do

not affect the results of the projected public doses,

Air Cleaning Systems

The inspectors verified that surveillance test results since the previous inspection for

technical specification required ventilation effluent discharge systems (HEPA and

charcoal filtration) meet technical specification acceptance criteria.

Enclosure

15

Dose Calculations

The inspectors reviewed three radioactive liquid waste discharge permits and three

radioactive gaseous waste discharge permits from Unit 2; and five radioactive liquid

waste discharge permits and four radioactive gaseous waste discharge permits from

Unit 3. The inspectors verified that the projected dose to members of the public were

accurate and based on representative samples of the discharge path. The inspectors

evaluated the methods used to determine the isotopes in the source term to ensure

applicable radionuclides were included, within detectability standards. The inspectors

reviewed the current 10 CFR Part 61 analyses to ensure hard{o-detect radionuclides

were included in the source term.

The inspectors reviewed changes in Entergy's offsite dose calculations since the last

inspection. The inspectors verified that the changes were consistent with the ODCM

and Regulatory Guide 1.109. The inspectors reviewed meteorologicaldispersion and

deposition factors used in the ODCM and effluent dose calculations to ensure

appropriate factors were being used for public dose calculations. The inspectors

reviewed the latest Land Use Census and verified that changes have been factored into

the dose calculations.

GPI lmplementation

The inspectors reviewed the identified leakage or spill events, and entries recorded in

the station's decommissioning file as required by 10 CFR 50.75 (g). The inspectors

verified that the recent soil excavation from the demolished Nuclear Environmental

Monitoring Laboratory preliminarily indicated some trace cesium contamination, was

being characterized and was documented in the decommissioning file.

The inspectors verified that onsite groundwater sample results and a description of any

significant onsite leaks/spills into groundwater for each calendar year were documented

in the Annual Radiological Environmental Operating Report (AREOR) for radiological

environmental monitoring program (REMP) or the Annual Radiological Effluent Release

Report (ARERR) for the RETS.

Problem ldentification and Resolution

The inspectors verified that problems associated with the effluent monitoring and control

program were being identified by Entergy staff at an appropriate threshold and were

properly addressed for resolution in the corrective action program.

b. Findinos and Observations

No findings were identified.

Groundwater Contam ination

On June 27, 2011 while reviewing the second quarter 201 1 groundwater monitoring well

sample results, Entergy personnel identified an increase in tritium concentrations in Unit

1 monitoring wells MW-56 and MW-57 (76,000 pCi/L and 20,000 pCi/L, respectively).

Subsequently, Entergy personnel conducted an investigation of this unexpected

Enclosure

16

condition. Previously, in 2008, the Unit 1 spent fuel was removed and the Unit 1 spent

fuel pools were subsequently drained, which terminated the previously known source of

groundwater contamination from the Unit 1 facility. Currently, the source of the

contamination has not been identified; however, several possible causes are being

evaluated by Entergy staff. This condition has been captured in CR-lP2-2011-3173.

The inspectors determined there is no dose impact to the public based on the current

scope of this groundwater contamination condition and will continue to follow-up the

issue via normal baseline inspection modules.

4. OTHER ACTIVITIES

4OA1 Performance Indicator (Pl) Verification (71151)

.1 Mitiqatinq Svstems Performance Index (5 samples)

a. Inspection Scope

The inspectors reviewed Entergy's submittal of the Mitigating Systems Performance

Index for the following systems for the period of July 1, 2010 through June 30, 2011:

o Unit 3 Emergency AC Power System

. Unit 3 High Pressure Injection System

. Unit 3 Heat Removal System

. Unit 3 Residual Heat Removal System

. Unit 3 Cooling Water System

To determine the accuracy of the performance indicator data reported during those

periods, the inspectors used definitions and guidance contained in NEI Document 99-02,

"Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors

also reviewed Entergy's operator narrative logs, CRs, event reports, and NRC integrated

inspection reports to validate the accuracy of the submittals.

b. Findinqs

No findings were identified.

.2 Emerqencv Preparedness (3 samples)

a. Inspection Scope

The inspectors reviewed data for the IPEC Emergency Preparedness Performance

Indicators (EP Pls), which are: (1) Drill and Exercise Performance; (2) ERO Drill

Participation; and (3) Alert and Notification System Reliability. The last NRC EP

inspection at IPEC was conducted in the third quarter of 2010, so the inspectors

reviewed supporting documentation from EP drills, training records, and equipment tests

from July 2010 through June 2011, to verify the accuracy of the reported Pl data. The

review of these Pls was conducted in accordance with lP 71151, using the acceptance

criteria documented in NEI 99-02, "Regulatory Assessment Performance lndicator

Guidelines," Revision 6.

Enclosure

17

b. Findinqs

No findings were identified.

4OA2 Problem ldentification and Resolution (71152 - 1 sample)

.1 Routine Review of Problem ldentification and Resolution Activities

a. Inspection Scope

As required by lnspection Procedure71152, "Problem ldentification and Resolution," the

inspectors routinely reviewed issues during baseline inspection activities and plant

status reviews to verify that Entergy personnel entered issues into the corrective action

program at an appropriate threshold, gave adequate attention to timely corrective

actions, and identified and addressed adverse trends. In order to assist with the

identification of repetitive equipment failures and specific human performance issues for

follow-up, the inspectors performed a daily screening of items entered into the corrective

action program and periodically attended condition report screening meetings.

b. Findinos

No findings were identified.

.2 Annual Sample: Review of Corrective Actions for Service Water (SW) Pipinq Leaks at

Indian Point Unit 2 and Unit 3

a. Inspection Scope

From August 8 - 12,2011, the inspectors reviewed several CRs for lndian Point Unit 2

and Unit 3 which documented leaks in the SW system piping of each unit.

The inspectors conducted a detailed review of CR-lP2-2010-06251, written

October 12,2010, which documents an adverse trend in the number of through wall SW

piping leaks which occurred during the third quarter o'12010 at both Indian Point Unit 2

and Unit 3. This CR discusses SW system leaks with six occurring at Unit 2 and five at

Unit 3. All 11 leaks had occurred during the third quarter of 2010. The inspectors also

conducted a detailed review of the 11 CRs from the reported leaks. The inspectors

conducted a walkdown of all accessible areas of the SW systems for Unit 2 and tor

Unit 3.

The inspectors also conducted a review of Entergy's apparent cause evaluation (ACE) of

the increasing number of leaks reported in CR-lP2-2010-06251. The inspectors

reviewed the operating experience contained in CR-lP2-2010-06251. Additionally, the

inspectors reviewed the corrective actions implemented in CR-lP2-2010-06251 to

address the increased occurrence of SW system piping leaks.

The inspectors also conducted a detailed review of CR-lP2-2010-05414, dated

August 31,2010, which documents the occurrence of pinhole, through wall, leaks in

three EDG SW couplings. Additional EDG SW coupling leaks are described in

CR-lP2-2010-05414, CR-lP2-2002-07051, and CR-lP2-2009-Q5169. The inspectors

Enclosure

18

interviewed system engineers and design engineers responsible for resolving the causes

of the leaking couplings.

b. Findinqs and Observations

No findings were identified.

cR-tP2-2010-06251

Entergy conducted an ACE of the increasing number of leaks reported in

CR-lP2-2010-06251 and determined that the direct cause was that "erosion and

installation deficiencies have created gaps in the cement lining of SW pipe, leaving bare

metal exposed to corrosive river water." The 11 identified leaks have either been

evaluated as operable in accordance with American Society of Mechanical Engineers

(ASME) Code Case N-513-2 or N-513-3, or the leaks have been repaired. Longer term

corrective actions, aimed at correcting the cause of the through wall leaks, have not

been completed but are in the planning stages.

cR-tP2-2010-05414

Because this CR was classified as a Category C, Non-Significant CR, Entergy staff did

not conduct a cause determination on these coupling leaks. Rather, Entergy staff made

modifications to the design of original couplings following Entergy engineering

procedures. The primary design change was the addition of an epoxy coating to new

stainless steel coupling bodies to prevent corrosive SW from contacting and degrading

the stainless steel.

The inspectors reviewed the Entergy specification for the modified couplings and the

Commercial Dedication Evaluation performed to support the coupling changes. The

inspectors confirmed that Entergy personnel have replaced the originally affected

couplings, including ones which had not leaked.

40A3 Follow-Up of Events and Notices of Enforcement Discretion (71153 - 4 samples)

.1 Plant Events

a. lnspection Scope

For the plant events listed below, the inspectors reviewed and/or observed plant

parameters, reviewed personnel performance, and evaluated performance of mitigating

systems. The inspectors communicated the plant events to appropriate regional

personnel, and compared the event details with criteria contained in IMC 0309, "Reactive

Inspection Decision Basis for Reactors," for consideration of potential reactive inspection

activities. As applicable, the inspectors verified that Entergy personnel made

appropriate emergency classification assessments and properly reported the event in

accordance with 10 CFR 50.72 and 50.73. The inspectors reviewed Entergy staff's

follow-up actions related to the events to assure that corrective actions commensurate

with their safety significance were implemented.

Enclosure

19

A seismic event and tremor were reported at Indian Point at 14:04 on August 23.

Unit 3 operators entered O-AOP-SEISMIC-1, Seismic Event, and ensured the

plant continued to operate safely. Entergy personnel performed a site walkdown

including containment and identified no damage or issues as a result of the

earthquake. No peak shock annunciators alarmed as a result of the earthquake

and lndian Point did not enter any emergency action levels. The inspectors

performed an independent walkdown of safety related equipment and reviewed

completed procedures to independently assess Entergy personnel conclusions

that there was no damage or issues from the seismic event.

Hurricane lrene was reported at Indian Point on August 27-28. Unit 3 operators

entered OAP-008, Severe Weather Preparations, to monitor the changing

weather conditions and take action as necessary. Entergy personnel performed

a site walkdown of internal and externalareas, updated plant risk status with a

severe weather risk and verified the capability of safety systems to respond when

needed. The inspectors performed an independent walkdown of safety related

equipment and reviewed plant procedures to ensure Unit 3 was adequately

prepared for the hurricane. The inspectors remained onsite assessing Hurricane

lrene's impact on Unit 3; however, the hurricane was significantly downgraded on

landing with heavy rains and mild winds. Entergy personnel documented issues

identified for further follow-up.

Unit 3 experienced a loss of normal 138kV offsite power during severe weather

on August 19. Unit 3 control room operators implemented applicable steps of

abnormal operating procedure 3-AOP-138kV-1, Loss of Power to 6.9kV Bus 5

and/or 6, to address the transient and to stabilize the plant. Additionally, control

room operators performed a downpower to approximately 76 percent, due to

degrading vacuum conditions following the loss of three circulating water pumps,

as a direct result of the loss of power event. Entergy operators evaluated and

entered applicable technical specifications, and appropriately reported the event

to the NRC in accordance with 10 CFR 50.72, and entered the issue for

evaluation within the corrective action program as CR-lP3-2011-04045.

Equipment performance aspects with regard to the loss of the offsite power

source will be subject to further baseline inspection during review of the root

cause evaluation and subsequent Licensee Event Report (LER), as applicable.

b. Findinos

No findings were identified.

.2 (Closed) LER 05000286-2010-002-00: Manual Reactor Trip Due to a Cooling Water

Leak in the Main Generator Exciter Air Cooler

On September 9, 2010, Unit 3 control room operators initiated a manual reactor trip after

operators observed a SW leak in the main generator exciter housing. Subsequently,

Entergy personnel determined the leak was in the 31 exciter air cooler and was caused

by the failure of an eroded and corroded Admiralty Brass tube. The issue was entered

into the corrective action program as CR-lP3-2010-02682 and a root cause evaluation

was performed. Entergy personnel repaired the leak, completed extent-of-condition

inspections on all 31 and 32 exciter air cooler tubes, and installed new sleeves on both

Enclosure

20

ends of all unplugged tubes of both exciter air coolers. Additionally, the 31 and 32

exciter air cooler heat exchanger tube bundles were replaced during the Unit 3 refueling

outage in the spring of 2011. The inspectors reviewed the LER and corrective action

program documents to verify that the Entergy staff's evaluation and corrective actions

were adequate. Additionally, the inspectors reviewed information obtained during the

NRC's baseline inspection during the actual event from the 3rd quarter 2010. The

inspectors did not identify any violations during the review of this LER; therefore, this

LER is closed.

4OAO Meetinqs. Includinq Exit

On October 24,2011, the inspectors presented the inspection results to Mr. Joseph

Pollock, Site Vice President, and other members of the Entergy staff. The inspectors

verified that no proprietary information was retained by the inspectors or documented in

this report.

ATTACHMENT: SUPPLEMENTARY INFORMATION

Enclosure

A-1

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Pollock, Site Vice President

B. Allen, Engineering

Y. Andreozzi, Systems Engineering Supervisor

N. Azevedo, Engineering Programs Manager

T. Beasely, System Engineer

R. Burroni, Systems Engineering Manager

P. Cloughessy, Maintenance Rule Coordinator

G. Dahl, Licensing Specialist

M. DeChristopher, System Engineer

J. Dinelli, Site Operations Manager

B. Dolansky, In-Service Inspection Program Manager

R. Drake, Design Engineering Supervisor

M. Dries, System Engineer

J. Lijoi, Instrument and Controls Superintendent

T. Motko, System Engineer

T. Orlando, Engineering Director

C. Rokes, Licensing Specialist

A. Singer, Training Superintendent

M. Tesoriero, Programs and Components Engineering Manager

M. Troy, Programs and Components Engineering Supervisor

J. Ventosa, General Manager, Plant Operations

B. Walpole, Licensing Manager

C. Wilson, System Engineer

W. Wittich, Engineering

V. Meyers, Design Engineering Supervisor

Attachment

A-2

LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED

Closed

05000286/201 0-002-00 LER Manual Reactor Trip Due to a Cooling Water Leak

in the Main Generator Exciter Air Cooler

(Section 4OA3)

LIST OF DOCUMENTS REVIEWED

Section 1R01: Adverse Weather Protection

Procedures

3-AOP-Flood-1, Flooding, Revision 6

OAP-008, Severe Weather Preparations, Revision 9

Section 1R04: Equipment Alisnment

Procedures

3-COL-FW-2, Auxiliary Feedwater System, Revision 29

3-COL-EL-005, Diesel Generators, Revision 36

3-COL-RW-002, Service Water System, Revision 43

Miscellaneous

lP3V-6-6.27-0003, Flexmaster Pipe Joint, Revision 2

Section 1R05: Fire Protection

Procedures

EN-DC-161, Control of Combustibles, Revision 5

Completed Procedures

3-FlR-005-FlR, lnspection, Cleaning and Preventive Maintenance of lP3 Fire and Smoke

Dampers, dated August 17,2Q11

3-PT-SA17, Fire Protection Ultra-Violet Flame Detectors, dated August 30,2011

Condition Reports (CR-lP3-201 1 -)

041 99

Drawinqs

9321-F-40483, Diesel Generator Building Heating & Ventilation Plan & Sections, Revision 9

9321-F-40563, Control Building Ventilation Fan Room -Et27'-0", Plans, Sections and Details,

Revision 5

9321-D-10685, Diesel Generator Building Fire Protection Upgrade of Wall Openings, Revision 2

Miscellaneous

PFP-354, Diesel Generators 31,32 & 33, Revision 0

PFP-354A, Control Building Exhaust Fan Room and DG Air lntake Enclosure, Revision 0

PFP-367, Atmospheric Steam Dumps - Auxiliary Feedwater Building, Revision 5

Attachment

A-3

PFP-3674, Auxiliary Feedwater Building, Revision 4

lP3-ANAL-FP-02143,lP3 Fire Hazards Analysis Report, Revision 4

Calculation lP3-CALC-FP-00901, New EDG Fire Barrier Design, Revision 0

Section 1R07: Heat Sink Performance

Procedures

SEP-SW-001, IPEC NRC G.L.89-13 Service Water Program, Revision 4

Condition Reports (CR-lP3-201 1 -)

03925

Maintenance OrdersMork Orders

5231 0926-01

Miscellaneous

Preliminary Report of Eddy Current Inspection, dated August 10,2011, for vendor inspection

conducted on the 32 EDG Jacket Water Heat Exchanger

Section 1Rl1: Licensed Operator Requalification Proqram

Procedures

TQF-210-DD03, LOR Simulator Crew Performance Evaluation Report, Revision 2

Section 1R12: Maintenance Effectiveness

Procedures

EN-DC-203, Maintenance Rule Program, Revision 1

EN-DC-204, Maintenance Rule Scope and Basis, Revision 2

EN-DC-205, Maintenance Rule Monitoring, Revision 3

EN-DC-206, Maintenance Rule (aX1) Process, Revision 1

3-SOP-EL-O13, Appendix R Diesel Generator Operation, Revision 25

3-SOP-EL-014, Energization of the 480V Buses from the Appendix R Diesel Generator,

Revision 10

3-AOP-SSD-1, Control Room Inaccessibility Safe Shutdown Control, Revision 13

3-PT-W012, Appendix R Diesel Support Systems Inspection, Revision 19

OAP-008, Severe Weather Preparations, Revision 7

OAP-008, Severe Weather Preparations, Revision 8

OAP-008, Severe Weather Preparations, Revision 10

Condition Reports (CR-lP3-)

2010-00208 2010,00249 2010-00303 2010-00367 2010-00368 2010-00375

2010-02440 2010-03980 2011-02368 2011-02905 2011-03095 2011-03381

2011-04090 2011-04428

Maintenance OrdersMork Orders

00279763 00279764 00260222

Attachment

A-4

Drawinqs

9321-F-36033, Appendix "R" On-Site Alternate Power Source Diesel Generator Main One-Line

Diagram, Revision 10

Miscellaneous

lndian Point Energy Center - lP2 and lP3 Maintenance Rule Basis Document Nuclear

Instrumentation System, Revision 0

Maintenance Rule Basis Document for Appendix R Emergency Diesel Generator and

Emergency Diesel Generators, Revision 0

Section 1Rl3: Maintenance Risk Assessments and Emerqent Work Control

Procedures

EN-WM-104, On Line Risk Assessment, Revision 4

OAP-008, Severe Weather Preparations, Revision 9

Section 1Rl5: Operabilitv Determinations and Functionalitv Assessments

Procedures

EN-OP-104, Operability Determination Process, Revision 5

Condition Reports (CR-lP3-201 1 -)

03737 04087 03831

Ma intenance OrdersMork Orders

166970

Miscellaneous

Nuclear Safety Advisory Letter NSAL-11-5, Westinghouse LOCA Mass and Energy Release

Calculation lssues, dated July 7,2011

Calculation lP-CALC-11-00056, Evaluation of Pipe Wall Thinning at Line 1093 and 1099,

Revision 0

Section 1Rl8: Plant Modifications

Condition Reports (CR-lP3-)

2o10-03776 2011-03776 201 1-03809

Miscellaneous

DC-96-3-129, Control Room AC Unit Condenser Replacement, Revision 0

EC-26365, Removal of Zinc Anode in the Reversing Heads of 31 and 32 CCR AC Units,

Revision 0

Section 1R19: Post-Maintenance Testinq

Completed Procedures

3-PT-M079A, 31 EDG Functional Test, dated July 14,2011

3-PT-M1341, Reactor Protection Logic Channel Functional Test (Reactor Power Greater Than

35o/o - P8), dated August 15,2011

0-f C-Sl-69, DAM502 Dual Alarm Module Replacement, dated July 15,2011

Attachment

A-5

3-PT-Q97, Steam Generator Level Analog Functional, dated July 15,2011

3-PT-M0798, 32 EDG Functional Test, dated August 10,2011

3-SOP-EL-001, Diesel Generator Operation, dated August 10,2011.

Condition Reports (CR-lP3-201 1 -)

03776 03957 04181 03809 03908

Maintenance OrdersMork Orders

00287215 52338291 00285659 52309613 52324898 52309890

00278452 52309560 52309613

Drawinos

113E301 Sheet 3, Reactor Protection System Schematic Diagram, Revision 10

Miscellaneous

Receipt Inspection No. 9988, Mueller Model 761-WE, 3" Y-Type Strainer, 150#

CGD Lab - Material Test Report, dated August 4,2011

lP3 1 1N-0227, Commercial Grade Dedication Report, dated August 10,2011

Procurement Engineering Evaluation 95408

Section 1R22: Surveillance Testinq

Completed Procedures

3-PT-Q1 168, 32 Safety Injection Pump, dated July 1 1, 2011

3-PT-Q1 168,32 Safety Injection Pump, dated July 12,2011

3-lC-PC-l-P-923, Safety Injection Pump Discharge Pressure 4" Header, dated July 13,2011

3-lC-PC-l-P-923, Safety lnjection Pump Discharge Pressure 6" Header, dated July 13,2011

lC-PC-l-F-950, Safety Injection Miniflow Indicator, dated November 30, 2009

3PT-Q94A, Pressurizer Level Functional Test - Channel l, dated August 16,2011

3PT-Q948, Pressurizer Level Functional Test - Channel ll, dated August 16,2011

3PT-Q94C, Pressurizer Level Functional Test - Channel lll, dated August 16,2011

3-PT-Q83, RWST Level lnstrument Check and Calibration (LlC-921), dated August 11,2011

0-SOP-LEAKRATE-001, dated September 11, 2100

Condition Reports (CR-lP3-201 1 -)

03559 03575 03944 03945

Maintenance OrdersMork Orders

52214696 52310135

Section 1EP2: Alert and Notification Svstem (ANS) Evaluation

Procedures

Entergy Indian Point Energy Center Alert and Notification System Design Report, Revision 4

lP-EP-AD20, Indian Point Energy Center Alert Notification System Test, Revision 4

lP-EP-AD3O, IPEC ATI Siren System Administration, Revision 3

lP-EP-AD31, IPEC ATI Siren System Maintenance Administration, Revision 1

f P-EP-AD3?,IPEC ATI Siren System Routine Polling and Testing, Revision 4

lP-EP-AD33, IPEC ATI Siren System Quarterly Preventive Maintenance, Revision 6

lP-EP-AD34, IPEC ATI Control Station Semi-Annual Preventive Maintenance, Revision 4

Attachment

A-6

IP-EP-AD3S, IPEC ATI Siren Site Annual Preventive Maintenance, Revision 4

lP-EP-AD38, IPEC ATI Repeater Site Annual Preventive Maintenance, Revision 6

lP-EP-AD39, IPEC ATI Control Station Annual Preventive Maintenance, Revision 4

Condition Reports (CR-lP2-)

2010-0078 2010-2449 2010-4455 2010-6106 2011-0065

2011-1589

9ection 1EP3: Emerqencv Response Oroanization (EROI Staffinq and Auqmentation

Svstem

Procedures

Indian Point Energy Center Emergency Plan Table B -1, Revision 1 1-00

EN-EP-801, Emergency Response Organization, Revision 2

ENN-PL-140, Emergency Response Organization Respiratory Protection Guidelines, Revision 1

EN-TQ-110, Emergency Response Organization Training, Revision 4

lP-EP-AD9, Notification Systems Testing and Maintenance, Revision 8

Miscellaneous

f PEC Emergency Response Organization Roster, dated August i,2011

Dialogics Drill Reportsfor: October27,2009, February 11,2010, June 10, 2010, September

21,2010, December 9,2010, March 3,2011, and June 30,2011

Section 1EP4: Emerqencv Action Level (EAL) and Emerqencv Ptan Ghanses

Procedures

lndian Point Energy Center Emergency Plan, Revision 10

EN-Ll-100, Process Applicability Determination, Revision 10

EN-EP-305, Emergency Planning 10 CFR 50.5a(q) Review program, Revision 2

Miscellaneous

50.sa(q) Decrease ln Effectiveness reviews for:

lP-EP-120, Emergency Classification, Revisions 5 and 6

lP-EP-320, Radiological Field Monitoring, Revision 5

lP-EP-360, Core Damage Assessment, Revision 2

lP-EP-410, Protective Action Recommendations, Revision 6

lP-EP-430, Site Assembly, Accountability and Relocation of Personnel Offsite, Revision 6

lP-EP-510, MRPDAS, Revision 5

50.54Q-2011-Q2l6,lmplementation of the Security Owner Controlled Area Boundary

50.54(q) Screenings conducted between November 2010 and July 2011

Section 1EPS: Correction of Emerqencv Preparedness Weaknesses

Condition Reports

rP3LO-2010-00016 LO-HQNLO-2010-00018

Miscellaneous

Quality Assurance Audit Report QA-07-2011-lP-1(10 CFR 50.54(t) Report)

Quality Assurance Surveillance Report QS-2010-lP-09 (Off-year 50.54(t) surveillance)

Attachment

A-7

Emergency Preparedness Audit Record, to Extend the Emergency Preparedness Audit to a 24

Month Frequency as Allowed by EN-QV-109, Audit Process, and 10 CFR 50.54(txlXii),

dated May 27,2010

IPEC Unit 2 Alert Report for November 7,2Q10, Transformer Explosion Event, dated

November 7,2010

IPEC Emergency Preparedness Drill Performance Reports for drills conducted on: June 2,

2010, August 12, 2010, September 1, 2010, September 14, 2010, December 7 , 2010,

February 3,2011, June 9,2011

Section 1EP6: Drill Evaluation

Procedures

IP-EP-210, Central Control Room, Revision 9

lP-EP-115, Emergency Plan Forms, Revision 31

lP-EP-120, Emergency Classification, Revision 6

Emergency Plan Form EP-4, CCR Initial Notification Checklist AIeTUSAE/GE, Revision 15

Miscellaneous

TQF-210-DD03, LOR Simulator Crew Performance Evaluation Report, Revision 2

Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment

Procedures

IPEC l.E. Bulletin 80-10 Program

lP-SMM-CY-001, Radioactive Effluent Control Program, Revision 9

0-CY-2730, Airborne Radioactive Effluents, Revision 3,

0-CY-1320, Effluents Management System, Revision 1

2-SOP-5.1.5, Calculation and Recording of Radioactive Liquid Releases, Revision 37

2-SOP-5.2.4, Calculation and Recording of Radioactive Gaseous Releases, Revision 37

3-SOP-WDS-O14, Liquid Waste Releases, Revision 25

3-SOP-WDS-O13, Gaseous Waste Releases, Revision 28

Condition Reports (CR-lP3-)

2009-4430 2010-1703 2010-3795 2011-0738 2011-1312 2011-3479

Condition Reports (CR-lP2-)

2010-0872 2010-2186 2010-3300 2010-4643 2010-7153 2011-0186

2011-0463 2011-0960 2011-1613 2011-3173

Miscellaneous

Quality Assurance Audit Report No. QA-02-06-2009-lP-1

IPEC Snapshot Self-Assessment Report, IP3LO-2010-154, Groundwater Protection Initiative

I PEC Snapshot Self-Assessment Report, I P3LO-2007 -1 49, l E Bulletin 80-1 0

2009 Annual Radioactive Effluent Release Report

2010 Annual Radioactive Effluent Release Report

Final Safety Analysis Report, Section 11, Waste Disposal and Radiation Protection

Attachment

A-8

Section 4OAl  : Performance Indicator Verification

Procedures

EN-Ll-114, Performance Indicator Process, Revision 4

Completed Procedures

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator High

Pressure Injection, dated October 13,2010

EN-LI-114, Performance Indicator Process - Mitigating Systems Performance Indicator High

Pressure lnjection, dated January 10,2011

EN-Ll-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator High

Pressure Injection, dated April 13,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator High

Pressure Injection, dated July 1 1, 2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance lndicator

Residual Heat Removal, dated October 13,2Q10

EN-LI-114, Performance Indicator Process - Mitigating Systems Performance Indicator

Residual Heat Removal, dated January 10,2011

EN-LI-114, Performance Indicator Process - Mitigating Systems Performance Indicator

Residual Heat Removal, dated April 13,2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance lndicator

Residual Heat Removal, dated July 1 1, 2011

EN-Ll-114, Performance lndicator Process - Mitigating Systems Performance lndicator Heat

Removal, dated October 13,2010

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator Heat

Removal, dated January 10,2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator Heat

Removal, dated April 13,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator Heat

Removal, dated July 1 1,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator

Emergency AC Power, dated October 13,2010

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator

Emergency AC Power, dated January 10,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator

Emergency AC Power, dated April 13, 2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator

Emergency AC Power, dated July 1 1,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance lndicator Cooling

Water Support (Component Cooling Water), dated October 13,2010

EN-LI-114, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Component Cooling Water), dated January lQ,2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Component Cooling Water), dated April 13,2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Component Cooling Water), dated July 1 1, 2011

EN-Ll-114, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Service Water), dated October 13,2010

Attachment

A-9

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Service Water), dated January 11,2011

EN-LI-114, Performance lndicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Service Water), dated April 13,2011

EN-LI-1 14, Performance Indicator Process - Mitigating Systems Performance Indicator Cooling

Water Support (Service Water), dated July 1 1,2011

Section 4OA2: Problem ldentification and Resolution

Procedures

EN-DC-315, Flow Accelerated Corrosion Program, Revision 5

EN-DC-184, NRC Generic Letter 89-13 Service Water Program, Revision 1

SEP-SW-001, NRC Generic Letter 89-13 Service Water Program, Revision 4

Completed Procedures

3PT-VO32S, Inservice Test of Service Water System Outside VC, dated March 25,2009

3PT-VO32S, lnservice Test of Service Water System Outside VC, dated March 4,2003

Condition Reports (CR-l P2-)

2002-07051 2008-04265 2009-03084 2009-05169 2010-03655 2010-04633

2010-04931 2010-05065 2010-05288 2010-05394 2010-05414 2010-05517

2010-05888 2010-06251 2011-01414 201 1-01901 2011-02714 2011-03723

2011-04015

Condition Reports (CR-lP3-)

2009-04713 2010-02039 2010-02185 2010-02438 2010-02674 2011-03831

2009-04025 2010-02039 2010-02185 2010-02398 2010-02438 2010-02674

2010-02724 2011-00784

Maintenance OrdersMork Orders

00220134 01 00243476 01 00251249 01 00250166 01

Miscellaneous Documents

EC 24332, Engineering Evaluation of the Use of Enecon Ceramalloy CL+, CP+ Adhesive

Coating for Stainless Steel Material in Service Water System

lP-CALC-11-00056, Evaluation of Pipe Wall Thinning at Line No. 1093 and 1099, dated August

8,2011

lP3-UT-11-070, UT Erosion/Corrosion Examination of 10" SWN-1099

lndian Point Unit 2, Service Water System Health Report, Q1- 2011

Indian Point Unit 2, Service Water System Health Report, Q4- 2010

Indian Point Unit 3, Service Water System Health Report, Q1- 2011

Indian Point Unit 3, Service Water System Health Report, Q4- 2010

lP3 FSAR Update, Chapter 9, Page 111 of 182,2009, Revision 3

American Society for Testing and Materials A513-94: Standard Specification for Electric-

Resistance-Welded Carbon Steel and Alloy Steel Mechanical Tubing

United Engineers and Constructors Inc., Specification for Flexible Piping Connectors for

Emergency Back-Up Diesel Generators, Westinghouse Electric Corporation

lndian Point Generating Station Unit No. 3, Consolidated Edison Company of New York;

Specification No. 9321-05-248-62, November 30, 1970

Attachment

A-10

American Society for Testing and Materials A 249lA 249M-94a: Standard Specification for

Welded Austenetic Steel Boiler, Superheater, Heat-Exchanger, and Condenser Tubes

Entergy Receipt Document 00006147; Joint, Pipe Restrained, SS, 4" X 8" Long, January 10,

2010

Material Procurement Dedication Plan, April24,1gg8, Po# 10262978, UTK#470889

Enecon North East letter dated August 16,2011; Subject: Application of the Enecon CeramAlloy

CL+ Coating System to the lP2 EDG Service Water Piping Flex Couplings

Section 4OA3: Follow-up of Events and Notices of Enforcement Discretion

Procedures

3-PT-M032, Seismic lnstrumentation Channel Check, Revision 21

EN-Ll-119, Apparent Cause Evaluation (ACE) Process, Revision 12

EN-Ll-102, Corrective Action Process, Revision 16

0-BKR-406-ELC, Westinghouse 6900 Volt Breaker Inspection and Cleaning, Revision 11

0-BKR-406-ELC, Westinghouse 6900 Volt Breaker Inspection and Cleaning, Revision 14

Completed Procedures

3-SOP-S-001, Seismic Monitoring Equipment Operation, dated August 23,2011

0-AOP-Seismic-1, Seismic Event, dated August 23, 2011

Gondition Reports (CR-lP3-)

2005-00992 2009-03380 2010-02682 2010-02683 2010-02703 2011-03730

2011-04371

Maintenance OrdersMork Orders

lP3-05-17643 52024157 00250188 00250184

Miscellaneous

PM Basis Template, Switchgear - Medium Voltage - 1KV to 7KV, Revision 3

lP3-RPT-ED-01917,13.8 kV, 138 kV, and 6.9 KV Distribution Systems Maintenance Rule Basis

Document, Revision 1

Attachment

A-11

LIST OF ACRONYMS

ABFP auxiliary boiler feed pump

ACE apparent cause evaluation

ADAMS Agencywide Document Management System

ALARA as low as is reasonably achievable

ANS alert and notification system

AREOR an n ua I radiolog ical environ mental operating report

ARERR annual radiological effluent release report

ASME American Society of Mechanical Engineers

CAP corrective action program

CB control building

CCRAC control room air conditioner

CFR Code of Federal Regulations

CR condition report

DRP Division of Reactor Projects

DRS Division of Reactor Safety

EAL emergency action level

EDG emergency diesel generator

ENTERGY Entergy Nuclear Northeast

EP emergency preparedness

ERO emergency response organization

FZ fire zone

GPI ground water protection initiative

HEPA high efficiency particulate air

lMc Inspection Manual Chapter

IPEC Indian Point Energy Center

IR inspection report

LER licensee event report

NEI Nuclear Energy Institute

NRC Nuclear Regulatory Commission

ODCM off-site dose calculation manual

OEDO Office of the Executive Director for Operations (NRC)

pci/L picocurie per liter

PI performance indicator

PM preventive maintenance

REMP radiological environmental monitoring program

RETS radiological effluents technical specifications

RPS reactor protection system

SSC structure, system, and component

SW service water

UFSAR updated final safety analysis report

Attachment