MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
RIV000085 United States Nuclear Regulatory Commission Official Hearing Exhibit Submitted: December 22, 2011 Entergy Nuclear Operations, Inc.
In the Matter of: EXCERPT (Indian Point Nuclear Generating Units 2 and 3)
v\,.t..~R REGU<.q" ASLBP #: 07-858-03-LR-BD01
!~~\:
Docket #: 05000247 l 05000286 C 0 Exhibit #: RIV000085-00-BD01 Identified: 10/15/2012
~ . Admitted: 10/15/2012 Withdrawn:
~ -' i-'
'I'/~ O~ Rejected: Stricken:
" .**.'" '" Other:
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 November 7, 2011 Mr. Joseph Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB Buchanan, NY 10511-0249 SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT 3 - NRC INTEGRATED INSPECTION REPORT 05000286/2011004
Dear Mr. Pollock:
On September 30, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Indian Point Nuclear Generating Unit 3. The enclosed integrated inspection report documents the inspection results, which were discussed on October 24, 2011, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room of from the Publicly Available Records component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
Sincerely,
~!.:::T Reactor Projects Branch 2 Division of Reactor Projects Docket No. 50-286 License No. DPR-26 Enclosure: Inspection Report 05000286/2011004 w/Attachment: Supplementary Information cc w/encl: Distribution via ListServ
Dose Calculations The inspectors reviewed three radioactive liquid waste discharge permits and three radioactive gaseous waste discharge permits from Unit 2; and five radioactive liquid waste discharge permits and four radioactive gaseous waste discharge permits from Unit 3. The inspectors verified that the projected dose to members of the public were accurate and based on representative samples of the discharge path. The inspectors evaluated the methods used to determine the isotopes in the source term to ensure applicable radionuclides were included, within detectability standards. The inspectors reviewed the current 10 CFR Part 61 analyses to ensure hard-to-detect radionuclides were included in the source term.
The inspectors reviewed changes in Entergy's offsite dose calculations since the last inspection. The inspectors verified that the changes were consistent with the ODCM and Regulatory Guide 1.109. The inspectors reviewed meteorological dispersion and deposition factors used in the ODCM and effluent dose calculations to ensure appropriate factors were being used for public dose calculations. The inspectors reviewed the latest Land Use Census and verified that changes have been factored into the dose calculations.
GPI Implementation The inspectors reviewed the identified leakage or spill events, and entries recorded in the station's decommissioning file as required by 10 CFR 50.75 (g). The inspectors verified that the recent soil excavation from the demolished Nuclear Environmental Monitoring Laboratory preliminarily indicated some trace cesium contamination, was being characterized and was documented in the decommissioning file.
The inspectors verified that onsite groundwater sample results and a description of any significant onsite leaks/spills into groundwater for each calendar year were documented in the Annual Radiological Environmental Operating Report (AREOR) for radiological environmental monitoring program (REMP) or the Annual Radiological Effluent Release Report (ARERR) for the RETS.
Problem Identification and Resolution The inspectors verified that problems associated with the effluent monitoring and control program were being identified by Entergy staff at an appropriate threshold and were properly addressed for resolution in the corrective action program.
b. Findings and Observations No findings were identified.
Groundwater Contamination On June 27, 2011 while reviewing the second quarter 2011 groundwater monitoring well sample results, Entergy personnel identified an increase in tritium concentrations in Unit 1 monitoring wells MW-56 and MW-57 (76,000 pCi/L and 20,000 pCi/L, respectively).
Subsequently, Entergy personnel conducted an investigation of this unexpected Enclosure
condition. Previously, in 2008, the Unit 1 spent fuel was removed and the Unit 1 spent fuel pools were subsequently drained, which terminated the previously known source of groundwater contamination from the Unit 1 facility. Currently, the source of the contamination has not been identified; however, several possible causes are being evaluated by Entergy staff. This condition has been captured in CR-IP2-2011-3173.
The inspectors determined there is no dose impact to the public based on the current scope of this groundwater contamination condition and will continue to follow-up the issue via normal baseline inspection modules.
4. OTHER ACTIVITIES 40A 1 Performance Indicator (PI) Verification (71151)
.1 Mitigating Systems Performance Index (5 samples)
a. Inspection Scope The inspectors reviewed Entergy's submittal of the Mitigating Systems Performance Index for the following systems for the period of July 1, 2010 through June 30, 2011:
- Unit 3 Emergency AC Power System
- Unit 3 High Pressure Injection System
- Unit 3 Heat Removal System
- Unit 3 Cooling Water System To determine the accuracy of the performance indicator data reported during those periods, the inspectors used definitions and guidance contained in NEI Document 99-02,
"Regulatory Assessment Performance Indicator Guideline," Revision 6. The inspectors also reviewed Entergy's operator narrative logs, CRs, event reports, and NRC integrated inspection reports to validate the accuracy of the submittals.
b. Findings No findings were identified .
.2 Emergency Preparedness (3 samples)
a. Inspection Scope The inspectors reviewed data for the IPEC Emergency Preparedness Performance Indicators (EP Pis), which are: (1) Drill and Exercise Performance; (2) ERO Drill Participation; and (3) Alert and Notification System Reliability. The last NRC EP inspection at IPEC was conducted in the third quarter of 2010, so the inspectors reviewed supporting documentation from EP drills, training records, and equipment tests from July 2010 through June 2011, to verify the accuracy of the reported PI data. The review of these Pis was conducted in accordance with IP 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 6.
Enclosure