Response to Request for Additional Information: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML18194A252
Person / Time
Site: FitzPatrick  Constellation icon.png
Issue date: 07/12/2018
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
JAFP-18-0068
Download: ML18194A252 (106)


Text

Exelon Generation ~ 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp com 10 CFR 50.90 10 CFR 50, Appendix E JAFP-18-0068 July 12, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant Independent Spent Fuel Storage Installation General License SFGL-12 Docket No.72-012

Subject:

Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors"

References:

1) Letter from David T. Gudger (Exelon Generation Company, LLC) to U.S.

Nuclear Regulatory Commission - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated January 31, 2018 (ML18037A786)

2) Electronic Mail Request from Tanya Hood (U.S. Nuclear Regulatory Commission) to Richard Gropp, et al. (Exelon Generation Company, LLC) -

Draft RAls - FitzPatrick - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6, dated June 7, 2018

3) Electronic Mail Request from Tanya Hood (U.S. Nuclear Regulatory Commission) to Bryan Hanson et al. (Exelon Generation Company, LLC) -

FitzPatrick RAls - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6, dated June 13, 2018(ML18164A365)

By letter dated January 31, 2018 (Reference 1}, Exelon Generation Company, LLC (Exelon) submitted a License Amendment Request (LAR) to support changes to the Emergency Plan for the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). Specifically, the proposed changes involve revising the Emergency Plan for FitzPatrick to adopt the Nuclear Energy lnstitute's

U.S. Nuclear Regulatory Commission Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes Docket No. 50-333 and 72-012 July 12, 2018 Page 2 (NEl's) revised Emergency Action Level (EAL) schemes described in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which have been endorsed by the NRC as documented in an NRC letter dated March 28, 2013 (ML12346A463).

Appendix E, Section IV.B.2, of 10 CFR 50 stipulates that a licensee desiring to change its entire EAL scheme shall submit an application for an amendment to its license and receive NRC approval before implementing the change. The currently approved Emergency Plan EAL schemes for the cited facilities are based on the guidance established in NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels." Exelon is proposing to adopt the EAL schemes based on the latest NRC-endorsed guidance, which is described in NEI 99-01, Revision 6.

In a U.S. Nuclear Regulatory Commission (NRC) electronic mail message dated June 7, 2018 (Reference 2), the NRC indicated that it had reviewed the information submitted in the Reference 1 letter pertaining to the proposed LAR and requested additional clarifying information to support its continued review. The Reference 2 electronic mail request contained a draft NRC questions, which were further discussed during a June 13, 2018, teleconference between Exelon and NRC representatives. Subsequently, in an electronic mail message dated June 13, 2018 (Reference 3), the NRC formally issued its Request for Additional Information (RAI) related to the amendment request and requested a response within 30 days.

Accordingly, Attachment 1 provides Exelon's response to the RAI contained in the Reference 3. includes revised redline and revised clean pages for the affected EAL Basis documents along with revised procedure matrix pages for FitzPatrick.

Exelon has reviewed the information supporting a finding of No Significant Hazards Consideration and the Environmental Consideration provided to the NRC in the Reference 1 submittal. The additional information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

In accordance with 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (b), Exelon is notifying the State of New York of this RAI response by transmitting a copy of this letter and the supporting attachments and enclosures to the designated State Official.

There are no regulatory commitments contained in this submittal.

U.S. Nuclear Regulatory Commission Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes Docket No. 50-333 and 72-012 July 12, 2018 Page 3 If you have any questions concerning this submittal, please contact Richard Gropp at (610) 765-5557.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of July 2018.

R;]spetfully, ~

. ~

~ ---- '~

J yu-David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: - Response to the Request for Additional Information - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors" - Revised Radiological Emergency Plan Annex Information for James A.

FitzPatrick Nuclear Power Plant

  • Enclosure 2B - Revised Redline EAL Basis Document Pages
  • Enclosure 2C - Revised EAL Clean Basis Document Pages
  • Enclosure 2E - Revised Procedure Matrix Pages cc: w/ Attachments/Enclosures Regional Administrator - NRC Region I NRC Senior Resident Inspector- James A. FitzPatrick Nuclear Power Plant NRC Project Manager, NRR - James A. FitzPatrick Nuclear Power Plant A. L. Peterson, NYSERDA

ATTACHMENT 1 Response to the Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors" Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 1 of XX Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01. Revision 6.

"Development of Emergency Action Levels for Non-Passive Reactors" By letter dated January 31, 2018 (Reference 1), Exelon Generation Company, LLC (Exelon) submitted a License Amendment Request (LAR) to support changes to the Emergency Plan for the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). Specifically, the proposed changes involve revising the Emergency Plan for FitzPatrick to adopt the Nuclear Energy lnstitute's (NEl's) revised Emergency Action Level (EAL) schemes described in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which have been endorsed by the NRC as documented in an NRC letter dated March 28, 2013 (ML12346A463).

Appendix E, Section IV.B.2, of 10 CFR 50 stipulates that a licensee desiring to change its entire EAL scheme shall submit an application for an amendment to its license and receive NRC approval before implementing the change. The currently approved Emergency Plan EAL schemes for the cited facilities are based on the guidance established in NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels. " Exelon is proposing to adopt the EAL schemes based on the latest NRC-endorsed guidance, which is described in NEI 99-01, Revision 6.

In a U.S. Nuclear Regulatory Commission (NRC) electronic mail message dated June 7, 2018 (Reference 2), the NRC indicated that it had reviewed the information submitted in the Reference 1 letter pertaining to the proposed LAR and requested additional clarifying information to support its continued review. The Reference 2 electronic mail request contained a draft NRC questions, which were further discussed during a June 13, 2018, teleconference between Exelon and NRC representatives. Subsequently, in an electronic mail message dated June 13, 2018 (Reference 3), the NRC formally issued its Request for Additional Information (RAI) related to the amendment request and requested a response within 30 days.

The questions included in the Reference 3 electronic mail message are restated below followed by Exelon's response.

Response to NRC Questions Section 4.3, "Instrumentation Used for EALs," to NE/ 99-01, Revision 6, states: "Scheme developers should ensure that specific values used as EAL setpoints are within the calibrated range of the referenced instrumentation." Confirm that all setpoints and indications used in the FitzPatrick EAL scheme are within the calibrated range(s) of the stated instrumentation and that the resolution of the instrumentation is appropriate for the setpointlindication.

Response to Request for Additional Information License Amendment Request Adoption of NEl 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 1 of 10 Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01. Revision 6.

"Development of Emergency Action Levels for Non-Passive Reactors" By letter dated January 31, 2018 (Reference 1), Exelon Generation Company, LLC (Exelon) submitted a License Amendment Request (LAR) to support changes to the Emergency Plan for the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). Specifically, the proposed changes involve revising the Emergency Plan for FitzPatrick to adopt the Nuclear Energy lnstitute's (NEl's) revised Emergency Action Level (EAL) schemes described in NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which have been endorsed by the NRC as documented in an NRC letter dated March 28, 2013 (ML12346A463).

Appendix E, Section IV.B.2, of 10 CFR 50 stipulates that a licensee desiring to change its entire EAL scheme shall submit an application for an amendment to its license and receive NRC approval before implementing the change. The currently approved Emergency Plan EAL schemes for the cited facilities are based on the guidance established in NEI 99-01, Revision 5, "Methodology for Development of Emergency Action Levels." Exelon is proposing to adopt the EAL schemes based on the latest NRG-endorsed guidance, which is described in NEI 99-01, Revision 6.

In a U.S. Nuclear Regulatory Commission (NRC) electronic mail message dated June 7, 2018 (Reference 2), the NRC indicated that it had reviewed the information submitted in the Reference 1 letter pertaining to the proposed LAR and requested additional clarifying information to support its continued review. The Reference 2 electronic mail request contained a draft NRC questions, which were further discussed during a June 13, 2018, teleconference between Exelon and NRG representatives. Subsequently, in an electronic mail message dated June 13, 2018 (Reference 3), the NRC formally issued its Request for Additional Information (RAI) related to the amendment request and requested a response within 30 days.

The questions included in the Reference 3 electronic mail message are restated below followed by Exelon's response.

Response to NRC Questions Section 4.3, "Instrumentation Used for EALs," to NE/ 99-01, Revision 6, states: "Scheme developers should ensure that specific values used as EAL setpoints are within the calibrated range of the referenced instrumentation." Confirm that all setpoints and indications used in the FitzPatrick EAL scheme are within the calibrated range(s) of the stated instrumentation and that the resolution of the instrumentation is appropriate for the setpointlindication.

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 2of10

Response

As part of Exelon's Emergency Action Level Scheme change process each threshold that is derived from plant instrumentation has been verified to be within the instrument's range in accordance with EP-AA-120-F-08, "Emergency Action Level (EAL) Numerical Change." For Exelon EAL HU6.5, the 255-foot threshold value is determined by lake water level in the screen well intake structure at the 255-foot floor level elevation.

The proposed EAL RA3. 1 includes either the Central Alarm Station (GAS) or the Secondary Alarm Station (SAS) as threshold criteria. If the GAS and SAS can both provide access to areas required to assure safe plant operations, explain why the EAL does not provide an "AND" logic to the GAS and SAS, or select the primary station as the threshold value as provided in accordance with endorsed guidance.

Response

The primary station has been selected as the Central Alarm Station (CAS), and the Secondary Alarm Station (SAS) has been removed from EAL RA3.1.

The Basis discussion for EAL RU3 states, in part: "Conditions that cause the specified monitor to alarm that are not related to fuel clad degradation should not result in the declaration of an Unusual Event."

Explain how a decision-maker can quickly and accurately determine whether or not a letdown radiation monitor alarm is due to clad damage. Altemative/y, revise the EAL RU3 basis to remove the identification of fuel cladding degradation as a criterion.

Response

The following sentence has been removed from the Basis discussion for EAL RU3.

"Conditions that cause the specified monitor to alarm that are not related to fuel clad degradation should not result in the declaration of an Unusual Event."

The proposed Fission Product Barrier EAL CT3 - Potential Loss 3 threshold value includes the qualifier "and rising" to the maximum containment pressure. NE/ 99-01, Revision 6, provides that the values used to assess EALs should be valid. The fact that containment pressure has reached the maximum design pressure represents itself a potential loss of containment. The inclusion of "and rising" could result in classification delays for valid containment pressure Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01 , Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 3of10 conditions that are substantially above the maximum design pressure because the pressure was not continuing to rise.

Remove "and rising" from the proposed Fission Product Barrier CT3 - Potential Loss 3 threshold value, consistent with the endorsed guidance, or explain how a containment pressure in excess of design pressure, with a lowering pressure due to barrier degradation, would be appropriately assessed.

Response

The qualifier "and rising" has been removed from the threshold for EAL CT3 - Potential Loss 3.

The proposed EALs MA 1 and CU1 imply that emergency diesel generator (EOG) A, EOG B, EOG C, and EOG O are independent power supplies, each of which is capable of powering emergency buses 10500 and 10600. This is consistent with the first bulleted example in the Basis section. However, the FitzPatrick Technical Specifications and Final Safety Analysis Report indicate that FitzPatrick has two subsystems capable of powering emergency buses 10500 and 10600. These subsystems each consist of two emergency diesel generators.

Explain whether or not the four EOGs provided in the threshold value for EALs MA 1 and CU1 can independently provide required power for a spectrum of events. If the EOGs cannot independently provide required power for a spectrum of events, then revise the MA 1 threshold value and Basis discussion as appropriate.

Response

Although an Emergency Diesel Generator (EOG) "Subsystem" is defined as a pair of EDGs which have the capability to power their respective emergency bus, the FitzPatrick EOG and emergency electrical distribution systems are designed such that a single EOG can be operated to power its respective emergency bus and power a reduced compliment of safety-related loads.

The normal Operating Procedure for the EDGs (i.e., OP-22), specifically allows for operation of a single EOG tied to its respective emergency bus.

This ability is even part of the automatic starting sequence design of an EOG Subsystem during a Loss of Coolant Accident (LOCA). If the EDGs fail to come up to speed as a matched pair, the EOG tie breaker will not auto-close (both engines must activate their 200 rpm relays within three seconds to allow force parallel closure of the tie breaker). In this case, when the first EOG reaches 90% of rated voltage, its output breaker will close to repower the emergency bus and the other EOG output breaker would be blocked from auto-closing onto the emergency bus.

This circuit logic is essentially looking for a failure of one EOG to start for any reason.

In either case, a single EOG rating is normally 2600 kW (provisions are available to operate above rated load for limited periods of time). In a LOCA situation, 2600 kW is sufficient to power a single Core Spray pump and a single Residual Heat Removal Pump, which are automatically re-sequenced onto the emergency bus after it is repowered by the single EOG .

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 4of10 The second Residual Heat Removal pump powered from that emergency bus is blocked from automatically re-sequencing onto the bus to prevent overloading the bus during initial EOG loading. Operation of additional emergency loads is then performed at the discretion and direction of the operating shift within the allowed loading limits of the single EOG.

This single EOG capability is generically described in UFSAR Section 8.6-5, Step 6. The lead-in sentence: "Although no credit for accident mitigation is taken, the design of the EOG system is such that if either diesel generator of an emergency AC power source fails to start in response to the automatic start signal. .. ," simply means that no credit is taken in the Technical Specifications for that train as far as accident mitigation is concerned. As part of the Emergency Plan, a single EOG will power a single emergency bus and will provide sufficient power to operate safety systems including multiple low-pressure Emergency Core Cooling System (ECCS) injection pumps.

a. For EALs MAS and CA2, Exelon proposed a wording modification to the NRG guidance contained in EPFAQ 2016-02, "Clarification of Equipment Damage as a Result of a Hazardous Event." 5 This modification affects a note for the threshold values. The key wording change is identified in bold as follows:

EPFAQ 2016-02 If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.

Exelon proposed For SAFETY SYSTEMS with multiple trains if the hazardous event only resulted in VISIBLE DAMAGE or degraded performance to the one train, then this emergency classification is not warranted.

This is a change of intent from the NRG guidance contained in EPFAQ 2016-02, which was that an Alert should not be declared unless there was VISIBLE DAMAGE resulting from the hazardous event, with no indications of degraded performance. Without this condition, an Alert could be declared even if the affected equipment was not currently required to be in operation. Align EALs MAS and CA2 EALs with the intent of EPFAQ 2016-0,2 or provide a justification that supports the revised MAS and CA2 in EAL notes.

b. For EALs MAS and CA2, Exelon proposed a wording modification to the NRG guidance contained in EPFAQ 2016-02. This modification affects threshold value 2.a. The key wording change is identified in bold as follows:

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 5of10 EPFAQ 2016-02 Event damage has caused indications of degraded performance on one train of a SAFETY SYSTEM needed for the current operating mode.

Exelon proposed Event damage has caused indications of degraded performance or VISIBLE DAMAGE to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

This is a change of intent from the NRG guidance contained in EPFAQ 2016-02. As the threshold value includes "or VISIBLE DAMAGE," an Alert could be declared when the only impact is visible damage to both trains. Revise EALs MA5 and CA2 to align with the intent of EPFAQ 2016-02, or provide a justification that supports the revised MA5 and CA2 EAL notes, as provided by Exelon, for Fitz Patrick.

c. Exelon proposes the addition of the following alternative condition to threshold value 2.b for EALS MA5 and CA2:
  • An additional train of the SAFETY SYSTEM is inoperable or out of service.

It appears that the above additional threshold value is intended to require the declaration of MA5 or CA2 whenever a hazardous event has caused degraded performance or visible damage to one train of a SAFETY SYSTEM, whenever an additional train of the safety system is inoperable or out of service. The intent of EPFAQ 2016-02 is to declare an Alert if the hazardous event has resulted in degraded performance to the one train, and VISIBLE DAMAGE or degraded performance of the second train. Additionally, it appears as though the above alternative condition proposed by Exelon for EALs MA5 and CA2 would not result in an Alert declaration based on the addition of the following note:

For SAFETY SYSTEMS with multiple trains if the hazardous event only resulted in VISIBLE DAMAGE or degraded performance to the one train, then this emergency classification is not warranted."

Revise EALs MA5 and CA2 to align with the intent of EPFAQ 2016-02, or provide a justification that supports the revised MA5 and CA2 EAL notes, as provided by Exelon, for Fitz Patrick.

5 ADAMS Accession No. ML17195A299

Response

EALs MA5 and CA2 have been revised as described below to clarify their applicability to SAFETY SYSTEMS with two (2) or more trains, where at least one train exhibits degraded performance and the other train has either visible damage or degraded performance. The Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 6of10 following terminology changes were made to be consistent with terminology used by Operators and to minimize confusion. The word "needed" was changed to "required" in the Initiating Condition (IC) and to "required by Technical Specification" in the EAL, and the reference to the phrase "out of service" was removed. The changes are consistent with the NRG-endorsed NEI 99-01, Revision 6, guidance as clarified by the NRC's response described in Emergency Preparedness Program Frequently Asked Question (EPFAQ) 2016-002 and further discussed during an April 10, 2018, teleconference between Exelon and NRC representatives. Therefore, there should no longer be any potential ambiguity in applying these EALs.

Revised the wording for EALs MA5 and CA2 as follows:

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of MA5 [CA2J are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01 , Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 7of10

a. For EALs MU7 and CU4, it appears that if only Out-of-Plant cellular phones were available, then FitzPatrick site would not be able to communicate with onsite personnel as needed to conduct routine operations. Additionally, it does not appear that Out-of-Plant cellular phones would support communications with offsite organizations and the NRG without resorting to relaying of information.

Justify using Out-of-Plant cellular phones as a means to support Onsite, Offsite, and NRG communications if no other communication method is available, or revise accordingly. This justification should explain how communications could be completed without resorting to extraordinary means as discussed in the proposed FitzPatrick Emergency Classification Technical Basis Document.

b. For EALs MU7 and CU4, the staff could not determine whether Plant Satellite Phones, refers to the TSC satellite phone, the handheld satellite phones, or both. Additionally, it does not appear that Plant Satellite Phones would support communications with offsite organizations and the NRG without resorting to relaying of information.

Justify using Plant Satellite phones as a means to support Offsite and NRG communications if no other communication method is available, or revise accordingly. This justification should explain how communications could be completed without resorting to extraordinary means as discussed in the proposed FitzPatrick Emergency Classification Technical Basis Document.

Response

a. FitzPatrick maintains installed out-of-plant cellular phones in the Control Room Shift Manager's Office (1), Technical Support Center (TSC) (3), Operations Support Center (OSC) (1), and CAS/SAS (1). The out-of-plant cellular phones are configured within each location to function like a normal desk telephone, but are not connected to the site phone switch and access cellular service via remote installed antennae. These devices are included in periodic surveillances of communications equipment, are in an always-ready state, and are included in the Emergency Telephone Directory as backup phone numbers in these locations. No extraordinary method is required to make use of the devices, they function as a normal desk phone and the user does not need to leave the buildings to use the devices.
  • Communication with onsite personnel via installed out-of-plant cellular phones would be limited during times of normal phone system failure to other cellular devices (fixed and hand-held) and satellite phone devices (e.g., installed device in Control Room, hand-held, and deployable) that are available at the station including personal cellular phones and spare site maintained cellular phones. Additionally, out-of-plant cellular phones and satellite phones are maintained as backup communications at the Emergency Operations Facility (EOF).

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 8of10

  • Installed out-of-plant cellular phones support external communications with offsite organizations without the need to relay information. The cellular phones bypass the site hardline telephone system so that during times of system failure the cellular phones are available to be used to directly contact outside agencies (e.g., NRC, vendors, State and County agencies, etc.) utilizing the cellular phone provider network and are strategically placed in the Control Room, CAS/SAS, TSC, and OSC as mounted desk phones.
  • The out-of-plant cellular phones function as normal desk phones to the user but bypass the site's hardline and Voice over Internet Protocol (VoIP) phone systems so they are not affected by system outages that could affect these other phone systems.
b. Plant satellite phones include: 1) the fixed permanently installed unit in the Control Room, which functions without additional setup; 2) portable handheld satellite phones staged in the emergency facilities including Control Room, EOF, TSC and OSC; and 3) deployable satellite phones staged in the emergency response facilities.

The fixed satellite phone in the Control Room can be utilized from the Control Room without resorting to relaying of information. The unit is maintained in a ready-state for use and no setup, cabling or relocation to outside is required to use this device.

Deployable satellite phones require some setup (i.e., running cables to external antennae, and the handheld satellite phones require the user to be outside.

Communication utilizing the installed out-of-plant cellular phones and installed satellite phone (Control Room Shift Manager Office area) ensure communications can be made to the offsite agencies, NRC and between emergency facilities when loss of hardline and VOiP phone systems occur without the need for extraordinary means such as relaying. Additionally, staged satellite phones (deployable and hand-held) are available for setup to provide additional service in the emergency facilities and from outside if needed. The titles in Tables M-3 and C-1 have been revised to specify "Installed Out-of-Plant Cellular Phones" and "Plant Satellite Phones (Installed in CR or deployable)."

Explain how the term "Security Force" is equivalent to "security supervision," as the intent of EALs HU1.1, HA 1.1, and HS1.1, is to ensure an individual specifically trained to identify a hostile action and communicate with the control room is tasked with this responsibility, or revise accordingly.

Response

The term "Security Force" has been replaced with "Security Supervisor" in the FitzPatrick EALs HU1.3, HA1.2, and HS1.

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 9of10 Concerning EAL HS2, the Basis discussions include the following:

The time period to establish control of the plant starts when either:

a) [c]ontrol of the plant is no longer maintained in the Control Room Or b) [t]he last Operator has left the Control Room, whichever comes first.

The first condition implies that as soon as control of the plant is no longer maintained in the Control Room, that the time period to establish control at the alternate location starts. It is not clear to the NRG staff whether this time should start "when control of the plant cannot be maintained." It appears that the second condition would provide a more clear and consistent start time for the declaration of EAL HS2. Provide clarification to address NRG staff's concern, or revise accordingly to provide a clear 30 minute start time that supports a timely and consistent event declaration.

Response

The phrase "Control of the plant. .. " was changed to "Control of needed safety functions ... " to more clearly identify when the time to establish control of key safety functions starts.

RAl-10 The proposed EAL HU4.2.b, requiring validation of the seismic event, is not consistent with NE/

99-01, Revision 6. Specifically, the proposed EAL criterion HU4.2.b does not include that the occurrence of a seismic event is confirmed by the Shift Manager, as provided in the NE/ 99-01, Revision 6, Developer's Notes.

a. Add a condition that the Shift Manager confirms the occu"ence of a seismic event, as provided by NE/ 99-01, Revision 6, or provide further justification as to why this variance from endorsed guidance is acceptable.
b. Explain why the basis discussion includes typical lateral acceleration values instead of site-specific values, or revise accordingly.

Response

a. The following bullet has been added to EAL HU4.2.b:
  • If the above bullets are not able to be confirmed, then the occurrence of a seismic event is confirmed in manner deemed appropriate by the Shift Manager or Emergency Director.

Response to Request for Additional Information License Amendment Request Adoption of NEI 99-01, Revision 6 EAL Schemes James A. FitzPatrick Nuclear Power Plant Page 10of10

b. The typical lateral acceleration value was removed from the affected EAL Basis section.

Site personnel will be able to readily feel and recognize a seismic event consistent with the operating basis earthquake as discussed in the Basis statement noted below:

"Earthquakes of this magnitude should be readily felt by on-site personnel and recognized as a seismic event..."

RAl-11 The FitzPatrick EAL alternative method (e.g., wall board) for presenting EAL scheme information is not consistent with the proposed EAL Technical Basis document. For example, the FitzPatrick Technical Basis document threshold value for MA4 is EGGS Injection instead of EGGS Actuation as identified on the FitzPatrick EAL alternative method. This could lead to inaccurate or delayed emergency classifications. Explain how the method is technically accurate and addresses human factors issues that could impact timely and accurate EAL assessments.

Response

The Fitzpatrick EAL alternative method (e.g., wall board/procedure matrix) has been reviewed and revised to ensure consistency with the Fitzpatrick Technical Basis.

References

1. Letter from David T. Gudger (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," dated January 31, 2018(Ml18037A786)
2. Electronic Mail Request from Tanya Hood (U.S. Nuclear Regulatory Commission) to Richard Gropp, et al. (Exelon Generation Company, LLC) - Draft RA ls - FitzPatrick - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6, dated June 7, 2018
3. Electronic Mail Request from Tanya Hood (U.S. Nuclear Regulatory Commission) to Bryan Hanson et al. (Exelon Generation Company, LLC) - FitzPatrick RAls - LAR to Adopt EAL Schemes Pursuant to NEI 99-01, Revision 6, dated June 13, 2018(Ml18164A365)

ATTACHMENT 2 REVISED RADIOLOGICAL EMERGENCY PLAN INFORMATION FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT EP-AA-1014 Enclosures

  • Enclosure 28 - Revised EAL Redline Basis Document Pages
  • Enclosure 2C - Revised EAL Clean Basis Document Pages
  • Enclosure 2E - Revised Procedure Matrix Pages

Enclosure 28 Revised EAL Redline Basis Document Pages

RA3 Initiating Condition:

Radiation levels that impede access to equipment necessary for normal plant operations, cooldown or shutdown.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

If the equipment in the room or area listed in Table R4 was already inoperable, or out of service, before the event occurred, then no emergency classification is warranted.

1. Dose rate > 15 mR/hr in ANY of the areas in Table R3.

Table R3 Areas Requiring Continuous Occupancy

  • Main Control Room - (by survey)
  • Central Alarm Station - (by survey)
  • Secondary Alarm Station - (by survey)

OR

2. UNPLANNED event results in radiation levels that prohibit or significantly impede access to ANY of the areas in Table R4.

Table R4 Areas with Entry Related Mode Applicability Entry Related Mode Area Applicability

  • Reactor Building East Crescent
  • Reactor Building West Crescent
  • Reactor Building 272 Elevation Mode 3, 4, and 5
  • Reactor Building 300 Elevation
  • Relay Room
  • North Cable Room Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RA3 (cont)

Basis:

UNPLANNED: A parameter change or an event that is not 1) the result of an intended evolution or 2) an expected plant response to a transient. The cause of the parameter change or event may be known or unknown.

This IC addresses elevated radiation levels in certain plant rooms/areas sufficient to preclude or impede personnel from performing actions necessary to transition the plant from normal plant operation to cooldown and shutdown as specified in normal plant procedures. As such, it represents an actual or potential substantial degradation of the level of safety of the plant. The Emergency Director should consider the cause of the increased radiation levels and determine if another IC may be applicable.

Assuming all plant equipment is operating as designed, normal operation is capable from the Main Control Room (MCR). The plant is also able to transition into a hot shutdown condition from the MCR, therefore Table R4 is a list of plant rooms or areas with entry-related mode applicability that contain equipment which require a manual/local action necessary to transition the plant from normal plant operation to cooldown and shutdown as specified in normal operating procedures (establish shutdown cooling), where if this action is not completed the plant would not be able to attain and maintain cold shutdown. This Table does not include rooms or areas for which entry is required solely to perform actions of an administrative or record keeping nature (e.g., normal rounds or routine inspections).

Rooms and areas listed in EAL #1 do not need to be included in EAL #2, including the Control Room.

For EAL #2, an Alert declaration is warranted if entry into the affected room/area is, or may be, procedurally required during the plant operating mode in effect and the elevated radiation levels preclude the ability to place shutdown cooling in service. The emergency classification is not contingent upon whether entry is actually necessary at the time of the increased radiation levels. Access should be considered as impeded if extraordinary measures are necessary to facilitate entry of personnel into the affected room/area (e.g., installing temporary shielding beyond that required by procedures, requiring use of non-routine protective equipment, requesting an extension in dose limits beyond normal administrative limits).

An emergency declaration is not warranted if any of the following conditions apply.

The plant is in an operating mode different than the mode specified for the affected room/area (i.e., entry is not required during the operating mode in effect at the time of the elevated radiation levels). For example, the plant is in Mode 1 when the radiation rise occurs, and the procedures used for normal operation, cooldown and shutdown do not require entry into the affected room until Mode 4.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RA3 (cont)

Basis (cont):

The increased radiation levels are a result of a planned activity that includes compensatory measures which address the temporary inaccessibility of a room or area (e.g., radiography, spent filter or resin transfer, etc.).

The action for which room/area entry is required is of an administrative or record keeping nature (e.g., normal rounds or routine inspections).

The access control measures are of a conservative or precautionary nature, and would not actually prevent or impede a required action.

Escalation of the emergency classification level would be via Recognition Category R, C or F ICs.

Basis Reference(s):

1. JAFNPP Safe Shutdown Analysis
2. NEI 99-01 Rev 6, AA3 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RU3 Initiating Condition:

Reactor coolant activity greater than Technical Specification allowable limits.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

1. Offgas radiation > hi-hi alarm OR
2. Specific coolant activity > 2.0 µCi/gm I-131 dose equivalent.

Basis:

This IC addresses a reactor coolant activity value that exceeds an allowable limit specified in Technical Specifications. This condition is a precursor to a more significant event and represents a potential degradation of the level of safety of the plant.

Conditions that cause the specified monitor to alarm that are not related to fuel clad degradation should not result in the declaration of an Unusual Event.

This EAL addresses site-specific radiation monitor readings that provide indication of a degradation of fuel clad integrity.

Escalation of the emergency classification level would be via ICs FA1 or the Recognition Category R ICs.

Basis Reference(s):

1. DVP-01.02 Offsite Dose Calculation Manual Specification 3.6.1
2. Technical Specification 3.7.5
3. Technical Specification 3.4.6
4. Technical Specification Bases 3.4.6
5. OP-31 Process Radiation Monitoring
6. NEI 99-01 Rev 6, SU3 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CT3 Initiating Condition:

Primary Containment Pressure / Conditions Operating Mode Applicability:

1, 2, 3 Fission Product Barrier (FPB) Threshold:

LOSS

1. UNPLANNED rapid drop in Primary Containment pressure following Primary Containment pressure rise.

OR

2. Primary Containment pressure response not consistent with LOCA conditions.

POTENTIAL LOSS

3. Primary Containment pressure > 56 psig and rising.

OR

4. a. Primary Containment hydrogen concentration > 6%.

AND

b. Primary Containment oxygen concentration > 5%.

OR

5. Heat Capacity Temperature Limit (HCTL) (EOP-11) exceeded.

Basis:

UNPLANNED: A parameter change or an event that is not 1) the result of an intended evolution or 2) an expected plant response to a transient. The cause of the parameter change or event may be known or unknown.

Loss Threshold #1 and #2 Basis Rapid UNPLANNED loss of primary containment pressure (i.e., not attributable to Drywell spray or condensation effects) following an initial pressure rise indicates a loss of primary containment integrity. Primary containment pressure should rise as a result of mass and energy release into the primary containment from a LOCA. Thus, primary containment pressure not increasing under these conditions indicates a loss of primary containment integrity.

These thresholds rely on operator recognition of an unexpected response for the condition and therefore a specific value is not assigned. The unexpected (UNPLANNED) response is important because it is the indicator for a containment bypass condition. A pressure suppression bypass path would not be an indication of a containment breach.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CT3 (cont)

Basis (cont):

Potential Loss Threshold #3 Basis The threshold pressure is the primary containment internal design pressure. Structural acceptance testing demonstrates the capability of the primary containment to resist pressures greater than the internal design pressure. A pressure of this magnitude is greater than those expected to result from any design basis accident and, thus, represent a Potential Loss of the Containment barrier.

Potential Loss Threshold #4 Basis If hydrogen concentration reaches or exceeds the lower flammability limit, as defined in plant EOPs, in an oxygen rich environment, a potentially explosive mixture exists. If the combustible mixture ignites inside the primary containment, loss of the Containment barrier could occur.

Potential Loss Threshold #5 Basis The HCTL is a function of RPV pressure, Torus temperature and Torus water level. It is utilized to preclude failure of the containment and equipment in the containment necessary for the safe shutdown of the plant and therefore, the inability to maintain plant parameters below the limit constitutes a potential loss of containment.

Basis Reference(s):

1. FSAR Update Section 5.2.3
2. EOP-4 Primary Containment Control
3. UFSAR 14.6.1.3.3
4. BWROG EPG/SAG Revision 3, Sections PC/G
5. FSAR section 5.2.3.14
6. FSAR Table 7.3-6
7. BWROG EPG/SAG Revision 3, Section 18
8. EOP-11 EOP and SAOG Graphs
9. NEI 99-01 Rev 6, Table 9-F-2 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 Initiating Condition:

Hazardous event affecting a SAFETY SYSTEM required for the current operating mode.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of MA5 are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.
  • If the only affected SAFETY SYSTEM train was already inoperable or out of service before the hazardous event occurred, then this emergency classification is not warranted.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

  • For SAFETY SYSTEMS with multiple trains if the hazardous event only resulted in VISIBLE DAMAGE or degraded performance to the one train, then this emergency classification is not warranted.
  • If it is determined that the conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.
1. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
2. a. Event damage has caused indications of degraded performance or VISIBLE DAMAGE to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

a. ANY of the following for SAFETY SYSTEMS with multiple trains:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • An additional train of the SAFETY SYSTEM is inoperable or out of service.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 (cont)

Basis:

FIRE: Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute FIRES. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.

EXPLOSION: A rapid, violent and catastrophic failure of a piece of equipment due to combustion, chemical reaction or overpressurization. A release of steam (from high energy lines or components) or an electrical component failure (caused by short circuits, grounding, arcing, etc.) should not automatically be considered an explosion. Such events may require a post-event inspection to determine if the attributes of an explosion are present.

SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

VISIBLE DAMAGE: Damage to a SAFETY SYSTEM train that is readily observable without measurements, testing, or analysis. The visual impact of the damage is sufficient to cause concern regarding the operability or reliability of the affected SAFETY SYSTEM train.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded SAFETY SYSTEM performance in one train, and there must be either indications of performance issues with the second SAFETY SYSTEM train or VISIBLE DAMAGE to the second train such that the potential exists for this second SAFETY SYSTEM train to have performance issues. In other words, in order for this EAL to be classified, the hazardous event must occur, at least one SAFETY SYSTEM train must have indications of degraded performance, and the second SAFETY SYSTEM train must have indications of degraded performance or VISIBLE DAMAGE such that the potential exists for performance issues. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance for criteria 1.b of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

If a hazardous event occurs and the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded performance or VISIBLE DAMAGE. For single train SAFETY SYSTEMS, in addition to the occurrence of the hazardous event, only 2.a of this EAL need be satisfied. In SAFETY SYSTEMS with multiple trains there must be either indications of degraded performance with the second SAFETY SYSTEM train, VISIBLE DAMAGE to the second train, or the second train is inoperable or out of service. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance or VISIBLE DAMAGE for criteria 2.a of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events. Manual or automatic electrical isolation of safety equipment due to flooding, in and of itself, does not constitute degraded performance and is classified under HU6.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in service/operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 (cont)

Basis (cont):

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

If the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

Basis Reference(s):

1. NEI 99-01, Rev 6 SA9 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MU7 Initiating Condition:

Loss of all onsite or offsite communication capabilities.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

1. Loss of ALL Table M3 onsite communication capabilities affecting the ability to perform routine operations.

OR

2. Loss of ALL Table M3 offsite communication capabilities affecting the ability to perform offsite notifications.

OR

3. Loss of ALL Table M3 NRC communication capabilities affecting the ability to perform NRC notifications.

Table M3 Communication Capabilities System Onsite Offsite NRC Page/Party System (Gaitronics) X Control Room/Portable Radio X Plant Telephones (all VOIP, switched, non-switched) X X X Installed Out-of-Plant Cellular Phones X X X Plant Satellite Phones (Installed in CR or deployable) X X RECS X Dedicated Phone Lines (ENS) X X HPN and FTS 2001 X X Basis:

This IC addresses a significant loss of onsite, offsite, or NRC communication capabilities. While not a direct challenge to plant or personnel safety, this event warrants prompt notifications to Offsite Response Organizations (OROs) and the NRC.

This IC should be assessed only when extraordinary means are being utilized to make communications possible (e.g., use of non-plant, privately owned equipment, relaying of on-site information via individuals or multiple radio transmission points, individuals being sent to offsite locations, etc.).

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MU7 (cont)

Basis (cont):

EAL #1 Basis Addresses a total loss of the communication methods used in support of routine plant operations.

EAL #2 Basis Addresses a total loss of the communication methods used to notify all Offsite Response Organizations (OROs) of an emergency declaration. The Offsite Response Organizations (OROs) referred to here are listed in procedure EP-CE-114-100-F-05, JAF Notification Fact Sheet .

EAL #3 Basis Addresses a total loss of the communication methods used to notify the NRC of an emergency declaration.

Basis Reference(s):

1. NY State Emergency Operations Center
2. NY State Warning Point
3. Alternate State Warning Point
4. State Department of Health
5. SEMO Regional Office
6. Oswego County EOC
7. Oswego County E-911 Center (Warning Point)
8. Nine Mile Point Control Rooms
9. Nine Mile Point TSC and EOF
10. JAFNPP Control Room
11. JAFNPP TSC
12. JAFNPP EOF
13. SEMO Technical Resources
14. NEI 99-01 Rev 6, SU6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 Initiating Condition:

Hazardous event affecting SAFETY SYSTEM required for the current operating mode.

Operating Mode Applicability:

4, 5 Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of CA2 are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.
  • If the only affected SAFETY SYSTEM train was already inoperable or out of service before the hazardous event occurred, then this emergency classification is not warranted.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

  • For SAFETY SYSTEMS with multiple trains if the hazardous event only resulted in VISIBLE DAMAGE or degraded performance to the one train, then this emergency classification is not warranted.
  • If it is determined that the conditions of CA2 are not met then assess the event via HU3, HU4, or HU6.
1. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
2. a. Event damage has caused indications of degraded performance or VISIBLE DAMAGE to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

b. ANY of the following for SAFETY SYSTEMS with multiple trains:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • An additional train of the SAFETY SYSTEM is inoperable or out of service.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 (cont)

Basis:

FIRE: Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute FIRES. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.

EXPLOSION: A rapid, violent and catastrophic failure of a piece of equipment due to combustion, chemical reaction or overpressurization. A release of steam (from high energy lines or components) or an electrical component failure (caused by short circuits, grounding, arcing, etc.) should not automatically be considered an explosion. Such events may require a post-event inspection to determine if the attributes of an explosion are present.

SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

VISIBLE DAMAGE: Damage to a SAFETY SYSTEM train that is readily observable without measurements, testing, or analysis. The visual impact of the damage is sufficient to cause concern regarding the operability or reliability of the affected SAFETY SYSTEM train.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded SAFETY SYSTEM performance in one train, and there must be either indications of performance issues with the second SAFETY SYSTEM train or VISIBLE DAMAGE to the second train such that the potential exists for this second SAFETY SYSTEM train to have performance issues. In other words, in order for this EAL to be classified, the hazardous event must occur, at least one SAFETY SYSTEM train must have indications of degraded performance, and the second SAFETY SYSTEM train must have indications of degraded performance or VISIBLE DAMAGE such that the potential exists for performance issues. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance for criteria 1.b of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

If a hazardous event occurs and the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded performance or VISIBLE DAMAGE. For single train SAFETY SYSTEMS, in addition to the occurrence of the hazardous event, only 2.a of this EAL need be satisfied. In SAFETY SYSTEMS with multiple trains there must be either indications of degraded performance with the second SAFETY SYSTEM train, VISIBLE DAMAGE to the second train, or the second train is inoperable or out of service. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance or VISIBLE DAMAGE for criteria 2.a of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events. Manual or automatic electrical isolation of safety equipment due to flooding, in and of itself, does not constitute degraded performance and is classified under HU6.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in service/operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 (cont)

Basis (cont):

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

If the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

Basis Reference(s):

1. NEI 99-01, Rev 6 CA6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CU4 Initiating Condition:

Loss of all onsite or offsite communication capabilities.

Operating Mode Applicability:

4, 5, D Emergency Action Level (EAL):

1. Loss of ALL Table C1 onsite communication capabilities affecting the ability to perform routine operations.

OR

2. Loss of ALL Table C1 offsite communication capabilities affecting the ability to perform offsite notifications.

OR

3. Loss of ALL Table C1 NRC communication capabilities affecting the ability to perform NRC notifications.

Table C1 Communication Capabilities System Onsite Offsite NRC Page/Party System (Gaitronics) X Control Room/Portable Radio X Plant Telephones (all VOIP, switched, non-switched) X X X Installed Out-of-Plant Cellular Phones X X X Plant Satellite Phones (Installed in CR and deployable) X X RECS X Dedicated Phone Lines (ENS) X X HPN and FTS 2001 X X Basis:

This IC addresses a significant loss of onsite, offsite, or NRC communication capabilities. While not a direct challenge to plant or personnel safety, this event warrants prompt notifications to Offsite Response Organizations (OROs) and the NRC.

This IC should be assessed only when extraordinary means are being utilized to make communications possible (e.g., use of non-plant, privately owned equipment, relaying of on-site information via individuals or multiple radio transmission points, individuals being sent to offsite locations, etc.).

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CU4 (cont)

Basis (cont):

EAL #1 Basis Addresses a total loss of the communication methods used in support of routine plant operations.

EAL #2 Basis Addresses a total loss of the communication methods used to notify all Offsite Response Organizations (OROs) of an emergency declaration. The Offsite Response Organizations (OROs) referred to here are listed in procedure EP-CE-114-100-F-05, JAF Notification Fact Sheet.

EAL #3 Basis Addresses a total loss of the communication methods used to notify the NRC of an emergency declaration.

Basis Reference(s):

1. NY State Emergency Operations Center
2. NY State Warning Point
3. Alternate State Warning Point
4. State Department of Health
5. SEMO Regional Office
6. Oswego County EOC
7. Oswego County E-911 Center (Warning Point)
8. Nine Mile Point Control Rooms
9. Nine Mile Point TSC and EOF
10. JAFNPP Control Room
11. JAFNPP TSC
12. JAFNPP EOF
13. SEMO Technical Resources
14. NEI 99-01 Rev 6, CU5 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS1 Initiating Condition:

HOSTILE ACTION within the PROTECTED AREA.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

A notification from the Security Force Supervisor that a HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA.

Basis:

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

PROTECTED AREA: An area that normally encompasses all controlled areas within the security protected area fence.

HOSTILE FORCE: Any individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI): A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.

This IC addresses the occurrence of a HOSTILE ACTION within the PROTECTED AREA. This event will require rapid response and assistance due to the possibility for damage to plant equipment.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS1 (cont)

Basis (cont):

As time and conditions allow, these events require a heightened state of readiness by the plant staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The Site Area Emergency declaration will mobilize Offsite Response Organization (ORO) resources and have them available to develop and implement public protective actions in the unlikely event that the attack is successful in impairing multiple safety functions.

This IC does not apply to a HOSTILE ACTION directed at an ISFSI PROTECTED AREA located outside the plant PROTECTED AREA; such an attack should be assessed using IC HA1. It also does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTILE ACTION perpetrated by a HOSTILE FORCE. Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc. Reporting of these types of events is adequately addressed by other EALs, or the requirements of 10 CFR § 73.71 or 10 CFR

§ 50.72.

Escalation of the emergency classification level would be via IC RG1, RG2 and HG7.

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. NEI 99-01 Rev 6, HS1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 Initiating Condition:

HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat within 30 minutes.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

1. A validated notification from NRC of an aircraft attack threat < 30 minutes from the site.

OR

2. Notification by the Security Force Supervisor that a HOSTILE ACTION is occurring or has occurred within the OWNER CONTROLLED AREA.

Basis:

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

OWNER CONTROLLED AREA (OCA): The property associated with the station and owned by the company. Access is normally limited to persons entering for official business.

PROTECTED AREA: An area that normally encompasses all controlled areas within the security protected area fence.

HOSTILE FORCE: Any individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

This IC addresses the occurrence of a HOSTILE ACTION within the OWNER CONTROLLED AREA or notification of an aircraft attack threat. This event will require rapid response and assistance due to the possibility of the attack progressing to the Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 (cont)

Basis (cont):

PROTECTED AREA, or the need to prepare the plant and staff for a potential aircraft impact.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

As time and conditions allow, these events require a heightened state of readiness by the plant staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The Alert declaration will also heighten the awareness of Offsite Response Organizations, allowing them to be better prepared should it be necessary to consider further actions.

This IC does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTILE ACTION perpetrated by a HOSTILE FORCE.

Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc. Reporting of these types of events is adequately addressed by other EALs, or the requirements of 10 CFR § 73.71 or 10 CFR § 50.72.

EAL #1 Basis Addresses the threat from the impact of an aircraft on the plant, and the anticipated arrival time is within 30 minutes. The intent of this EAL is to ensure that threat-related notifications are made in a timely manner so that plant personnel and OROs are in a heightened state of readiness. This EAL is met when the threat-related information has been validated in accordance with AOP-70, Airborne Security.

EAL #2 Basis Applicable for any HOSTILE ACTION occurring, or that has occurred, in the OWNER CONTROLLED AREA. This includes any action directed against an ISFSI that is located outside the plant PROTECTED AREA.

The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an aircraft. The status and size of the plane may be provided by NORAD through the NRC.

In some cases, it may not be readily apparent if an aircraft impact within the OWNER CONTROLLED AREA was intentional (i.e., a HOSTILE ACTION). It is expected, although not certain, that notification by an appropriate Federal agency to the site would clarify this point. In this case, the appropriate federal agency is intended to be NORAD, FBI, FAA or NRC. The emergency declaration, including one based on other ICs/EALs, should not be unduly delayed while awaiting notification by a Federal agency.

Escalation of the emergency classification level would be via IC HS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 (cont)

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. NEI 99-01 Rev 6, HA1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU1 Initiating Condition:

Confirmed SECURITY CONDITION or threat.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

1. Notification of a credible security threat directed at the site as determined per SY-AA-101-132, Security Assessment and Response to Unusual Activities.

OR

2. A validated notification from the NRC providing information of an aircraft threat.

OR

3. Notification by the Security Force Supervisor of a SECURITY CONDITION that does not involve a HOSTILE ACTION.

Basis:

SECURITY CONDITION: Any Security Event as listed in the approved security contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety of the plant. A SECURITY CONDITION does not involve a HOSTILE ACTION SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

This IC addresses events that pose a threat to plant personnel or SAFETY SYSTEM equipment, and thus represent a potential degradation in the level of plant safety.

Security events which do not meet one of these EALs are adequately addressed by the Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU1 (cont)

Basis (cont):

requirements of 10 CFR § 73.71 or 10 CFR § 50.72. Security events assessed as HOSTILE ACTIONS are classifiable under ICs HA1, and HS1.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Classification of these events will initiate appropriate threat-related notifications to plant personnel and Offsite Response Organizations (OROs).

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

EAL #1 Basis Addresses the receipt of a credible security threat. The credibility of the threat is assessed in accordance with SY-AA-101-132, Security Assessment and Response to Unusual Activities.

EAL #2 Basis Addresses the threat from the impact of an aircraft on the plant. The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an aircraft. The status and size of the plane may also be provided by NORAD through the NRC. Validation of the threat is performed in accordance with AOP-70, Airborne Security.

EAL #3 Basis References Security Force because these are the individuals trained to confirm that a security event is occurring or has occurred. Training on security event confirmation and classification is controlled due to the nature of Safeguards and 10 CFR § 2.39 information.

Escalation of the emergency classification level would be via IC HA1.

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. SY-AA-101-132, Security Assessment and Response to Unusual Activities
4. NEI 99-01 Rev 6, HU1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS2 Initiating Condition:

Inability to control a key safety function from outside the Control Room.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

The Emergency Director should declare the event promptly upon determining that the applicable time has been exceeded, or will likely be exceeded.

1. A Control Room evacuation has resulted in plant control being transferred from the Control Room to alternate locations per AOP-43, Plant Shutdown from Outside the Control Room.

AND

2. Control of ANY Table H1 key safety function is not reestablished in < 30 minutes.

Table H1 Safety Functions

  • Reactivity Control (ability to shut down the reactor and keep it shutdown)
  • RPV Water Level (ability to cool the core)
  • RCS Heat Removal (ability to maintain heat sink)

Basis:

The time period to establish control of the plant starts when either:

a. Control of the plantneeded safety functions is no longer maintained in the Main Control Room OR
b. The last Operator has left the Main Control Room.

This IC addresses an evacuation of the Control Room that results in transfer of plant control to alternate locations, and the control of a key safety function cannot be reestablished in a timely manner. The failure to gain control of a key safety function following a transfer of plant control to alternate locations is a precursor to a challenge to any fission product barrier within a relatively short period of time.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS2 (cont)

Basis (cont):

The determination of whether or not control is established at the remote safe shutdown location(s) is based on Emergency Director judgment. The Emergency Director is expected to make a reasonable, informed judgment within 30 minutes whether or not the operating staff has control of key safety functions from the remote safe shutdown location(s).

Escalation of the emergency classification level would be via IC FG1 or CG6.

Basis Reference(s):

1. AOP-43 Plant Shutdown from Outside the Control Room
2. NEI 99-01, Rev 6 HS6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 Initiating Condition:

Seismic event greater than OBE levels.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

  • For emergency classification if EAL # 2.b is not able to be confirmed, then the occurrence of a seismic event is confirmed in manner deemed appropriate by the Emergency Director in < 15 minutes of the event.
  • Escalation of the emergency classification level would be via IC CA2 or MA5
1. Seismic event > Operating Basis Earthquake (OBE) as determined by seismic monitoring system in accordance with AOP-14 Earthquake.

OR

2. When Seismic Monitoring Equipment is not available:
a. Control Room personnel feel an actual or potential seismic event.

AND

b. ANY one of the following confirmed in < 15 minutes of the event:
  • The earthquake resulted in Modified Mercalli Intensity (MMI) > VI and occurred

< 3.5 miles of the plant.

  • The earthquake was magnitude > 5.0 and occurred < 125 miles of the plant.
  • If the above bullets are not able to be confirmed, then the occurrence of a seismic event is confirmed in a manner deemed appropriate by the Shift Manager or Emergency Director.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 (cont)

Basis:

EAL #1 Basis This IC addresses a seismic event that results in accelerations at the plant site greater than those specified for an Operating Basis Earthquake (OBE)1. An earthquake greater than an OBE but less than a Safe Shutdown Earthquake (SSE)2 should have no significant impact on safety-related systems, structures and components; however, some time may be required for the plant staff to ascertain the actual post-event condition of the plant (e.g., performs walk-downs and post-event inspections). Given the time necessary to perform walk-downs and inspections, and fully understand any impacts, this event represents a potential degradation of the level of safety of the plant.

Event verification with external sources should not be necessary during or following an OBE. Earthquakes of this magnitude should be readily felt by on-site personnel and recognized as a seismic event (e.g., typical lateral accelerations are in excess of 0.08g).

The Shift Manager or Emergency Director may seek external verification if deemed appropriate (e.g., a call to the USGS, check internet news sources, etc.); however, the verification action must not preclude a timely emergency declaration.

EAL #2 Basis EAL #2 is included to ensure that a declaration does not result from felt vibrations caused by a non-seismic source (e.g., a dropped load). The Shift Manager or Emergency Director may seek external verification if deemed appropriate (e.g., call to USGS, check internet source, etc.) however, the verification action must not preclude a timely emergency declaration. This guidance recognizes that it may cause the site to declare an Unusual Event while another site, similarly affected but with readily available OBE indications in the Control Room, may not.

Depending upon the plant mode at the time of the event, escalation of the emergency classification level would be via IC CA2 or MA5.

1 An OBE is vibratory ground motion for which those features of a nuclear power plant necessary for continued operation without undue risk to the health and safety of the public will remain functional.

2 An SSE is vibratory ground motion for which certain (generally, safety-related) structures, systems, and components must be designed to remain functional.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 (cont)

Basis Reference(s):

1. FSAR Update Section 2.6 Engineering Seismology
2. AOP-14 Earthquake
3. US NRC Reg. Guide 1.166, Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Earthquake Actions
4. NEI 99-01, Rev 6 HU2 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

Enclosure 2C Revised EAL Clean Basis Document Pages

RA3 Initiating Condition:

Radiation levels that impede access to equipment necessary for normal plant operations, cooldown or shutdown.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

If the equipment in the room or area listed in Table R4 was already inoperable, or out of service, before the event occurred, then no emergency classification is warranted.

1. Dose rate > 15 mR/hr in ANY of the areas in Table R3.

Table R3 Areas Requiring Continuous Occupancy

  • Main Control Room - (by survey)
  • Central Alarm Station - (by survey)

OR

2. UNPLANNED event results in radiation levels that prohibit or significantly impede access to ANY of the areas in Table R4.

Table R4 Areas with Entry Related Mode Applicability Entry Related Mode Area Applicability

  • Reactor Building East Crescent
  • Reactor Building West Crescent
  • Reactor Building 272 Elevation Mode 3, 4, and 5
  • Reactor Building 300 Elevation
  • Relay Room
  • North Cable Room Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RA3 (cont)

Basis:

UNPLANNED: A parameter change or an event that is not 1) the result of an intended evolution or 2) an expected plant response to a transient. The cause of the parameter change or event may be known or unknown.

This IC addresses elevated radiation levels in certain plant rooms/areas sufficient to preclude or impede personnel from performing actions necessary to transition the plant from normal plant operation to cooldown and shutdown as specified in normal plant procedures. As such, it represents an actual or potential substantial degradation of the level of safety of the plant. The Emergency Director should consider the cause of the increased radiation levels and determine if another IC may be applicable.

Assuming all plant equipment is operating as designed, normal operation is capable from the Main Control Room (MCR). The plant is also able to transition into a hot shutdown condition from the MCR, therefore Table R4 is a list of plant rooms or areas with entry-related mode applicability that contain equipment which require a manual/local action necessary to transition the plant from normal plant operation to cooldown and shutdown as specified in normal operating procedures (establish shutdown cooling), where if this action is not completed the plant would not be able to attain and maintain cold shutdown. This Table does not include rooms or areas for which entry is required solely to perform actions of an administrative or record keeping nature (e.g., normal rounds or routine inspections).

Rooms and areas listed in EAL #1 do not need to be included in EAL #2, including the Control Room.

For EAL #2, an Alert declaration is warranted if entry into the affected room/area is, or may be, procedurally required during the plant operating mode in effect and the elevated radiation levels preclude the ability to place shutdown cooling in service. The emergency classification is not contingent upon whether entry is actually necessary at the time of the increased radiation levels. Access should be considered as impeded if extraordinary measures are necessary to facilitate entry of personnel into the affected room/area (e.g., installing temporary shielding beyond that required by procedures, requiring use of non-routine protective equipment, requesting an extension in dose limits beyond normal administrative limits).

An emergency declaration is not warranted if any of the following conditions apply.

The plant is in an operating mode different than the mode specified for the affected room/area (i.e., entry is not required during the operating mode in effect at the time of the elevated radiation levels). For example, the plant is in Mode 1 when the radiation rise occurs, and the procedures used for normal operation, cooldown and shutdown do not require entry into the affected room until Mode 4.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RA3 (cont)

Basis (cont):

The increased radiation levels are a result of a planned activity that includes compensatory measures which address the temporary inaccessibility of a room or area (e.g., radiography, spent filter or resin transfer, etc.).

The action for which room/area entry is required is of an administrative or record keeping nature (e.g., normal rounds or routine inspections).

The access control measures are of a conservative or precautionary nature, and would not actually prevent or impede a required action.

Escalation of the emergency classification level would be via Recognition Category R, C or F ICs.

Basis Reference(s):

1. JAFNPP Safe Shutdown Analysis
2. NEI 99-01 Rev 6, AA3 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

RU3 Initiating Condition:

Reactor coolant activity greater than Technical Specification allowable limits.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

1. Offgas radiation > hi-hi alarm OR
2. Specific coolant activity > 2.0 µCi/gm I-131 dose equivalent.

Basis:

This IC addresses a reactor coolant activity value that exceeds an allowable limit specified in Technical Specifications. This condition is a precursor to a more significant event and represents a potential degradation of the level of safety of the plant.

This EAL addresses site-specific radiation monitor readings that provide indication of a degradation of fuel clad integrity.

Escalation of the emergency classification level would be via ICs FA1 or the Recognition Category R ICs.

Basis Reference(s):

1. DVP-01.02 Offsite Dose Calculation Manual Specification 3.6.1
2. Technical Specification 3.7.5
3. Technical Specification 3.4.6
4. Technical Specification Bases 3.4.6
5. OP-31 Process Radiation Monitoring
6. NEI 99-01 Rev 6, SU3 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CT3 Initiating Condition:

Primary Containment Pressure / Conditions Operating Mode Applicability:

1, 2, 3 Fission Product Barrier (FPB) Threshold:

LOSS

1. UNPLANNED rapid drop in Primary Containment pressure following Primary Containment pressure rise.

OR

2. Primary Containment pressure response not consistent with LOCA conditions.

POTENTIAL LOSS

3. Primary Containment pressure > 56 psig.

OR

4. a. Primary Containment hydrogen concentration > 6%.

AND

b. Primary Containment oxygen concentration > 5%.

OR

5. Heat Capacity Temperature Limit (HCTL) (EOP-11) exceeded.

Basis:

UNPLANNED: A parameter change or an event that is not 1) the result of an intended evolution or 2) an expected plant response to a transient. The cause of the parameter change or event may be known or unknown.

Loss Threshold #1 and #2 Basis Rapid UNPLANNED loss of primary containment pressure (i.e., not attributable to Drywell spray or condensation effects) following an initial pressure rise indicates a loss of primary containment integrity. Primary containment pressure should rise as a result of mass and energy release into the primary containment from a LOCA. Thus, primary containment pressure not increasing under these conditions indicates a loss of primary containment integrity.

These thresholds rely on operator recognition of an unexpected response for the condition and therefore a specific value is not assigned. The unexpected (UNPLANNED) response is important because it is the indicator for a containment bypass condition. A pressure suppression bypass path would not be an indication of a containment breach.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CT3 (cont)

Basis (cont):

Potential Loss Threshold #3 Basis The threshold pressure is the primary containment internal design pressure. Structural acceptance testing demonstrates the capability of the primary containment to resist pressures greater than the internal design pressure. A pressure of this magnitude is greater than those expected to result from any design basis accident and, thus, represent a Potential Loss of the Containment barrier.

Potential Loss Threshold #4 Basis If hydrogen concentration reaches or exceeds the lower flammability limit, as defined in plant EOPs, in an oxygen rich environment, a potentially explosive mixture exists. If the combustible mixture ignites inside the primary containment, loss of the Containment barrier could occur.

Potential Loss Threshold #5 Basis The HCTL is a function of RPV pressure, Torus temperature and Torus water level. It is utilized to preclude failure of the containment and equipment in the containment necessary for the safe shutdown of the plant and therefore, the inability to maintain plant parameters below the limit constitutes a potential loss of containment.

Basis Reference(s):

1. FSAR Update Section 5.2.3
2. EOP-4 Primary Containment Control
3. UFSAR 14.6.1.3.3
4. BWROG EPG/SAG Revision 3, Sections PC/G
5. FSAR section 5.2.3.14
6. FSAR Table 7.3-6
7. BWROG EPG/SAG Revision 3, Section 18
8. EOP-11 EOP and SAOG Graphs
9. NEI 99-01 Rev 6, Table 9-F-2 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 Initiating Condition:

Hazardous event affecting a SAFETY SYSTEM required for the current operating mode.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of MA5 are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 (cont)

Basis:

FIRE: Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute FIRES. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.

EXPLOSION: A rapid, violent and catastrophic failure of a piece of equipment due to combustion, chemical reaction or overpressurization. A release of steam (from high energy lines or components) or an electrical component failure (caused by short circuits, grounding, arcing, etc.) should not automatically be considered an explosion. Such events may require a post-event inspection to determine if the attributes of an explosion are present.

SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

VISIBLE DAMAGE: Damage to a SAFETY SYSTEM train that is readily observable without measurements, testing, or analysis. The visual impact of the damage is sufficient to cause concern regarding the operability or reliability of the affected SAFETY SYSTEM train.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded SAFETY SYSTEM performance in one train, and there must be either indications of performance issues with the second SAFETY SYSTEM train or VISIBLE DAMAGE to the second train such that the potential exists for this second SAFETY SYSTEM train to have performance issues. In other words, in order for this EAL to be classified, the hazardous event must occur, at least one SAFETY SYSTEM train must have indications of degraded performance, and the second SAFETY SYSTEM train must have indications of degraded performance or VISIBLE DAMAGE such that the potential exists for performance issues. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance for criteria 1.b of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MA5 (cont)

Basis (cont):

If a hazardous event occurs and the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

Basis Reference(s):

1. NEI 99-01, Rev 6 SA9 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MU7 Initiating Condition:

Loss of all onsite or offsite communication capabilities.

Operating Mode Applicability:

1, 2, 3 Emergency Action Level (EAL):

1. Loss of ALL Table M3 onsite communication capabilities affecting the ability to perform routine operations.

OR

2. Loss of ALL Table M3 offsite communication capabilities affecting the ability to perform offsite notifications.

OR

3. Loss of ALL Table M3 NRC communication capabilities affecting the ability to perform NRC notifications.

Table M3 Communication Capabilities System Onsite Offsite NRC Page/Party System (Gaitronics) X Control Room/Portable Radio X Plant Telephones (all VOIP, switched, non-switched) X X X Installed Out-of-Plant Cellular Phones X X X Plant Satellite Phones (Installed in CR and deployable) X X RECS X Dedicated Phone Lines (ENS) X X HPN and FTS 2001 X X Basis:

This IC addresses a significant loss of onsite, offsite, or NRC communication capabilities. While not a direct challenge to plant or personnel safety, this event warrants prompt notifications to Offsite Response Organizations (OROs) and the NRC.

This IC should be assessed only when extraordinary means are being utilized to make communications possible (e.g., use of non-plant, privately owned equipment, relaying of on-site information via individuals or multiple radio transmission points, individuals being sent to offsite locations, etc.).

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

MU7 (cont)

Basis (cont):

EAL #1 Basis Addresses a total loss of the communication methods used in support of routine plant operations.

EAL #2 Basis Addresses a total loss of the communication methods used to notify all Offsite Response Organizations (OROs) of an emergency declaration. The Offsite Response Organizations (OROs) referred to here are listed in procedure EP-CE-114-100-F-05, JAF Notification Fact Sheet.

EAL #3 Basis Addresses a total loss of the communication methods used to notify the NRC of an emergency declaration.

Basis Reference(s):

1. NY State Emergency Operations Center
2. NY State Warning Point
3. Alternate State Warning Point
4. State Department of Health
5. SEMO Regional Office
6. Oswego County EOC
7. Oswego County E-911 Center (Warning Point)
8. Nine Mile Point Control Rooms
9. Nine Mile Point TSC and EOF
10. JAFNPP Control Room
11. JAFNPP TSC
12. JAFNPP EOF
13. SEMO Technical Resources
14. NEI 99-01 Rev 6, SU6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 Initiating Condition:

Hazardous event affecting SAFETY SYSTEM required for the current operating mode.

Operating Mode Applicability:

4, 5 Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of CA2 are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 (cont)

Basis:

FIRE: Combustion characterized by heat and light. Sources of smoke such as slipping drive belts or overheated electrical equipment do not constitute FIRES. Observation of flame is preferred but is NOT required if large quantities of smoke and heat are observed.

EXPLOSION: A rapid, violent and catastrophic failure of a piece of equipment due to combustion, chemical reaction or overpressurization. A release of steam (from high energy lines or components) or an electrical component failure (caused by short circuits, grounding, arcing, etc.) should not automatically be considered an explosion. Such events may require a post-event inspection to determine if the attributes of an explosion are present.

SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

VISIBLE DAMAGE: Damage to a SAFETY SYSTEM train that is readily observable without measurements, testing, or analysis. The visual impact of the damage is sufficient to cause concern regarding the operability or reliability of the affected SAFETY SYSTEM train.

This IC addresses a hazardous event that causes damage to SAFETY SYSTEMS required for the current operating mode, "required", i.e. required to be operable by Technical Specifications for the current operating mode. In order to provide the appropriate context for consideration of an Alert classification, the hazardous event must have caused indications of degraded SAFETY SYSTEM performance in one train, and there must be either indications of performance issues with the second SAFETY SYSTEM train or VISIBLE DAMAGE to the second train such that the potential exists for this second SAFETY SYSTEM train to have performance issues. In other words, in order for this EAL to be classified, the hazardous event must occur, at least one SAFETY SYSTEM train must have indications of degraded performance, and the second SAFETY SYSTEM train must have indications of degraded performance or VISIBLE DAMAGE such that the potential exists for performance issues. Note that this second SAFETY SYSTEM train is from the same SAFETY SYSTEM that has degraded performance for criteria 1.b of this EAL; commercial nuclear power plants are designed to be able to support single system issues without compromising public health and safety from radiological events.

Indications of degraded performance address damage to a SAFETY SYSTEM train that is in operation since indications for it will be readily available. The indications of degraded performance should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Operators will make a determination of VISIBLE DAMAGE based on the totality of available event and damage report information. This is intended to be a brief assessment not requiring lengthy analysis or quantification of the damage. This VISIBLE DAMAGE should be significant enough to cause concern regarding the operability or reliability of the SAFETY SYSTEM train.

Escalation of the emergency classification level would be via IC FS1 or RS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CA2 (cont)

Basis (cont):

If a hazardous event occurs and the EAL conditions of MA5 are not met then assess the event via HU3, HU4, or HU6.

Basis Reference(s):

1. NEI 99-01, Rev 6 CA6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CU4 Initiating Condition:

Loss of all onsite or offsite communication capabilities.

Operating Mode Applicability:

4, 5, D Emergency Action Level (EAL):

1. Loss of ALL Table C1 onsite communication capabilities affecting the ability to perform routine operations.

OR

2. Loss of ALL Table C1 offsite communication capabilities affecting the ability to perform offsite notifications.

OR

3. Loss of ALL Table C1 NRC communication capabilities affecting the ability to perform NRC notifications.

Table C1 Communication Capabilities System Onsite Offsite NRC Page/Party System (Gaitronics) X Control Room/Portable Radio X Plant Telephones (all VOIP, switched, non-switched) X X X Installed Out-of-Plant Cellular Phones X X X Plant Satellite Phones (Installed in CR and deployable) X X RECS X Dedicated Phone Lines (ENS) X X HPN and FTS 2001 X X Basis:

This IC addresses a significant loss of onsite, offsite, or NRC communication capabilities. While not a direct challenge to plant or personnel safety, this event warrants prompt notifications to Offsite Response Organizations (OROs) and the NRC.

This IC should be assessed only when extraordinary means are being utilized to make communications possible (e.g., use of non-plant, privately owned equipment, relaying of on-site information via individuals or multiple radio transmission points, individuals being sent to offsite locations, etc.).

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

CU4 (cont)

Basis (cont):

EAL #1 Basis Addresses a total loss of the communication methods used in support of routine plant operations.

EAL #2 Basis Addresses a total loss of the communication methods used to notify all Offsite Response Organizations (OROs) of an emergency declaration. The Offsite Response Organizations (OROs) referred to here are listed in procedure EP-CE-114-100-F-05, JAF Notification Fact Sheet.

EAL #3 Basis Addresses a total loss of the communication methods used to notify the NRC of an emergency declaration.

Basis Reference(s):

1. NY State Emergency Operations Center
2. NY State Warning Point
3. Alternate State Warning Point
4. State Department of Health
5. SEMO Regional Office
6. Oswego County EOC
7. Oswego County E-911 Center (Warning Point)
8. Nine Mile Point Control Rooms
9. Nine Mile Point TSC and EOF
10. JAFNPP Control Room
11. JAFNPP TSC
12. JAFNPP EOF
13. SEMO Technical Resources
14. NEI 99-01 Rev 6, CU5 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS1 Initiating Condition:

HOSTILE ACTION within the PROTECTED AREA.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

A notification from the Security Supervisor that a HOSTILE ACTION is occurring or has occurred within the PROTECTED AREA.

Basis:

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

PROTECTED AREA: An area that normally encompasses all controlled areas within the security protected area fence.

HOSTILE FORCE: Any individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI): A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.

This IC addresses the occurrence of a HOSTILE ACTION within the PROTECTED AREA. This event will require rapid response and assistance due to the possibility for damage to plant equipment.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS1 (cont)

Basis (cont):

As time and conditions allow, these events require a heightened state of readiness by the plant staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The Site Area Emergency declaration will mobilize Offsite Response Organization (ORO) resources and have them available to develop and implement public protective actions in the unlikely event that the attack is successful in impairing multiple safety functions.

This IC does not apply to a HOSTILE ACTION directed at an ISFSI PROTECTED AREA located outside the plant PROTECTED AREA; such an attack should be assessed using IC HA1. It also does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTILE ACTION perpetrated by a HOSTILE FORCE. Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc. Reporting of these types of events is adequately addressed by other EALs, or the requirements of 10 CFR § 73.71 or 10 CFR

§ 50.72.

Escalation of the emergency classification level would be via IC RG1, RG2 and HG7.

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. NEI 99-01 Rev 6, HS1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 Initiating Condition:

HOSTILE ACTION within the OWNER CONTROLLED AREA or airborne attack threat within 30 minutes.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

1. A validated notification from NRC of an aircraft attack threat < 30 minutes from the site.

OR

2. Notification by the Security Supervisor that a HOSTILE ACTION is occurring or has occurred within the OWNER CONTROLLED AREA.

Basis:

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

OWNER CONTROLLED AREA (OCA): The property associated with the station and owned by the company. Access is normally limited to persons entering for official business.

PROTECTED AREA: An area that normally encompasses all controlled areas within the security protected area fence.

HOSTILE FORCE: Any individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

This IC addresses the occurrence of a HOSTILE ACTION within the OWNER CONTROLLED AREA or notification of an aircraft attack threat. This event will require rapid response and assistance due to the possibility of the attack progressing to the Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 (cont)

Basis (cont):

PROTECTED AREA, or the need to prepare the plant and staff for a potential aircraft impact.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

As time and conditions allow, these events require a heightened state of readiness by the plant staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The Alert declaration will also heighten the awareness of Offsite Response Organizations, allowing them to be better prepared should it be necessary to consider further actions.

This IC does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTILE ACTION perpetrated by a HOSTILE FORCE.

Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc. Reporting of these types of events is adequately addressed by other EALs, or the requirements of 10 CFR § 73.71 or 10 CFR § 50.72.

EAL #1 Basis Addresses the threat from the impact of an aircraft on the plant, and the anticipated arrival time is within 30 minutes. The intent of this EAL is to ensure that threat-related notifications are made in a timely manner so that plant personnel and OROs are in a heightened state of readiness. This EAL is met when the threat-related information has been validated in accordance with AOP-70, Airborne Security.

EAL #2 Basis Applicable for any HOSTILE ACTION occurring, or that has occurred, in the OWNER CONTROLLED AREA. This includes any action directed against an ISFSI that is located outside the plant PROTECTED AREA.

The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an aircraft. The status and size of the plane may be provided by NORAD through the NRC.

In some cases, it may not be readily apparent if an aircraft impact within the OWNER CONTROLLED AREA was intentional (i.e., a HOSTILE ACTION). It is expected, although not certain, that notification by an appropriate Federal agency to the site would clarify this point. In this case, the appropriate federal agency is intended to be NORAD, FBI, FAA or NRC. The emergency declaration, including one based on other ICs/EALs, should not be unduly delayed while awaiting notification by a Federal agency.

Escalation of the emergency classification level would be via IC HS1.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HA1 (cont)

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. NEI 99-01 Rev 6, HA1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU1 Initiating Condition:

Confirmed SECURITY CONDITION or threat.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

1. Notification of a credible security threat directed at the site as determined per SY-AA-101-132, Security Assessment and Response to Unusual Activities.

OR

2. A validated notification from the NRC providing information of an aircraft threat.

OR

3. Notification by the Security Supervisor of a SECURITY CONDITION that does not involve a HOSTILE ACTION.

Basis:

SECURITY CONDITION: Any Security Event as listed in the approved security contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety of the plant. A SECURITY CONDITION does not involve a HOSTILE ACTION SAFETY SYSTEM: A system required for safe plant operation, cooling down the plant and/or placing it in the cold shutdown condition, including the ECCS. These are typically systems classified as safety-related.

HOSTILE ACTION: An act toward a NPP or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILEs, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the NPP. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals in the owner controlled area).

HOSTAGE: A person(s) held as leverage against the station to ensure that demands will be met by the station.

PROJECTILE: An object directed toward a NPP that could cause concern for its continued operability, reliability, or personnel safety.

This IC addresses events that pose a threat to plant personnel or SAFETY SYSTEM equipment, and thus represent a potential degradation in the level of plant safety.

Security events which do not meet one of these EALs are adequately addressed by the Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU1 (cont)

Basis (cont):

requirements of 10 CFR § 73.71 or 10 CFR § 50.72. Security events assessed as HOSTILE ACTIONS are classifiable under ICs HA1, and HS1.

Timely and accurate communications between Security Shift Supervision and the Control Room is essential for proper classification of a security-related event.

Classification of these events will initiate appropriate threat-related notifications to plant personnel and Offsite Response Organizations (OROs).

Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

EAL #1 Basis Addresses the receipt of a credible security threat. The credibility of the threat is assessed in accordance with SY-AA-101-132, Security Assessment and Response to Unusual Activities.

EAL #2 Basis Addresses the threat from the impact of an aircraft on the plant. The NRC Headquarters Operations Officer (HOO) will communicate to the licensee if the threat involves an aircraft. The status and size of the plane may also be provided by NORAD through the NRC. Validation of the threat is performed in accordance with AOP-70, Airborne Security.

EAL #3 Basis References Security Force because these are the individuals trained to confirm that a security event is occurring or has occurred. Training on security event confirmation and classification is controlled due to the nature of Safeguards and 10 CFR § 2.39 information.

Escalation of the emergency classification level would be via IC HA1.

Basis Reference(s):

1. JAFNPP Safeguards Contingency Plan
2. AOP-70 Security Threat
3. SY-AA-101-132, Security Assessment and Response to Unusual Activities
4. NEI 99-01 Rev 6, HU1 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS2 Initiating Condition:

Inability to control a key safety function from outside the Control Room.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

The Emergency Director should declare the event promptly upon determining that the applicable time has been exceeded, or will likely be exceeded.

1. A Control Room evacuation has resulted in plant control being transferred from the Control Room to alternate locations per AOP-43, Plant Shutdown from Outside the Control Room.

AND

2. Control of ANY Table H1 key safety function is not reestablished in < 30 minutes.

Table H1 Safety Functions

  • Reactivity Control (ability to shut down the reactor and keep it shutdown)
  • RPV Water Level (ability to cool the core)
  • RCS Heat Removal (ability to maintain heat sink)

Basis:

The time period to establish control of the plant starts when either:

a. Control of needed safety functions is no longer maintained in the Main Control Room OR
b. The last Operator has left the Main Control Room.

This IC addresses an evacuation of the Control Room that results in transfer of plant control to alternate locations, and the control of a key safety function cannot be reestablished in a timely manner. The failure to gain control of a key safety function following a transfer of plant control to alternate locations is a precursor to a challenge to any fission product barrier within a relatively short period of time.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HS2 (cont)

Basis (cont):

The determination of whether or not control is established at the remote safe shutdown location(s) is based on Emergency Director judgment. The Emergency Director is expected to make a reasonable, informed judgment within 30 minutes whether or not the operating staff has control of key safety functions from the remote safe shutdown location(s).

Escalation of the emergency classification level would be via IC FG1 or CG6.

Basis Reference(s):

1. AOP-43 Plant Shutdown from Outside the Control Room
2. NEI 99-01, Rev 6 HS6 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 Initiating Condition:

Seismic event greater than OBE levels.

Operating Mode Applicability:

1, 2, 3, 4, 5, D Emergency Action Level (EAL):

Note:

  • For emergency classification if EAL # 2.b is not able to be confirmed, then the occurrence of a seismic event is confirmed in manner deemed appropriate by the Emergency Director in < 15 minutes of the event.
  • Escalation of the emergency classification level would be via IC CA2 or MA5
1. Seismic event > Operating Basis Earthquake (OBE) as determined by seismic monitoring system in accordance with AOP-14 Earthquake.

OR

2. When Seismic Monitoring Equipment is not available:
a. Control Room personnel feel an actual or potential seismic event.

AND

b. ANY one of the following confirmed in < 15 minutes of the event:
  • The earthquake resulted in Modified Mercalli Intensity (MMI) > VI and occurred

< 3.5 miles of the plant.

  • The earthquake was magnitude > 5.0 and occurred < 125 miles of the plant.
  • If the above bullets are not able to be confirmed, then the occurrence of a seismic event is confirmed in a manner deemed appropriate by the Shift Manager or Emergency Director.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 (cont)

Basis:

EAL #1 Basis This IC addresses a seismic event that results in accelerations at the plant site greater than those specified for an Operating Basis Earthquake (OBE)1. An earthquake greater than an OBE but less than a Safe Shutdown Earthquake (SSE) 2 should have no significant impact on safety-related systems, structures and components; however, some time may be required for the plant staff to ascertain the actual post-event condition of the plant (e.g., performs walk-downs and post-event inspections). Given the time necessary to perform walk-downs and inspections, and fully understand any impacts, this event represents a potential degradation of the level of safety of the plant.

Event verification with external sources should not be necessary during or following an OBE. Earthquakes of this magnitude should be readily felt by on-site personnel and recognized as a seismic event. The Shift Manager or Emergency Director may seek external verification if deemed appropriate (e.g., a call to the USGS, check internet news sources, etc.); however, the verification action must not preclude a timely emergency declaration.

EAL #2 Basis EAL #2 is included to ensure that a declaration does not result from felt vibrations caused by a non-seismic source (e.g., a dropped load). The Shift Manager or Emergency Director may seek external verification if deemed appropriate (e.g., call to USGS, check internet source, etc.) however, the verification action must not preclude a timely emergency declaration. This guidance recognizes that it may cause the site to declare an Unusual Event while another site, similarly affected but with readily available OBE indications in the Control Room, may not.

Depending upon the plant mode at the time of the event, escalation of the emergency classification level would be via IC CA2 or MA5.

1 An OBE is vibratory ground motion for which those features of a nuclear power plant necessary for continued operation without undue risk to the health and safety of the public will remain functional.

2 An SSE is vibratory ground motion for which certain (generally, safety-related) structures, systems, and components must be designed to remain functional.

Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

HU4 (cont)

Basis Reference(s):

1. FSAR Update Section 2.6 Engineering Seismology
2. AOP-14 Earthquake
3. US NRC Reg. Guide 1.166, Pre-Earthquake Planning and Immediate Nuclear Power Plant Operator Earthquake Actions
4. NEI 99-01, Rev 6 HU2 Month 20XX JAF 2-XX EP-AA-1014 Addendum 3 (Rev X)

Enclosure 2E Revised Procedure Matrix Pages

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Abnormal Rad Levels / Radiological Effluents RG1 1 2 3 4 5 D RS1 1 2 3 4 5 D RA1 1 2 3 4 5 D RU1 1 2 3 4 5 D Release of gaseous radioactivity resulting in offsite dose greater Release of gaseous radioactivity resulting in offsite dose greater Release of gaseous or liquid radioactivity resulting in offsite Release of gaseous or liquid radioactivity greater than 2 times than 1000 mRem TEDE or 5000 mRem thyroid CDE. than 100 mRem TEDE or 500 mRem thyroid CDE. dose greater than 10 mRem TEDE or 50 mRem thyroid CDE. the ODCM limits for 60 minutes or longer.

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Notes: Notes: Notes: Notes:

  • The Emergency Director should declare the event promptly
  • The Emergency Director should declare the event promptly
  • The Emergency Director should declare the event
  • The Emergency Director should declare the event upon determining that the applicable time has been upon determining that the applicable time has been promptly upon determining that the applicable time has promptly upon determining that the applicable time has exceeded, or will likely be exceeded. exceeded, or will likely be exceeded. been exceeded, or will likely be exceeded. been exceeded, or will likely be exceeded.
  • If an ongoing release is detected and the release start time
  • If an ongoing release is detected and the release start time
  • If an ongoing release is detected and the release start
  • If an ongoing release is detected and the release start is unknown, assume that the release duration has is unknown, assume that the release duration has time is unknown, assume that the release duration has time is unknown, assume that the release duration has exceeded 15 minutes. exceeded 15 minutes. exceeded 15 minutes. exceeded 60 minutes.
  • Classification based on effluent monitor readings assumes
  • Classification based on effluent monitor readings assumes
  • Classification based on effluent monitor readings assumes
  • Classification based on effluent monitor readings assumes that a release path to the environment is established. If the that a release path to the environment is established. If the that a release path to the environment is established. If that a release path to the environment is established. If effluent flow past an effluent monitor is known to have effluent flow past an effluent monitor is known to have the effluent flow past an effluent monitor is known to have the effluent flow past an effluent monitor is known to have stopped due to actions to isolate the release path, then the stopped due to actions to isolate the release path, then the stopped due to actions to isolate the release path, then stopped due to actions to isolate the release path, then effluent monitor reading is no longer valid for classification effluent monitor reading is no longer valid for classification the effluent monitor reading is no longer valid for the effluent monitor reading is no longer valid for Radiological Effluents purposes. purposes. classification purposes. classification purposes.
  • The pre-calculated effluent monitor values presented in
  • The pre-calculated effluent monitor values presented in
  • The pre-calculated effluent monitor values presented in EAL #1(Table R1) should be used for emergency EAL #1 (Table R1) should be used for emergency EAL #1 (Table R1) should be used for emergency classification assessments until the results from a dose classification assessments until the results from a dose classification assessments until the results from a dose 1. Reading on the Liquid Radwaste Effluent Monitor (17RM-assessment using actual meteorology are available. assessment using actual meteorology are available. assessment using actual meteorology are available. 350) > 2 times hi-hi trip for 60 minutes.

OR

1. Readings on ANY Table R1 Effluent Monitor > Table R1 value
1. Readings on ANY Table R1 Effluent Monitor > Table R1 value 1. Readings on ANY Table R1 Effluent Monitor > Table R1 value for > 15 minutes. 2. Readings on ANY Table R1 Effluent Monitor > Table R1 value for > 15 minutes. for > 15 minutes. for > 60 minutes.

OR OR OR 2. Dose assessment using actual meteorology indicates doses at OR

2. Dose assessment using actual meteorology indicates doses at or beyond the site boundary of EITHER:
2. Dose assessment using actual meteorology indicates doses at 3. Confirmed sample analyses for gaseous or liquid releases or beyond the site boundary of EITHER: a. > 10 mRem TEDE or beyond the site boundary of EITHER: indicate concentrations or release rates
a. > 1000 mRem TEDE OR
a. > 100 mRem TEDE > 2 times ODCM Limit with a release duration OR b. > 50 mRem CDE Thyroid of > 60 minutes.
b. > 5000 mRem CDE Thyroid OR OR OR b. > 500 mRem CDE Thyroid 3. Analysis of a liquid effluent sample indicates a concentration
3. Field survey results at or beyond the site boundary indicate or release rate that would result in doses greater than OR EITHER of the following at or beyond the site boundary.

EITHER:

a. Gamma (closed window) dose rates 3. Field survey results at or beyond the site boundary indicate a. 10 mRem TEDE for 60 minutes of exposure.

EITHER: OR

> 1000 mR/hr are expected to continue for > 60 minutes. b. 50 mRem CDE Thyroid for 60 minutes

a. Gamma (closed window) dose rates of exposure.

OR > 100 mR/hr are expected to continue for > 60 minutes. OR

b. Analyses of field survey samples indicate 4. Field survey results at or beyond the site boundary indicate

> 5000 mRem CDE Thyroid for 60 minutes OR EITHER:

of inhalation. b. Analyses of field survey samples indicate a. Gamma (closed window) dose rates

> 500 mRem CDE Thyroid for 60 minutes > 10 mR/hr are expected to continue of inhalation. for > 60 minutes.

OR

b. Analyses of field survey samples indicate

> 50 mRem CDE Thyroid for 60 minutes of inhalation.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-1 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear Table R1 Effluent Monitor Thresholds Effluent Monitor General Emergency Site Area Emergency Alert Unusual Event Stack 7880 mR/hr 788 mR/hr 78.8 mR/hr 0.451 mR/hr (High Range Monitor)

Rx Bldg Exh N/A N/A N/A 9.50E+05 cpm (Low Range Monitor)

Turb Bldg Exh 2.44 mR/hr 0.244 mR/hr N/A 6.72E+05 cpm (Low Range Monitor)

Radw Bldg Exh 4.74 mR/hr 0.474 mR/hr N/A N/A Refuel Floor Exh N/A N/A N/A 9.28E+05 cpm (Low Range Monitor)

Month 20XX HOT MATRIX JAF 2-2 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Abnormal Rad Levels / Radiological Effluents RG2 1 2 3 4 5 D RS2 1 2 3 4 5 D RA2 1 2 3 4 5 D RU2 1 2 3 4 5 D Spent fuel pool level cannot be restored to at least 1.00 foot Spent fuel pool level at 1.00 foot. Significant lowering of water level above, or damage to, UNPLANNED loss of water level above irradiated fuel.

for 60 minutes or longer. irradiated fuel.

Emergency Action Level (EAL): Emergency Action Level (EAL):

Emergency Action Levels (EAL): Emergency Action Level (EAL):

Lowering of spent fuel pool level to 1.00 foot as indicated

1. a. UNPLANNED water level drop in the REFUELING Note: The Emergency Director should declare the event on 19LI-60A or 19LI-60B.

PATHWAY as indicated by ANY of the following:

promptly upon determining that the applicable time 1. Uncovery of irradiated fuel in the REFUELING has been exceeded, or will likely be exceeded. PATHWAY.

  • Inability to restore and maintain Spent Fuel Pool water level > low water level alarm.

OR Spent fuel pool level cannot be restored to at least OR 1.00 foot as indicated on19LI-60A or 19LI-60B 2. Damage to irradiated fuel resulting in a release of for > 60 minutes. radioactivity from the fuel as indicated by ANY

  • Indication or report of a drop in water level Table R2 Refuel Floor Radiation Monitors Table R2 Radiation Monitor Alarm. in the REFUELING PATHWAY.

OR AND

3. Lowering of spent fuel pool level to 11.00 feet as b. UNPLANNED Area Radiation Monitor reading rise

Radiological Effluents

  • 17RIS-456A or B Refuel Floor Exhaust RA3 1 2 3 4 5 D RU3 1 2 3 Radiation levels that impede access to equipment necessary Reactor coolant activity greater than Technical Table R4 for normal plant operations, cooldown or shutdown. Specification allowable limits.

Areas with Entry Related Mode Applicability Emergency Action Level (EAL): Emergency Action Level (EAL):

Table R3 Areas Requiring Continuous Occupancy Entry Note: If the equipment in the room or area listed in Table Related R4 was already inoperable, or out of service, before

  • Main Control Room - (by survey) Area 1 Offgas radiation > hi-hi alarm Mode the event occurred, then no emergency classification
  • Central Alarm Station - (by survey) Applicability is warranted. OR
1. Dose rate > 15 mR/hr in ANY of the areas in Table R3. 2. Specific coolant activity > 2.0 µCi/gm I-131 dose
  • Reactor Building East Crescent equivalent.

OR

  • Reactor Building West Crescent
  • Reactor Building 272 Elevation 2. UNPLANNED event results in radiation levels that Mode 3, 4, prohibit or significantly impede access to ANY of the
  • Reactor Building 300 Elevation and 5 areas in Table R4.
  • Relay Room
  • North Cable Room Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-3 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT FG1 Loss of ANY two barriers AND Loss or Potential Loss of third barrier. 1 2 3 FS1 Loss or Potential Loss of ANY two barriers. 1 2 3 FA1 ANY Loss or ANY Potential Loss of either Fuel Clad or RCS. 1 2 3 FC - Fuel Clad RC - Reactor Coolant System CT - Containment Sub-Category Loss Potential Loss Loss Potential Loss Loss Potential Loss Coolant activity > 300 uCi/gm I-131 dose None None

1. RCS Activity None None None equivalent.
2. RPV water level cannot be restored and 1. RPV water level cannot be restored and
1. SAOG entry required maintained > 0 inches (TAF). maintained > 0 inches (TAF). SAOG entry required
2. RPV Water Level None None OR OR
3. RPV water level cannot be determined. 2. RPV water level cannot be determined.
3. Primary Containment pressure > 56 psig.

OR

1. a. Primary Containment pressure 1. UNPLANNED rapid drop in Primary 4. a. Primary Containment hydrogen
3. Primary > 2.7 psig. Containment pressure following Primary concentration > 6%.

Containment AND Containment pressure rise. AND None None None Pressure / b. Primary Containment pressure rise is OR b. Primary Containment oxygen concentration Conditions due to RCS leakage. 2. Primary Containment pressure response not > 5%.

consistent with LOCA conditions. OR

5. Heat Capacity Temperature Limit (HCTL)

(EOP-11) exceeded.

3. UNISOLABLE primary system leakage that results in EITHER of the following:
1. UNISOLABLE Main Steam Line (MSL),

HPCI, RWCU, RCIC, or Feedwater line a. Secondary Containment area temperature break. > EOP-5 Maximum Normal Operating

4. RCS Leak Rate None None Limit. None None OR
2. Emergency RPV Depressurization is OR required. b. Secondary Containment area radiation

> EOP-5 Maximum Normal Operating Limit.

5. Primary Drywell radiation monitor reading Drywell radiation monitor reading Drywell radiation monitor reading Containment None None None

> 1.8E+03 R/hr (1800 R/hr). > 63 R/hr. > 1.8E+04 R/hr (18,000 R/hr).

Radiation

1. UNISOLABLE direct downstream pathway to the environment exists after Primary Containment isolation signal.

OR

2. Intentional Primary Containment venting or purging per EOPs or SAOGs due to accident conditions.
6. Primary OR Containment None None None None None Isolation Failure 3. UNISOLABLE primary system leakage that results in EITHER of the following:
a. Secondary Containment area temperature

> EOP-5 Maximum Safe Operating Limit.

OR

b. Secondary Containment area radiation

> EOP-5 Maximum Safe Operating Limit.

7. Emergency 1. Any Condition in the opinion of the 2. Any Condition in the opinion of the 1. Any Condition in the opinion of the 2. Any Condition in the opinion of the 1. Any Condition in the opinion of the 2. Any Condition in the opinion of the Director Emergency Director that indicates Loss Emergency Director that indicates Emergency Director that indicates Loss of Emergency Director that indicates Potential Emergency Director that indicates Loss of the Emergency Director that indicates Potential Judgment of the Fuel Clad Barrier. Potential Loss of the Fuel Clad Barrier. the RCS Barrier. Loss of the RCS Barrier. Containment Barrier. Loss of the Containment Barrier.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-4 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT System Malfunction MG1 1 2 3 MS1 1 2 3 MA1 1 2 3 MU1 1 2 3 Prolonged loss of all offsite and all onsite AC power to Loss of all offsite and onsite AC power to emergency Loss of all but one AC power source to emergency buses for Loss of all offsite AC power capability to emergency buses emergency buses. buses for 15 minutes or longer. 15 minutes or longer. for 15 minutes or longer.

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event promptly upon determining that the applicable time has promptly upon determining that the applicable time promptly upon determining that the applicable time promptly upon determining that the applicable time been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded.

Loss of AC Power

1. Loss of ALL offsite and onsite AC power to 4160 V
1. Loss of ALL offsite and onsite AC power to 4160 V 1. AC power capability to 4160 V emergency buses 10500 Loss of ALL offsite AC power capability 4160 V emergency emergency buses 10500 and 10600.

emergency buses 10500 and 10600. and 10600 reduced to only one of the following power buses 10500 and 10600 for > 15 minutes.

AND sources for > 15 minutes.

2. EITHER of the following: AND
  • Reserve Station Transformer T-2
  • Reserve Station Transformer T-2
a. Restoration of at least one 4160 V emergency bus
  • Reserve Station Transformer T-3
2. Failure to restore power to at least one 4160 V
  • Reserve Station Transformer T-3 10500 or 10600 in < 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is not likely. emergency bus 10500 or 10600 in < 15 minutes from
  • Station Service Transformer T-4 (While

OR the time of loss of both offsite and onsite AC power. backfeeding from Main Transformer)

b. RPV water level cannot be restored and maintained

> -19 inches (MSCRWL).

  • Main Generator via T-4 AND
2. ANY additional single power source failure will result in a loss of ALL AC power to SAFETY SYSTEMS.

MG2 1 2 3 MS2 1 2 3 Loss of all AC and Vital DC power sources for 15 minutes or Loss of all Vital DC power for 15 minutes or longer.

longer.

Emergency Action Level (EAL):

Emergency Action Level (EAL):

Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event promptly upon determining that the applicable time Loss of DC Power promptly upon determining that the applicable time has has been exceeded, or will likely be exceeded.

been exceeded, or will likely be exceeded.

1. Loss of ALL offsite and onsite AC power to 4160 V Voltage is < 105 VDC on Vital DC buses 71BCB-2A emergency buses 10500 and 10600. and 71BCB-2B for > 15 minutes.

AND

2. Voltage is < 105 VDC on Vital DC buses 71BCB-2A and 71BCB-2B.

AND

3. All AC and Vital DC power sources in EALs #1 and #2 have been lost for > 15 minutes.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-5 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT System Malfunction MS3 1 2 MA3 1 2 MU3 1 2 Inability to shutdown the reactor causing a challenge to RPV Automatic or manual scram fails to shutdown the Automatic or manual scram fails to shutdown the reactor.

water level or RCS heat removal. reactor, and subsequent manual actions taken at the Emergency Action Level (EAL):

Reactor Control Console are not successful in shutting Emergency Action Level (EAL):

down the reactor. Note: A manual action is any operator action, or set of

1. Automatic scram did not shutdown the reactor as actions, which causes the control rods to be rapidly Emergency Action Level (EAL):

indicated by Reactor Power > 2.5%. inserted into the core. This action does not include Note: A manual action is any operator action, or set of manually driving in control rods or implementation of AND actions, which causes the control rods to be rapidly boron injection strategies.

2. ALL manual / ARI actions to shutdown the reactor have inserted into the core. This action does not include
1. a. Automatic scram did not shutdown the reactor as been unsuccessful as indicated by Reactor Power manually driving in control rods or implementation of indicated by Reactor Power > 2.5%.

> 2.5%. boron injection strategies.

RPS Failure AND AND 1. Automatic or manual scram did not shutdown the

b. Subsequent manual / ARI action taken at the reactor as indicated by Reactor Power > 2.5%.
3. EITHER of the following conditions exist: Reactor Control Console is successful in shutting AND down the reactor as indicated by
  • RPV water level cannot be restored and maintained Reactor Power < 2.5%.

> -19 inches (MSCRWL). 2. Manual / ARI actions taken at the Reactor Control Console are not successful in shutting down the reactor OR OR as indicated by Reactor Power > 2.5%. 2. a. Manual scram did not shutdown the reactor as

  • Heat Capacity Temperature Limit (HCTL) indicated by Reactor Power > 2.5%.

(EOP-11) exceeded. AND

b. EITHER of the following:
1. Subsequent manual / ARI action taken at the Reactor Control Console is successful in shutting down the reactor as indicated by Reactor Power < 2.5%.

OR

2. Subsequent automatic scram / ARI is successful in shutting down the reactor as indicated by Reactor Power < 2.5%.

MA4 1 2 3 MU4 1 2 3 UNPLANNED loss of Control Room indications for 15 UNPLANNED loss of Control Room indications for 15 Control Room Indications minutes or longer with a significant transient in progress. minutes or longer.

Table M1 Control Room Parameters Table M2 Significant Transients Emergency Action Level (EAL): Emergency Action Level (EAL):

  • Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event Reactor Power
  • Auto/Manual runback > 25% thermal reactor promptly upon determining that the applicable time promptly upon determining that the applicable time
  • RPV Water Level power has been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded.
  • Electric load rejection > 25% full electric
  • Primary Containment Pressure load 1. UNPLANNED event results in the inability to monitor UNPLANNED event results in the inability to monitor ANY
  • Torus Level
  • Reactor Scram ANY Table M1 parameter from within the Control Room Table M1 parameter from within the Control Room for > 15 minutes. for > 15 minutes.
  • Torus Temperature
  • Thermal Power oscillations > 10% (peak to 2. ANY Table M2 transient in progress.

peak)

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-6 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT System Malfunction MA5 1 2 3 Hazardous event affecting a SAFETY SYSTEM required for the current operating mode.

Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of MA5 are not met, then assess the event via HU3, HU4, or HU6.
1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Hazard affects Safety System AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-7 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT System Malfunction MU6 1 2 3 RCS leakage for 15 minutes or longer.

Emergency Action Level (EAL):

Note: The Emergency Director should declare the event promptly upon determining that the applicable time has been exceeded, or will likely be exceeded.

1. RCS unidentified or pressure boundary leakage in the Drywell > 10 gpm for > 15 minutes.

OR

2. RCS identified leakage in the Drywell > 25 gpm for > 15 minutes.

OR

3. Leakage from the RCS to a location outside the Drywell > 25 gpm for > 15 minutes.

MU7 1 2 3 Table M3 Communications Capability Loss of all onsite or offsite communication capabilities.

System Onsite Offsite NRC Emergency Action Level (EAL):

Page/Party System X 1. Loss of ALL Table M3 onsite communication (Gaitronics) capabilities affecting the ability to perform routine Control Room/Portable X operations.

Radio OR Plant Telephones (all X X X 2. Loss of ALL Table M3 offsite communication capabilities affecting the ability to perform offsite Communications VOIP, switched, non- notifications.

switched)

OR Installed Out-of-Plant X X X 3. Loss of ALL Table M3 NRC communication Cellular Phones capabilities affecting the ability to perform NRC Plant Satellite Phones X X notifications.

(Installed in CR and deployable)

RECS X Dedicated Phone Lines X X

(ENS)

HPN and FTS 2001 X X

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-8 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HS1 1 2 3 4 5 D HA1 1 2 3 4 5 D HU1 1 2 3 4 5 D HOSTILE ACTION within the PROTECTED AREA. HOSTILE ACTION within the OWNER CONTROLLED Confirmed SECURITY CONDITION or threat.

AREA or airborne attack threat within 30 minutes.

Emergency Action Level (EAL): Emergency Action Level (EAL):

Emergency Action Level (EAL):

A notification from the Security Supervisor that a HOSTILE 1. Notification of a credible security threat directed at the Hostile Action ACTION is occurring or has occurred within the 1. A validated notification from NRC from an aircraft site as determined per SY-AA-101-132, Security PROTECTED AREA. attack threat < 30 minutes of the site. Assessment and Response to Unusual Activities.

OR OR

2. A validated notification from the NRC providing
2. Notification by the Security Supervisor that a information of an aircraft threat.

HOSTILE ACTION is occurring or has occurred OR within the OWNER CONTROLLED AREA.

3. Notification by the Security Supervisor of a SECURITY CONDITION that does not involve a HOSTILE ACTION.

HS2 1 2 3 4 5 D HA2 1 2 3 4 5 D Inability to control a key safety function from outside the Control Room evacuation resulting in transfer of plant control Table H1 Safety Functions Control Room. to alternate locations.

Emergency Action Level (EAL): Emergency Action Level (EAL):

  • Reactivity Control (ability to shutdown the reactor and keep it shutdown)

A Control Room evacuation has resulted in plant control Transfer of Plant Control Note: The Emergency Director should declare the event

  • RPV Water Level (ability to cool the core) promptly upon determining that the applicable time has being transferred from the Control Room to alternate been exceeded, or will likely be exceeded. locations per AOP-43, Plant Shutdown from Outside the
  • RCS Heat Removal (ability to maintain heat sink) Control Room.
1. A Control Room evacuation has resulted in plant control being transferred from the Control Room to alternate locations per AOP-43, Plant Shutdown from Outside the Control Room.

AND

2. Control of ANY Table H1 key safety function is not reestablished in < 30 minutes.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-9 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HU3 1 2 3 4 5 D Table H2 Areas FIRE potentially degrading the level of safety of the plant.

  • Reactor Building (when inerted the Drywell is exempt) Emergency Action Level (EAL):
  • Control Room / Relay Room / Cable Note:

Run Rooms / Cable Spreading

  • The Emergency Director should declare the Room event promptly upon determining that the
  • Electric Bays applicable time has been exceeded, or will likely
  • Control Room AC Equipment Room be exceeded.
  • Control Room Chiller Room
  • Escalation of the emergency classification level would

Building

1. A FIRE in ANY Table H2 area is not extinguished
  • Battery Rooms / Battery Room in < 15 minutes of ANY of the following FIRE detection Corridor indications:
  • Report from the field (i.e., visual observation)
  • Cable Tunnels
  • Receipt of multiple (more than 1) fire alarms or
  • Field verification of a single fire alarm ADS) OR Fire 2. a. Receipt of a single fire alarm in ANY Table H2 area (i.e., no other indications of a FIRE).

AND

b. The existence of a FIRE is not verified in < 30 minutes of alarm receipt.

OR

3. A FIRE within the plant PROTECTED AREA not extinguished in < 60 minutes of the initial report, alarm or indication.

OR

4. A FIRE within the plant PROTECTED AREA that requires firefighting support by an offsite fire response agency to extinguish.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-10 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HU4 1 2 3 4 5 D Seismic event greater than OBE levels.

Emergency Action Level (EAL):

Note:

  • For emergency classification if EAL # 2.b is not able to be confirmed, then the occurrence of a seismic event is confirmed in manner deemed appropriate by the Emergency Director in < 15 minutes of the event.
  • Escalation of the emergency classification level would be via IC CA2 or MA5.
1. Seismic event > Operating Basis Earthquake (OBE) as determined by seismic monitoring system in accordance with AOP-14 Earthquake.

OR

2. When Seismic Monitoring Equipment is not available:
a. Control Room personnel feel an actual or potential seismic event.

Earthquake AND

b. ANY one of the following confirmed in < 15 minutes of the event:
  • The earthquake resulted in Modified Mercalli Intensity (MMI) > VI and occurred < 3.5 miles of the plant.
  • The earthquake was magnitude > 5.0 and occurred < 125 miles of the plant.
  • If the above bullets are not able to be confirmed, then the occurrence of a seismic event is confirmed in a manner deemed appropriate by the Shift Manager or Emergency Director.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-11 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HA5 3 4 5 Table H3 Areas with Entry Related Mode Applicability Gaseous release impeding access to equipment Entry Related necessary for normal plant operations, cooldown or Area Mode shutdown.

Toxic Gas Applicability Emergency Action Level (EAL):

  • Reactor Building East Crescent Note: If the equipment in the listed room or area was already inoperable, or out of service, before the
  • Reactor Building West Crescent event occurred, then no emergency classification
  • Reactor Building 272 Elevation Mode 3, 4, is warranted.
  • Reactor Building 300 Elevation
  • Relay Room and 5 1. Release of a toxic, corrosive, asphyxiant or
  • North Cable Room flammable gas in a Table H3 area.

AND

2. Entry into the room or area is prohibited or impeded.

HU6 1 2 3 4 5 D Hazardous Event Emergency Action Level (EAL):

Note:

  • EAL #4 does not apply to routine traffic impediments such as fog, snow, ice, or vehicle breakdowns or accidents.
  • Escalation of the emergency classification level would be via IC CA2 or MA5.

Hazardous Event

1. Tornado strike within the PROTECTED AREA.

OR

2. Internal room or area flooding of a magnitude sufficient to require manual or automatic electrical isolation of a SAFETY SYSTEM component required by Technical Specifications for the current operating mode.

OR

3. Movement of personnel within the PROTECTED AREA is impeded due to an offsite event involving hazardous materials (e.g., an offsite chemical spill or toxic gas release).

OR

4. A hazardous event that results in on-site conditions sufficient to prohibit the plant staff from accessing the site via personal vehicles.

OR

5. Intake Water Level > 255 feet.

OR

6. ESW intake bay water level < 237 feet.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-12 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HG7 1 2 3 4 5 D HS7 1 2 3 4 5 D HA7 1 2 3 4 5 D HU7 1 2 3 4 5 D Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Emergency Director warrant declaration of a GENERAL Emergency Director warrant declaration of a SITE AREA Emergency Director warrant declaration of an ALERT. Emergency Director warrant declaration of an UNUSUAL EMERGENCY. EMERGENCY. EVENT.

Emergency Action Level (EAL):

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Other conditions exist which, in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Emergency Director, indicate that events are in progress or Other conditions exist which in the judgment of the Emergency Emergency Director indicate that events are in progress or Emergency Director indicate that events are in progress or have occurred which involve an actual or potential Director indicate that events are in progress or have occurred have occurred which involve actual or IMMINENT substantial have occurred which involve actual or likely major failures of substantial degradation of the level of safety of the plant or a which indicate a potential degradation of the level of safety of core degradation or melting with potential for loss of plant functions needed for protection of the public or HOSTILE security event that involves probable life threatening risk to the plant or indicate a security threat to facility protection has containment integrity or HOSTILE ACTION that results in an ACTION that results in intentional damage or malicious acts, site personnel or damage to site equipment because of been initiated. No releases of radioactive material requiring actual loss of physical control of the facility. Releases can be (1) toward site personnel or equipment that could lead to the HOSTILE ACTION. Any releases are expected to be limited offsite response or monitoring are expected unless further reasonably expected to exceed EPA Protective Action likely failure of or, (2) that prevent effective access to to small fractions of the EPA Protective Action Guideline degradation of safety systems occurs.

Guideline exposure levels offsite for more than the immediate equipment needed for the protection of the public. Any exposure levels.

site area. releases are not expected to result in exposure levels which Emergency Director Judgment exceed EPA Protective Action Guideline exposure levels beyond the site boundary.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-13 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex HOT MATRIX HOT MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ISFSI Malfunction E-HU1 1 2 3 4 5 D Damage to a loaded cask CONFINEMENT BOUNDARY.

Emergency Action Level (EAL):

Damage to a loaded cask CONFINEMENT BOUNDARY as indicated by a radiation reading > Table E-1 values:

Table E-1 Radiation Reading Overpack Overpack Overpack Overpack Serial Average Serial Average Surface Number Surface Dose Number Dose Rates Rates mrem/hr mrem/hr (gamma+neutron) HI- (gamma+neutron)

STORM 100S (XXX)

HI- 80 on the side S/N - 220 on the side STORM 0186, 100S 20 on the top 0187, 40 on the top ISFSI 32 at the inlet 0188 S/N - 15, 16, 17 and outlet vent ducts S/N -

0307, 0308, 0309, 0310, 0311, HI- 100 on the side 0312, STORM 20 on the top 0679, 100S 600 on the side 0680, (232) 90 at the inlet 0681, 60 on the top S/N - and outlet 0682, 0169, vent ducts 0683, 0170, 0690, 0171 0691, 0692, 0693, 0694, 0695 Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX HOT MATRIX JAF 2-14 HOT MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Abnormal Rad Levels / Radiological Effluents RG1 1 2 3 4 5 D RS1 1 2 3 4 5 D RA1 1 2 3 4 5 D RU1 1 2 3 4 5 D Release of gaseous radioactivity resulting in offsite dose greater Release of gaseous radioactivity resulting in offsite dose greater Release of gaseous or liquid radioactivity resulting in offsite dose Release of gaseous or liquid radioactivity greater than 2 than 1000 mRem TEDE or 5000 mRem thyroid CDE. than 100 mRem TEDE or 500 mRem thyroid CDE. greater than 10 mRem TEDE or 50 mRem thyroid CDE. times the ODCM limits for 60 minutes or longer.

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Notes: Notes: Notes: Notes:

  • The Emergency Director should declare the event promptly
  • The Emergency Director should declare the event promptly
  • The Emergency Director should declare the event promptly
  • The Emergency Director should declare the event upon determining that the applicable time has been upon determining that the applicable time has been upon determining that the applicable time has been exceeded, promptly upon determining that the applicable time has exceeded, or will likely be exceeded. exceeded, or will likely be exceeded. or will likely be exceeded. been exceeded, or will likely be exceeded.
  • If an ongoing release is detected and the release start time
  • If an ongoing release is detected and the release start time
  • If an ongoing release is detected and the release start time is
  • If an ongoing release is detected and the release start is unknown, assume that the release duration has is unknown, assume that the release duration has unknown, assume that the release duration has exceeded 15 time is unknown, assume that the release duration has exceeded 15 minutes. exceeded 15 minutes. minutes. exceeded 60 minutes.
  • Classification based on effluent monitor readings assumes
  • Classification based on effluent monitor readings assumes
  • Classification based on effluent monitor readings assumes that
  • Classification based on effluent monitor readings that a release path to the environment is established. If the that a release path to the environment is established. If the a release path to the environment is established. If the effluent assumes that a release path to the environment is effluent flow past an effluent monitor is known to have effluent flow past an effluent monitor is known to have flow past an effluent monitor is known to have stopped due to established. If the effluent flow past an effluent monitor stopped due to actions to isolate the release path, then the stopped due to actions to isolate the release path, then the actions to isolate the release path, then the effluent monitor is known to have stopped due to actions to isolate the effluent monitor reading is no longer valid for classification effluent monitor reading is no longer valid for classification reading is no longer valid for classification purposes. release path, then the effluent monitor reading is no Radiological Effluents purposes. purposes.
  • The pre-calculated effluent monitor values presented in EAL longer valid for classification purposes.
  • The pre-calculated effluent monitor values presented in
  • The pre-calculated effluent monitor values presented in #1(Table R1) should be used for emergency classification EAL #1(Table R1) should be used for emergency EAL #1(Table R1) should be used for emergency assessments until the results from a dose assessment using classification assessments until the results from a dose classification assessments until the results from a dose actual meteorology are available. 1. Reading on the Liquid Radwaste Effluent Monitor assessment using actual meteorology are available. assessment using actual meteorology are available. (17RM-350) > 2 times hi-hi trip for 60 minutes.
1. Readings on ANY Table R1 Effluent Monitor > Table R1 value for OR
1. Readings on ANY Table R1 Effluent Monitor > Table R1 value 1. Readings on ANY Table R1 Effluent Monitor > Table R1 value > 15 minutes. 2. Readings on ANY Table R1 Effluent Monitor > Table R1 for > 15 minutes. for > 15 minutes. OR value for > 60 minutes.

OR OR 2. Dose assessment using actual meteorology indicates doses at or beyond the site boundary of EITHER: OR

2. Dose assessment using actual meteorology indicates doses at
2. Dose assessment using actual meteorology indicates doses at a. > 10 mRem TEDE 3. Confirmed sample analyses for gaseous or liquid releases or beyond the site boundary of EITHER:

or beyond the site boundary of EITHER: OR indicate concentrations or release rates

a. > 1000 mRem TEDE
a. > 100 mRem TEDE b. > 50 mRem CDE Thyroid > 2 times ODCM Limit with a release duration OR OR of > 60 minutes.
b. > 5000 mRem CDE Thyroid OR
3. Analysis of a liquid effluent sample indicates a concentration or OR b. > 500 mRem CDE Thyroid release rate that would result in doses greater than EITHER of
3. Field survey results at or beyond the site boundary indicate OR the following at or beyond the site boundary EITHER: a. 10 mRem TEDE for 60 minutes of exposure
a. Gamma (closed window) dose rates 3. Field survey results at or beyond the site boundary indicate OR EITHER:

> 1000 mR/hr are expected to continue b. 50 mRem CDE Thyroid for 60 minutes for > 60 minutes. a. Gamma (closed window) dose rates of exposure OR > 100 mR/hr are expected to continue OR

b. Analyses of field survey samples indicate for > 60 minutes. 4. Field survey results at or beyond the site boundary indicate

> 5000 mRem CDE Thyroid for 60 minutes OR EITHER:

of inhalation. a. Gamma (closed window) dose rates

b. Analyses of field survey samples indicate

> 500 mRem CDE Thyroid for 60 minutes > 10 mR/hr are expected to continue of inhalation. for > 60 minutes.

OR

b. Analyses of field survey samples indicate

> 50 mRem CDE Thyroid for 60 minutes of inhalation.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-15 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear Table R1 Effluent Monitor Thresholds Effluent Monitor General Emergency Site Area Emergency Alert Unusual Event Stack 7880 mR/hr 788 mR/hr 78.8 mR/hr 0.451 mR/hr (High Range Monitor)

Rx Bldg Exh N/A N/A N/A 9.50E+05 cpm (Low Range Monitor)

Turb Bldg Exh 2.44 mR/hr 0.244 mR/hr N/A 6.72E+05 cpm (Low Range Monitor)

Radw Bldg Exh 4.74 mR/hr 0.474 mR/hr N/A N/A Refuel Floor Exh N/A N/A N/A 9.28E+05 cpm (Low Range Monitor)

Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-16 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Abnormal Rad Levels / Radiological Effluents RG2 1 2 3 4 5 D RS2 1 2 3 4 5 D RA2 1 2 3 4 5 D RU2 1 2 3 4 5 D Spent fuel pool level cannot be restored to at least 1.00 foot Spent fuel pool level at 1.00 foot. Significant lowering of water level above, or damage to, UNPLANNED loss of water level above irradiated fuel.

for 60 minutes or longer. irradiated fuel.

Emergency Action Level (EAL): Emergency Action Level (EAL):

Emergency Action Levels (EAL): Emergency Action Level (EAL):

Lowering of spent fuel pool level to 1.00 foot as indicated

1. a. UNPLANNED water level drop in the REFUELING Note: The Emergency Director should declare the event on 19LI-60-A or 19LI-60B.

PATHWAY as indicated by ANY of the following:

promptly upon determining that the applicable time 1. Uncovery of irradiated fuel in the REFUELING has been exceeded, or will likely be exceeded. PATHWAY.

  • Inability to restore and maintain Spent Fuel Pool water level > low water level alarm.

OR Spent fuel pool level cannot be restored to at least OR 1.00 foot as indicated on 19LI-60A or 19LI-60B 2. Damage to irradiated fuel resulting in a release of for > 60 minutes. radioactivity from the fuel as indicated by ANY

  • Indication or report of a drop in water level in Table R2 Refuel Floor Radiation Monitors Table R2 Radiation Monitor Alarm. the REFUELING PATHWAY.

OR AND

3. Lowering of spent fuel pool level to 11.00 feet as b. UNPLANNED Area Radiation Monitor reading rise

Radiological Effluents

  • 17RIS-456A or B Refuel Floor Exhaust RA3 1 2 3 4 5 D Radiation levels that impede access to equipment necessary for normal plant operations, cooldown or shutdown.

Table R4 Emergency Action Level (EAL):

Areas with Entry Related Mode Applicability Table R3 Note: If the equipment in the room or area listed in Table Areas Requiring Continuous Occupancy Entry R4 was already inoperable, or out of service, before Related the event occurred, then no emergency classification

  • Main Control Room - (by survey) Area Mode is warranted.
  • Central Alarm Station - (by survey) Applicability
1. Dose rate > 15 mR/hr in ANY of the areas in Table R3.
  • Reactor Building East Crescent OR
  • Reactor Building West Crescent 2. UNPLANNED event results in radiation levels that
  • Reactor Building 272 Elevation prohibit or significantly impede access to ANY of the Mode 3, 4,
  • Reactor Building 300 Elevation areas in Table R4.

and 5

  • Relay Room
  • North Cable Room Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-17 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Cold Shutdown / Refueling System Malfunctions CA1 4 5 D CU1 4 5 D Loss of all offsite and all onsite AC power to emergency buses Loss of all but one AC power source to emergency buses for for 15 minutes or longer. 15 minutes or longer.

Emergency Action Level (EAL): Emergency Action Level (EAL):

Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event promptly upon determining that the applicable time has promptly upon determining that the applicable time has been exceeded, or will likely be exceeded. been exceeded, or will likely be exceeded.

1. Loss of ALL offsite and onsite AC power to 4160 V 1. AC power capability to 4160 V emergency buses 10500 and emergency buses 10500 and 10600. 10600 reduced to only one of the following power sources for > 15 minutes.

AND

  • Reserve Station Transformer T-2
2. Failure to restore power to at least one 4160 V emergency
  • Reserve Station Transformer T-3 bus 10500 or 10600 in < 15 minutes from the time of loss
  • Station Service Transformer T-4 (While backfeeding of both offsite and onsite AC power.

from Main Transformer)

2. ANY additional single power source failure will result in a loss of ALL AC power to SAFETY SYSTEMS.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-18 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Cold Shutdown / Refueling System Malfunctions CA2 4 5 Hazardous event affecting SAFETY SYSTEM required for the current operating mode.

Emergency Action Level (EAL):

Note:

  • This EAL is only applicable to SAFETY SYSTEMs having two (2) or more trains.
  • If the affected SAFETY SYSTEM train was already inoperable before the hazardous event occurred, then this emergency classification is not warranted.
  • If the hazardous event only resulted in VISIBLE DAMAGE, with no indications of degraded performance to at least one train of a SAFETY SYSTEM, then this emergency classification is not warranted.
  • If a hazardous event occurs and it is determined that the conditions of CA2 are not met, then assess the event via HU3, HU4, or HU6.

Safety System

1. a. The occurrence of ANY of the following hazardous events:
  • Internal or external flooding event
  • FIRE
  • EXPLOSION
  • Other events with similar hazard characteristics as determined by the Shift Manager AND
b. Event damage has caused indications of degraded performance to one train of a SAFETY SYSTEM required by Technical Specifications for the current operating mode.

AND

c. EITHER of the following:
  • Event damage has caused indications of degraded performance to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

OR

  • Event damage has resulted in VISIBLE DAMAGE to a second train of the SAFETY SYSTEM required by Technical Specifications for the current operating mode.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-19 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Cold Shutdown / Refueling System Malfunctions CU3 4 5 DC Power Loss of Vital DC power for 15 minutes or longer.

Emergency Action Level (EAL):

Note: The Emergency Director should declare the event promptly upon determining that the applicable time has been exceeded, or will likely be exceeded.

Voltage is < 105 VDC on required Vital DC buses 71BCB-2A and 71BCB-2B for > 15 minutes.

CU4 4 5 D Table C1 Communication Capabilities Loss of all onsite or offsite communication capabilities.

System Onsite Offsite NRC Page/Party System X Emergency Action Level (EAL):

(Gaitronics) 1. Loss of ALL Table C1 onsite communication Communications Control Room/Portable X capabilities affecting the ability to perform routine Radio operations.

Plant Telephones (all VOIP, X X X OR switched, non-switched)

2. Loss of ALL Table C1 offsite communication Installed Out-of-Plant X X X capabilities affecting the ability to perform offsite Cellular Phones notifications.

Plant Satellite Phones X X OR (Installed in CR and deployable) 3. Loss of ALL Table C1 NRC communication capabilities affecting the ability to perform NRC RECS X notifications.

Dedicated Phone Lines X X (ENS)

HPN and FTS 2001 X X CA5 4 5 CU5 4 5 Table C2 RCS Heat-up Duration Thresholds Inability to maintain the plant in cold shutdown. UNPLANNED rise in RCS temperature.

RCS Containment Heat-up Status Closure Status Duration Emergency Action Levels (EAL): Emergency Action Levels (EAL):

Intact Not Applicable 60 minutes* Note: Note:

  • The Emergency Director should declare the event
  • The Emergency Director should declare the event promptly upon determining that the applicable time Heat Sink Established 20 minutes* promptly upon determining that the applicable time has been exceeded, or will likely be exceeded.

has been exceeded, or will likely be exceeded.

  • A momentary UNPLANNED excursion above the Not Intact
  • A momentary UNPLANNED excursion above the Technical Specification cold shutdown temperature Technical Specification cold shutdown temperature limit when heat removal function is available does Not Established 0 minutes not warrant classification.

limit when heat removal function is available does not warrant classification. 1. UNPLANNED rise in RCS temperature > 212 ºF.

  • If an RCS heat removal system is in operation 1. UNPLANNED rise in RCS temperature > 212 ºF OR within this time frame and RCS temperature is being for > Table C2 duration. 2. Loss of the following for > 15 minutes.

reduced, then EAL #1 is not applicable.

OR

  • ALL RCS temperature indications AND
2. UNPLANNED RPV pressure rise > 10 psig as a
  • ALL RPV water level indications result of temperature rise Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-20 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Cold Shutdown / Refueling System Malfunctions CG6 4 5 CS6 4 5 CA6 4 5 CU6 4 5 Loss of RPV inventory affecting fuel clad integrity with Loss of RPV inventory affecting core decay heat removal Loss of RPV inventory. UNPLANNED loss of RP inventory for 15 minutes or containment challenged. capability. longer.

Emergency Action Level (EAL):

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event Note: The Emergency Director should declare the event promptly upon determining that the applicable time Note: The Emergency Director should declare the event promptly upon determining that the applicable time promptly upon determining that the applicable time has been exceeded, or will likely be exceeded. promptly upon determining that the applicable time has been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded. has been exceeded, or will likely be exceeded.

1. Loss of RPV inventory as indicated by 1 a. RPV water level < 0 inches (TAF) for 1. With CONTAINMENT CLOSURE not established, level < 126.5 inches. 1. UNPLANNED loss of reactor coolant results in the

> 30 minutes. RPV water level < 120.5 inches. inability to restore and maintain RPV level to above the OR AND OR procedurally established lower limit

2. With CONTAINMENT CLOSURE established, RPV 2. a. RPV water level cannot be monitored for > 15 minutes.
b. ANY Table C4 Containment Challenge Indication.

water level < 0 inches (TAF). for > 15 minutes.

OR OR OR AND

2. a. RPV water level cannot be monitored 3. a. RPV water level cannot be monitored for 2. a. RPV water level cannot be monitored.

for > 30 minutes. b. Loss of RPV inventory per Table C3 indications.

> 30 minutes. AND AND RCS Leakage / Inventory AND

b. Loss of RPV inventory per Table C3 indications.
b. Core uncovery is indicated by ANY of the following: b. Core uncovery is indicated by ANY of the following:
  • Table C3 indication of a sufficient magnitude to indicate core uncovery.
  • Table C3 indication of a sufficient magnitude to indicate core uncovery.

OR OR

1247) Rad monitor > 3 R/hr.

AND

c. ANY Table C4 Containment Challenge Indication.

Table C3 Indications of RCS Leakage

  • UNPLANNED Drywell equipment drain sump level Table C4 Containment Challenge Indications rise*
  • UNPLANNED Drywell floor drain sump level rise*

> 6% and Oxygen > 5%

  • UNPLANNED Reactor Building equipment sump level rise*
  • UNPLANNED rise in containment pressure
  • UNPLANNED Reactor Building floor drain sump level
  • CONTAINMENT CLOSURE not established*

rise*

  • UNPLANNED Torus level rise* Maximum Safe Operating Limit (EOP-5)
  • UNPLANNED RPV make up rate rise*
  • if CONTAINMENT CLOSURE is re-established prior
  • Observation of leakage or inventory loss to exceeding the 30-minute core uncovery time limit, then escalation to a General Emergency is not
  • Rise in level is attributed to a loss of RPV inventory required.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-21 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HS1 1 2 3 4 5 D HA1 1 2 3 4 5 D HU1 1 2 3 4 5 D HOSTILE ACTION within the PROTECTED AREA. HOSTILE ACTION within the OWNER CONTROLLED Confirmed SECURITY CONDITION or threat.

AREA or airborne attack threat within 30 minutes.

Emergency Action Level (EAL): Emergency Action Level (EAL):

Emergency Action Level (EAL):

A notification from the Security Supervisor that a HOSTILE 1. Notification of a credible security threat directed at Hostile Action ACTION is occurring or has occurred within the 1. A validated notification from NRC of an aircraft the site as determined per SY-AA-101-132, Security PROTECTED AREA. attack threat < 30 minutes from the site. Assessment and Response to Unusual Activities.

OR OR

2. A validated notification from the NRC providing
2. Notification by the Security Supervisor that a information of an aircraft threat.

HOSTILE ACTION is occurring or has occurred OR within the OWNER CONTROLLED AREA.

3. Notification by the Security Supervisor of a SECURITY CONDITION that does not involve a HOSTILE ACTION.

HS2 1 2 3 4 5 D HA2 1 2 3 4 5 D Inability to control a key safety function from outside the Control Room evacuation resulting in transfer of plant Table H1 Safety Functions Control Room. control to alternate locations.

Emergency Action Level (EAL): Emergency Action Level (EAL):

  • Reactivity Control (ability to shutdown the reactor and keep it shutdown)

A Control Room evacuation has resulted in plant control Transfer of Plant Control Note: The Emergency Director should declare the event

  • RPV Water Level (ability to cool the core) promptly upon determining that the applicable time has being transferred from the Control Room to alternate been exceeded, or will likely be exceeded. locations per AOP-43, Plant Shutdown from Outside the
  • RCS Heat Removal (ability to maintain heat sink) Control Room.
1. A Control Room evacuation has resulted in plant control being transferred from the Control Room to alternate locations per AOP-43, Plant Shutdown from Outside the Control Room.

AND

2. Control of ANY Table H1 key safety function is not reestablished in < 30 minutes.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-22 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety Table H2 Areas HU3 1 2 3 4 5 D

  • Reactor Building (when inerted the FIRE potentially degrading the level of safety of the plant.

Drywell is exempt) Emergency Action Level (EAL):

  • Control Room / Relay Room / Cable Note:

Run Rooms / Cable Spreading Room

  • The Emergency Director should declare the
  • Electric Bays event promptly upon determining that the applicable time has been exceeded, or will likely
  • Control Room AC Equipment Room be exceeded.
  • Control Room Chiller Room
  • Escalation of the emergency classification level would
  • Battery Rooms / Battery Room 1. A FIRE in ANY Table H2 area is not extinguished in Corridor < 15 minutes of ANY of the following FIRE detection
  • Cable Tunnels
  • Report from the field (i.e., visual observation)
  • Receipt of multiple (more than 1) fire alarms or
  • Field verification of a single fire alarm ADS)

OR Fire

2. a. Receipt of a single fire alarm in ANY Table H2 area (i.e., no other indications of a FIRE).

AND

b. The existence of a FIRE is not verified in

< 30 minutes of alarm receipt.

OR

3. A FIRE within the plant PROTECTED AREA not extinguished in < 60 minutes of the initial report, alarm or indication.

OR

4. A FIRE within the plant PROTECTED AREA that requires firefighting support by an offsite fire response agency to extinguish.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-23 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HU4 1 2 3 4 5 D Seismic event greater than OBE levels.

Emergency Action Level (EAL):

Note:

  • For emergency classification if EAL # 2.b is not able to be confirmed, then the occurrence of a seismic event is confirmed in manner deemed appropriate by the Emergency Director in < 15 minutes of the event
  • Escalation of the emergency classification level would be via IC CA2 or MA5.
1. Seismic event > Operating Basis Earthquake (OBE) as determined by seismic monitoring system in accordance with AOP-14 Earthquake.

OR

2. When Seismic Monitoring Equipment is not available:
a. Control Room personnel feel an actual or potential Earthquake seismic event.

AND

b. ANY one of the following confirmed in < 15 minutes of the event:
  • The earthquake resulted in Modified Mercalli Intensity (MMI) > VI and occurred < 3.5 miles of the plant.

< 125 miles of the plant.

  • If the above bullets are not able to be confirmed, then the occurrence of a seismic event is confirmed in a manner deemed appropriate by the Shift Manager or Emergency Director.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-24 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HA5 3 4 5 Table H3 Gaseous release impeding access to equipment Areas with Entry Related Mode Applicability necessary for normal plant operations, cooldown or shutdown.

Entry Toxic Gas Related Emergency Action Level (EAL):

Area Mode Note: If the equipment in the listed room or area was Applicability already inoperable, or out of service, before the event occurred, then no emergency classification

  • Reactor Building East Crescent is warranted.
  • Reactor Building West Crescent
  • Reactor Building 272 Elevation 1. Release of a toxic, corrosive, asphyxiant or flammable gas in a Table H3 area.
  • Reactor Building 300 Elevation Mode 3, 4,
  • Relay Room and 5 AND
  • North Cable Room 2. Entry into the room or area is prohibited or impeded HU6 1 2 3 4 5 D Hazardous Event Emergency Action Level (EAL):

Note:

  • EAL #4 does not apply to routine traffic impediments such as fog, snow, ice, or vehicle breakdowns or accidents.
  • Escalation of the emergency classification level would be via IC CA2 or MA5 Hazardous Event
1. Tornado strike within the PROTECTED AREA.

OR

2. Internal room or area flooding of a magnitude sufficient to require manual or automatic electrical isolation of a SAFETY SYSTEM component required by Technical Specifications for the current operating mode.

OR

3. Movement of personnel within the PROTECTED AREA is impeded due to an offsite event involving hazardous materials (e.g., an offsite chemical spill or toxic gas release).

OR

4. A hazardous event that results in on-site conditions sufficient to prohibit the plant staff from accessing the site via personal vehicles.

OR

5. Intake Water Level > 255 feet.

OR

6. ESW intake bay water level < 237 feet.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-25 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Hazards and Other conditions Affecting Plant Safety HG7 1 2 3 4 5 D HS7 1 2 3 4 5 D HA7 1 2 3 4 5 D HU7 1 2 3 4 5 D Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Emergency Director warrant declaration of a GENERAL Emergency Director warrant declaration of a SITE AREA Emergency Director warrant declaration of an ALERT. Emergency Director warrant declaration of an UNUSUAL EMERGENCY. EMERGENCY. EVENT.

Emergency Action Level (EAL):

Emergency Action Level (EAL): Emergency Action Level (EAL): Emergency Action Level (EAL):

Other conditions exist which, in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Emergency Director, indicate that events are in progress or Other conditions exist which in the judgment of the Emergency Emergency Director indicate that events are in progress or Emergency Director indicate that events are in progress or have occurred which involve an actual or potential Director indicate that events are in progress or have occurred have occurred which involve actual or IMMINENT substantial have occurred which involve actual or likely major failures of substantial degradation of the level of safety of the plant or a which indicate a potential degradation of the level of safety of core degradation or melting with potential for loss of plant functions needed for protection of the public or HOSTILE security event that involves probable life threatening risk to the plant or indicate a security threat to facility protection has containment integrity or HOSTILE ACTION that results in an ACTION that results in intentional damage or malicious acts, site personnel or damage to site equipment because of been initiated. No releases of radioactive material requiring actual loss of physical control of the facility. Releases can be (1) toward site personnel or equipment that could lead to the HOSTILE ACTION. Any releases are expected to be limited offsite response or monitoring are expected unless further reasonably expected to exceed EPA Protective Action likely failure of or, (2) that prevent effective access to to small fractions of the EPA Protective Action Guideline degradation of safety systems occurs.

Guideline exposure levels offsite for more than the immediate equipment needed for the protection of the public. Any exposure levels.

site area. releases are not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels Emergency Director Judgment beyond the site boundary.

Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-26 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)

James A. FitzPatrick Nuclear Power Plant Annex COLD SHUTDOWN/REFUELING MATRIX COLD SHUTDOWN/REFUELING MATRIX Exelon Nuclear GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT ISFSI Malfunction E-HU1 1 2 3 4 5 D Damage to a loaded cask CONFINEMENT BOUNDARY.

Emergency Action Level (EAL):

Damage to a loaded cask CONFINEMENT BOUNDARY as indicated by a radiation reading > Table E-1 values:

Table E-1 Radiation Reading Overpack Overpack Overpack Overpack Serial Average Serial Average Surface Number Surface Dose Number Dose Rates Rates mrem/hr mrem/hr (gamma+neutron) HI- (gamma+neutron)

STORM 100S (XXX)

HI- 80 on the side S/N - 220 on the side STORM 0186, 100S 20 on the top 0187, 40 on the top 32 at the inlet 0188 S/N - 15, ISFSI 16, 17 and outlet vent ducts S/N -

0307, 0308, 0309, 0310, 0311, HI- 100 on the side 0312, STORM 20 on the top 0679, 100S 600 on the side 0680, (232) 90 at the inlet 0681, 60 on the top S/N - and outlet 0682, 0169, vent ducts 0683, 0170, 0690, 0171 0691, 0692, 0693, 0694, 0695 Modes: 1 - Power Operation 2 - Startup 3 - Hot Shutdown 4 - Cold Shutdown 5 - Refueling D - Defueled Month 20XX COLD SHUTDOWN/REFUELING MATRIX JAF 2-27 COLD SHUTDOWN/REFUELING MATRIX EP-AA-1014 Addendum 3 (Rev.X)