Category:Inservice/Preservice Inspection and Test Report
MONTHYEARJAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-20-0087, Inservice Inspection Summary Report Cycle 242020-12-28028 December 2020 Inservice Inspection Summary Report Cycle 24 JAFP-19-0004, Inservice Inspection Summary Report Cycle 232019-01-0404 January 2019 Inservice Inspection Summary Report Cycle 23 JAFP-18-0113, Fifth Ten-Year Lnservice Inspection Interval Program Plan2018-12-17017 December 2018 Fifth Ten-Year Lnservice Inspection Interval Program Plan JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan2018-08-0606 August 2018 Fifth Ten-Year Interval Inservice Testing Program Plan JAFP-17-0057, Inservice Inspection Summary Report 2017 Refuel Outage 222017-05-25025 May 2017 Inservice Inspection Summary Report 2017 Refuel Outage 22 JAFP-16-0136, Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-2412016-08-24024 August 2016 Alternative Examination Requirements Nozzle-to-Vessel Welds and Nozzle Inner Radii Using ASME Code Case N-702 and BWRVIP-241 JAFP-14-0012, Inservice Testing Program 10 CFR 50.55a Request PRR-052014-02-21021 February 2014 Inservice Testing Program 10 CFR 50.55a Request PRR-05 JAFP-13-0004, Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21)2013-01-14014 January 2013 Inservice Inspection Summary Report 2012 Refuel Outage (Reload 20/Cycle 21) JAFP-11-0009, Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20)2011-01-18018 January 2011 Inservice Inspection Summary Report 2010 Refuel Outage (Reload 19/Cycle 20) JAFP-09-0088, Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program2009-07-31031 July 2009 Proposed Relief Request VRR-06 for the Fourth Interval In-Service Testing Program JAFP-09-0008, Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-012009-01-20020 January 2009 Response to Request for Additional Information Regarding: Request for Additional Information Third Ten-Year Inservice Inspection Interval Program Plan Relief Request RR-CRV-01 JAFP-09-0004, Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19)2009-01-10010 January 2009 Inservice Inspection Summary Report 2008 Refuel Outage (Reload 18/Cycle 19) JAFP-08-0109, Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay2008-10-20020 October 2008 Submittal of the Final Ultrasonic Test Results on the N2C-SE Weld Overlay JAFP-08-0038, Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout2008-04-30030 April 2008 Inservice Inspection Program Relief Requests Third Ten-year Interval Closeout JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves2007-09-26026 September 2007 Fourth Interval Inservice Testing Program for Pumps and Valves JAFP-07-0107, Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program2007-08-29029 August 2007 Response to Request for Additional Information Regarding Proposed Relief Request PRR-01 for the Fourth Interval In-Service Testing Program JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program2007-04-11011 April 2007 Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program JAFP-07-0030, Fourth Inservice Inspection Interval Inspection Program Plan2007-02-27027 February 2007 Fourth Inservice Inspection Interval Inspection Program Plan JAFP-07-0020, Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18)2007-02-0202 February 2007 Submittal of James A. Fitzpatrick - Inservice Inspection Summary Report 2006 Refuel Outage (Reload 17/Cycle 18) JAFP-05-0151, Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection2005-10-0707 October 2005 Request for Approval of Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection ML0515802032005-05-26026 May 2005 Request for Relief from System Hydrostatic Test Requirements for Small Bore (5 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (RCPB) Vent, Drain, and Branch (Vtdb) Lines and Connections JAFP-05-0013, Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17)2005-01-19019 January 2005 Inservice Inspection Summary Report 2004 Refuel Outage (Reload 16/Cycle 17) JPN-04-010, Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs2004-04-14014 April 2004 Request to Use 1998 Edition, 2000 Addenda of American Society of Mechanical Engineers (ASME) Section Xl Code Requirements for Examination of Reactor Vessel Closure Studs JAFP-03-0096, James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program2003-07-0808 July 2003 James a FitzPatrick Nuclear Power Plant, Proposed Relief Request No. VRR-08 to In-Service Testing Program JAFP-02-0251, In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16)2002-12-26026 December 2002 In-Vessel Visual Inspection Summary Report 2002 Refuel Outage (Reload 15/Cycle 16) JPN-02-026, Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan2002-09-12012 September 2002 Relief Request RR-28, Revision 3 for Third 10-Year Inservice Inspection Interval Program Plan JPN-02-022, License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan2002-07-10010 July 2002 License DPR-59, Relief Request RR-28, Revision 2 for the Third 10-Year Inservice Inspection Interval Program Plan JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval2002-01-28028 January 2002 Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval 2023-02-22
[Table view] Category:Letter type:JAFP
MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31
[Table view] |
Text
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Mark Hawes Acting Regulatory Assurance Manager - JAF JAFP-22-0053 December 20, 2022 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333
Subject:
Inservice Inspection Summary Report Cycle 25
Reference:
- 1) Exelon letter, Fifth Ten-Year Inservice Inspection Interval Program Plan, JAFP-18-0113, dated December 17, 2018
Dear Sir or Madam:
This letter submits the James A. FitzPatrick Nuclear Power Plant (JAF) Owner's Activity Report, Second Period, Fifth Interval which contains a summary of the lnservice Inspection (ISI) examinations conducted during the plant's 2022 Refuel Outage 25 (FP1R25).
Table 1 of the enclosed report summarizes the items with flaws or relevant indications that required evaluation for continued service and Table 2 provides an abstract of repair/replacement activities required for continued service.
This report is being submitted in accordance with JAFs approved Fifth Interval Inservice Inspection Program Plan [Reference 1].
There are no new regulatory commitments contained in this letter. If you have any questions in this regard, please contact Mr. Peter Logar, Programs Engineering Branch Manager, at (315) 791-3620.
Very truly yours, Mark Hawes Acting Regulatory Assurance Manager MH/pa
Enclosure:
JAF Owners Activity Report (OAR) Second Period, Fifth Interval cc: NRC Region 1 Administrator NRC Project Directorate NRC Resident Inspector NYSERDA
JAFP-22-0053 ENCLOSURE JAF Owners Activity Report (OAR)
Second Period, Fifth Interval (3 Pages)
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number FP1 R25 Plant ---------=J=a=m=e=s_,_A.,_. .._F=itz=P-=a=tn="ck"-'-'-N=u=d=e=a._r,_Po=w=e=r_..P_.la=n=t....,.2...,6=8._,L=a...,ke=-'-'R=d=**-=L..._yco=m=i""ng,..._..N=ew"'"'-Y"""'o=rk""-'1=30=9=3 Plant Unit_~_ Commercial Service Date _ _ _ _ _J=u=lv~2=8~*~1~9...... 75~---- Refueling Outage Number R25
~f applicable)
Current Inspection lnterval:_ _ _ _ _ _ _ _ _ _ _ _ __,_F""'ift=h.__________
(111, 2nd, 3rd, 4th, Olh*r)
Current Inspection Period:_ _ _ _ _ _ ____,,S,...e=c:...on.....,d=---....,,.~-:-:--::----------------------------------
<1s1, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plan: 2007 Edition. 2008 Addenda Date and Revision of Inspection Plan: ER-JF-330-1001. Rev. 2 9-17-2020 Edition and Addenda of ASME Section XI applicable to Repairs and Replacements, if different than the Inspection Plan: Same Code Cases used: N-460. N-513-4, N-532-5, N-552-1. N-578-1 N-613-2, N-639, N-648-1. N-663. N-695. N-702. N-716-1, N-747, N-798, N-800, N-823 N-845 N-858 (W applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) statements made in this report are correct; (b) the examination and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of ~conform to the requirements of Section XI. (refueling outage numbarJ Graham Jacqueline Titus Digitally signed byGraham,JacquelineTitus Signed / s Date: 2022. 12.1 13:12:1 6 -os*oo* Date Owner of Owner's Designee, Tile: Engineer ---------------------------
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by The Hartford Steam Boiler lnsoection and Insurance Company of Hartford. CT have inspected the items described in this Owner's Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Powers Brandon 01g1~11ys1gnedby~o~ers,e~an~on 2022 2 1514 09 06 05 00
' Date. .1 * * * - Commissions 16158 ANIR NY5570 lnapectar'a Signature National Board, s-. Province, and Endorsements Date_ _ _ _ _ _ _ __
Table 1:
Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category Item Description Evaluation Description and Item Number E-A, E1.11 Drywall Liner 7 indications greater than IVVE acceptance criteria were examined, areas were measured and evaluated to be greater than design thickness.
IR 04525962 F-A, F1.10c H10-344 Spring Can Spring can support on Residual Heat Removal found out of tolerance, evaluation determined support could perform intended design function in as found condition.
IR 04526268 D-8, D2.10 15-8"-VllES-151-100 [2022] A through-wall leak was identified on Class 3 Emergency Service Water piping.
ASME Section XI Code Case N-513 was employed.
IR 04524479 D-8, D2.10 15-3"-VllES-151-136 [2021] Exam showed a measured wall thickness below acceptance criteria. This wall thickness was evaluated for structural integrity until repairs could be made. See 21-005 in Table 2.
IR 04419896 D-8, D2.10 15-6"-VllES-151-103 [2021] A through-wall leak was identified on Class 3 Emergency Service Water piping.
ASME Section XI Code Case N-513 was employed.
IR 04416039
Table2:
Abstract of Reoair/Reclacement Activities RAnuired for Continued Service REPAIR/
DESCRIPTION REPLACEMENT CODE ACTIVITY OF DATE PLAN CLASS DESCRIPTION WORK COMPLETED NUMBER 1 Repair OPEN / INSPECT I REPAIR 13MOV-21 10/1612022 20-078 3 Replacement Repair Leak in Line 15-3"-VVES-151-136 11/1712021 21-005 3 Repair Repair Elbow Leak in Line 15-6"-WES-151- 11/1712021 21-008 103 1 Repair OPEN, INSPECT, REPAIR 34NRV-111A 10/1312022 22-004 3 Replacement/Repair Weld Repair Leak in Pipe 15-8"-VVES-151-100 10/10/2022 22-013