MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARJAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments ML21138A0132021-05-18018 May 2021 NRC Response to Request for Additional Time to Respond to James A. Fitzpatrick Nuclear Power Plant: Final Significance Determination of a White Finding with Assessment Follow Up and Notice of Violation-Inspection No. 05000333/2021090 JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0008, Supplement to Application to Revise Surveillance Requirement (SR) 3.5.1.62021-02-18018 February 2021 Supplement to Application to Revise Surveillance Requirement (SR) 3.5.1.6 JAFP-21-0005, Response to Request for Additional Information to Support Review of License Amendment Request - Application to Modify Technical Specifications 3.6.1.3 Primary Containment Isolation Valves2021-01-26026 January 2021 Response to Request for Additional Information to Support Review of License Amendment Request - Application to Modify Technical Specifications 3.6.1.3 Primary Containment Isolation Valves ML20315A2452020-11-10010 November 2020 Response to Request for Additional Information to Support Review of License Amendment Request - Application to Modify Technical Specifications 3.6.1.3 Primary Containment Isolation Valves JAFP-20-0030, Response to Request for Additional Information in Support of License Amendment Request - Proposed Changes to the Technical Specifications to Primary Containment Hydrodynamic Loads2020-04-0606 April 2020 Response to Request for Additional Information in Support of License Amendment Request - Proposed Changes to the Technical Specifications to Primary Containment Hydrodynamic Loads JAFP-20-0026, Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2020-03-31031 March 2020 Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation JAFP-20-0020, Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation2020-02-21021 February 2020 Response to Request for Additional Information to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation JAFP-20-0008, Response to Request for Additional Information Associated with the License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences2020-01-16016 January 2020 Response to Request for Additional Information Associated with the License Amendment Request for Application of the Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences JAFP-19-0105, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (Rwcu)...2019-11-0606 November 2019 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Revise the Allowable Value for Reactor Water Cleanup (Rwcu)... ML19279A0012019-10-0606 October 2019 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to the TS 3.8.1 Action ... JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants JAFP-19-0009, End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval2019-01-15015 January 2019 End of Interval Relief Request Associated with the Fourth Ten-Year Inservice Inspection (ISI) Interval JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 JAFP-18-0068, Response to Request for Additional Information: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2018-07-12012 July 2018 Response to Request for Additional Information: License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors RS-18-067, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-29029 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 JAFP-18-0038, Response to Request for Additional Information Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-04-19019 April 2018 Response to Request for Additional Information Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 JAFP-18-0029, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of James A. FitzPatrick Nuclear Power Plant to Address Secondary Containment Personnel Access Door Openings2018-03-15015 March 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of James A. FitzPatrick Nuclear Power Plant to Address Secondary Containment Personnel Access Door Openings JAFP-18-0014, Response to Request for Additional Information on Submittal of Relief Request JAF-15R-05 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702)2018-03-0202 March 2018 Response to Request for Additional Information on Submittal of Relief Request JAF-15R-05 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 JAFP-18-0012, Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22018-01-22022 January 2018 Supplemental Response Concerning License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML17346A1532017-12-11011 December 2017 Submittal of Response to Request for Additional Information on Relief Requests Associated with the Fifth Inservice Inspection (ISI) Interval JAFP-17-0029, Revision to Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights...2017-04-27027 April 2017 Revision to Entergy'S Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of Near-Term Task Force Review of Insights... JAFP-17-0005, Response to 03/12/2012 Request for Information Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident, Recommendation 9.3 for Emergency Preparedness2017-01-23023 January 2017 Response to 03/12/2012 Request for Information Regarding Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident, Recommendation 9.3 for Emergency Preparedness JAFP-16-0182, Spent Fuel Pool Evaluation, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-12-22022 December 2016 Spent Fuel Pool Evaluation, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML16335A1042016-11-29029 November 2016 Independent Spent Fuel Storage Installation, Response to Request for Additional Information Regarding Application for Order Approving Transfer F Renewed Facility Operating License and Proposed Conforming License Amendment JAFP-16-0170, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies - Supplement 12016-11-21021 November 2016 Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies - Supplement 1 JAFP-16-0165, Response to Generic Letter 2016-01 - Monitoring of Neutron Absorbing Materials in Spent Fuel Pools2016-11-0303 November 2016 Response to Generic Letter 2016-01 - Monitoring of Neutron Absorbing Materials in Spent Fuel Pools JAFP-16-0142, Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 22016-09-19019 September 2016 Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 2 JAFP-16-0131, Response to Request for Additional Information Regarding Request for Approval of a Certified Fuel Handler Training and Retraining Program2016-08-18018 August 2016 Response to Request for Additional Information Regarding Request for Approval of a Certified Fuel Handler Training and Retraining Program JAFP-16-0130, License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition - Supplement 22016-08-10010 August 2016 License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition - Supplement 2 JAFP-16-0113, License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition - Supplement 12016-07-0606 July 2016 License Amendment Request to Revise the Emergency Plan to Address the Permanently Defueled Condition - Supplement 1 JAFP-16-0114, Response to Request for Additional Information for Proposed Inservice Inspection Program Alternative in Accordance with 10 CFR 50.55a(z)(2), RR-202016-06-27027 June 2016 Response to Request for Additional Information for Proposed Inservice Inspection Program Alternative in Accordance with 10 CFR 50.55a(z)(2), RR-20 JAFP-16-0077, Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 12016-06-0303 June 2016 Response to Request for Additional Information (RAI) Regarding Revision to Technical Specification (TS) Administrative Controls for Staffing and Training Upon Permanent Cessation of Operation (CAC No. MF7280) - Supplement 1 JAFP-16-0078, Response to Request for Additional Information (RAI) Regarding Request for Approval of Certified Fuel Handler Training and Retaining Program2016-06-0303 June 2016 Response to Request for Additional Information (RAI) Regarding Request for Approval of Certified Fuel Handler Training and Retaining Program CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) ML16071A4412016-03-0707 March 2016 Entergy Fleet Relief Request No. RR-EN-15-1-Proposed Alternative to Use ASME Code Case N-789-1 - E-mail from G.Davant to R.Guzman - Response to Second RAI (MF6340 - MF6349) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 JAFP-15-0094, Response to Request for Additional Information for Expedited Seismic Evaluation Process Report2015-08-0404 August 2015 Response to Request for Additional Information for Expedited Seismic Evaluation Process Report 2022-06-16
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.90 JAFP-18-0029 March 15, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington. DC 20555-0001 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRG Docket No. 50-333
Subject:
Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of James A. FitzPatrick Nuclear Power Plant to Address Secondary Containment Personnel Access Door Openings
References:
- 1. Letter from J. Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "License Amendment Request-Proposed Change to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings," dated September 14, 2017
- 2. Letter from B. Venkataraman (Project Manager, U.S Nuclear Regulatory Commission) to C. Williams (Exelon), "Draft Request for Additional Information License Amendment Request to Revise Technical Specifications to Address Secondary Containment Personnel Access Door Openings," dated January 12, 2018 By letter dated September 14, 2017 (Reference 1), Exelon Generation Company, LLC (Exelon) requested to change the James A. FitzPatrick Nuclear Power Plant (JAF) Technical Specifications (TS). The proposed amendment request would modify TS Surveillance Requirement (SR) 3.6.4.1.3 to acknowledge that Secondary Containment access openings may be open for entry and exit.
On January 12, 2018 (Reference 2), the U.S. Nuclear Regulatory Commission (NRG) identified a request for additional information was necessary to complete the review.
Attachment 1 to this letter contains the NRC's request for additional information immediately followed by Exelon's response.
U.S. Nuclear Regulatory Commission Response to Request for Additional Information Secondary Containment Access Door Openings Docket No. 50-333 March 15, 2018 Page2 Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRG in Reference 1. The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration.
Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no commitments contained in this response.
If you should have any questions regarding this submittal, please contact Ron Reynolds at 610-765-5247.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 151h day of March 2018.
J~,J 14-Jr, C~D L-James Barstow Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC : Response to Request for Additional Information cc: USNRC Region I Regional Administrator w/attachments USN RC Senior Resident Inspector - JAF USNRC Project Manager, NRR - JAF A. L. Peterson, NYSERDA
ATTACHMENT 1 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333 Response to Request for Additional Information
Response to Request for Additional Information Attachment 1 Secondary Containment Personnel Access Door Openings Page 1 of 5 SCPB-RAl-1:
Currently, the FitzPatrick SR 3.6.4.1.4 verifies that the secondary containment can be maintained 2:0.25 inch of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rates 6000 cubic feet per minute (cfm). There are no SRs to verify that the secondary containment can be drawn down to the required vacuum within a prescribed time. In addition, the LAR did not provide a specific draw down time applicable to FitzPatrick other than referencing the 97 seconds in the LAR.
Therefore, please state the draw down time applicable to FitzPatrick and discuss how the draw down time is tested periodically at FitzPatrick. In addition, please provide the results of the draw down tests performed during the last three years.
Exelon Response to SCPB-RAl-1:
The LOCA analysis performed for James A. FitzPatrick Nuclear Power Plant (JAF) used Regulatory Guide (RG) 1.3 methodology, and therefore, a drawdown time is not applicable. The discussion in regards to 97 seconds in the LAR is associated with Peak Cladding Temperature (PCT) occuring approximately ninety-seven (97) seconds post-accident. It is an assumption in the Current Licensing Basis (CLB) for JAF that Reactor Building isolation and the start of the Standby Gas Treatment System (SGTS) precludes significant fission product release. See the response to RAI Question ARCB-RAl-1 for more detail regarding inadvertent inner and outer door opening of Secondary Containment.
ARCB-RAl-1:
The FitzPatrick LOCA radiological dose consequence analysis was approved by letter dated December 6, 1996 (ADAMS Accession No. ML010960125), as part of the power uprate application and is reflected in Updated Final Safety Analysis Report (UFSAR) Section 14.8.2.1.1, "Loss of Coolant Accident." The PCT evaluation stated above is part of thermal hydraulic analysis that was used as the basis for the current radiological dose consequence analysis for LOCA at FitzPatrick. The design basis analysis assumptions which, evaluate the LOCA analysis, are in accordance with Regulatory Guide (RG) 1.3, "Assumption Used for Evaluating the Potential Radiological Consequences of a Loss of Coolant Accident for Boiling Water Reactors," Revision 2 (ADAMS Accession No. ML003739601 ). RG 1.3, Revision 2, and UFSAR Section 14.8.2.1.1 assume that all the noble gases and 25 percent of the halogens become airborne within the drywell at the time of the accident and are available for release. In addition, the FitzPatrick LOCA analysis assumes that all the noble gases and halogens leaking from the drywell into the reactor building are exhausted to the atmosphere via the SGTS and the main stack. Furthermore, the charcoal filter efficiency of the SGT system is 90 percent. This means that the current FitzPatrick licensing basis for the LOCA analysis assumes:
Response to Request for Additional Information Attachment 1 Secondary Containment Personnel Access Door Openings Page 2 of 5
- 1. An instantaneous release at the time of the accident,
- 2. Secondary containment vacuum is establish at the start of the accident by the SGT system (i.e., there is no secondary containment draw down time),
- 3. The secondary containment is maintained at the required vacuum for the duration of the accident,
- 4. The amount of release is reduced by the SGT system charcoal and particulate filters,
- 5. The release occurs from a pathway with an elevated release point (i.e., main stack), and
- 6. None of the release bypasses the secondary containment.
The simultaneous opening of both an inner and outer secondary containment door, appears to allow a ground level release to occur which bypasses the SGT system which is not consistent with the FitzPatrick licensing basis radiological dose consequence analysis for LOCA.
Therefore, with regard to the current licensing basis radiological dose consequence analysis for LOCA, please demonstrate that the proposed change does not bypass the SGT system and cause a ground level release and that the functional capability of secondary containment is maintained, without an explicit secondary containment drawdown time.
Alternatively, please provide a revised radiological consequence analysis for LOCA that (1) states what assumptions and inputs are changing, (2) provides the technical reasoning for the changes, (3) explains how the brief, inadvertent, simultaneous opening of the secondary containment access doors is accounted for, and (4) demonstrates that the regulatory limits are met.
Exelon Response to ARCB-RAl-1:
Regarding the JAF CLB radiological dose consequence analysis for LOCA, the following demonstrates that the proposed change does not bypass the SGTS and cause a ground level release, and that the functional capability of Secondary Containment is maintained without an explicit Secondary Containment drawdown time.
Licensing Basis Review Secondary Containment at JAF consists of four systems, which acting in concert limit the release of radioactive substances resulting from postulated accidents to within regulatory limits.
These systems are the Reactor Building, the Reactor Building Isolation and Control system, the SGTS, and the Main Stack.
The licensing basis establishes the following requirements for Secondary Containment with respect to Reactor Building performance and SGTS operation:
- 1. A safety design basis of the Secondary Containment system, as described in the Updated Final Safety Analysis Report (UFSAR) 5.3.2.4, is to limit ground level release of radioactive material so that offsite dose rate may be maintained below 10 CFR 100 values in the event of an accident (including LOCA).
Response to Request for Additional Information Attachment 1 Secondary Containment Personnel Access Door Openings Page 3 of 5
- 2. The Reactor Building is designed to be sufficiently leak-tight to allow the SGTS to reduce the building pressure to a value at least 0.25 in. H20 below atmospheric with a flow rate of 3600 cfm (two volumes per day) under neutral wind conditions.
The UFSAR description of Secondary Containment (UFSAR 5.3.3.1) states that the Reactor Building, the Reactor Building Isolation and Control System, and the SGTS provide a negative pressure barrier that minimizes the ground level release of fission products by exfiltration. The Reactor Building and the Reactor Building Isolation and Control System provide a large, low-leakage containment volume providing a holdup time for fission product decay prior to release.
The UFSAR description of SGTS capability (UFSAR 5.3.3.4) states that each of the two fans have the capacity to reduce and hold the building at a minimum sub-atmospheric pressure of 0.25 in. of H20 with the building isolated. These fans have design flow rates of 6000 cfm.
The Secondary Containment Safety Evaluation (UFSAR 5.3.4) includes the statement:
"If the leakage rate of the building is low and most of the leakage air is filtered and discharged to the elevated release point (utilizing the SGTS and the main stack), the offsite radiation doses that result from postulated accidents are below 10 CFR 100 limits."
The Safety Evaluation also states that the building is designed for a maximum in-leakage rate of 100%/day at a building sub-atmospheric pressure of 0.25 in. H20 at neutral wind conditions -
there will be a low exfiltration rate at high wind conditions. Building exfiltration under varying wind conditions and system performance assumptions was considered in the Safety Evaluation, however dynamic system response during building isolation and SGTS initiation was not modeled. UFSAR chapter 5 analysis starts with an initial condition of an isolated building (there is an explicit statement that "two redundant, full capacity filtration trains in the SGTS ensure that no direct release of fission products to the environment occurs once the Reactor Building is isolated").
In discussing fission product release to Secondary Containment during a LOCA, the accident analysis states (UFSAR 14.6.1.3.5):
"Reactor Building (Secondary Containment) isolation and starting of one or both SGT subsystems is assumed to occur prior to significant fission product release from primary containment (Reference 55, 61, 62, and 68). With the Reactor Building isolated and SGTS operating, the standby gas treatment fan maintains the Reactor Building below atmospheric pressure and discharges at a rate of 3.3 volume fractions per day through high efficiency and charcoal filters to the main stack."
The LOCA radiological analysis (UFSAR 14.8.2.1.1) assumes an elevated release through the Main Stack at a SGTS flow rate of 6000 cfm. The Primary Containment atmosphere is assumed to leak at a rate of 1.5% per day with no holdup or mixing in the Reactor Building before processing by SGTS. Engineered Safety Feature leakage to the Secondary Containment atmosphere is assumed to mix uniformly with the Reactor Building atmosphere
Response to Request for Additional Information Attachment 1 Secondary Containment Personnel Access Door Openings Page 4 of 5 prior to discharge through the Main Stack after processing by the SGTS. This is consistent with the Regulatory Position of Regulatory Guide 1.3, Revision 2, which is the basis of the LOCA radiological analysis.
Coupled Reactor Building I SGTS Performance Technical Evaluation EC 622932 was performed to evaluate the ability of the SGTS to maintain the Secondary Containment at sub-atmospheric pressure when the building is isolated, even if both doors in a single airlock are inadvertently opened at the same time. The evaluation demonstrates that when SGTS is able to maintain the building at 0.25 in. H20 below the outside pressure at a flow rate of 6000 cfm (as required by TS}; it will maintain the building approximately 0.004 in. H20 below the outside pressure with both doors in an airlock open.
This may also be understood qualitatively - for the SGTS fans to develop flow they require a source of suction. This source is from the Reactor Building. Therefore, flow must be into the building to permit outflow through the SGTS.
The Technical Evaluation considered recent performance testing of SGTS and the Reactor Building and shows there is considerable margin to Technical Specification limits. Typical performance on an isolated Reactor Building is maintenance of building pressure at -1.35 +/- 0.18 in. H20 below the outside pressure at a flow rate of 5509 +/- 224 cfm. Increased leak-tightness does not significantly affect the pressure at which building pressure will stabilize if both doors in an airlock are inadvertently opened, although it will shift the balance of in-flow from pre-existing leakage paths to the open airlock (flow will be biased more to the airlock as building leak-tightness improves).
Therefore, the proposed change does not bypass the SGTS and cause a ground level release.
The functional capability of Secondary Containment is maintained without an explicit Secondary Containment drawdown time.
ARCB-RAl-2:
Section 3.0, "Technical Evaluation," in Attachment 1 to the LAR, dated September 14, 2017, states in part:
Empirical data from two previously reported events in which both secondary containment airlock doors were inadvertently opened simultaneously demonstrates that this condition does not significantly impact the secondary containment differential pressure. Neither of these events resulted in violation of the required secondary containment vacuum requirement (References 3 & 4).
It is not clear to the NRG staff how it was determined that the Secondary Containment differential pressure would be maintained during accident conditions. These reported events are not representative of the conditions present during a LOCA.
Response to Request for Additional Information Attachment 1 Secondary Containment Personnel Access Door Openings Page 5 of 5 Please provide additional information demonstrating how these reported events would apply during LOCA conditions and that the functional capability of Secondary Containment is maintained during accident conditions. The demonstration shall include the brief, inadvertent, simultaneous opening of the Secondary Containment access doors.
Exelon Response to ARCB-RAl-2:
There is no empirical evidence that reported airlock breach events during normal operation are necessarily relevant to accident conditions. Under normal conditions with the building not isolated, pressure is controlled through positioning of inlet, exhaust and recirculation valves in the normal ventilation system. Under accident conditions with an isolated building, pressure is determined by the balance of SGTS flow with in-leakage through pre-existing leakage paths, or in the case of an inadvertently opened airlock, door opening. See the response to RAI Question ARCB-RAl-1 for more detail regarding inadvertent inner and outer door opening of Secondary Containment.