Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (IR 05000335/2017005 and 05000389/2017005)
ML17234A411
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/22/2017
From: Ladonna Suggs
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017005
Download: ML17234A411 (5)


Text

UNITED STATES ust 22, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 -

(REPORT 05000335/2017005 AND 05000389/2017005)

Dear Mr. Nazar:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019 for St.

Lucie Plant Unit 1 and Unit 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

The NRC plans on conducting one non-routine inspection for Saint Lucie Unit 2 per IP 71003, Post Approval Site Inspection for License Renewal, Phase II. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4539 with any questions you have regarding this letter.

Sincerely,

/RA/

LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 Enclosure:

St Lucie Inspection/Activity Plan (09/01/2017 - 06/30/2019)

cc: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT, UNIT 1 AND UNIT 2 -

(REPORT 05000335/2017005 AND 05000389/2017005) August 22, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource ROPassessment.Resource@nrc.gov ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML17234A411 OFFICE RII:DRP RII:DRP NAME LPressley LSuggs DATE 8/16/2017 8/16/2017 OFFICIAL RECORD

Page 1 of 2 Saint Lucie 08/18/2017 14:57:54 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site LR - POST APPROVAL LR PHASE 2 (UNIT 2) 4 2 08/28/2017 09/01/2017 IP 71003 Post-Approval Site Inspection for License Renewal 2 09/11/2017 09/15/2017 IP 71003 Post-Approval Site Inspection for License Renewal OL RQ - REQUAL INSPECTION 2 1, 2 10/16/2017 10/20/2017 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL LICENSE EXAM PREP 4 1 11/06/2017 11/10/2017 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 4 1 12/04/2017 12/22/2017 V23497 SAINT LUCIE/JULY 2017 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC INSPECTION 2 1, 2 01/22/2018 01/26/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 01/22/2018 01/26/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 01/22/2018 01/26/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 01/22/2018 01/26/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EP - EP EXERCISE 6 1, 2 02/12/2018 02/16/2018 IP 7111401 Exercise Evaluation 1, 2 02/12/2018 02/16/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 02/12/2018 02/16/2018 IP 7111408 Exercise Evaluation - Scenario Review 1, 2 02/12/2018 02/16/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/19/2018 03/23/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 03/19/2018 03/23/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/19/2018 03/23/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 03/19/2018 03/23/2018 IP 7111108P Inservice Inspection Activities - PWR PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 05/07/2018 05/11/2018 IP 71152B Problem Identification and Resolution 1, 2 05/21/2018 05/25/2018 IP 71152B Problem Identification and Resolution ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 09/03/2018 09/07/2018 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 09/03/2018 09/07/2018 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Saint Lucie 08/18/2017 14:57:54 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EP PROGRAM INSPECTION 3 1, 2 01/14/2019 01/18/2019 IP 7111402 Alert and Notification System Testing 1, 2 01/14/2019 01/18/2019 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 01/14/2019 01/18/2019 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 01/14/2019 01/18/2019 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 01/14/2019 01/18/2019 IP 71151 Performance Indicator Verification DBAI - DESIGN BASES ASSURANCE INSPECTION (TEAMS 6 1, 2 01/14/2019 01/18/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 02/11/2019 02/15/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

1, 2 03/04/2019 03/08/2019 IP 7111121M Design Bases Assurance Inspection (Teams)

TFPI - ST. LUCIE NFPA 805 3 1, 2 06/24/2019 06/28/2019 IP 7111105X Fire Protection - NFPA 805 (Triennial)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.