Pages that link to "DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8"
Jump to navigation
Jump to search
The following pages link to DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8:
Displayed 50 items.
- ML17229B617 (← links)
- ML16314B082 (← links)
- ML16314C691 (← links)
- ML16169A265 (← links)
- ML16146A095 (← links)
- ML16238A104 (← links)
- ML16083A564 (← links)
- ML16061A468 (← links)
- ML16061A464 (← links)
- ML16061A459 (← links)
- ML17341A065 (← links)
- ML17334A105 (← links)
- ML16061A476 (← links)
- ML16061A475 (← links)
- ML16061A474 (← links)
- ML16061A473 (← links)
- ML16061A471 (← links)
- ML16061A470 (← links)
- ML16061A469 (← links)
- ML16061A467 (← links)
- ML16061A466 (← links)
- ML16061A465 (← links)
- ML16061A463 (← links)
- ML16061A461 (← links)
- ML16061A460 (← links)
- ML16004A354 (← links)
- ML15176A535 (← links)
- ML15176A534 (← links)
- ML15176A531 (← links)
- ML15176A530 (← links)
- ML15176A529 (← links)
- ML15176A528 (redirect page) (← links)
- ML17025A400 (← links)
- ML17012A246 (← links)
- ML17229B617 (← links)
- ML16314B082 (← links)
- ML16314C691 (← links)
- ML16279A343 (← links)
- ML16251A091 (← links)
- ML16193A332 (← links)
- ML16169A265 (← links)
- ML16146A095 (← links)
- ML16238A104 (← links)
- ML16063A170 (← links)
- ML16083A564 (← links)
- ML16061A468 (← links)
- ML16061A464 (← links)
- ML16061A459 (← links)
- ML17341A065 (← links)
- ML17334A105 (← links)
- ML16061A476 (← links)
- ML16061A475 (← links)
- ML16061A474 (← links)
- ML16061A473 (← links)
- ML16061A471 (← links)
- ML16061A470 (← links)
- ML16061A469 (← links)
- ML16061A467 (← links)
- ML16061A466 (← links)
- ML16061A465 (← links)
- ML16061A463 (← links)
- ML16061A461 (← links)
- ML16061A460 (← links)
- ML16004A354 (← links)
- ML15355A157 (← links)
- ML15278A049 (← links)
- ML15176A535 (← links)
- ML15176A534 (← links)
- ML15176A531 (← links)
- ML15176A530 (← links)
- ML15176A529 (← links)
- ML15176A527 (← links)
- ML15099A065 (← links)
- ML15099A064 (← links)
- ML15099A063 (← links)
- ML15099A062 (← links)
- ML15056A705 (← links)
- ML14364A269 (← links)
- ML14364A266 (← links)
- ML14364A265 (← links)
- ML14364A264 (← links)
- ML14364A262 (← links)
- ML14260A069 (← links)
- ML14260A068 (← links)
- ML14260A067 (← links)
- ML14260A066 (← links)
- ML14260A065 (← links)
- ML14260A064 (← links)
- ML14260A063 (← links)
- ML14260A062 (← links)
- ML14260A061 (← links)
- ML14260A060 (← links)
- ML14260A059 (← links)
- ML14260A058 (← links)
- ML14260A057 (← links)
- ML14260A056 (← links)
- ML14260A055 (← links)
- ML14260A051 (← links)
- ML14260A050 (← links)
- ML14260A049 (← links)
- ML14260A048 (← links)
- ML14260A047 (← links)
- ML14260A046 (← links)
- ML14260A045 (← links)
- ML14260A044 (← links)
- ML14260A043 (← links)
- ML14260A042 (← links)
- ML14260A041 (← links)
- ML14260A040 (← links)
- ML14260A039 (← links)
- ML14260A038 (← links)
- ML14260A037 (← links)
- ML14260A036 (← links)
- ML14260A035 (← links)
- ML14260A034 (← links)
- ML14260A033 (← links)
- ML14260A030 (← links)
- ML14260A028 (← links)
- ML14260A027 (← links)
- ML14260A026 (← links)
- ML14260A025 (← links)
- ML14260A024 (← links)
- ML14205A039 (← links)
- ML14205A038 (← links)
- ML14205A037 (← links)
- ML14023A602 (← links)
- ML13364A192 (← links)
- ML13308B839 (← links)
- ML13308B837 (← links)
- ML13267A133 (← links)
- ML13154A047 (← links)
- ML13004A474 (← links)
- ML13004A473 (← links)
- ML13004A472 (← links)
- ML13004A471 (← links)
- ML13004A470 (← links)
- ML13004A469 (← links)
- ML12222A101 (← links)
- ML12222A100 (← links)
- ML12222A099 (← links)
- ML12222A098 (← links)
- ML12222A095 (← links)
- ML12170A838 (← links)
- ML12125A387 (← links)
- ML12125A382 (← links)
- ML11326A070 (← links)
- ML11319A072 (← links)
- ML11319A071 (← links)
- ML11319A070 (← links)
- ML11319A068 (← links)
- ML11319A067 (← links)
- ML11319A066 (← links)
- ML11319A064 (← links)
- ML11318A030 (← links)
- ML11318A029 (← links)
- ML11318A028 (← links)
- ML11307A333 (← links)
- ML11307A332 (← links)
- ML110140415 (← links)
- CAC:MF6399 (← links)
- ML13308B830 (← links)
- DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). (← links)
- DCL-16-057, Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-854-0-NP, Protection Set Iii, Hardware Validation Test Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-861-NP, V&V Design Phase Summary Report PPSII-IV (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 1 to 993754-11-862-NP, V&V Implementation Phase Summary Report Ppsi (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 1 to 993754-11-854-0-NP, Protection Set I, Hardware Validation Test Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-11-818-NP, Protection Set I, System Time Response Confirmation Report (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis (← links)
- DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report (← links)
- DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 (← links)
- DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 (← links)
- DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 (← links)
- DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 (← links)
- DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 (← links)
- DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 (← links)
- DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 9, GEO.DCPP.TR.14.01 R0.Text.w.ITR (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 9, GEO.DCPP.TR.14.01 R0 Plates 07-31-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 9, GEO.DCPP.TR.14.01 R0 Figures 07-31-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 9, GEO.DCPP.TR.14.01 R0 App E Plates 07-31-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 9, GEO.DCPP.TR.14.01 R0 App A-E Figures 07-31-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Txt.W.Itr (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 14, Findings and Conclusions (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0.Txt.w.ITR (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 13, GEO.DCPP.TR.14.08 R0 Figures 08-10-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0.Txt.w.ITRs (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 12, GEO.DCPP.TR.14.07 R0 Figures 08-01-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0.Txt.w.ITR (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 11, GEO.DCPP.TR.14.06 R0 Figures 08-10-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Figures Incl App A-B 08-05-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 10, Fugro.PGEQ-PR-16 R1 Txt.W.Itr (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 7, GEO.DCPP.TR.14.03.Txt.w.ITR (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 7, GEO.DCPP.TR.14.03 R0 Plates 08-06-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 7, GEO.DCPP.TR.14.03 R0 Figures 09-05-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 6, Hess Hosgri (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 6, Hess Hosgri Report Figures 08-05-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 6, Appendix a (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0.Txt.w.ITR (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 Figures 09-03-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 4, GEO.DCPP.TR.14.05 R0 Txt.W.Itr (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 4, Ch4.GEO.DCPP.TR.14.05 R0 Plates 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 4, GEO.DCPP.TR.14.05 R0 Figures 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 3, GEO.DCPP.TR.14.02 R0 Plates 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 3, GEO.DCPP.TR.14.02 R0 Txt.W.Itr (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 3, GEO.DCPP.TR.14.02 R0 Figures 09-02-14 Compressed (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 3, GEO.DCPP.TR.14.02 R0 App a Figures 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Txt.W.Itr (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Plates 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 App a (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Technical Summary (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Executive Summary (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 1, Introduction, Figures (← links)
- DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Table of Contents (← links)
- DCL-14-034, 993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification (← links)
- DCL-14-034, 993754-1-868 (-NP), Revision 1, Software Verification Test Plan (← links)
- DCL-14-034, 993754-1-819 (-NP), Revision 0, Reliability Analysis (← links)
- DCL-14-034, 993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis (← links)
- DCL-11-104, Attachment 9: Revision 1 to 10115-J-NPG, Diablo Canyon Power Plant Units 1 & 2 Process Protection System Replacement Controller Transfer Function Specification. (← links)
- DCL-11-104, Attachment 8: Revision 4 to Diablo Canyon Power Plant Units 1 & 2, Process Protection System (PPS) Replacement Interface Requirements Specification, Nuclear Safety-Related. (← links)
- DCL-11-104, Attachment 10: Revision 1 to Diablo Canyon Power Plant Units 1 & 2 Human System Interface (Hsi) Development Guidelines. (← links)
- DCL-13-016, Attachment 5 to DCL-13-016 - WCAP-17706-NP, Revision 0, Westinghouse Setpoint Methodology as Applied to the Diablo Canyon Power Plant. (← links)
- DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System. (← links)
- DCL-13-065, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition, (Volume 1 of 2) (← links)
- DCL-13-061, PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1 (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Invensys Operations Management Document 993754-1-916, V10 Tricon Reference Design Change Analysis, Revision 0, Attachment 4 (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 (← links)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - 08-0015-SP-001, Functional Requirements Specification, Revision 5, Attachment 2 (← links)
- DCL-12-050, Diablo Canyon, Units 1 and 2, Attachment 4 to DCL-12-050, Scm 36-01, Rev. 0, Process Protection System (PPS) Replacement Software Configuration Management Plan (SCMP) Nuclear Safety Related. (← links)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 (← links)
- DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 5 of 5 (← links)
- DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California (← links)
- ML11166A177 (← links)
- DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish (← links)
- ML11166A153 (← links)
- DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock (← links)
- ML11166A151 (← links)
- ML11166A129 (← links)
- DCL-11-059, Diablo Canyon Units 1 & 2, License Amendment Request 11-04, Revision to Technical Specification 3.6.6, Containment Spray and Cooling Systems, TS 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources-Operating, TS 3.8.9, Distribution Sys (← links)
- DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix J, Analysis of Inhibition of Faulting at Fault Branches (← links)
- ML102350297 (← links)
- DCL-10-028, Diablo Canyon, Units 1 and 2, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-09-093, License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17 (← links)
- ML091960177 (← links)
- ML081010207 (← links)
- ML16287A755 (← links)
- DCL-07-093, Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank (← links)
- ML072840049 (← links)
- ML070990057 (← links)
- ML070440493 (← links)
- ML063450372 (← links)
- ML063380020 (← links)
- ML063040030 (← links)
- DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight (← links)
- DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 (← links)
- DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) (← links)
- DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 (← links)
- DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 (← links)
- DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint (← links)
- DCL-09-062, Emergency License Amendment Request 09-04 Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) for Unit 2 Cycle 15. (← links)
- DCL-17-064, Plant Focused Evaluation Report for External Flooding (← links)
- DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 (← links)
- DCL-16-099, License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. (← links)
- DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term. (← links)
- DCL-16-015, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. (← links)
- DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (← links)
- DCL-16-001, License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process (← links)
- DCL-15-130, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term (← links)
- DCL-15-135, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term. (← links)
- DCL-15-125, Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Term (← links)
- DCL-15-105, Supplement to License Amendment Request 15-03, Application of Alternative Source Term. (← links)
- DCL-15-091, Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating (← links)
- DCL-15-080, License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results (← links)
- DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8 (← links)
- DCL-15-023, License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident (← links)
- DCL-14-081, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 8, Fugro.PGEQ-PR-21 R0 Figures Incl App a 07-31-14 (← links)
- DCL-14-011, Reactor Coolant System Pressure and Temperature Limits Report (← links)
- DCL-13-119, Annual Update to Renewal Application and License Renewal Application Amendment Number 47 (← links)
- DCL-13-057, License Amendment Request 13-01, Administrative Revisions to Technical Specifications 3.7.10 and 5.6.5 (← links)
- DCL-13-023, Reactor Coolant System Pressure and Temperature Limits Report (← links)
- DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement (← links)
- DCL-12-122, License Amendment Request 12-04, Emergency Revision to Technical Specification 3.7.10, Control Room Ventilation System (Crvs). (← links)
- DCL-12-081, License Amendment Request 12-02 James M. Welsch Station Director 10 CFR 50.90 Revision to Technical Specification 5.5.7. Reactor Coolant Pump Flywheel Inspection Program (TSTF-421) (← links)
- DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 (← links)
- DCL-11-124, Standard Review Plan Comparison Tables for License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake. (← links)
- DCL-11-127, Submittal of Control Room Envelope Testing (← links)
- DCL-11-097, License Amendment Request 11-05, Evaluation Process for New Seismic Information and Clarifying the Diablo Canyon Power Plant Safe Shutdown Earthquake (← links)
- DCL-11-040, Response to Request for Additional Information E-mail Dated March 4, 2011, from the U.S. NRC Concerning Cyber Security Plan License Amendment Request 09-05 (← links)
- DCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) (← links)
- DCL-10-122, Response to NRC Letter Dated August 26, 2010, Request for Additional Information Set (20) for License Renewal Application (← links)
- DCL-10-087, License Amendment Request 09-05 for Approval of Cyber Security Plan and Revision to the Facility Operating Licenses (← links)
- DCL-10-018, License Amendment Request 10-01, Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-10-002, License Amendment Request 09-05, Request for Approval of the Cyber Security Plan and Revision to the Facility Operating Licenses (← links)
- DCL-10-003, Submittal of Progress Report on Shoreline Fault Zone, Central Coastal California (← links)
- DCL-09-086, License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings (← links)
- DCL-09-032, License Amendment Request 09-03, License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. (← links)
- DCL-09-009, License Amendment Request 09-01 - Revision to Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, Deletion of the High Negative Rate Trip Function (← links)
- DCL-08-050, and Humboldt Bay Power Plant, Unit 3, Application to Use Weighting Factors for Effective Dose Equivalent (← links)
- DCL-08-008, License Amendment Request 08-01, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (← links)
- DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b) (← links)
- DCL-07-061, Pressure and Temperature Limits Report, Revision 7 (← links)
- DCL-06-143, License Amendment Request 06-10 Revision to Technical Specification 5.5.8, Inservice Testing Program (← links)
- DCL-06-142, License Amendment Request 06-09, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program (TSTF-343) (← links)
- DCL-06-029, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Unit 1 Thirteenth Refueling Outage (← links)
- DCL-06-008, License Amendment Request 06-01 Revision to Technical Specification 1.1, Definitions, and Technical Specification 3.4.16, RCS Specific Activity. (← links)
- DCL-05-146, License Amendment Request 05-07 Revision to Technical Specification 5.6.5, Core Operating Limits Report (Colr). (← links)
- DCL-01-127, License Amendment Request 01-09, Revision to Diablo Canyon Power Plant Physical Security Program to Incorporate Diablo Canyon ISFSI & Associated Request for Exemption for Four 10CFR73.55 Requirements (← links)
- ML060230052 (← links)
- ML053010152 (← links)
- DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report (← links)
- DCL-13-074, ISFSI - License Amendment Request 13-04, Application for U.S. NRC Authorization to Use Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended (← links)
- DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology (← links)
- DCL-19-008, License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification (← links)
- DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report (← links)
- DCL-16-061, Supplement to License Amendment Request 15-03, Application of Alternative Source Term. (← links)
- DCL-10-028, Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-06-136, License Amendment Request 06-05 Revision to Technical Specification 3.4.1, Reactor Coolant System Pressure, Temperature, and Flow Departure from Nucleate Boiling Limits, and Technical Specification 5.6.5, Core Operating.... (← links)
- DCL-06-061, License Amendment Request 06-04, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity (TSTF-449) (← links)
- DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 (← links)
- DCL-16-057, License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. (← links)
- ML052860374 (← links)
- DCL-05-080, License Amendment Request 05-02, Revision to Technical Specification 3.7.5. Auxiliary Feedwater (AFW) System. (← links)
- ML051300430 (← links)
- DCL-05-024, Special Report 05-01 - Results of Steam Generator (SG) Tube Inspections Twelfth Refueling Outage for Diablo Canyon Power Plant Unit 2 (← links)
- DCL-05-018, License Amendment Request 05-01 Revision to Technical Specification 5.5.9, Steam Generator Tube Surveillance Program, and 5.6.10, Steam Generator Tube Inspection Report. to Allow Use of the W* Alternate Repair Criteria. (← links)
- DCL-04-141, Response to 09/08/2004 Request for Additional Information Re License Amendment Request 03-18, Revision to Technical Specifications 5.5.9. 'Steam Generator (SG) Tube Surveillance Program.' & 5.6.10 (← links)
- DCL-04-180, License Amendment Request 04-08 Revision to Technical Specification 3.4.10, Pressurizer Safety Valves. (← links)
- DCL-04-178, License Amendment Request 04-09, Relocation of Technical Specification Cycle Specific Parameters to the Core Operating Limits Report (← links)
- DCL-04-165, Special Report 04-02: Steam Generator Tube Plugging During Unit 2 Twelfth Refueling Outage (← links)
- DCL-04-123, License Amendment Request 04-06 Removal of Technical Specifications 5.6.1, Occupational Radiation Exposure Report, and 5.6.4, Monthly Operating Reports (← links)
- ML043130398 (← links)
- DCL-04-149, License Amendment Request 04-07, Revision to Technical Specifications 3.7.17 and 4.3 for Cycles 14-16 for a Cask Pit Spent Fuel Storage Rack (← links)
- DCL-04-118, License Amendment Request 04-04 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil, Starting Air, and Turbocharger Air Assist. (← links)
- DCL-04-055, Supporting Information for License Amendment Request (LAR) 03-07. 'Revision to Technical Specifications (TS) 3.8.1 'Ac Sources - Operating' & TS 3.8.4 'Dc Sources - Operating' Surveillance Requirements. (← links)
- DCL-04-046, CFR 50.59 Report of Changes. Tests, and Experiments for the Period January 1, 2002, Through December 31, 2003 (← links)
- DCL-04-040, Supplement to Exigent Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation (← links)
- DCL-04-037, Exigent License Amendment Request 04-02 Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation. (← links)
- DCL-04-031, Supplement to Special Report 03-04: San Simeon Earthquake of December 22, 2003 (← links)
- DCL-04-028, License Amendment Request 04-01, Revised Steam Generator Voltage-based Repair Criteria Probability of Detection Method (← links)
- DCL-04-013, License Amendment Request 03-17, Common Stars Amendment, Implementation of WCAP-14333 and WCAP-15376, RTS and ESFAS Test Times, Completion Times, and Surveillance Test Intervals (← links)
- DCL-04-008, Response to NRC Request for Additional Information Regarding License Amendment Request 03-02, Response Time Testing Elimination and Revision to Technical Specification 3.3.1. 'Reactor Trip System (RTS) Instrumentation'. (← links)
- DCL-03-183, License Amendment Request 03-18, Revision to Technical Specifications 5.5.9, Steam Generator (SG Tube Surveillance Program, and 5.6.10, SG Tube Inspection Report, for 4-Volt Alternate Repair Criteria for SG Tube Repair (← links)
- DCL-03-173, License Amendment Request 03-19 for Revision to Technical Specifications 3.3.3, Post-Accident Monitoring (PAM) Instrumentation and 3.6.8, Hydrogen Recombiners (← links)
- DCL-03-174, License Amendment Request 03-16 Regarding Revised Wedge Region Exclusion Zones for Steam Generator Tube Alternate Repair Criteria (← links)
- DCL-03-134, License Amendment Request 03-14 - Revision to Technical Specification 3.6.3, Containment Systems/Containment Isolation Valves (← links)
- DCL-03-126, Request for Exemption from 10CFR50.68, Criticality Accident Requirements for Spent Fuel Cask Handling (← links)
- ML032680796 (← links)
- DCL-03-111, License Amendment Request 03-12 Revision to Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2, ESFAS Instrumentation, Enclosures 1 - 4 (← links)
- DCL-03-095, Supplement 1 to License Amendment Request 03-05, Revision of Technical Specification (TS) 3.7.10, Control Room Ventilation System (Crvs). TS 3.7.12. Auxiliary Building Ventilation System (Abvs). TS 3.7.13 (← links)
- DCL-03-084, License Amendment Request 03-11, Revision to Technical Specifications Associated with DC Electrical Power Systems (← links)
- DCL-03-080, Response to NRC Request for Additional Information Regarding License Amendment Request 03-03, Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days (← links)
- DCL-03-077, Response to NRC Questions Regarding License Amendment Request 02-03, Spent Fuel Cask Handling (← links)
- DCL-03-069, License Amendment Request 03-09, Revision of TS 3.1.7, Rod Position Indication 3.2.1, Heat Flux Hot Channel Factor, 3.2.4, Quadrant Power Tilt Ratio, & 3.3.1, Reactor Trip System Instrumentation for Beacon Implementation (← links)
- DCL-03-067, License Amendment Request 03-08 Revision to Technical Specification 3.5.1, Emergency Core Cooling Systems/Accumulator. (← links)
- DCL-03-060, License Amendment Request 03-06, Revision to Technical Specification 3.8.1, AC Sources - Operating. (← links)
- DCL-03-061, License Amendment Request 03-07, Revision to Technical Specifications (TS) 3.8.1 AC Sources - Operating & 3.8.4 DC Sources - Operating Surveillance Requirements (← links)
- DCL-02-115, License Amendment Request (LAR) 01-08, to Modify Technical Specification 3.4.11 & Licensing Basis to Credit Automatic Actuation of Class One Power Operated Relief Valves (Porvs) Instead of Pressurizer Safety Valves (Psvs) (← links)
- DCL-03-034, License Amendment Request 03-05 Revision of Technical Specification 3.7.10, Control Room Ventilation System, TS 3.7.12, Auxiliary Building Ventilation System, and TS 5.5.11, Ventilation Filter Testing Program. (← links)
- DCL-03-016, License Amendment Request 03-02, Response Time Testing Elimination & Revision to TS 3.3.1, Reactor Trip System Instrumentation (← links)
- DCL-03-019, Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days (← links)
- DCL-03-026, Emergency Request for Approval to Use an Alternative Method of Determining Probability of Detection for Steam Generator 4 Tube R44C45 Indication (← links)
- DCL-03-011, License Amendment Request 03-01, Revision to TS 3.3.1, Reactor Trip System Instrumentation (← links)
- DCL-02-125, License Amendment Request 02-06 Revisions to Technical Specifications 3.3.1 Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation. (← links)
- DCL-02-100, Request for Enforcement Discretion Re Compliance with Technical Specification 3.7.7, Vital Component Cooling Water (CCW) System. (← links)
- DCL-02-097, License Amendment Request 02-05, Revision to Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation, & Revised Reactor Coolant System Flow Measurement (← links)
- DCL-02-079, Units, 1 and 2, License Amendment Request 02-04, Revision of Technical Specification 5.6.6 - Reactor Coolant System Pressure and Temperature Limits Report (← links)
- DCL-02-044, License Amendment Request 02-03, Spent Fuel Cask Handling (← links)
- DCL-02-038, License Amendment Request 02-02, Revision to Technical Specifications Re Suspension of Positive Reactivity Additions (← links)
- DCL-02-001, License Amendment Request 02-01, Revision to Technical Specification SR 3.0.3, Missed Surveillances (← links)
- DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System (← links)
- DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications (← links)
- DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (← links)
- ML21076A614 (← links)
- DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance (← links)
- DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (← links)
- ML20239A956 (← links)
- DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition (← links)
- ML21188A214 (← links)
- DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses (← links)
- DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System (← links)
- DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions (← links)
- DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors (← links)
- DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System (← links)
- ML15176A527 (← links)
- ML15099A065 (← links)
- ML15099A064 (← links)
- ML15099A063 (← links)
- ML15099A062 (← links)
- ML15056A705 (← links)
- ML14364A269 (← links)
- ML14364A266 (← links)
- ML14364A265 (← links)
- ML14364A264 (← links)
- ML14364A262 (← links)
- ML14260A069 (← links)
- ML14260A068 (← links)
- ML14260A067 (← links)
- ML14260A066 (← links)
- ML14260A065 (← links)
- ML14260A064 (← links)
- ML14260A063 (← links)