Letter Sequence Request |
---|
|
|
MONTHYEARDCL-09-086, License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings2009-12-14014 December 2009 License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings Project stage: Request ML1005407852010-02-22022 February 2010 Acceptance Review Email, Amendment Request, Revise Final Safety Analysis Report Update Critical Damping Value for Structural Dynamic Qualification of Control Rod Drive Mechanism Pressure Housings Project stage: Acceptance Review ML1010505212010-04-15015 April 2010 Email, Request for Additional Information Re License Amendment Request, Revise FSAR Update Critical Damping Value for Structural Dynamic Qualification of Control Rod Drive Mechanism Pressure Housings (TAC ME2995-ME2996) Project stage: RAI DCL-10-045, Response to NRC Request for Additional Information Re License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings2010-04-23023 April 2010 Response to NRC Request for Additional Information Re License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings Project stage: Response to RAI ML1011700162010-04-23023 April 2010 Response to NRC Request for Additional Information Regarding License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings. Project stage: Response to RAI DCL-10-065, Supplement to Response to NRC Request for Additional Information Regarding License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings2010-06-11011 June 2010 Supplement to Response to NRC Request for Additional Information Regarding License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings Project stage: Supplement DCL-10-072, Supplement to Response to NRC Request for Additional Information Regarding License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings2010-07-0202 July 2010 Supplement to Response to NRC Request for Additional Information Regarding License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings Project stage: Supplement ML1018901172010-07-30030 July 2010 Issuance of Amendment Nos. 207 and 209, Revise FSAR Update to Include Critical Damping Value for Structural Dynamic Qualification of Control Rod Drive Mechanism Pressure Housings Project stage: Approval 2010-04-23
[Table View] |
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARDCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2022-02-16016 February 2022 License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses2022-01-13013 January 2022 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition2021-10-0808 October 2021 Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML21188A2142021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance2021-03-29029 March 2021 Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2020-12-0303 December 2020 License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-19-008, License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification2019-02-14014 February 2019 License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 DCL-16-099, License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2016-10-25025 October 2016 License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-09-15015 September 2016 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 DCL-16-057, License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. DCL-16-057, Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2016-01-28028 January 2016 Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) DCL-16-001, License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2016-01-21021 January 2016 License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process DCL-15-105, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2015-08-31031 August 2015 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-091, Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating2015-08-12012 August 2015 Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating DCL-15-080, License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results2015-07-0101 July 2015 License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results ML15176A5302015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 ML15176A5352015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 82015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5292015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 ML15176A5312015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 ML15176A5272015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5342015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15056A7052015-02-25025 February 2015 Update to the Diablo Canyon Power Plant License Renewal Application(Lra), Amendment 49 and LRA Appendix E, Applicant'S Environmental Report-Operating License Renewal Stage, Amendment 2 DCL-15-023, License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident2015-02-25025 February 2015 License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident ML14364A2622014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 1 of 2 ML14364A2642014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 2 of 2 ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)2014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) 2023-09-27
[Table view] |
Text
Pacific Gas and Electric Company' James R.Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/5/601 P a Box 56 Avila Beach, CA 93424 805.545.3462 December 14, 2009 Internal: 691.3462 Fax: 805.545.6445 PG&E Letter DCL-09-086 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Diablo Canyon Units 1 and 2 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 License Amendment Request 09-06, Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings Pursuant to 10 CFR 50.90, Pacific Gas and Electric (PG&E) hereby requests approval of the enclosed proposed amendments to Facility Operating License Nos.
DPR-80 and DPR-82, for Diablo Canyon Power Plant Units 1 and 2, respectively.
This license amendment request (LAR) would change the design basis and Final Safety Analysis Report Update (FSARU) to allow use of a damping value of 5 percent of critical damping for the structural dynamic qualification of the control rod drive mechanism (CRDM) pressure. housings on the replacement reactor vessel head for the design earthquake (DE), double design earthquake (DDE), Hosgri earthquake (HE), and loss of coolant accident (LOCA) loading conditions. The 5 percent damping value for the CRDMs has been accepted by the NRC staff at several other plants with equivalent CRDMs and seismic support structures. The current documented design basis for the installed CRDMs describes the use of lower damping values.
The enclosure contains a description of the proposed changes, the supporting technical analyses, and the no significant hazards consideration determination. contains marked-up FSARU pages.
PG&E has determined that this LAR does not involve a significant hazard consideration as determined per 10 CFR 50.92. Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment.
PG&E requests approval of this LAR by June 1,2010, to support the Unit 1 head replacement during the refueling outage beginning on October 4, 2010. Also, PG&E requests the license amendment(s) be made effective upon NRC issuance, to be implemented within 180 days from the date of issuance.
The proposed amendments have been reviewed by the Plant Staff Review Committee and approved by the Station Director. Pursuant to 10 CFR 50.91, a copy A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway - Comanche Peak
- South Texas Project - Wolf Creek
Document Control Desk PG&E Letter DCL-09-086 December 14, 2009 Page 2 of this proposed amendment is being sent to the California Department of Public Health.
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
This letter includes no revisions to existing regulatory commitments.
If you have any questions or require additional information, please contact Tom Baldwin at (805) 545-4720.
I state under penalty of perjury that the foregoing is true and correct.
Executed on December 14, 2009.
Sin erely, James Becker Site Vice President tcg5 SAPN50276288 Enclosure cc: Gary W. Butner, California Department of Public Health Elmo E. Collins, NRC Region IV Diablo Distribution cc/enc: Michael S. Peck, NRC, Senior Resident Inspector Alan B. Wang, NRC Project Manager, Office of NRR A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak - Diablo Canyon
Enclosure PG&E Letter DCL-09-086 Evaluation of the Proposed Change
Subject:
License Amendment Request 09-06 Critical Damping Value for Structural Dynamic Qualification of the Control Rod Drive Mechanism Pressure Housings
- 1.
SUMMARY
DESCRIPTION
- 2. DETAILED DESCRIPTION
- 3. TECHNICAL EVALUATION
- 4. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 Significant Hazards Consideration 4-4 Conclusions
- 5. ENVIRONMENTAL CONSIDERATIONS
- 6. REFERENCES ATTACHMENT:
- 1. Final Safety Analysis Update Pages
Enclosure PG&E Letter DCL-09-086
SUMMARY
DESCRIPTION This evaluation supports a request to amend Facility Operating License Nos.
DPR-80 and DPR-82 for Diablo Canyon Power Plant (DCPP), Units 1 and 2, respectively.
This LAR would change the design basis and FSARU to allow use of a damping value of 5 percent of critical damping for the structural dynamic qualification of the CRDM pressure housings on the replacement reactor vessel head for the design earthquake (DE), double design earthquake (DDE), Hosgri earthquake (HE), and Loss of Coolant Accident (LOCA) loading conditions. The 5 percent damping value for the CRDMs has been accepted by the NRC staff at several other plants with equivalent CRDMs and seismic support structures. The current documented design basis for the installed CRDMs describes the use of lower damping values.
- 2. DETAILED DESCRIPTION Proposed Amendment The proposed change would revise FSARU Section 3.7.1.3, Critical Damping Values, to allow a damping value of 5 percent of critical damping for the seismic/LOCA qualification of the CRDM pressure housings for the DE, DDE, and HE.
Purpose for Proposed Amendment The purpose of this proposed change is to obtain NRC staff approval for the use of a damping value of 5 percent of critical damping for the structural dynamic qualification of the CRDM pressure housings on the replacement reactor vessel head for the DE, DDE, and HE, and LOCA loading conditions. The 5 percent damping value has been accepted by the NRC staff for CRDM dynamic analysis at several other plants with DCPP-equivalent CRDMs and seismic support structures.
Risk-Informed Licensinq Chanqe The requested change in the LAR is not a risk-informed licensing change.
1
Enclosure PG&E Letter DCL-09-086 3 TECHNICAL EVALUATION System Design Basis The CRDMs are Code Class I components designed and qualified to meet the, requirements of the ASME Code,Section III. All design, operating and accident conditions are included.
Basis for damping value for CRDM component analysis Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," (Reference 2) provides acceptable damping values to be used in the elastic dynamic seismic analysis and design of SSCs, where energy dissipation is approximated by viscous damping unless otherwise specified. RG 1.61 does not explicitly specify damping values for CRDMs. Piping is the closest approximation to CRDM structure; however, the specified piping damping values do not account for the significant damping inherent to the CRDM design (i.e.,
internal mechanical components and more importantly, the gapped seismic support plate structure).
RG 1.61 does allow the use of damping values higher than those provided in the regulatory guide if documented test data support the higher values. Damping is a property of the structure or system being excited by earthquake motion rather than of the earthquake itself. It varies as a function of material and configuration.
The CRDM damping values used in the seismic qualification analyses of the original equipment manufacturer (OEM), Westinghouse, were established via testing conducted by Westinghouse. The tests were performed on a full size CRDM and seismic support system (Type L-105 CRDM) with nonfunctioning rod position indication coils with an operating coil stack installed. Latches were disengaged from the drive shaft for the tests. A weight was included at the bottom of the drive shaft to simulate the weight of the control rods. All tests were run at an internal pressure of 2250 pounds per square inch (psi) and a temperature of 4000 F.
The testing program consisted of transient vibration tests in which the CRDM was deflected a specified initial amount and suddenly released. The effect on damping of variations in the drive shaft axial position, upper seismic support clearance and initial deflection amplitude was investigated. The effective damping was determined by calculating the logarithmic decrement for one cycle and for five cycles.
This testing is discussed in WCAP-7921-AR, "Damping Values of Nuclear Power Plant Components." WCAP 7921-AR presents and evaluates damping values and data from tests of nuclear power plant components and other structures.
2
Enclosure PG&E Letter DCL-09-086 The NRC (then AEC) in a letter dated May 14, 1974, stated that WCAP-7921-AR is acceptable for reference as a topical report, on license applicationsfor which the constructionpermit application was docketed afterApril 1, 1973, when it is used in support of damping values for Westinghouse primary coolant loop system components and large piping with a configuration similarto that defined in the report. The acceptability did not apply to damping values for reactor internals.
The Westinghouse test results described in WCAP 7921-AR state that CRDM damping varied from 2.5 percent to 17 percent of critical damping depending on the number of cycles of decay used in the calculation and on the size of the gap between the seismic support plates. The gap between seismic support plates had the largest effect on the CRDM damping with the damping increasing. with increasing clearance. With a gap of 0.060-inch, the measured damping was approximately 8 percent. The gap between typical CRDM seismic support plates is a minimum of 0.100-inch.
The replacement CRDM design provides a 0.070-inch (cold)/0.100-inch (hot) gap between the CRDM seismic support plates. This gap would result in damping equal to or greater than the 8 percent damping discussed in WCAP 7921-AR.
Therefore, the use of 5 percent critical damping is conservative for the DCPP DE, DDE, HE, and LOCA events.
Similarity Evaluation Several operating Westinghouse PWRs of design and vintage similar to DCPP have qualified CRDMs using the 5 percent damping value on the basis of similarity between the Type L-106A CRDM and the tested CRDM. The design of the AREVA-supplied CRDMs and supporting structure was specified as an equivalent replacement for the OEM CRDMs (Type L-1 06A) in fit, form and function. In comparison with the OEM CRDMs, the as-built configuration of the AREVA-supplied replacement CRDMs provide the similarity in geometry, seismic support elevation and physical interfaces, etc. required to maintain virtually identical structural characteristics.
The following provides the basis of similarity between the OEM CRDM and the AREVA-supplied CRDM, as depicted in Figure 1:
- 1. Gap at the seismic support plates. The CRDM testing that supports the 5 percent damping value was based on a seismic support plate gap of 0.060-inch. The seismic support plates / seismic support structure for the replacement CRDM design provides a 0.070-inch (cold)/0.100-inch (hot) gap between the CRDM seismic support plates, consistent with the gap between the OEM CRDM seismic support plates.
3
Enclosure PG&E Letter DCL-09-086
- 2. CRDM length. The OEM and AREVA supplied replacement CRDMs are the same in length.
- 3. Latch housing and Rod Travel Housing (RTH) materials. The OEM and replacement CRDMs materials for the latch housing and RTH are the same type 304 stainless steel.
- 4. Section properties. The OEM and replacement CRDM geometry is essentially the same by design. Differences in tolerances are insignificant to damping.
- 5. Operating parameters. The operating parameters are the same.
- 6. Appurtenances. The existing Westinghouse Type L-1 06A control rod drive coil assemblies and digital rod position indicator coil stacks have been or will be installed on the replacement CRDMs
- 7. Specific design differences. The design enhancements are shown in the circled areas in Figure 1. Alloy 690 is substituted for Alloy 600 for its superior resistance to PWSCC. These materials' physical properties are equivalent and with no change in the effect on damping. Threaded joints with canopy seal welds at the top and lower positions have been eliminated in favor of one-piece construction. The OEM fine-threaded joint connections are pressure-loaded and designed to minimize or eliminate relative displacement between the joined parts; therefore, any difference in damping effects of these joint connections and the one-piece design are negligible.
Therefore, based on the similarity of the AREVA-supplied replacement CRDMs to the OEM CRDMs, 5 percent critical damping is a conservative value to use for dynamic analysis.
4
Enclosure PG&E Letter DCL-09-086
- 4. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," provides acceptable damping values to be used in the elastic dynamic seismic analysis and design of SSCs, where energy dissipationis approximatedby viscous damping unless otherwise specified. RG 1.61 does not specify damping values for CRDMs; however, the use of damping values higher than those provided in the regulatory guide is specifically allowed if documented test data support the higher values. The use of damping values for non-specified structural components based upon documented test data is therefore presumed acceptable for use with prior approval.
The proposed damping values are based on testing conducted by Westinghouse. This testing is discussed in WCAP-7921-AR. The use of 5 percent of critical damping has been approved by the NRC for structural dynamic qualification of similar CRDMs at several plants.
4.2 Precedent The use of 5 percent damping has been accepted by the NRC staff in the licensing review of several plants of design and construction similar to DCPP, including Watts Bar and Comanche Peak. These plants have similar CRDMs to the DCPP OEM and replacement CRDMs.
The testing on which the acceptance is based is discussed in WCAP-7921-AR. WCAP 7921-AR presents and evaluates damping values and data from tests of nuclear power plant components and other structures, and was approved for use by the AEC.
4.3 No Significant Hazards Consideration Pacific Gas and Electric (PG&E) has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment,"'as discussed below:
- 1. Does the change involve a significant increasein the probabilityor consequences of an accidentpreviously evaluated?
The proposed change revises the design basis and Final Safety Analysis Report Update (FSARU) to reflect a damping value of 5 percent of critical damping for the structural dynamic qualification of the control rod drive 5
Enclosure PG&E Letter DCL-09-086 mechanism (CRDM) pressure housings for the replacement reactor vessel head for the design earthquake (DE), double design earthquake (DDE),
Hosgri earthquake (HE), and loss of coolant accident (LOCA). The 5 percent damping value has been accepted by the NRC staff at several other plants with equivalent CRDMs and seismic support structures.
The damping value is an element of the structural dynamic analysis performed to confirm the CRDMs' ability to function under a postulated seismic disturbance or LOCA while maintaining resulting stresses under ASME Code Section III allowable values. Because the ASME Code requirements continue to be met, this proposed change to the damping value could not result in an increase in the probability or consequences of an accident previously evaluated Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the change create the possibility of a new or different kind of accident from any accidentpreviously evaluated?
The proposed change revises the design basis and FSARU to reflect a damping value of 5 percent of critical damping for the structural dynamic qualification of the CRDM pressure housings for the replacement reactor vessel head for the DE, DDE, HE, and LOCA. The 5 percent damping value has been accepted by the NRC staff at several other plants with equivalent CRDMs and seismic support structures and is a conservative value based on the testing performed by the OEM.
The damping value is an element of the structural dynamic analysis performed to confirm the CRDMs' ability to function under a postulated seismic disturbance or LOCA while maintaining resulting stresses under ASME Code Section III allowable values. Because the ASME Code requirements continue tobe met, this proposed change to-the damping value could not create the possibility of a new or different kind of accident from any accident previously evaluated.
Therefore the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the change involve a significant reduction in a margin of safety?
The proposed change revises the design basis and FSARU to reflect a damping value of 5 percent of critical damping for the structural dynamic qualification of the CRDM pressure housings for the replacement reactor 6
Enclosure PG&E Letter DCL-09-086 vessel head for the DE, DDE, HE, and LOCA. The 5 percent damping value for CRDMs has been accepted by the NRC staff at several other plants with equivalent CRDMs and seismic support structures.
The damping value is an element of a structural dynamic analysis performed to confirm the CRDMs ability to function under a postulated seismic disturbance or LOCA while maintaining resulting stresses under ASME Code,Section III, allowable values. The margin of safety is maintained by meeting the ASME Code requirements.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above evaluation, PG&E concludes that the change proposed by this License Amendment Request (LAR) satisfies the no significant hazards consideration standards of 10 CFR 50.92(c), and accordingly a no significant hazards finding is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above: (1) There is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
- 5. ENVIRONMENTAL CONSIDERATION PG&E has evaluated the proposed amendment and has determined that the proposed amendment does not involve: (1) a significant hazards consideration, (2) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (3) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
7
Enclosure PG&E Letter DCL-09-086
- 6. REFERENCES
- 1. WCAP-7921-AR, "Damping Values of Nuclear Power Plant Components,"
May 1974.
- 2. Regulatory Guide 1.61, "Damping Values for Seismic Design of Nuclear Power Plants," Revision 1, March 2007.
8
Figure 1 Structural Schematic OEM CRDM vs. AREVA CRDM 1
Enclosure PG&E Letter DCL-09-086
- N DCPP OEM DCPP AREVA STRUCTURAL SCHEMATIC FIGURE I 2
Enclosure PG&E Letter DCL-09-086 Marked up FSARU Pages (Section 3.7.1.3, Critical Damping Values) 3
Enclosure PG&E Letter DCL-09-086 3.7.1.3 Critical Damping Values The specific percentages of critical damping used for Design Class I SSCs, and the Design Class IIturbine building and intake structure are listed in the following table:
Type of Structure % of Critical Damping DE DDE HE Containment structures and all internal concrete structures 2.0 5.0 7.0 Other conventionally reinforced concrete structures above ground, such as shear walls or rigid frames 5.0 5.0 7.0 Welded structural steel assemblies 1.0 1.0 4.0 Bolted or riveted steel assemblies 2.0 2.0 7.0 Mechanical components (PG&E purchased) 2.0 2.0 4.0 Vital piping systems (except reactor coolant loop)(a) 0.5 0.5 3 0. (b)
Reactor coolant loop(a)(c) 1.0 1.0 4.0 Replacement Steam Generators(f) 2.0 4.0 4.0 Foundation rocking (containment structure only)(d) 5.0 5.0 NA(e)
CRDMs 5.0 5.0 5.0 (a) ASME Code Case N-411 damping may be used provided it is applied to all earthquake cases and used in response spectrum modal superposition analysis. When used, pipe displacements are checked for adequacy of clearances and pipe mounted equipment accelerations are verified against project qualification criteria.
For equipment and components modeled inline, damping should be consistent with RG 1.61; a composite damping value may be used for the analysis of these piping systems.
A log of calculations is kept that indicates which calculations have used Code Case N-411 damping.
Request for NRC approval for the use of ASME Code Case N-411 was made in letter DCL-86-009, dated January 22, 1986. NRC approval was granted by letter on April 7, 1986 (b) Two percent of critical damping is used for piping less than or equal to 12 inches in diameter.
(c) Although a damping value of 1 percent is used for the DE and DDE analyses of the reactor coolant loop (RCL), damping values of greater than 4 percent have been measured 4
Enclosure PG&E Letter DCL-09-086 experimentally for the RCL in full-size power plants (Reference 8). These testing programs have been reviewed and approved by the NRC. The damping values recommended in RG 1.61 are acceptable for use in analysis of mechanical equipment and systems. (References 24-26)
(d) Five percent of critical damping is used for structures founded on rock for the purpose of computing the response in the rocking mode, and 7 percent of critical damping is used for the purpose of computing the response in the translation mode.
(e) Analysis utilizes fixed base.
{ These values are valid for replacement steam generator (RSG) internals and shell components up to the RSG nozzle to pipe/tube connections in the RCS, MS, and FW systems and the interface between the RSG shell and upper and lower lateral and lower vertical supports. The restrictions imposed by WCAP 7921-AR (Reference 8) shall be observed when applying these values. (Reference 27) 5