Category:Report
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling 2024-06-14
[Table view] Category:Technical
MONTHYEARML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report 2024-05-08
[Table view] |
Text
Attachments 8-13 to the Enclosure contain Proprietary Information - Withhold Under 10 CFR 2.390 Enclosure Attachment 6 PG&E Letter DCL-12-120 Invensys Operations Management Document "993754-1-900, Revision 1, Process Protection System Replacement Diablo Canyon Power Plant Project Quality Plan (PQP)"
(Non-Proprietary)
Attachments 8-13 to the Enclosure contain Proprietary Information When separated from Attachments 8-13 to the Enclosure, this document is decontrolled.
i n V'e. n s*.* s" Operations Management Triconex Project: PG&E PROCESS PROTECTION SYSTEM REPLACEMENT Purchase Order No.: 3500897372 Project Sales Order: 993754 PACIFIC GAS & ELECTRIC COMPANY NUCLEAR SAFETY-RELATED PROCESS PROTECTION SYSTEM REPLACEMENT DIABLO CANYON POWER PLANT 1
PROJECT QUALITY PLAN (PQP)
Document No. 993754-1-900 Revision 1 March 2, 2012 Name Si Ltture A Title Author: S. Dwire l f 11. Project Qualty Assurance Approvals: R. Shaffer Project Manager H. Rice Quality Manager - Nuclear
i n V'e. n s'.j so M i n V e. n s.* s" Operations Management Triconex Document I 974190 ITte IPoect Quality Plan Revision: 1Page: 2 of 8 Date: 02 MAR 2012 Document Change History Revision Date Changes Author 0 29 JUL 11 Initial Issue. S. Dwire 1 02 MAR 12 -Updated with Phase 2 deliverables S. Dwire from PO#3500897372 Revision 6
-IOM-Q2 changed to QM-2
-Section 1.4 requirements document number updated
-Added references to specific PPMs I -'
i n v'e. n so"ýjs '.i s, 00 Tm i nV e. n s Operations Management Triconex Document: 7 - 993754-1-900 1
Title:
Project Quality Plan Revision: 1 Page: 3 of 8 1 Date: 02 MAR 2012 Table of Contents
- 1. GENERAL .................................. ............ ... ... .... ............ o4 1.1 Background/Purpose ........................................................................................................................... 4 1.2 Objectives ............................................................................................................................................ 4 1.3 Project Overview ................................................................................................................................. 4 1.4 Requirem ents ....................................................................................................................................... 4 1.5 Re ferences ........................................................................................................................................... 4
- 2. ORGANIZATION............. .. ..... ...... .............................................. .... 5 2 1 Responsibilities ................................................................................................................................... 5 2.2 Qualification and Traininr .................................................................................................................. 5
- 3. QA PROGRAM ns.ruct.ons.................................5..
APPLICABjLITY ..... 5 3.1 QA Programn ........................................................................................................................................ 5 3.2 Project Instru tions .............................................................................................................................. 5 3.3 Design Control .................................................................................................................................... 5 3.4 Non-Conformances and Corective Actions .................................................................................. 6
- 4. NEW AND/OR UNIQUE ACTIVITIES ..................... o.o........o............... 6 4.1 NRC Interim Staff Guidance 6 (ISG 06) ...................................................................................... 6
- 5. KEY PROGRAM AREASe...................................................... 6
- 6. QA MONITORING .... o................. .o.....o.............oo............ ... .......... o..... .. o.o.......6 6.1 Inspection Plan .................................................................................................................................... 7
- 7. DOCUM ENTATION ..... o....o........................... ...... ................................ ....7
- 8. DELIVERABLES ........ o.o.o....o............................o.....o......................... .........oo....o7
- 9. ATTACH MIENTS ...ooo... o.....o.o.....o~o.....o......o~o.... o........oooo .................................. oo8
n V'e. n s'.> s-oTM in V e. n s'. s" Operations Management Triconex 1Document: 7 -993754-1-900 1 Titde: IPtoject Quality Plan Revision: 1 Page: 4 of 8 Date: 02 MAR 2012
- 1. General 1.1 Background/Purpose The purpose of this Project Quality Plan (PQP) is to provide planned and systematic quality activities for the design and approval of required Process Protection System (PPS)
Replacement documents in accordance with Customer Purchase Order (PO) #3500897372 and Master Service Agreement (MSA) 4600018177.
1.2 Objectives This PQP is intended to ensure that project deliverables, including project documents supplied to the customer, meet specified quality standards; and that customer contract, Invensys Operations Management quality management system and applicable industry standards requirements are satisfied.
This PQP applies to all deliverables and services provided in satisfaction of the contract, regardless of the System/Safety classification.
1.3 Project Overview The PPS Replacement documents will be provided appropriately as deliverables in accordance with the customer PO and MSA. The list of documents required includes normal digital design documentation, e.g., Software Requirements Specification (SRS), System Design Description (SDD), test plans, etc.. Phase I of ISG-06 for this project has been completed with the acceptance of the SRS as well as the test plans. This version of the PQP will address the completed Phase 1 and planned Phase 2. Phase 2 requires software code listings as well as test documentation (e.g. test specifications and test reports). Subsequent phases may require additional revisions to this PQP.
1.4 Requirements This is a Safety Related Class 1E project with Software Integrity Level (SIL) 4 software.
Requirements for this project are specified in customer PO #3500897372 and in accordance with the MSA # 4600018177. At a minimum if there is conflict with this PQP and required standards or customer requirements; QM-2 and customer quality requirements shall take precedence. QM-2 satisfies all customer QSL quality clauses and TEC I OCFR21 reporting requirements.
1.5 References 1.5.1. Nuclear System Integration Program Manual (NSIPM), NTX-SER-09-21 1.5.2. Project Management Plan (PMP), 993754-1-905 1.5.3. Nuclear Quality Assurance Manual, QM-2 1.5.4. Software Quality Assurance Plan (SQAP), 993754-1-801 1.5.5. U.S. NRC Digital Instrumentation and Controls Interim Staff Guidance (ISG 06),
DI&C-ISG-06, Revision 1 I
i n v'e. n s Operations Management Triconex Docment: 993754-1-900
Title:
Project Quality Plan Revision: 1 Page: 5 of 8 Date: 02 MAR 2012 1.5.6. Pacific Gas & Electric Purchase Order #3500897372
- 2. ORGANIZATION 2.1 Responsibilities Detailed roles and responsibilities of key Invensys Operations Management personnel are described in 993754-1-905, Project Management Plan (PMP).
2.2 Qualification and Training This project will be implemented by qualified and trained Invensys personnel. Project training will be provided to project personnel in accordance with Invensys Operations Management Triconex Project Procedure Manual (PPM) 9.0, Personnel Training and the PMP.
- 3. QA Program Appficability 3.1 QA Program The Invensys Operations Management System Requirements: Quality Manual (QM-2) and supporting quality management system documentation shall control all work performed under the contract. All process control activities are controlled by applicable quality management system documents. Project activities will be controlled and performed in compliance with these requirements through implementation of QM-2, the Quality Procedure Manual (QPM), and the Nuclear System Integration Program Manual (NSIPM), NTX-SER-09-21; except as specified in Section 3.2 and 3.3 of this plan.
The Triconex QPM, Project Procedure Manual (PPM), and Manufacturing Department Manual (MDM) are the implementing procedures under the NSIPM. These procedures have been verified via external audit, including the NRC, and found compliant with the Invensys (10 CFR 50) Appendix B program as well as NRC requirements for the development of software for safety-related applications in nuclear power plants.
3.2 Project Instructions When necessary, project management has the authority to develop and implement project-specific Project Instructions (PI) to provide instructions for additional methods/processes for new/unique customer contract-specific requirements. Project Instructions, at a minimum, shall be developed by the PE or designee, reviewed by PQAE and approved by the PM.
3.3 Design Control Design activities are conducted in accordance with the NSIPM, Section 4.0, Design Control and PPM 2.0, Design Control. The design process includes measures for identification, control of design interfaces, and verification of design adequacy. Specific details for software I
n v e.n s-". s-TMi n V. e." n s. '- . s $"
o0 Operations Management Triconex Document: 9974- I0Title: Pioect Qait Plan Revision: 1 Page: 6 of 8 Date: 02 MAR2012 design control shall be found in the Software Quality Assurance Plan (SQAP), 993754 801.
3.4 Non-Conformances and Corrective Actions Non-Conformances and Corrective Actions shall be handled in accordance with NSIPM Section 7.0, Nonconforming Items and PPM 10.0, Nonconformance and Corrective Action.
- 4. NEW and/or UNIQUE Activities 4.1 NRC Interim Staff Guidance 06 (ISG 06)
Project documents shall be developed in accordance with the guidance from Invensys Operations Management Triconex manuals and ISG 06. If the Invensys Triconex manuals and ISG 06 differ significantly in document requirements, the more stringent requirements of the two shall be incorporated.
- 5. Key Program Areas Important areas of the QA program which will be emphasized are:
" Surveillance of the engineering activities to verify compliance with the project and quality procedures, project plans, customer purchase order/specifications.
- Review and approval of documents assuring consistent formats, good revision control and not repeating errors throughout the project.
- Periodic audits providing independent reviews and monitoring.
- 6. QA Monitoring The PM and project personnel are responsible for the overall quality of the project. In general, quality assurance is verified by:
- Peer review of project documents.
- Review and monitoring of project activities by the PM.
In addition, the assigned Project Quality Assurance Engineer (PQAE) will perform independent quality assurance activities, which include:
- Reviewing project documents for adequacy and completeness.
- Conducting surveillances of project activities to measure and assure program compliance.
- Serving as the primary interface with the customer quality representatives.
Throughout the project, QA will advise the PM on issues relating to quality and will identify potential noncompliance with customer requirements or project QA commitments. QA does not report to the PM and has the organizational freedom to identify quality issues to Invensys senior management, where necessary to resolve conflicts in quality issues.
in v'0e. novTes s ".js i nS..'n. s* ss Operations Management Triconex Document: 993754-1-900 ITitle: I Project Quality Plan Revision: 1 Page: 7 of 8 Date: -1 02 MAR2012 6.1 Inspection Plan Invensys Operations Management shall conduct a phase exit surveillance prior to exiting the Requirements, Design, Implementation, and Test Phases before recommending work to begin on documents of the next phase. This will help ensure all inputs of the next phase are verified to be acceptable and approved before beginning activities of that phase.
- 7. Documentation All documents generated as a result of this project shall be classified as Quality Records and shall be processed in accordance with NSIPM, Section 10.0, Project Document and Data Control, PPM 3.0, Drawing Preparation and Control, PPM 4.0, Project Document and Data Control and QPM, Section 16.0, Quality Records Retention.
- 8. Deliverables Deliverable dates and other specific data for these documents are described in the PMP, 993754-1-905.
Project deliverables to be provided are:
- 1. System Architecture Description
- a. Hardware Architecture Description
- b. Software Architecture Description
- 2. V10 Tricon Reference Design Change Analysis
- 3. 603/7-4.3.2/ISG-04 Conformance Report
- 4. RG 1.152 Conformance Report
- a. Vulnerability Assessment
- b. Secure Development Environment and Operational Environment Controls
- 5. Project Management Plan
- 6. Software Management Plan
- 7. Software Development Plan
- 8. Software Safety Plan
- 9. Software Quality Assurance Plan
- 10. Software Verification and Validation Plan
- 11. Software Configuration Management Plan
- 12. Software Integration Plan Requirements Phase
- 13. Hardware Requirements Specification
- 14. Software Requirements Specification
- 15. Safety (Criticality/Hazard/Risk) Analysis
- 16. Validation Test Plan
- 17. Project Traceability Matrix
- 18. Requirements Phase Summary Report
- a. Requirements V&V Report Design Phase
- 19. Software Design Description I
i n v e. n s*." s" *°,M i n V'e. n. s'.t s" Operations Management Triconex Document- I 993754-1-900 I
Title:
I Project Quality Plan Revision: I Page: 8 of 8 Date: 02 MAR2012
- 20. Hardware Design Description
- 21. I/O List
- 22. Failure Modes and Effects Analysis
- 23. Safety Analysis (Design Phase Update)
- 24. Validation Test Specification
- 25. Software Verification Test Plan
- 26. Software Verification Test Specification
- 27. Project Traceability Matrix - Design Phase
- 28. Design Phase Summary Report
- a. Design Phase V&V Report Implementation Phase
- 29. Application Software (PT2 File)
- 30. I/O List (Implementation Phase Update, if necessary)
- 31. Software Verification Test Cases
- 32. Software Verification Test Report
- 33. Safety Analysis (Implementation Phase Update)
- 34. Project Traceability Matrix - Implementation Phase
- 35. Implementation Phase Summary Report
- a. Implementation Phase V&V Report Test Phase
- 36. Hardware Validation Test Procedure
- 37. Factory Acceptance Test Procedure
- 38. Project Traceability Matrix - Test Phase
- 39. Hardware Validation Test Report
- 40. Factory Acceptance Test Report
- 41. System Response Time Confirmation Report
- 42. Safety Analysis (Test Phase Update)
- 43. Final Master Configuration List
- 44. Test Phase Summary Report
- 45. Final Verification and Validation Report Delivery Phase
- 46. Nuclear Certificate of Conformance
- 47. Final System Integration Document Package
- 48. System Delivery
- 9. Attachments NONE