Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/10/2014
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14260A106 List: ... further results
References
DCL-14-081
Download: ML14260A058 (19)


Text

PACIFIC GAS AND ELECTRIC COl\'IP ANY GEOSCIENCES DEPARTMENT TECHNICAL REPORT REPORT TITLE: Site Conditions Evaluation SIGNATORIES PREPAREDBY: Norman Abrahamson Printed Name VERIFIED BY: Kathryn Wooddell Printed Name Richard Klimczak Printed Name Report Number: GEO. DCPP.TR.14.06 Report Revision:

0 Report Date: 8/6/2014 Quality Related: Y Page 1 of 17 DATE: .c:;' It. ( 261'( PG&E Organization DATE: 0/3 /()!J /j_/;/1 PG&E Organization DATE: OCj j;o /Zotf Organization

Page 1 of2 GEO.DCPP.TR.14.06 RO Attachment 1 VERIFICATION

SUMMARY

REPORT Item Parameter Yes No* N/A* 1 Purpose is clearly stated and the repmt satisfies the ./ Purpose. 2 Data to be interpreted and/or analyzed are included or ./ referenced.

3 Methodology is appropriate and properly applied. ./ 4 Assumptions are reasonable, adequately described, and ./ based upon sound geotechnical principles and practices.

5 Software is identified and properly applied. Validation N/A* is referenced or included, and is acceptable.

Input files are correct. 6 Interpretation and/or Analysis is complete, accurate, ./ and leads logically to Results and Conclusions.

7 Results and Conclusions are accurate, acceptable, and ./ reasonable compared to the Data, interpretation and/or analysis, and Assumptions.

8 The Limitation on the use of the Results has been ./ addressed and is accurate and complete.

9 The Impact Evaluation has been included and is ./ accurate and complete.

10 References are valid for intended use. ./ 11 Appendices are complete, accurate, and support text. N/A* *All calculations were done by hand using Excel, and no specialized software was used for the calculations in this chapter.

  • There are no appendices or supporting documents.

Comments:

  • Table 3-1 was verified against Table 9.2-8 in GEO.DCPP.14.03 revO.
  • Table 3-2 was verified against Table 9.3-3 in GEO.DCPP.14.03 revO.
  • Table 3-3 was verified against Table 10.1-1 in GEO.DCPP.l4.03 revO.
  • Figure 3-1 was verified to be taken from the 2011 Shoreline Fault repmt (Figure 7, Appendix L).
  • Figure 3-2 was verified to be taken from Figure 9.3-1 in GEO.DCPP.l4.03 revO.
  • Figure 3-3 was verified to be taken from Figure 9.2-1 in GEO.DCPP.14.03 revO.
  • Figure 3-4 was verified to be taken from Figure 9.2-2 in GEO.DCPP.14.03 revO.
  • Figure 3-5 was verified to be a plot of the data from Table 6.3-1 in GEO.DCPP.l4.03 revO.
  • Figure 3-6 was verified to be taken from Figure 9.3-2 in GEO.DCPP.l4.03 revO.
  • Figure 3-7 was verified to be taken from Figure 9.3-4 in GEO.DCPP.14.03 revO. There are no supporting documents to this ITR report.

There are no suppmting documents to this ITR repmt. Page 2 of2 GEO.DCPP.TR.14.06 RO Attachment 1 (date)