Letter Sequence Supplement |
---|
|
|
MONTHYEARDCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications Project stage: Request RS-20-129, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 52020-10-29029 October 2020 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5 Project stage: Request ML20303A3232020-10-29029 October 2020 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 1 of 5 Project stage: Request ML20303A3262020-10-29029 October 2020 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 3 of 5 Project stage: Request ML20303A3272020-10-29029 October 2020 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 4 of 5 Project stage: Request ML20303A3252020-10-29029 October 2020 License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 2 of 5 Project stage: Request DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2020-12-0303 December 2020 License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition Project stage: Request ML21012A4432021-01-12012 January 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation Project stage: Acceptance Review DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition Project stage: Supplement ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition Project stage: RAI ML21264A6722021-09-21021 September 2021 NRR E-mail Capture - Revised Schedule: Diablo Canyon Request to Revise Technical Specification to Reflect the Permanent Cessation of Reactor Operation Project stage: Other DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses2022-01-13013 January 2022 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses Project stage: Supplement ML22152A1502022-06-21021 June 2022 Request for Additional Information Regarding License Amendment Request for Technical Specifications and Revised License Conditions for the Permanently Defueled Condition Project stage: RAI DCL-22-058, Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2022-07-20020 July 2022 Responses to NRC Requests for Additional Information on LAR 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition Project stage: Response to RAI ML21242A2162022-12-21021 December 2022 Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 Project stage: Approval ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 Project stage: Other 2021-04-14
[Table View] |
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARDCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2022-02-16016 February 2022 License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses2022-01-13013 January 2022 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition2021-10-0808 October 2021 Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML21188A2142021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance2021-03-29029 March 2021 Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2020-12-0303 December 2020 License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-19-008, License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification2019-02-14014 February 2019 License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 DCL-16-099, License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2016-10-25025 October 2016 License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-09-15015 September 2016 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 DCL-16-057, License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. DCL-16-057, Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2016-01-28028 January 2016 Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) DCL-16-001, License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2016-01-21021 January 2016 License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process DCL-15-105, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2015-08-31031 August 2015 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-091, Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating2015-08-12012 August 2015 Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating DCL-15-080, License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results2015-07-0101 July 2015 License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results ML15176A5302015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 ML15176A5352015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 82015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5292015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 ML15176A5312015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 ML15176A5272015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 ML15176A5342015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15056A7052015-02-25025 February 2015 Update to the Diablo Canyon Power Plant License Renewal Application(Lra), Amendment 49 and LRA Appendix E, Applicant'S Environmental Report-Operating License Renewal Stage, Amendment 2 DCL-15-023, License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident2015-02-25025 February 2015 License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident ML14364A2622014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 1 of 2 ML14364A2642014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 2 of 2 ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-14-058, License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294)2014-07-28028 July 2014 License Amendment Request 14-03 for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1. Change in Technical Specification End States (WCAP-16294) 2023-09-27
[Table view] |
Text
mPacHic Gas and Electric Company*
Maureen R. Zawalick Vice President Decommissioning and Diablo Canyon Power Plant Mail code 104/6/608 P.O. Box 56 Technical Services Avila Beach, CA 93424 805.545.4242 Internal: 691.4242 PG&E Letter DCL-22-001 ATTN: Document Control Desk 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses
References:
- 1. PG&E Letter DCL-20-092, "License Amendment Request 20-03,
'Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition,'" dated December 3, 2020 (ML20338A546)
- 2. PG&E Letter DCL-21-019, "Supplement to License Amendment Request 20-03, 'Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition,'" dated April 1, 2021 (ML21091A069)
Dear Commissioners and Staff:
In Reference 1, Pacific Gas and Electric Company (PG&E) submitted License Amendment Request (LAR) 20-03, to propose revisions to the technical specifications and license conditions to reflect the permanently defueled condition.
In Reference 2, PG&E supplemented LAR 20-03 to request additional changes. The purpose of this submittal is to provide the title pages for the Diablo Canyon Power Plant (DCPP) Units 1 and 2 facility operating licenses (FOLs) to remove reference to the term "operating," and update the marked up and clean copies of a page of the FOLs to make an editorial correction to License Condition 2.C.(2).
In Reference 2, PG&E provided an updated marked up copy of the FOLs for DCPP Units 1 and 2. Enclosure 1 provides a marked up copy of the DCPP Units 1 and 2 FOLs title pages and replaces the corresponding marked up pages of Reference 2, Enclosure, Attachment 1, for License Condition 2.C.(2). Enclosure 2 provides a clean copy of the DCPP Units 1 and 2 FOLs titles pages and replaces the corresponding pages in the clean copy of Reference 2, Enclosure, Attachment 2, for License Condition 2.C.(2). Refer to Enclosures 1 and 2 for additional details.
A member of the STARS Alliance Callaway
Document Control Desk PG&E Letter DCL-22-001 Page 2 This supplement does not impact the updated No Significant Hazards Determination included in Reference 2.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions or require additional information, please contact Mr. Philippe Soenen at (805) 459-3701.
I state under penalty of perjury that the foregoing is true and correct.
January 13, 2022 Executed on __________________.
Sincerely, Maureen R. Zawalick Vice President, Decommissioning and Technical Services Enclosures cc: Diablo Distribution cc/enc: James F. Drake, NRC Acting Senior Resident Inspector Samson S. Lee, NRR Senior Project Manager Scott A. Morris, NRC Region IV Administrator Gonzalo L. Perez, Branch Chief, California Dept of Public Health A member of the STARS Alliance Callaway
PG&E Letter DCL-22-001 Enclosure 1 Diablo Canyon Power Plant - Units 1 and 2 Replacement Pages to Markups for Facility Operating Licenses (FOLs)
References:
- 1. PG&E Letter DCL-21-019, "Supplement to License Amendment Request 20-03, 'Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition,'" dated April 1, 2021 (ML21091A069)
- 2. NRC Letter, Diablo Canyon Nuclear Power Plant, Units 1 and 2 -
Issuance of Amendment Nos. 239 and 240 RE: Revising Technical Specification 3.2.1, Heat Flux Hot Channel Factor (FQ(Z)), to Implement Methodology from WCAP-17661, Revision 1 (EPID: L-2020-LLA-0200), dated September 2, 2021 (ML21160A174)
- 3. PG&E Letter DCL-20-092, "License Amendment Request 20-03,
'Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition,'" dated December 3, 2020 (ML20338A546)
Remove Insert
- Enclosure 1, Page 11
- Enclosure 1, Page 21 Reference 1, Enclosure, Attachment 1 [Proposed Facility Operating Enclosure 1, License Changes (DPR-80 and DPR-82) - Markups (22 Pages)], Page 32 Diablo Canyon - Unit 1, Page 3, includes License Conditions 2.C.(1) through 2.C.(3)
Reference 1, Enclosure, Attachment 1 [Proposed Facility Operating Enclosure 1, License Changes (DPR-80 and DPR-82) - Markups (22 Pages)], Page 42, Diablo Canyon - Unit 2, Page 3, includes License Conditions 2.C.(1) through 2.C.(4).a Note 1 - The title pages are being updated to remove reference to the term "operating."
This is an administrative change that updates the title pages to more align with a decommissioning facility.
Note 2 - On September 2, 2021, the NRC issued License Amendments 239 and 240 to Facility Operating Licenses DPR-80 and DPR-82, respectively (Reference 2). The implementation of these License Amendments are reflected in license condition 2.C.(2),
but have not yet been implemented at the facility. The changes to the technical specifications (TSs) included in License Amendments 239 and 240 have no impact on the proposed deletion of TS 3.2.1 and TS 5.6.5 proposed in Reference 3.
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DOCKET N0. 50-275 FACILITY OPERATING LICENSE License No. DPR-80 DIABLO CANYON - UNIT 1
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 DOCKET N0. 50-323 FACILITY OPERATING LICENSE License No. DPR-82 DIABLO CANYON - UNIT 2
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
Deleted per Amendment No. ###.
(2) Permanently Defueled Technical Specifications The Permanently Defueled Technical Specifications contained in l
Appendix A and the Environmental Protection Plan contained in Appendix l
B, as revised through Amendment No. 239###, are hereby incorporated in the license. Pacific Gas & Electric Company shall operatemaintain the facility in accordance with the Permanently Defueled Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Initial Test Program The Pacific Gas and Electric Company shall conduct the post-fuel-loading initial test program (set forth in Section 14 of Pacific Gas and Electric Company's Final Safety Analysis Report, as amended), without making any major modifications of this program unless modifications have been identified and have received prior NRC approval. Major modifications are defined as:
- a. Elimination of any test identified in Section 14 of PG&E's Final Safety Analysis Report as amended as being essential;
- b. Modification of test objectives, methods, or acceptance criteria for any test identified in section 14 of PG&E's Final Safety Analysis Report, as amended, as being essential;
- c. Performance of any test at a power level different from that described in the program; and
- d. Failure to complete any test included in the described program (planned or scheduled for power levels up to the authorized power level).
Deleted per Amendment No. ###.
DIABLO CANYON - UNIT 1
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level The Pacific Gas and Electric Company is authorized to operate the facility at reactor core power levels not in excess of 3411 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
Deleted per Amendment No.###.
(2) Permanently Defueled Technical Specifications (SSER 32, Section 8)
- and Environmental Protection Plan The Permanently Defueled Technical Specifications contained in l Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. ###240, are hereby l incorporated in the license. Pacific Gas & Electric Company shall operatemaintain the facility in accordance with the Permanently Defueled l Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Initial Test Program (SSER 31, Section 4.4.1)
Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.
Deleted per Amendment No. ###.
(4) Fire Protection
- a. PG&E shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c), as specified in the PG&E amendment request dated June 26, 2013, as supplemented by letters dated October 3, 2013, September 29, 2014, October 27, 2014, October 29, 2014, November 26, 2014, and December 31, 2014, February 25, 2015 (two letters), May 7, 2015, October 15, 2015, and December 31, 2015; and January 28, 2016, and as approved in the safety evaluation dated April 14, 2016. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c),
and provided no other regulation, technical specification, license condition or requirement would require prior NRC approval, PG&E may make changes to the Fire Protection Program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
DIABLO CANYON - UNIT 2
PG&E Letter DCL-22-001 Enclosure 2 Diablo Canyon Power Plant - Units 1 and 2 Replacement Pages to Clean Copy of Facility Operating Licenses
Reference:
- 1. PG&E Letter DCL-21-019, "Supplement to License Amendment Request 20-03, 'Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition,'" dated April 1, 2021 (ML21091A069)
Remove Insert
- Enclosure 2, Page 1
- Enclosure 2, Page 2 Reference 1, Enclosure, Attachment 2 [Proposed Facility Operating Enclosure 2, License Changes (DPR-80 and DPR-82) - Clean (11 Pages)], Diablo Page 3 Canyon - Unit 1, Page 3, includes License Conditions 2.C.(1) through 2.C.(7)(3)
Reference 1, Enclosure, Attachment 2 [Proposed Facility Operating Enclosure 2, License Changes (DPR-80 and DPR-82) - Clean (11 Pages)], Diablo Page 4 Canyon - Unit 2, Page 3, includes License Conditions 2.C.(1) through 2.C.(13)
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DOCKET N0. 50-275 FACILITY LICENSE License No. DPR-80 DIABLO CANYON - UNIT 1
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 DOCKET N0. 50-323 FACILITY LICENSE License No. DPR-82 DIABLO CANYON - UNIT 2
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Deleted per Amendment No. ###.
(2) Permanently Defueled Technical Specifications The Permanently Defueled Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. ###, are hereby incorporated in the license. Pacific Gas & Electric Company shall maintain the facility in accordance with the Permanently Defueled Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Deleted per Amendment No. ###.
(4) Deleted per Amendment No. ###.
(5) Deleted per Amendment No. ###.
(6) Deleted per Amendment No. ###.
(7) Seismic Design Bases Reevaluation Program (SSER 27 Section IV.5)
PG&E shall develop and implement a program to reevaluate the seismic design bases used for the Diablo Canyon Nuclear Power Plant.
The program shall include the following Elements:
(1) PG&E shall identify, examine, and evaluate all relevant geologic and seismic data, information, and interpretations that have become available since the 1979 ASLB hearing in order to update the geology, seismology and tectonics in the region of the Diablo Canyon Nuclear Power Plant. If needed to define the earthquake potential of the region as it affects the Diablo Canyon Plant, PG&E will also reevaluate the earlier information and acquire additional new data.
(2) PG&E shall reevaluate the magnitude of the earthquake used to determine the seismic basis of the Diablo Canyon Nuclear Plant using the information from Element 1.
(3) PG&E shall reevaluate the ground motion at the site based on the results obtained from Element 2 with full consideration of site and other relevant effects.
DIABLO CANYON - UNIT 1
C. This License shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Deleted per Amendment No. ###.
(2) Permanently Defueled Technical Specifications (SSER 32, Section 8)
- and Environmental Protection Plan The Permanently Defueled Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. ###, are hereby incorporated in the license. Pacific Gas & Electric Company shall maintain the facility in accordance with the Permanently Defueled Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
(3) Deleted per Amendment No. ###.
(4) Deleted per Amendment No. ###.
(5) Deleted per Amendment No. ###.
(6) Deleted per Amendment No. ###.
(7) Deleted per Amendment No. ###.
(8) Deleted per Amendment No. ###.
(9) Deleted per Amendment No. ###.
(10) Deleted per Amendment No. ###.
(11) Deleted per Amendment No. ###.
(12) Deleted per Amendment No. ###.
(13) Aging Management Program If all spent fuel has not been removed from the Unit 2 spent fuel pool prior to August 26, 2029, an aging management program shall be submitted prior to this date for NRC approval. The scope of the program shall include those long-lived, passive structures and components that are needed to provide reasonable assurance of the safe condition of the spent fuel in the spent fuel pool. Once approved, the program shall be
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
DIABLO CANYON - UNIT 2