DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Cultural Resources Overview for the Diablo Relicensing Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California
From kanterella
(Redirected from ML11166A177)
Jump to navigation
Jump to search
ML11166A177 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 02/28/2009 |
From: | Peterson B, Price B A, Trumbly M Pacific Gas & Electric Co, Applied Earth Works |
To: | Office of Nuclear Reactor Regulation |
References | |
DCL-10-083 | |
Download: ML11166A177 (2) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Report
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024
[Table view]CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24305A1872024-10-31031 October 2024 OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML23130A0052023-06-27027 June 2023 Report to Congress Regarding Diablo Canyon ML22108A1662022-05-0303 May 2022 Enclosure 1 - Assessment Event Inquiry Into the Nuclear Regulatory Commission Oversight of the Auxiliary Feedwater System at Diablo Canyon Nuclear ML22108A2892022-05-0303 May 2022 Enclosure - Response to Representative Carbajal Regarding OIG Report on Diablo ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation DCL-21-071, Federally Listed Species Affects Determination Memorandum2021-10-14014 October 2021 Federally Listed Species Affects Determination Memorandum ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML20353A3972020-12-18018 December 2020 NRC Response to Public Comment Regarding Spent Fuel Canister Drop from 2019 Regcon DCL-20-102, Nuclear Material Transaction Report for New Fuel2020-12-0909 December 2020 Nuclear Material Transaction Report for New Fuel ML20335A0132020-11-30030 November 2020 NRC Response to Public Watchdogs November 2 ML20328A3012020-11-23023 November 2020 NERC Reliability Standards for the Bulk Electric System of North America Updated July 20, 2020 (Cgnp Public Comments on Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Pre-submittal Meeting of 11/24/2020) ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 ML18254A0402019-01-22022 January 2019 Staff Review of Seismic Probabilistic Risk Assessment Associated with Reevaluated Seismic Hazard Implementation of the Near Term Task Force Recommendation 2.1: Seismic DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17024A2072017-12-18018 December 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-117, Reactor Coolant System Pressure and Temperature Limits Report, Revision 152016-11-10010 November 2016 Reactor Coolant System Pressure and Temperature Limits Report, Revision 15 ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16215A1092016-08-0202 August 2016 OEDO-16-00436 - Supplemental Information from Mr. Lochbaum 10 CFR 2.206 Petition on Apparent Violation of 10 CFR 50.9 at Diablo Canyon Nuclear Power Plant ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16019A2242016-02-0101 February 2016 Record of Review, Dispositions to Diablo Canyon Nuclear Plant, Units 1 and 2, Internal Events, Internal Flooding, Seismic, and Fire PRA Facts and Observations DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List ML16048A2072015-12-15015 December 2015 Once Through Cooling 2024-06-14 Category:Technical MONTHYEARML24305A1872024-10-31031 October 2024
[Table view]OEDO-24-00083 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic CDF - Petition Supplement 10-30-2024 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage OIG-24-A-01, Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 20242023-11-0303 November 2023 OIG-24-A-01 Inspector General’S Assessment of the Most Serious Management and Performance Challenges Facing the U.S. Nuclear Regulatory Commission in Fiscal Year 2024 ML24289A0962022-03-31031 March 2022 Definition of a Probable Maximum Tsunami at the Diablo Canyon Nuclear Power Plant Site: a Historical Perspective L-22-003, Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation2022-03-0909 March 2022 Independent Spent Fuel Storage Installation - License Renewal Application for the Diablo Canyon Independent Spent Fuel Storage Installation ML20239A9562020-08-26026 August 2020 Evaluation of the Potential Piping Degradation Safety Concern on the Auxiliary Feedwater System at Diablo Canyon Unit 1 DCL-19-054, Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 12019-07-0101 July 2019 Submittal of Acceptance Report Following the Installation of Structural Weld Overlay, REP-RHR-SWOL for Unit 1 DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 22018-09-11011 September 2018 Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2 DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-72018-08-0808 August 2018 Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7 DCL-18-027, Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insight2018-04-24024 April 2018 Seismic Probabilistic Risk Assessment for the Diablo Canyon Power Plant, Units 1 & 2 - Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1: Seismic of the Near-Term Task Force Review of Insights ML17341A0652017-11-30030 November 2017 Technical Evaluation Report Diablo Canyon Nuclear Power Plant Tsunami Hazard Reevaluation Review ML17334A1052017-11-29029 November 2017 Reactor Coolant System Pressure and Temperature Limits Report ML17229B6172017-08-17017 August 2017 Flaw Evaluation of Residual Heat Removal Suction Weld Joint DCL-17-064, Plant Focused Evaluation Report for External Flooding2017-07-19019 July 2017 Plant Focused Evaluation Report for External Flooding DCL-17-049, Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint2017-05-18018 May 2017 Flaw Evaluation of Unit 2 Residual Heat Removal Suction Weld Joint DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 ML16314C6912016-11-0909 November 2016 Enclosure, Statement of the Problem Concerning PWR Primary Coolant System Pipe Rupture ML16314B0822016-11-0909 November 2016 Criteria for Protection Against Dynamic Effects Associated with a Postulated Rupture of Piping ML16287A7552016-10-0606 October 2016 Technical Assessment Implementation of Alternative Source Terms Summary of Dose Analyses and Results Revision 4 ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 ML16146A0952016-04-21021 April 2016 54006-CALC-01, Diablo Canyon Power Plant: Evaluation of Risk Significance of Permanent ILRT Extension. DCL-16-081, 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm).2016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). ML16238A1042016-03-31031 March 2016 15-0681-RTM-001, Revision 0, System Level Requirements Traceability Matrix (Rtm). DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV2016-01-15015 January 2016 Diablo Canyon, Units 1 and 2 - 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4682016-01-15015 January 2016 9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV ML16061A4642016-01-15015 January 2016 Revision 3 to 993754-11-861-NP, V&V Design Phase Summary Report Ppsi DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report2016-01-14014 January 2016 Diablo Canyon, Units 1 and 2 - Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16061A4592016-01-14014 January 2016 Revision 3 to 993754-11-854-1-NP, Protection Set I, Factory Acceptance Test Report ML16004A3542015-12-11011 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Application of Alternative Source Terms Summary of Dose Analysis & Results, Revision 1 DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report2014-12-12012 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report2014-12-12012 December 2014 Revision 0 to 993754-13-854-1-NP, Protection Set III, Factory Acceptance Test Report ML16061A4712014-12-12012 December 2014 Revision 0 to 993754-12-854-1-NP, Protection Set Ii, Factory Acceptance Report ML16061A4752014-12-12012 December 2014 Revision 0 to 993754-14-854-1-NP, Protection Set Iv, Factory Acceptance Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis2014-12-0909 December 2014 Diablo Canyon, Units 1 and 2 - Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4602014-12-0909 December 2014 Revision 9 to 993754-1-915-NP, Safety Analysis ML16061A4732014-12-0101 December 2014 Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report2014-12-0101 December 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-818-NP, Protection Set Iv, System Time Response Confirmation Report ML16061A4662014-12-0101 December 2014 Revision 0 to 993754-12-818-NP, Protection Set Ii, System Time Response Confirmation Report ML16061A4692014-12-0101 December 2014 Revision 0 to 993754-13-818-NP, Protection Set Ii, System Time Response Confirmation Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-14-854-0-NP, Protection Set Iv, Hardware Validation Test Report DCL-16-020, Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report2014-09-12012 September 2014 Diablo Canyon, Units 1 and 2 - Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report ML16061A4702014-09-12012 September 2014 Revision 0 to 993754-12-854-0-NP, Protection Set Ii, Hardware Validation Test Report 2024-05-08 |
Text
TECHNICAL REPORT Cultural Resources Overview for the Diablo Relicensing Feasibility Study, San Luis Obispo, Monterey, Fresno, Kings and Kern Counties, California Written by: Barry A. Price, Applied EarthWorks, Inc., and Maggie Trumbly, PG&E, Contributions by Bob Peterson, Applied EarthWorks, Inc.Prepared By Pacific Gas and Electric Company 5555 Florin Perkins Road, Room 100 Sacramento, California 95826 AND Applied EarthWorks, Inc.5090 N. Fruit Avenue, Suite 101 Fresno, California 93711 February 2009 Withheld from Public Disclosure Per 36 CFR 800 Protection of Historic Properties