MONTHYEARIR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment IR 05000382/20230012023-04-24024 April 2023 Integrated Inspection Report 05000382/2023001, Independent Spent Fuel Storage Installation Report 07200075/2023001, and Exercise of Enforcement Discretion ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23108A2542023-04-18018 April 2023 WCGS Information Request, Security IR 2023401 IR 05000382/20234032023-04-17017 April 2023 Security Baseline Inspection Report 05000382/2023403 ML23093A2122023-04-0303 April 2023 Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models for Calendar Year 2022 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML23059A2592023-03-0707 March 2023 Correction to Issuance to Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23065A2002023-03-0303 March 2023 EN 56252 Update - Flow Serve - Final Notification of Potential Part 21 on Peerless 56 Frame DC Motors ML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) IR 05000382/20220062023-03-0101 March 2023 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3, (Report 05000382/2022006) ML22322A1092023-02-17017 February 2023 Issuance of Amendment No. 270 Adoption of TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000382/20230902023-02-0101 February 2023 Final Significance Determination of a White Finding, NOV, and Follow-Up Assessment Letter; NRC Inspection Report 05000382/2023090 ML23032A5062023-02-0101 February 2023 Technical Specification Index and Bases Update to the NRC for the Period November 11, 2021 Through July 25, 2022 ML23030A6642023-01-27027 January 2023 Flowserve, Part 21 Second Interim Notification Report Re Peerless 56 Frame DC Motors IR 05000382/20220042023-01-26026 January 2023 Integrated Inspection Report 05000382/2022004 and Independent Fuel Storage Installation Inspection Report 07200075/2022001 ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment IR 05000382/20220912023-01-12012 January 2023 Emergency Preparedness Inspection Report 05000382/2022091 and Preliminary White Finding and Apparent Violation IR 05000382/20220032023-01-0505 January 2023 Revised Integrated Inspection Report 05000382/2022003 ML22342B1402022-12-0202 December 2022 56252-EN 56252 - Flowserve - Limitorque - Interim Report Potential Part 21 on Peerless 56 Frame DC Motors ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22332A5292022-11-29029 November 2022 Notification of NRC Initial Operator Licensing Examination 05000382/2023301 IR 05000382/20220132022-11-28028 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000382/2022013 IR 05000382/20220022022-11-0101 November 2022 Revised Integrated Inspection Report 05000382/2022002 2024-01-31
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000382/20223012022-03-28028 March 2022 NRC Examination Report 05000382/2022301 ML20307A1752020-10-19019 October 2020 NRC Examination Report 05000382/202008, ML20293A178 IR 05000382/20203012020-10-19019 October 2020 NRC Examination Report 05000382/2020301 IR 05000382/20183012018-12-14014 December 2018 NRC Examination Report 05000382/2018301 IR 05000382/20173012017-05-16016 May 2017 NRC Examination Report 05000382/2017301 IR 05000382/20153012015-11-0202 November 2015 Er 05000382/2015301; on 09/14/2015, 10/05/2015; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20143012014-05-15015 May 2014 Er 05000382-14-301; 04/02/2014 - 04/22/2014; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report IR 05000382/20123012013-01-0303 January 2013 Er 05000382-12-301, on October 1-November 19, 2012, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report W3F1-2011-0062, Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 32011-07-24024 July 2011 Preparation and Scheduling of Operator Licensing Examinations, Waterford Steam Electric Station, Unit 3 IR 05000382/20113012011-05-13013 May 2011 NRC Examination Report 05000382-11-301 IR 05000382/20103022010-11-23023 November 2010 Er 05000382/10-302, on 10/04/10 - 10/21/10; Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20103012010-05-0606 May 2010 Er 05000382-10-301 on March 16-24, 2010, Waterford Steam Electric Station, Unit 3, Initial Operator Licensing Examination Report IR 05000382/20093012009-11-16016 November 2009 Er 05000382-09-301 on 10/05/2009 - 10/27/09 for Waterford Steam Electric Station, Unit 3 IR 05000382/20083012008-05-0101 May 2008 Er 05000382-08-301 on 03/24/08 - 04/16/08 for Waterford, Unit 3; Initial Operator Licensing Examination Report ML0808102172008-03-21021 March 2008 NRC Initial Operator Licensing Operating Test) Examination Approval (05000382/08/301) W3F1-2005-0076, Preparation and Scheduling of Operator Licensing Examinations2005-10-27027 October 2005 Preparation and Scheduling of Operator Licensing Examinations ML0409200332004-03-30030 March 2004 Generic Fundamentals Section of the Written Operator Licensing Examination IR 05000382/20033012003-09-16016 September 2003 Er 05000382-03-301, on 8/22/03 Through 28/2003, for Waterford 3, Entergy Operation Inc.; Initial Operator Licensing Examinations W3F1-2002-0014, WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations2002-01-30030 January 2002 WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations 2022-03-28
[Table view] |
See also: IR 05000382/2020008
Text
October 19, 2020
Mr. John Ferrick
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION
REPORT 05000382/2020301
Dear Mr. Ferrick:
On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an initial
operator license examination at your Waterford Steam Electric Station, Unit 3. The enclosed
report documents the examination results and licensing decisions. The preliminary examination
results were discussed on August 20, 2020, with Mr. V. Ford, Operations Training
Superintendent, and other members of your staff. A telephonic exit meeting was conducted on
September 30, 2020, with Mr. J. Jarrell, Operations Manager, who was provided the NRC
licensing decisions.
The examination included the evaluation of 5 applicants for reactor operator licenses,
5 applicants for instant senior reactor operator licenses, and 3 applicants for upgrade senior
reactor operator licenses. The license examiners determined that all 13 applicants satisfied the
requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55 and the
appropriate licenses have been issued. There were no post-examination comments submitted
by your staff. The enclosure contains details of this report.
No findings were identified during this examination.
J. Ferrick 2
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for
Withholding.
Sincerely,
Gregory E. Werner
Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Docket No. 05000382
License No. NPF-38
Enclosure:
Examination Report 05000382/2020301,
w/attachment: Supplemental Information
cc w/ encl: Distribution via LISTSERV
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Number: 05000382
License Number: NPF-38
Report Number: 05000382/2020301
Enterprise Identifier: L-2020-OLL-0020
Licensee: Entergy Operations, Inc.
Facility: Waterford Steam Electric Station, Unit 3
Location: Killona, Louisiana
Inspection Dates: August 17, 2020, to September 30, 2020
Inspectors: C. Osterholtz, Chief Examiner, Senior Operations Engineer
N. Hernandez, Chief Examiner Under Instruction, Operations Engineer
M. Kennard, Senior Operations Engineer
B. Bergeon, Operations Engineer
M. Doyle, Operations Engineer
Approved By: Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Enclosure
SUMMARY
Examination Report 05000382/2020301; August 17, 2020-September 30, 2020; Waterford
Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report
The NRC examiners evaluated the competency of five applicants for reactor operator licenses,
five applicants for instant senior reactor operator licenses, and three applicants for upgrade
senior reactor operator licenses at Waterford Steam Electric Station, Unit 3.
The licensee developed the examinations using NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors," Revision 11. The written examination was
administered by the licensee on August 26, 2020. The NRC examiners administered the
operating tests on August 17-21, 2020.
The NRC examiners determined that all the applicants satisfied the requirements of
10 CFR Part 55 and the appropriate licenses have been issued.
A. NRC-Identified and Self-Revealing Findings
None.
B. Licensee-Identified Violations
None.
2
REPORT DETAILS
OTHER ACTIVITIES - INITIAL LICENSE EXAM
.1 License Applications
a. Scope
The NRC examiners reviewed all license applications submitted to ensure each
applicant satisfied relevant license eligibility requirements. The NRC examiners also
audited six of the license applications in detail to confirm that they accurately reflected
the subject applicants qualifications. This audit focused on the applicants experience
and on-the-job training, including control manipulations that provided significant reactivity
changes.
b. Findings
No findings were identified.
.2 Examination Development
a. Scope
The NRC examiners reviewed integrated examination outlines and draft examinations
submitted by the licensee against the requirements of NUREG-1021. The NRC
examiners conducted an onsite validation of the operating tests.
b. Findings
The NRC examiners provided outline, draft examination, and post-validation comments
to the licensee. The licensee satisfactorily completed comment resolution prior to
examination administration.
The NRC examiners determined the written examinations and operating tests initially
submitted by the licensee were within the range of acceptability expected for a proposed
examination.
.3 Operator Knowledge and Performance
a. Scope
On August 26, 2020, the licensee proctored the administration of the written
examinations to all 13 applicants. The licensee staff graded the written examinations,
analyzed the results, and presented their analysis to the NRC on August 27, 2020.
The NRC examination team administered the various portions of the operating tests to
all applicants on August 17-21, 2020.
3
b. Findings
No findings were identified.
All applicants passed the written examination and all parts of the operating tests. The
final written examinations and post-examination analysis may be accessed in the
ADAMS system under the accession numbers noted in the attachment. There were no
post-examination comments as indicated in the licensee submittal.
The examination team noted three generic weaknesses associated with applicant
performance on the dynamic scenario and in-plant job performance measures sections
of the operating tests. These are listed below:
1) Three of ten applicants failed to check instrument air compressor oil level at both
available indications during in-plant job performance measures.
2) Two of four crews had at least one crew member that failed to read and adhere to
turnover sheets.
3) Two of four crews demonstrated inconsistencies in action taken for inoperable
instrument channels.
These deficiencies were captured in the licensees corrective action program as
corrective action number 70 of Condition Report 2019-0315.
Post-examination analysis revealed four generic weaknesses associated with applicant
performance on the written examination.
1) Question 40 - 77 percent missed it due to applicant knowledge weakness and the
topic was alarms associated with containment spray.
2) Question 66 - 54 percent missed it due to applicant knowledge weakness and the
topic was the ability to interpret and execute procedural steps.
3) Question 92 - 63 percent missed it due to applicant knowledge weakness and the
topic was abnormal operating procedures and spent fuel pool cooling.
4) Question 97 - 75 percent missed it due to applicant knowledge weakness and the
topic was the process used to track inoperable alarms.
These deficiencies were captured in the licensees corrective action program as
corrective action number 69 of Condition Report 2019-0315.
Copies of all individual examination reports were sent to the facility training manager for
evaluation and determination of appropriate remedial training.
4
.4 Simulation Facility Performance
a. Scope
The NRC examiners observed simulator performance with regard to plant fidelity during
examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Scope
The NRC examiners reviewed examination security for examination development during
both the onsite preparation week and examination administration week for compliance
with 10 CFR 55.49 and NUREG-1021. Plans for examination security and applicant
control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
Exit Meeting Summary
The chief examiner presented the preliminary examination results to Mr. V. Ford, Operations
Training Superintendent, and other members of the staff on August 20, 2020. A telephonic exit
was conducted on September 30, 2020, between Mr. C. Osterholtz, Chief Examiner, and
Mr. J. Jarrell, Operations Manager. The licensee did not identify any information or materials
used during the examination as proprietary.
5
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
J. Jarrell, Operations Manager
V. Ford, Operations Training Superintendent
J. Mendoza, Lead Exam Developer
W. Wesley, Supervisor, Operations Training
R. Peter, Exam Writer
NRC Personnel
F. Ramirez, Senior Resident Inspector
ADAMS DOCUMENTS REFERENCED
Accession No. ML20267A212 - FINAL WRITTEN EXAMS
Accession No. ML20267A213 - FINAL OPERATING TEST
Accession No. ML20281A751 - POST-EXAMINATION ANALYSIS
Attachment
ML20293A178
x SUNSI Review: ADAMS: Non-Publicly Available x Non-Sensitive Keyword:
By: NAH x Yes No x Publicly Available Sensitive NRC-002
OFFICE SOE:OB OE:OB SOE:OB OE:OB OE:OB
NAME COsterholtz CO NHernandez NH MKennard MK BBurgeon BB MDoyle MD
DATE 10/07/2020 10/07/2020 10/08/2020 10/13/2020 10/13/2020
OFFICE C:PBD C:OB
NAME JDixon JD GWerner GW
DATE 10/19/2020 10/19/2020