ML16154A165

From kanterella
Jump to navigation Jump to search
Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report
ML16154A165
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/27/2016
From: Gerfen P A
Pacific Gas & Electric Co
To: Robertson J M
Office of Nuclear Reactor Regulation, State of CA, Central Coast Regional Water Quality Control Bd
References
DCL-2016-518
Download: ML16154A165 (2)


Text

m Pacific Gas tBJtJBd Electric Comparay


PG&E Letter DCL-2016-518 April 27, 201e,. John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 PG&E Diablo Canyon Power Plant (DCPP) Receiving*Water Monitoring Program 2.015 Annual Report Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2015 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2015. Per prior agreement, no analysis or interpretation of the data was performed.

Tables in the appendices provide summary statistics for each program task. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or th<;>se persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility.of fine and imprisonment for knowing violations.

If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Bryan Cunning.ham at (805) 545-4439.

Paula A. Gerfen {) Station Director-Diab/a Canyon Power Plant 2016518/jlk/bkc Enclosure (1)

PG&E Letter DCL-2016-518 John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board April27,2016 . Page 2 cc w/enclosure:

PDF Formatted Electronic File Copy: Regional Administrator, Region 9 U.S. Environmental Protection Agency .75 Hawthorne Street San Francisco, CA 94105 Attention:

Water Division California Department of Fish and Wildlife Marine Region 20 Lower Ragsdale Drive,' Suite 100 Monterey, CA 93940 Hardcopy Format: U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 John Reynoso NRC Acting Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 m Pacific Gas tBJtJBd Electric Comparay


PG&E Letter DCL-2016-518 April 27, 201e,. John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 PG&E Diablo Canyon Power Plant (DCPP) Receiving*Water Monitoring Program 2.015 Annual Report Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 Electronic Submission PDF Formatted File Enclosed is a copy of the Receiving Water Monitoring Program (RWMP) 2015 Annual Report for DCPP. This report presents the physical and biological data collected in the RWMP during 2015. Per prior agreement, no analysis or interpretation of the data was performed.

Tables in the appendices provide summary statistics for each program task. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.

Based on my inquiry of the person or persons who manage the system, or th<;>se persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility.of fine and imprisonment for knowing violations.

If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Bryan Cunning.ham at (805) 545-4439.

Paula A. Gerfen {) Station Director-Diab/a Canyon Power Plant 2016518/jlk/bkc Enclosure (1)

PG&E Letter DCL-2016-518 John M. Robertson, Executive Officer Central Coast Regional Water Quality Control Board April27,2016 . Page 2 cc w/enclosure:

PDF Formatted Electronic File Copy: Regional Administrator, Region 9 U.S. Environmental Protection Agency .75 Hawthorne Street San Francisco, CA 94105 Attention:

Water Division California Department of Fish and Wildlife Marine Region 20 Lower Ragsdale Drive,' Suite 100 Monterey, CA 93940 Hardcopy Format: U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 John Reynoso NRC Acting Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511