Mid-Cycle Performance Review and Inspection Plan - Davis-Besse Nuclear Power Plant
ML102440198
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/01/2010
From: West K S
Division Reactor Projects III
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML102440198 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010

Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company

Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Allen:

On August 4, 2010, the NRC staff completed its mid-cycle performance review of the Davis-Besse Nuclear Power Station. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Overall, Davis-Besse operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRC's Action Matrix, based on one finding associated with the Emergency Preparedness Cornerstone being classified as having low-to-moderate safety significance (White). This White finding, from the fourth quarter of 2009, involved your failure to classify an actual Alert in a timely manner during a June 2009 switchyard event. This finding caused Davis-Besse to transition from the Licensee Response column to the Regulatory

Response column in the fourth quarter of 2009.

On March 29, 2010, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White finding. The supplemental inspection was performed during the week of August 16, 2010, in accordance with Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." In addition to this supplemental inspection, we plan to conduct reactor oversight program (ROP) baseline inspections at Davis-Besse.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

B. Allen

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA by Gary L. Shear for/

Steven West, Director

Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ

Inspection / Activity Plan Page 1 of 2 08/26/2010 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse ISFSI-ISFSI INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2010 10/31/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 09/13/2010 09/17/2010 1 IP RETS/ODCM Radiological Effluent 71151-PR01 09/13/2010 09/17/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/15/2010 11/19/2010 1 IP Reactor Coolant System Activity 71151-BI01 11/15/2010 11/19/2010 BI OL-LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2 1 IP Licensed Operator Requalification Program 7111111B 11/15/2010 11/19/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 12/13/2010 12/17/2010 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/13/2010 12/17/2010 1 IP Occupational ALARA Planning and Controls 71124.02 12/13/2010 12/17/2010 1 IP Occupational Exposure Control Effectiveness 71151-OR01 12/13/2010 12/17/2010 BI ENG-MODIFICATIONS / 50.59 INSPECTION 1 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/10/2011 01/28/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/24/2011 01/28/2011 1 IP Occupational Dose Assessment 71124.04 01/24/2011 01/28/2011 1 IP Reactor Coolant System Activity 71151-BI01 01/24/2011 01/28/2011 STRIKE-STRIKE CONTINGENCY - CLERICAL 2 1 IP Licensee Strike Contingency Plans 92709 02/01/2011 03/10/2011 BI PI&R-BIENNIAL PI&R INSPECTION 4 1 IP Identification and Resolution of Problems 71152B 02/14/2011 03/04/2011 RENEWAL-LICENSE RENEWAL 71002 4 1 IP License Renewal Inspection 71002 04/25/2011 05/13/2011 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION 2 1 IP Exercise Evaluation 7111401 05/09/2011 05/13/2011 1 IP Drill/Exercise Performance 71151-EP01 05/09/2011 05/13/2011 1 IP ERO Drill Participation 71151-EP02 05/09/2011 05/13/2011 1 IP A lert & Notification System 71151-EP03 05/09/2011 05/13/2011 BI ENG-TRIENNIAL HEAT SINK INSPECTION 1 1 IP Heat Sink Performance 7111107T 06/20/2011 06/24/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 08/26/2010 Report 22 09/01/2010

-12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Davis-Besse HEAD-HEAD REPLACEMENT INSPECTION 1 1 IP Reactor Vessel Head Replacement Inspection 71007 07/01/2011 11/30/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/08/2011 08/12/2011 1 IP Occupational ALARA Planning and Controls 71124.02 08/08/2011 08/12/2011 1 IP Occupational Exposure Control Effectiveness 71151-OR01 08/08/2011 08/12/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiation Monitoring Instrumentation 71124.05 09/12/2011 09/16/2011 1 IP RETS/ODCM Radiological Effluent 71151-PR01 09/12/2011 09/16/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Environmental Monitoring Program 71124.07 10/17/2011 10/21/2011 STRIKE-STRIKE CONTINGENCY - OPS/MAINT/RP 2 1 IP Licensee Strike Contingency Plans 92709 10/15/2011 11/15/2011 0L PREP-INITIAL EXAM FOR DECEMBER 2011 2 1 OL - INITIAL EXAM - AUG 2011 - DAVI W90244 11/14/2011 11/18/2011 BI OL-BIENNIAL REQUAL PROGRAM INSPECTION 2 1 IP Licensed Operator Requalification Program 7111111B 11/14/2011 11/18/2011 OL EXAM-DAVIS-BESSE INIT EXAM - 08/2011 2 1 OL - INITIAL EXAM - AUG 2011 - DAVI W90244 12/05/2011 12/16/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

B. Allen

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Jamnes Cameron at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA by Gary L. Shear for/

Steven West, Director

Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis Besse Inspection/Activity Plan cc w/encl: Distribution via ListServ

DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\Davis Besse 2010 MOC Letter.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII NAME AGarmoe:dtp JCameron SWest*GLS for DATE 08/18/10 08/19/10 08/20/10 OFFICIAL RECORD COPY

Letter to B. Allen from S. West dated September 1, 2010.

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION

Susan Bagley

RidsNrrDorlLpl3-2 RidsNrrPMDavisBesse Resource RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource