MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Inspection Plan
MONTHYEARML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) ML23005A1732023-01-0909 January 2023 Notification of Commercial Grade Dedication Inspection IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) ML22019A0412021-12-29029 December 2021 RFI ML21230A3902021-09-0101 September 2021 DC Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21229A2242021-08-17017 August 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000275/2021004 and 05000323/2021004) and Request for Information ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21069A2102021-03-12012 March 2021 Notification of Inspection (NRC Inspection Report 05000275/2021002, 05000323/2021002) and Request for Information IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) ML21061A3302021-02-25025 February 2021 Request for Information: Diablo Canyon Power Plant, Dated January 6, 2021; IR 05000275/323/2021-001 Occupational Radiation Safety Inspection - 2, 4 ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information IR 05000275/20200052020-09-0101 September 2020 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005) ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20055E1082020-03-0303 March 2020 DC 2019006 Annual Assessment Letter IR 05000275/20190052019-08-30030 August 2019 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2, Report 05000275/2019005 and 05000323/2019005 IR 05000275/20180062019-03-0404 March 2019 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018006 and 05000323/2018006) ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) IR 05000275/20170062018-03-0101 March 2018 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006) IR 05000275/20170052017-08-28028 August 2017 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017005 and 05000323/2017005) ML17243A3022017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 IR 05000275/20160062017-03-0101 March 2017 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016006 and 05000323/2016006) ML17037D1232017-02-0606 February 2017 Notification of Inspection (NRC Inspection Report 05000275/2017002; 05000323/2017002) and Request for Information ML16239A2532016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2016401 and 05000323/201640) IR 05000275/20150062016-03-0202 March 2016 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015006 and 05000323/2015006) IR 05000275/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2015401 and 05000323/2015401) IR 05000275/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015005 and 05000323/2015005) IR 05000275/20140012015-03-0404 March 2015 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2, (Report 05000275/2014001 and 05000323/2014001) IR 05000275/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2014402 and 05000323/2014402) IR 05000275/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2014006 and 05000323/2014006) IR 05000275/20130012014-03-0404 March 2014 IR 05000275-13-001 & 05000323-13-001, 02/12/2014, Diablo Canyon, Unit 1 & 2, Annual Assessment Inspection Plan ML13246A2882013-09-0303 September 2013 Midcycle Assessment Letter 2013 ML13206A1892013-07-25025 July 2013 IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection IR 05000275/20128012013-03-0404 March 2013 Annual Assessment Letter for Diablo Canyon Power Plant Units 1 & 2 (IR 05000275-12-801 and 05000323-12-801) ML13032A3142013-02-0101 February 2013 IR 05000275-13-007, 05000323-13-007, on 05/20/2013, Diablo Canyon - Notification of NRC Component Design Bases Inspection and Initial RAI IR 05000275/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant (05000275/2012006, 05000323/2012006) IR 05000275/20120012012-03-0505 March 2012 Annual Assessment Letter for Diablo Canyon Power Plant - Units 1 and 2 (Report 05000275/2012001 and 05000323/2012001) ML1124401692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant - Units 1 and 2 ML1029503242010-10-21021 October 2010 Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005 ML1024403362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant IR 05000275/20100012010-03-0303 March 2010 Annual Assessment Letter - Diablo Canyon Power Plant (NRC IR 05000275-10-001 and 05000323-10-001 ML0924001372009-09-0101 September 2009 Midcycle Assessment IR 05000275/20090012009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan 2008 (NRC Inspection Reports 05000275-09-001 and 05000323-09-001) 2023-09-06
[Table view] |
See also: IR 05000275/2013004
Text
July 25, 2013
Mr. Edward D. Halpin
Senior Vice President and
Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION (05000275/2013004
AND 05000323/2013004)
AND REQUEST FOR INFORMATION
Dear Mr. Halpin
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV staff will conduct a triennial heat sink performance inspection at your Diablo Canyon Power
Plant. The inspection will be comprised of two reactor inspectors from the NRC Region IV office. The inspection will be conducted in accordance with NRC Inspection Procedure
71111.07, "Heat Sink Performance." The schedule for the inspection is as follows:
Onsite Inspection Dates: September 9 - 12, 2013
Experience has shown that this
inspection is resource intens
ive both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to
be provided by August 26, 2013. We request, that during the onsite inspection week, you ensure that copies of analyses, evaluations, or
documentation regarding the implementation and m
aintenance of your heat exchanger program are available. Of specific interest are those documents that establish that your heat exchanger
program satisfies NRC regulatory requirement
s and conforms to applicable NRC guidance. Also, appropriate personnel knowledgeable of safety-related heat exchangers should be
available to support the inspector at the site during the inspection.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
E. Halpin - 2 -
We have discussed the schedule for this inspection activity with your staff and understand that our regulatory contact for this inspection will be Mike McCoy of your licensing organization. If
there are any questions about this inspection or the material requested, please contact the
inspectors, Wayne Sifre, at 817-200-1193
or by e-mail at Wayne.Sifre@nrc.gov, or Christie Hale at 650-479-5434 or e-mail at Christie.Hale@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Offi
ce of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electr
onically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 05000275, 05000323
License Nos.: DPR-80; DPR-82
Enclosure: Triennial Heat Sink Performance Inspection Request for Information
cc: Electronic Distribution for Diablo Canyon Power Plant
ML13206A189
SUNSI Review Complete Initials: WCS Non-Sensitive
Sensitive Publicly Available Non-Publicly Available SRI:EB1 RI:EB1 C:EB1 WSifre CHale TFarnholtz /RA/ /RA/ /RA/ 7/24/13 7/25/13 7/25/13
- 1 - Enclosure
Request for Information
Triennial Heat Sink Performance Inspection Diablo Canyon Power Plant
Inspection Report: 05000275/2013004, 05000323/2013004
Inspection Dates: September 9 - 12, 2013
Inspection Procedure: IP 71111.07, Triennial "Heat Sink Performance"
Inspectors: Wayne Sifre, Senior Reactor Inspector
Christie Hale, Reactor Inspector
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format (Certrec IMS preferred), to the attention of Wayne Sifre, by August 26, 2013. The inspector will select specific items from t
he information requested below and then request from your staff additional documents needed during the onsite inspection week. Also, we request that you categorize the documents in your response with the numbered list below. Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the lead inspector as soon as possible.
The following heat exchangers/heat sinks have been selected for inspection:
- Safety Injection Pump Lube Oil and Seal Water Coolers (2-2, 2-2A/B, 2-1, 2-1A/B)
- Spent Fuel Pit Heat Exchanger (HX 2-1)
For all Generic Letter 89-13 exchangers
- 1. List of corrective action program documents (with a short description) associated with Generic Letter 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
exchanger cavitation, or heat exchanger testing, in the previous three years
2. System health report(s) and maintenance rule system notebooks for all the Generic
Letter 89-13 heat exchangers
3. Copy of any self-assessments done on any Generic Letter 89-13 heat exchangers in the
previous three years
4. Copies of any procedures developed to implement the recommendations of Generic Letter 89-13, e.g., the Generic Letter 89-13 Heat Exchanger Program description
5. Copies of any commitments to the Generic Letter 89-13 program
- 2 - Enclosure
For the specific heat exchangers selected:
Testing Documents
6. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested
7. Instrument uncertainties of the instruments used during testing
8. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the
selected heat exchangers
9. Documents that show the as-found results are recorded, evaluated, and appropriately dispositioned such that the as-left condition is acceptable
Cleaning Documents
10. The cleaning and inspection maintenance schedule for each heat exchanger for the next
five years
11. Copy of the document describing the inspection results for the last two cleaning and inspection activities completed on each heat exchanger
12. Cleaning procedures with acceptance criteria for the selected heat exchangers
13. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results
14. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
Design Documents
15. Copies of the design basis documents and updated final safety analysis report pages for the selected heat exchangers
16. Provide a list of calculations with a description which currently apply to each heat
exchanger
17. Copies of vendor data sheets and design basis data for the selected heat exchangers
18. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers
19. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria)
20. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping
- 3 - Enclosure
21. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number
of tubes which can be plugged in each heat exchanger
22. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
For the ultimate heat sink or safety-related service water system:
23. Dam inspections that monitor the integrity of the ultimate heat sink (if applicable)
24. Copies of calculations and surveillances that determine the ultimate heat sink reservoir capacity and heat transfer capability (if applicable)
25. Copies of any design changes performed on the ultimate heat sink or safety-related service water system
26. Copies of procedures for a loss of ultimate heat sink or safety-related service water system 27. Copies of inspections and/or maintenance related to macrofouling (silt, mussel shells, debris, etc.) and aquatic life
28. Copies of inspections and/or maintenance related to preventing biotic fouling
29. Copies of procedures and/or test results to survey or monitor interface valves between the safety-related section of the service water system and the nonsafety related section
30. Copy of the most recent service water flow balance test results, both as-found and as-
left 31. History of any thru-wall pipe leaks on the safety-related service water system
Inspector Contact Information:
Wayne C. Sifre Christie Hale
Senior Reactor Inspector Reactor Inspector
817-200-1193 650-479-5434
Wayne.Sifre@nrc.gov Christie.Hale@nrc.gov
Mailing Address:
U.S. NRC, Region IV Attn: Wayne C. Sifre
1600 East Lamar Blvd.
Arlington, TX 76011-4511