PR EPAR ED BY FLORIDA POWER&LIGHT COMPANY 700 UNIVERSE BLVD JUNO BEACH'LORIDA 33408 ST LUCIE NUCLEAR POWER PLANT UNIT NO.2 10 MILES SOUTH OF FT.PIERCE ON A1A FT.PIERCE, FLORIDA 33450 1986 INSERVICE INSPECTION

SUMMARY

REPORT COMMERCIAL SERVICE DATE: 8 AUGUST 1983 sosli4oi ie alii so PDR ADQCK 05QQQ389 ,8...PDR)1

~.I'P IL FORM NIS-1 OWNERS'ATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules page 1 of 18 l.Owner Florida Power and Li ht Co.700 Universe Blvd Mia Fl (Name and address of Owner)St.Lucie Nuclear Power Plant 2.Plant 10 MILES SOUTH OF FT.PIERCE ON AlA Ft.Pierce FL 33450 (Name and address of Plant)3.Plant Unit 2 4.Owner Certificate of Authorization (if required)~N A 5.Commercial service date 8 AUGUST 1983 6.National Board Number for Unit~N A 7.Components Inspected Component or Appurtenance RPV VESSEL PRESSUR IZER Manufacturer or Installer COMBUSTION ENG.COMBUSTION ENG Manufacturer or Installer Serial No.71172 71372 State or Province Number N A N A National Board Number N/A N A STM.GEN.2A 2B MAIN REACTOR COOLANT REACTOR COOLANT COMBUSTION ENG.EBASCO FPL 71272-1 71272-2 N/A N/A N A N/A N/A N/A 22227 22228 N/A N/A SAFETY IN JECTION EBASCO/FPL N/A N/A N/A CVCS FPL N/A N/A N/A MAIN STEAM FEEDWATER FPL FPL N A N/A N A N/A N A N/A SAFETY IN JECT ION FPL N/A N A N A Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1)size is 8 1/2 in.x ll in., (2)information in items 1 through 6 on this data report is included on each sheet, and (3)each sheet is numbered and the number of sheets is recorded at the top of this form.

t l l*~n U'4'lF i k'k NIS-1 REPORT CONTINUED page 2 of 18 S.Examination Dates 4-5-1986 to 6-1-1986 9.Inspection Period Identification from 0 YEARS to 3 1 3 YEARS 10.Inspection Interval Identification from 8-8-83 to 8-8-93 11.Applicable Edition of Section XI 1980 Addenda W-1980 12.Date/Revision of Inspection Plan~5/10 85 Rev.l 13.Abstract of Examination.

Include a list of examinations and a statement concerning status of work required for inspection program.The Inservice Examinations (ISI)of selected Class I,II components of Florida Power and Light Company's (FPL)ST.LUCIE PLANT (PSL), UNIT NO.2, was performed during the refueling outage which began on 5 APRIL 1986.These examinations constitute the SECOND OUTAGE of the FIRST 40 MONTH PERIOD OF COMMERCIAL OPERATION.

The components were selected in accordance with ST.LUCIE LONG-TERM PLAN which was prepared to meet the requirements of SECTION XI of the AMERICAN SOCIETY of MECHANICAL ENGINEERS BOILER and PRESSURE VESSEL CODE" RULES FOR INSERVICE INSPECTION OF NUCLEAR POWER PLANT COMPONENTS," 1980 EDITION with ADDENDA through WINTER 1980.Manual Ultrasonic, Liquid Penetrant, Magnetic Particle and Visual techniques were used in the performance of the Inservice Inspection Examinations.

Mechanized Ultrasonic examination techniques were used in the RPV Nozzle examinations.

Eddy Current examination were conducted from ll April 1986 to 3 May 1986 on steam generators 2A and 2B.These examinations were performed by Combustion Engineering.

8,233 tubes were examined on S/G 2A and 8,276 tubes were examined on S/G 2b.See attached NIS-BB report for summary of examination results.The snubber visual examinations and functional testing was conducted in accordance with the requirements of St.Lucie Plant Technical Specifications.

These examinations were performed by Paul-Munroe Energy Services.The System Pressure test's were conducted in accordance with plant procedures.

CLASS I NIS-1 REPORT CONTINUED page 3 of 18 Representative samples of the following components and areas were examined with nondestructive testing (NDE)techniques REACTOR PRESSURE CLOSUR E HEAD PRESSURIZER STEAM GENERATORS REACTOR COOLANT 42"-RC-201 30"-RC-103 30"-RC-107 30"-RC-109 30"-RC-112 30"-RC-115 30"-RC-1501 30"-RC-401 3"-RC-502 3"-RC-147 2"-RC-149 VESSEL 2A AND 2B SAFETY INJECTION 12"-SI-501 10"-SI-130 10"-SI-378 10"-SI-4205 6"-SI-151 6"-SI-518 3"-SI-191 3"-SI-9 CHEMICAL 6 VOLUME 2"-CH-146 2"-CH-347 2"-CH-147 2"-CH-145 CLASS II MAIN STEAM 36"-MS-52 34"-MS-28 35.5"-MS-1 CONTAINMENT SPRAY 24"-CS-1-1 24"-CS-41 14"-CS-7-3.

14"-CS-6-1 12"-CS-14 FEEDWATER 18"-BF-51 18"-BF-52 20"-BF-55 20"-BF-14 SAFETY INJECTION 24"-SI-504 24"-SI-2407 12"-SI-407 12"-SI-406 12 M-SI-459 12"-SI-4203 10"-SI-362 10"-SI-472 6"-SI-113 6"-SI-146 6"-SI-110 14.Abstract of Results of Examinations:

This section of the report provides a summary of the NDE examinations performed.

NIS-1 REPORT CONTINUED page 4 of 18 A.EXAMINATION

SUMMARY

CLASS I ZONE 1 REACTOR VESSEL Mechanized Ultrasonic examination of the Reactor Pressure Vessel was performed by Nuclear Energy Services, Inc.The examinations conducted from the inside surface were as follows: The outlet nozzles at 0 and 180 degrees, the inner radius sections at 0 and 180 degrees, the outlet nozzle to extension piece at 0 and 180 degrees, and the extension to pipe weld at 0 and 180 degrees.In addition to the Mechanized examinations FPL conducted manual examinations of the upper shell to flange weld, and the threads in the base material flange surface.Results of the mechanized examinations can be found in Nuclear Energy Services Final Report, Document no.83A2843.ZONE 2 RPV CLOSURE HEAD All (4)four peel.segments welds were examined by ultrasonic examination techniques.

No Recordable indications were noted.ZONE 3 STEAM GENERATOR 2A Twenty-one (21)examinations were conducted.

Three (3)geometric reflectors were noted due to the inside inner radius section.During the visual examination of studs some dents were noted.ZONE 6 RCS LOOP A HOT LEG Six (6)examinations were conducted.

No Recordable indications were noted.ZONE 8 RCS LOOP A STEAM GENERATOR TO REACTOR COOLANT PUMP Five (5)examinations were conducted.

No recordable indications were noted.ZONE 10 RCS LOOP B STEAM GENERATOR TO REACTOR COOLANT PUMP Three (3)examinations were conducted.

No Recordable indications were noted.

NIS-1 REPORT CONTINUED page 5 of 18 ZONE 11 RCS LOOP B,REACTOR COOLANT PUMP TO REACTOR VESSEL Six (6)examinations were conducted.

One (1)Recordable indication was noted, determined to be acceptable.

ZONE 12 RCS LOOP A STEAM GENERATOR TO REACTOR COOLANT PUMP Three (3)examinations were conducted.

No Recordable indications were noted.ZONE 17 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway wa's examined as required by R.G.1.14.No recordable indications noted.ZONE 18 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway was examined as required by R.G.1.14.No recordable indications noted.ZONE 19 REACTOR COOLANT PUMP FLYWHEEL The flywheel bore and keyway was examined as required by R.G.1.14.No recordable indications noted.ZONE 20 REACTOR COOLANT PUMP FLYWHEEL\THE FLYWHEEL BORE AND KEYWAY WAS EXAMINED AS REQUIRED BY R.G.1.14.NO RECORDABLE INDICATIONS NOTED.ZONE 24 SAFETY INJECTION LOOP 2B2 Three (3)visual examinations were conducted on valve bolting in place.One (1)indication was noted and determined to be acceptable.

NIS-1 REPORT CONTINUED CLASS I CONTINUED page 6 of 18 ZONE 28 LOOP B SHUTDOWN COOLING Five (5)examinations were conducted.

Three (3)rounded indications noted on the branch connection, determined to be acceptable.

ZONE 29 SHUTDOWN COOLING 8(HOT LEG INJECTION LOOP A Three (3)visual examinations were conducted.

One (1)cap screw was noted as missing, and boric acid residue was noted.ZONE 33 2A1 PRIMARY DRAIN One (1)examination was conducted.

No Recordable indications we'e noted ZONE 34 2A2 PRIMARY DRAIN One (1)examination was conducted.

Rust was noted on bolting.ZONE 35 2Bl PRIMARY DRAIN One (1)examination was conducted.

No recordable indications noted.ZONE 36 2B2 PRIMARY DRAIN One (1)examination was conducted.

Boric acid residue was noted.ZONE 37 LETDOWN LINE Two (2)examinations were conducted.

Boric acid residue was noted.

NIS-1 REPORT CONTINUED page 7 of 18 CLASS II STEAM GENERATOR 2A Four (4)examinations were conducted.

Keyway Bracket I 0 degrees, Secondary extension ring to Lower shell, Secondary extension ring to Tube sheet and Clevis bracket 9 45 degrees.Two (2)rounded indications were noted and determined to be acceptable.

ZONE 43 LPSI 2A DISCHARGE SEVEN (7)examinations were conducted, Pipe to Valve, Pipe Long Seam, Reducer to pipe and shear lugs.No Recordable indications were noted.ZONE 49 SHUTDOWN COOLING"A" Seven (7)examinations were conducted, Penetration to Pipe, Pipe Long Seam, Elbow Long Seam, Elbow to Pipe.No Recordable indications were noted.ZONE 52 SHUTDOWN COOLING Six (6)examinations were conducted, Two (2)Pipe to Elbows and associated Long Seams.No Recordable examinations were noted.ZONE 62 HIGH PRESSURE SAFETY INJECTION 2B Two (2)examinations were conducted on a Pipe to Valve Weld.No Recordable indications were noted.ZONE 63 MAIN STEAM 2A1, Eleven (ll)examinations were conducted.

No Recordable indications were noted.ZONE 64 MAIN STEAM 2Bl Five (5)examinations were conducted.

No Recordable indications were noted.

0 t't\~Cl V 0/1~4 I NIS-1 REPORT CONTINUED page 8 of 18 ZONE 65 MAIN STEAM PA Four (4)examinations were conducted.

No Recordable indications were noted.ZONE 67 MAIN FEEDWATER 2A1 Three (3)examinations were conducted and Augmented examinations were also conducted as a follow up of IGE Bulletin 79-13"CRACKING IN FEEDWATER SYSTEM PIPING".FP&L conducted 100 8 ultrasonic examination of base metal from the nozzle ramp out to a point one pipe diameter upstream of the pipe to elbow weld on the horizontal run.(applicable to Zones 67&Zone 68)Two (2)geometric reflectors were noted, one from the counterbore and one from a redirected shear wave.ZONE 68 MAIN FEEDWATER 2Bl Two (2)examinations were conducted and Augmented examinations as described in zone 67.No Recordable indications noted.ZONE 78 SHUTDOWN COOLING 2B One (1)examinations were conducted.

Radiographic examination performed on the CS pump 2B Flange to Reducer weld.No Reportable indications were noted.ZONE 79 SHUTDOWN COOLING 2B Three (3)examinations were conducted.

No Recordable indications were noted.SNUBBER'S SNUBBER EXAMINATIONS AND TESTS The program for the visual examination and functional testing were conducted in accordance with Plant technical specifications.

The results of these examinations and tests are available at the site.Twenty Eight (28)snubbers were replaced during this outage.

'0~.1 1 I pl p I C, K~~~NIS-1 REPORT CONTINUED page 9 of 18 CLASS Ii SYSTEM LEAKAGE TESTS la SYSTEM LEAKAGE TESTS The system leakage tests and visual (VT-2)examinations of class I systems prior to plant startup was performed by the plant.The system leakage was conducted during the Reactor Coolant (RCS)overpressure, and Instrumented Inspection Technique was conducted on the charging lines.The following are the results of those examinations:I 2-IPT-07 No leakage noted Reactor coolant discharge boundary 2-IPT-05 Packing Leakage Charging pump suction header 2-IPT-06 Check Valve Leaking Charging Pump discharge Header 15.Abstract of Corrective Measures All of the above conditions were dispositioned in accordance with plant procedures.

The following section of this report are presented for explanation of the summary of NDE examination tables (

SUMMARY

TABLES).The summary table, which are included in this report, provides information and results for the nondestructive examinations which were performed.

ZONE NUMBER Each specific system has been given a unique zone number, each zone number is identified in the upper left corner of the summary sheet tables.SYSTEM Also identified in the upper left hand corner of the summary sheet tables is a brief description of the system.PROGRAM ITEM NUMBER The program item number is an administrative number assigned to each weld or item for correlation purposes.

NIS-1 REPORT CONTINUED page 10 of 18 COMPONENT IDENTIFICATION AND COMPONENT DESCRIPTION I I Component identification and component description are listed in the second and th)rd column respectively.

Each component examined is identified either by listing the name of the component or by a unique coded number.ISOMETRIC NUMBER Each isometric number is listed on the top left corner of each page.NDE PROCEDURE IDENTIPICATION COLUMN The column titled procedure number lists the NDE procedure that was used for each examination.

CODE EXAM METHOD This column describes the NDE examination to be performed.

INDICATION COLUMNS The four columns under the general heading of"INDICATIONS" are"NRI","IN""GEO" AND"OTHER" These columns were used as required, and their general description is provided below.The results for the VT, MT and PT examinations are indicated by an"X" in the appropriate column to be either"NRI", or"OTHER".The term"OTHER" is used when indications are observed that do not exceed the recording requirements of the applicable procedure.

The results of the UT examinations are indicated by recording a"X" in the appropriate column to be either"NRI""IN""GEO" or"OTHER" column.In the performance of the UT examinations, the data recording level was established by the applicable NDE procedure.

10 0 1 NIS-1 REPORT CONTINUED page ll of 18"NRI" The term"NRI" (NO RECORDABLE INDICATIONS

)was applied when no indications were observed greater than the recording level."IN" The term"IN" (INSIGNIFICANT

)was applied when (1)the amplitude of any indication observed was equal to or greater than the recording level, but less than 100%of the DAC curve, and was not resolved as being relevant or (2)non-relevant indications, such as reflections due to standing wave, trapped couplant, etc."GEO%The term (GEOMETRIC) was applied when (1)indications which have an amplitude equal to or greater than 100%of the DAC curve, and have been documented to be GEOMETRIC in nature, or (2)indications that are less than 1008 of the DAC curve but were suspected by the level II examiner to be other than geometric in nature, and were determined and documented to be geometric."OTHER" The term (OTHER)indications include those indications evaluated to be other than INSIGNIFICANT or GEOMETRIC indications.

The resolution of each GEOMETRIC and OTHER indication is either documented on the indication report form or on a sheet of paper that is attached with the weld data package.REMARKS COLUMN The remarks column is used to provide additional information pertinent to the examination results.1.When complete coverage of the examination was not possible, the remarks column was used to indicate the limitation.

0 0 I e'$'j>II NIS-1 REPORT CONTINUED page 12 of 18 2.For VT,MT an/PT results, reportable in the OTHER column, a brief description is given in the remarks column.3.For UT results reported in the OTHER column, a brief description of the resolution of the indications is presented in the remarks column.4.References is made in the remarks column to CORRECTIVE ACTION REQUESTS used in reporting the indications to the plant for action.5.Augmented examinations that were performed are also identified in the remarks column.We certify that the statements made in this report are correct and the examinations meet the Inspection Plan as required by the ASME Code,Section XI.Date: 11-6-86 Signed FLORIDA POWER&LIGHT CO.By Owner Certificate of Authorization no.(if applicable)

~N A Expiration date N/A CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of OHIO and employed by ARKWRIGHT BOSTON MFGS MUTUAL INSURANCE COMPANY ofNORWOOD MASS have inspected the components described in this Owners'ata Report during the period04-05-1986 to 06-01-1986

, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners'ata Report in accordance with the requirements of the ASME Code,Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and'corrective measures described in this Owners'ata Report.Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date: 7 November 1986 FACTORY MUTUAL SYSTEM Inspector's Signature Commissions NB-7719 National Board, state, Province and No.12 0 P NIS-1 REPORT CONTINUED SUPPLEMENTAL SHEET NIS-1 page 13 of 18 l.Owner: Florida Power 6 Light Co.700 Universe Blvd.Juno Beach, Florida 33408 3.Plant Unit: 2 4.Owner Certificate of Authorization

N/A 5.Commercial Service Date: 8 AUGUST 1983 6.National Board Number for Unit: N/A 10.REPORT NUMBER ORGANIZATION MCI-PSL-RPT-86-002-2 FPL DESCRIPTION OF SERVICE INSERVICE INSPECTION FINAL REPORT EDDY CURRENT EXAMINATION OF STEAM GENERATORS IR-ISI-096 CE 2.Plant: St.Lucie Nuclear Power Plant 10 Miles South of Ft.Pierce on AlA Ft.Pierce, Florida 33450 83A2843 NES REACTOR VESSEL MECHANIZED Ul trasoni C EXAMINATION FINAL R EPOR T 13

~~C 1 t

~l~~~I FORM NIS-BB OWNERS'ATA REPORT FOR EDDY CURRENT EXAMINATION RESULTS As required by the provisions of the ASME CODE RULES PAGE 14 OF 18 EDDY CURRENT EXAMINATION RESULTS PLANT: ST LVCIE PLANT UNIT NO~2 EXAMINATION DATES: PROM 4-11-1986 THRU 5-3-1986 STEAM GENERATOR NUMBER TOTAL TUBES INSPECTED TOTAL INDICATIONS 20%TOTAL INDICATION OR=TO 20%TO 39%TOTAL INDICATION OR=TO 40%-100%TOTAL TUBES PLUGGED SG 2A SG 2B 8233 8276 48 37 30 16 18.12 LOCATION OF INDICATIONS STEAM GENERATOR SG 2A SG 2B APEX OF U-BENDS 59 30 FULL EGGCRATES 1 THRU 7 23 19 PARTIAL EGGCRATES 8 AND 9 TOP OF TUBE SHEET TO 1 DRILLED SUPPORT CERTIFICATION OF RECORD We certify that the statements in this record are correct and the tubes inspected were tested in accordance with the requirements of Section XI of the ASME Code.FLORIDA POWER&LIGHT COMPANY (Organization

)DATE 6 November 1986 BY OWNERsS DESIGNEE 14

~~

~~FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As required by the provisions of the ASME Code Section XI l.Owner: name address 2.Plant: name address FLORIDA POWER 6 LIGHT CO.700 UNIVERSE BLVD.JUNO BEACH'LORIDA 33408 ST.LUC I E POWER PLANT 10 MILES SOUTH OF FT.PIERCE ON A1A FT.PIERCE, FLORIDA 33450 Date 6 November 1986 sheet 15 of 18 Unit 2 PC/M NO.N/A repair organization P.O.No.job No., etc.3.Work Performed by: name PAUL MUNROE address 1701 W.SEQUOIA AVE.P.O.BOX 5900 ORANGE, CALIFORNIA 92668 Type Code Symbol Stamp N/A Authorization no.N/A Expiration Date N/A 4.Identification of system: SEE ATTACHED TABLES 5.(a)Applicable Construction Code N/A (b)Applicable Edition of Section XI utilized for repairs or replacements 1980 EDITION THROUGH THE WINTER 1980 ADDENDA 6.Identification of components repaired or replaced and replacement components Name of Component Name of Mfr.Mfrs.Ser.Nat'1 No.Bd.No.Crn No.Other Year Ident-Built ifica-tion Repaired Replaced or repl-acement ASME Code stamped (yes,no)MECH.SNUBBERS MECH.SNUBBER MECH.SNUBBER MECH.SNUBBER PSA PSA PSA PSA SEE ATTACHED SEE ATTACHED SEE ATTACHED SEE ATTACHED N/A N/A N/A N/A N/A N/A N/A N/A 0.25 1.00 0.50 10.0 N/A N/A N/A N/A REPLACE-MENT REPLACE-MENT REPLACE-MENT REPLACE-MENT YES YES YES YES 15

~~~I f A E\1 g~C1'C~t lj.A t.

NIS-2 REPORT CONTINUED PAGE 16 OF 18 7.Description of work: Replace twenty-eight (28)mechanical snubbers during outage 8.Tests Conducted:

Hydrostatic Pneumatic Nominal Operating Pressure Other X Pressure psig Test Temp.9.Remarks: Applicable Manufacturer's data Report's are attached NONE CERTIFICATE OF COMPLIANCE To certify that the statements made in this report are correct and this REPLACEMENT conforms to Section XI of the ASME Code.(Repair or Replacement

)Signed (wn r or Owner's Designee)BY~>'l~~~, 11-6-86 (Title)(Date)CERTIFICATE OF INSPECTION (Inspector I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of OHIO employed by Arkwri ht Boston Mf's Mutual Insurance Com an of NORWOOD MASS have inspected the REPLACEMENT described in this report on NOVEMBER 1986 and state that to the best of my knowledge and belief, this re lacement has been constructed in accordance with Section XI of the ASME Code.By signing this certificate, neither the Inspector nor his employer takes any warranty.expressed or implied, concerning the repair or replacement described in this report.Furthermore neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date ll-7-1986 Commissions FACTORY MUTUAL SYSTEM COMM.NO NB-7719 (State or Province, National Board)16

~~

NIS-2 SUPPLEMENTAL SHEET PAGE 17 OF 18 1.OWNER: FLORIDA POWER&LIGHT 700 UNIVERSE BLVD.JUNO BEACH, FLORIDA 33408 DATE: 6 November 1986 2.PLANT: ST.LUCIE POWER PLANT UNIT: 2 10 MILES SOUTH OF FT.PIERCE ON AIA, FT.PIERCEg FLA 3.WORK PERFORMED BY: Paul Munroe

SUMMARY

OF REPLACED SNUBBERS JOB NO.N/A TAG NO.2-021 2-022 2-024 2-025 2-027 2-029 2-030 2-033 2-034 2-045 2-046 2-051 2-059 2-061 2-071 2-086 2-088 2-091 2-117 2-162 2-214 2-215 2-224 2-230 2-232 2-318 2-321 2-322 MARK NO.RC58-22 RC48-R8 RC44-R7 RC35-Rll RC2-R5 RC5-R4 RC59-R2 RC18-R9 RC26-R10A CH108-R4 CH108-R8 SI4201-7368 SI4200-322B SI4200-6307 SI4208-2668 SI99-Rl SI4204-1270B BF4007-7012A SI4206-6271B RC4300-157 CH2081-147A CH2081-100A CH2081-685B CH1-R5 CH1-R3 MS4102-2828 MS50-R4 MS7-R2B SERIAL NO.24078 26319 26329 29186 29194 19071 29190 26327 24081 19100 26315 12901 29372 19069 12905 12910 20361 16442 12050 8947 14138 14137 14139 19105 19104 10168 19111 26318 MANUFACTUR ER CAPACXTY PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-0.25 PSA-1.00 PSA-10.00 PSA-0.25 PSA-10.00 PSA-0.50 PSA-0.50 PSA-0.50 PSA-0.25 PSA-0.25 PSA-10.00 PSA-0.25 PSA-0.25 LINE/COMPONENT DESCRIPTION RCP 2Bl DIFFERENTIAL PRESS.RCP 2B1 UPPER SEAL CAV.PRESS RCP 2B1 MID SEAL CAV.PRESS RCP 2B2 MID.SEAL CAV.PRESS.2B1 LETDOWN SURGE LINE SAMPLE RCP 2B2 DIFF.PRESS.RCP 2A2 MID.SEAL CAV.PRESS.RCP 2A1 MID.SEAL CAV.PRESS.CH TO LOOP 2B2 CH TO LOOP 2B2 SI TO LOOP 2A1 SI LOOP 2A2 SI TO LOOP 2A2 HPSI TO LOOP 2A SI TANKS TO RWT SI TO LOOP 2Bl FEEDWATER TO 2A S/G HPSI TO LOOP 2B PRESSURIZER RELIEF BAM PUMP SUCTION BAMT 2B OUTLET BAMT GRAVITY FEED LETDOWN LETDOWN S/G 2B OUTLET AUX FSWTR.2C TURB SUP.DRAIN 2B MS DRAIN TO CATCH BASIN 17 II~OWNERS REPORT FOR PROGRAM"B" COMPLIANCE As referenced by the provisions of the ASME Code Rules page 18 of 18 h l.Owner: Florida Power&Light Company Name 700 Universe Blvd.Address: Juno Beach, Florida 33408 Date: 6 November 1986 2.Plant: Name Address: St.Lucie Power Plant 10 Miles South of Ft.Pierce on A1A Ft.Pierce, Florida 33450 Unit No.2 3.Commercial Service Date: 8 August 1983 4.Inspection Period: from 0 years to 3 1/3 years 5.Inspection Interval Dates: 8-8-83 to 8-8-93 6.Applicable Edition of Section XI 1980, Addenda Winter 1980 7.OVERALL FIRST PERIOD PROGRAM COMPLIANCE CLASS TOTAL ITEMS SUBJECT TO EXAMINATION INTERVAL 16%34%FIRST PERIOD 8 REQUIRED TOTAL ITEMS COMPLETE FIRST PERIOD TOTAL COMPLETE FIR ST PER IOD WELDS 1 1443 454 230 72 490 154 435 113 33%40%SUPPORTS 1 TOTAL 68 120 49 2134 10 19 341 23 40 16 725 20 33 48 649 34%36%100%32%18 ZONE 01 SYSTEM REPCHR VESSEL ISO NO.501-014 ST.LU IE NK:LEAR PLANT UNIT 2 1986 SNARY REKRT TABLES CLASS 1 N>n Oct 13 1986 PPQE 1 ITEM IDENTIFICATION N).=%MBA 200 101-121 210 105-121-A 240 105-121-B 330 401-128-A 340 RC-114-1 390 401-128-B 480 T-01 TIBU T-54 400 RC-123-1 300 CN-IR-B ITEN DERE IPTION UPPER SHELL-FLANGE WKD OVPLEP NOZ"SHELL 6 0 DEG OVPLEP NOZ-SHELL 0 180 DEG OVPLEP NOZZLE EXT 9 0 DEB QJILET NOZ EXT-PIPE 0 0 DEB OUPLEP NOZ.To EXT 6 180'DREADS IN BASE MAT'L FLANGE OVP NOZ EXT-PIPE 9 180 deg.INN.RAD NE 9 180 degrees RB4ARKS QONJ WI'IH NOZ EXAM FROM THE ID SURFACE X 1 ACCP CCNJ.WITH NOZ.EXA*5CSCL-40 5.12 83A2835 83A2835 83A2836 83A2836 83A2836 NDE 5.12 83A2836 83A2836 UP-8 UP-10 UP-10*UP-6R UP-8 IA'IR UP-10 X X X X X GE)5~40 0,1.5,5.7,12.5 deg.X'X X IN OCNJ.WI'IH NOZ.EXAM EBOC CAL M)ICATICNS MEIH NO BLK tBI IN GEO OIKB ZONE 02 SYSTH4 CMSlRB HEAD ISO NO.501-102 Sr.LK.'IB NU LEAR PLANT UNIT 2 1986 SQUABBY REKRT TABLES CLASS" 1 R>n Oct 13 1986 PPQB 2 ITEM NO.IDENrIPICATION NRBZR 20 101-104-A 30 101-104-B 50 101-104-D 40: 101-104M ITEH DESCR IPTION pEEL smmr 8 0 Dm PEEL SEGMENT 6 90 degrees PEEL SEREPP 9 270 degrees PEEL SKMENT WELD 9180 EXAM EROC CAL INDICATIONS MBIH NO BLK QtI IN GE)OIHER Ur NDE 5.14 Ur-3A X Ur NDE 5.1 Ur-2 X Ur 5.14 Ur-2 x Ur M)E 5.14 Ur-2 X RBSRKS R.G.1.150 ZCNE 03 SYSTEM SIM.GEN.2A ISO NO.501-103 ST.LU IE NU LEAR PLANT WIT 2 1986 SUKQRY REPCRT TABLES CLASS 1 R>n Oct 13 1986 PPQE 3 ITEM IDnmlPICAPION NO.NMBER PZEM DESCRIPTION INDICATIONS tRI IN GEO OIHER REMARKS 150 101-244M 160 101-244-D 260 EMN-B 70 101-254-E 170 IN-IR 90 201-246 190 CN-IR-B 110 102-251-A 80 202-271 250 EMS-B 140 101-244-B 30 101-254-A 40 101-254-B 50 101-254M 180 CZI-IR-A 100 104-251 120 102"251"B 130 101-244-A 60 101-254-D 240 EMN-A 230 EMS-A EKT.RING IDNG WEXD 9 180 EXT.RING GONG WEXD 9 270 IRI.MANWAY NVIS 9112 D83 30'ERIDIONAL 9 324 INLET NOZZLE INNER RADIUS IBI.EXT.RING-IUBESHEEP OUZLEP NOZ.9 315 INNER RADIUS OVZLET NOZZLE-HEAD 9 45 PRIMARY EKT.RING-HEAD ERI.MANWAY SIUDS 9112 DES 30'KT.RING IDNG WEXD 9 90 MERIDIONAL 9 36 MERIDIONAL 9 108 MERIDImL 9 180 OUZLET NOZZLE 945 INNER RADIUS INLEP NOZZLE IO HEAD OUZLET NOZZLE'IO HEAD 9 315 EKT.RING IlNG WEXD 9 0 MERIDI(MAL 9 252 IRIMARY MANWAY 9 0 NUIS IRIMARY MANWAY 9 0 SIUDS VP VP VP-1 VP UP UP UP UZ UP VP-1 UZ UP UP UP UP UP UP UP UP VP-1 VP-1 M)E 5.1 UP-27 NDE 5.1 UP-27 NDE 4.1 N/A 800-99 UP-27 NDE 5.13 UP-2 5.1 UP-27 tSE 5.13 VP-2 5.1 UP-27 5.1 UZ 27 M)E 4.1 N/A NDE 5.1 UP-27 800-99 UP-27 5.1 UP-27 800-99 UP-27 NDE 5'3 UP-2 5.1 UP-27 5.1 UP-27 5.1 UP-27 800-99 VP-27 NDE 4.1 N/A NDE 4.1 N/A UZ 3A 0 deg.only LIMITED GEO GEO 0 deg.only LIMITED X DENTS INPLACE,R M%ED ZONE 04 SYSTEM SIN.GEN.2B ISO NO.501-104 SZ.LK.'IE NUCLEAR PLANT UNIT 2 1986 SRTQRY REKRT TABLES CLASS 1 Mon Oct 13 1986 PAGE 4 ITEM IDEÃZIPICATION NO.NR93ER 230 IMS-A 260 PQl-B 250 WS-B 240~BW-A ITEM DESCRIFZION IBIMARY MANHAY 6 0 DIG SDX8 IBI MAHHAY NUIS 6112 DEC 30'BIMARY MANHAY SIUDS 9 112 30'BIMARY MANHAY 9 0 DHr NUIS EXAM EBOC CAL INDICATIONS MEIR NO BLK NII IN GEO OILER VZ-1 NDE 4.1 N/A X DENNIS VZ-1 NDE 4.1 N/A X FROZE VZ-1 NDE 4.1 N/A X DELIS VZ-1 NDE 4.1 N/A X ZONE 06 SYSTEM RCS LOOP A HOP LEG ISO NO.501-106 ST.IlLIE NlCLEAR PLANT UNIT 2 1986 S8%ARY RERRT TABLES CLASS 1 Aw Oct 13 1986 PAGE 5 ITEM IDEÃZIPICATION NO.NEER ITEM DESCRIPTION EXAM tao CAL INDICATIONS MEIH NO BLK&I IN GEO OIIIER 31 42"WC-101-722-B 20 42"WC-101-722-A 10 42"WC-l14-1 30 42"WC-101-722-B 100 3"WC-502-77l 21 42"WC-101-722"A PIPE-IONG SEAM PIPE-IlÃG SEAM RPV NOZ.EXT.-PIPE PIPE-IONG SEAM NOZZLE'IO SAFE END PIPE-KNG SEAM UP'Pi HP MP~UF.UP~NES NDE 2.2 NDE 2.2 NDE 2.2 NDE S.ll NES UP-4A X N/A X N/A X N/A X UP-33 X UP-4A X 12" OP IONG SEAM 12" OF IDNG SEAM FROM NOZ.KRE ZN.12" OP IDNG SEAM COILS.ON ITEM 4 2l 12" OP DOG SEAM ZONE 08 SYSTEM RCS IDOP A S/&RCP ISO NO.501-108 ST.LK'.IE NU:LEAR PLANT WIT 2 1986 SASSY REKRT TABLES CLASS 1 Wn Oct 13 1986 PAGE 6 ITEM NO.40 20 21 10 30 IDBIPIFICATION NQ93ER 30"-RC-107-742-B 30"WC-1501-771-A 30"WC-1501-771-A 30"WC-115-4 30"WC-107-742-A ITEM DEKRIP1'ION ELKM-IDNG SEAM SAFE M)TO EL83W SAFE END TO ELBOH RCP 2A2 INLET'10 SAFE END ELB3W-IDNG SEAM NDE 5.3 N)E 5.11 UZ-59 NDE 5.3 UP-6CS NDE 5.3 UP-59 NDE 5.3 UP-6 X X X X X EXAM EROC CAL INDICATIONS

-MEIH NO BLK tRI IN GEO OIHER REEKS 12" OF IDNG SEAM EXCEEDS 2.4 S/M 12" OF IDNG SEAM ZONE 10 SYSTEM RC IDOP B S/&RCP ISO NO.501-110 ST.LU:IE NlLLEAR PLANT UNIT 2 1986$3%QRY REKRT TABLES CLASS 1 Wn Oct 13 1986 PAGE 7 ITEN IDENTIFICATION NO.AMBER re DESCRIPTION EXAM EROC CAL INDICATIONS NO BLK tBI IN GEO OILER 170 30"RC-121-1501-771-B ELBOW-2Bl RCP INLET SAFE END 10 30"WC-121-401-258-B S/G NOZZLE-EXT PIECE 171 30"RC-121-1501-771-B ELK%-2B1 RCP INLET SAFE END UT NDE 5.3 UT-59 X UT NDE 5.3~X UT NDE 5.3 UT-6CS X KNE 11 SYSTEM RC IMP B RC~PV ISO NO.501-111 ST.LICIE NUCLEAR PLANT UNIT 2 1986 SUhSARY REKRT TABLES CLASS 1 Non Oct 13 1986 PAGE 8 PPEM NO.ll 30 40 21 10 20 IDERPIFICATION NRBER 30"WC-121-5 30"WC-103-722-A 30"WC-103-722-B 30"-RC-901-771 30"-RC-121-5 30"WC-901-771 ITEM DERE IPTION RCP 2B2-SAFE M)PIPE-IlSG SEAM PIPE-IONG SEAN SAFE END 10 PIPE RCP 2Bl-SAFE M)SAFE BB'IO PIPE EXAM ERCX: CAL INDICATIONS MEIH NO BLK<BI IN GEO OQiER PP USE 3.3 N/A X VP NDE 5.3~X UP NDE 5.3 UP-6 X UP~NDE 5.3~X UP NDE 5.3 UP-59 UP NDE 5.3 VP-59 X 12" OF IlSG SEAN 12" OF IONG SEAN SNE 12 SYSTEM RCS ZOOP A S/~CP ISO NO.501-112 ST.LU:IE NU LEAR PLANT UNIT 2 1986 SUhi4RY RERRT TABLES CLASS 1 Wn Oct 13 1986 PPQE 9 ITEM IDENTIFICATION NO.ARGUER ITEM DEKRIPTION EXAM PRO=CAL INDICATIONS MEIN NO BLK lRI IN GEO OTHER 150 30"WC-107-742-A ELBOW-IlSG SEAN 170 30"WC-1501-771-C EUKW'IO SAFE END 171 30"WC-1501-771-C ELBOH'IO SAFE BQ UT NDE 5.3 UP-6 X UZ NDE 5.11 UT-59 X UT NDE 5.3 UT-6 X 12" OF IlbQ SEAN ZONE 17 SYSTEM RCP 2A1 ISO NO.501-117 ST.LK,'IE NUCLEAR PLANT WIT 2 1986 SURGERY REKRT TABLES CLASS 1 Ran Oct 13 1986 PAGE 10 ITEM IDENTIFICATION NO.NtHBER 80 02&1708 ITEM DEKR IPTIOH FLYNHEEL BCRE 6 KEYWAY EXAM IBO" CAL MEIH NO BIZ UI')E 5.15 N/A INDICATI(NS kRI IN GEO GIBER REMARKS R.G.1.14 RNE 18 SYSTEM RCP 2A2 ISO NO.501-118 ST.LK',IE NU'LEAR PLANT UNIT 2 1986 SPTCRY REPCRT TABLES CLASS 1 Ran Oct 13 1986 PAGE 11 ITEM IDEÃZIFICATION NO.NtMBER 80 02-018-008 ITEM DESCRIPTION FLYNHEEL BCRE&KEYWAY EXAM EROC CAL MEIT NO BLK UT NDE 5.15 N/A INDICATIONS tBI IN GEO OIHER REKRKS R.G.1.14 ZONE 19 SYSTEM RCP 2B1 ISO NO.501-119 ST.LU.IE NK,'LEAR PLANT UNIT 2 1986 SURGERY RERRT TABLES CLASS 1 Mon Oct 13 1986 PAGE 12 ITEM IDEÃZIFICATION NO.NUMBER 80 02-019-008 ITEM OESmlPrrON HYWHEEL KRE&KEMAY EXAM EROC CAL MEW NO BLK UI'.15-1 N/A INDICATIONS Qkf IN GEO OWER REMARKS R.G.1.14 ZONE 20 SYSTEM RCP 2B2 ISO NO.501-120 ST.LU:IB NU:LEAR PLANT[NIT 2 1986 SOAPILY REKRT TABLES CLASS 1 Mn Oct 13 1986 PAGE 13 ITEM IDEMIPICATION NO.NEER 80 02-020-008 ITEM DESCRIPTION ERH&OC CAL MEIH NO BLK UZ NDE 5.15 N/A M)ICATICNS tRI IN GEO OMFR X REMARKS R.G.1.14 ZCNE 24 SYSTEM SI IDOP 2B2 (IC)ISO NO.501-124 ST.LU IE NK,'LEAR PLANT UNIT 2 1986 SR@PRY REKRT TABLES CLASS 1 bk>n Oct 13 1986 PAGE 14 ITEM IDENTIFICATION NO.NUMBER 221 V-3644 51 V-3247 271 V-3261 ITEM DESCRIPTION VALVE BOLTING VALVE BOLTING VALVE BOLTING 16 SIUDS/NUIS EXAM ERCC CAL INDICATIONS MEIH NO BLK FBI IN GEO OTHER VZ-1 NDE 4.1 N/A X ACICEPT VP-1 NDE 4.1 N/A X VT-1 NDE 4.1 N/A X REMARKS W I RSE 28 SYSTEM S.C.&HLI IDOP B ISO NO.501-128 ST.LU:IE N(CLEAR PLANT UNIT 2 1986 SNARY REPCRT TABLES CLASS 1 Mon Oct 13 1986<ME 15 ITEM NO.IDENPIPICATION NUMBER ITEM DESCRIPTION EXAM EROC CAL INDICATIQ4S MEIH NO BLK lRI IN GEO OIHER 380 390 381 310 391 10"-130-EW-901 10"-SI-130-PW-902 10"-SI-130-EW-901 10"-SI-130-1-SW-6 10"-SI-130-EW-902 PIPE TO PIPE PIPE m TEE PIPE'IO PIPE 2" ERAN H C NNECTION PIPE'IO'IKE NDE 5.4 UP"37 X M)E 5.4 UP-37 X me 3.3 N/A X NDE 3.3 N/A NDE 3.3 N/A X X ACCEPT (3)RCUM)IND ZONE 29 SYSTEM S.C.&HLI IDOP A ISO NO.501-129 SF.LU IE NU LEAR PLANT UNIT 2 1986 SRlQRY REKRT TABLES CLASS 1 Mn Oct 13 1986 PAGE 16 ITEM IDENTIFICATION NO.NUMBER ITEM DERE IPTION INDICATIONS i@I IN GEO OIHER 331 V-3480 511 V-3545 441.V-3481 VALVE BOLTING VALVE BOLTING VALVE BOLTING VZ 1 NDE 4.1 N/A VT-1 NDE 4.1 N/A VP-1 NDE 4.1 N/A X X KREWS MISSING CAP SCREE X KRIC PCID LIGHT ZONE 33 SYSTEM IRIMARY IRAIN 2Al ISO NO.501-133 ST.LK:IE NU:LEAR PLANT WIT 2 1986 SR%PRY REPCRT~CLASS 1 Non Oct 13 1986 PAGE 17 ITEM IDEVPIFICATION NO.NRBER 80 2"-RC-113-FB ITEM DEKRIPTION HINGE BOLTING 8 SIU)S 16 NVIS VT-1&OC CAL NO BLK NDE 4.1 N/A INDICATI(SS tRI IN GEO OILER X O.Jp'(~r 1 ZQK 34 SYSTEM IRI.IRAIN IDOP 2A2 ISO 83.501-134 SF.LK'.IE NU LEAR PLANT UNIT 2 1986 SORRY REKRT TABLES CLASS 1 Wn Oct 13 1986 PAGE 18 ITEM IDENPIPICATION NO.NUMBER 80 2"WC-116-FB ITEM DBKR IPTION FLANGE BOLTING 8 SIU)S 16 NUTS VP-1 IBOC CAL NO BLK NDE 4.1 N/A INDICATIONS WI IN GEO OIHER X RUST ZONE 35 SYSTEM IRI.CRAIN LOOP 281 ISO NO.501-135 ST.IlCIE NU:LEAR PLANT UNIT 2 1986 SRRQRY REPCRT TABLES CLASS 1 Mon Oct 13 1986 PAGE 19 ITEM IDENPIPICATION Q3.%NKB 80 2"-RC-122-FB ITEM DESCR I PTION HANGE BOLTING 8 SIUDS 16 NUIS VZ-1 ERCC CAL NO BLK NDE 4.1 N/A INDICATIONS tRI IN GEO OIHER ZONE 36 SYSTEM IRI.IRAIN IDOP 2B2 ISO NO.501-136 SP.LU IE NUCLEAR PLANT UNIT 2 1986 SQT4$Y REPCRT TABLES CLASS 1 Mon Oct 13 1986 PAGE 20 ITEM IDBfrIFICATION NO.NOHBER 80 2"-RC-125-FB ITEM OESCRrerION PL!Q4E BOLTING 8 SGDS 16 NVIS VZ-1 HDE 4.1 N/A IHDICATICHS WI IH GEO OIHER X KROH KNE 37 SYSTEM LEHXWM LINE ISO NO.501-137 SP.ULIE NELS@PLANT UNIT 2 1986 SRSPRY REKRT TABLES CLASS 1 Wn Oct U l986 PAGE 21 ITEM IDENTIFICATION NO.NUMBER 420 V"2516 230 2"-CH-145-SRÃ-3 ITEM DEKRIPTION VALVE BOLTING (12)ELEOW'Io PIPE VP-1'DE 4.1 N/A PT NDE 3.1 N/A INDICATICNS tRI IN GEO OIHER X KRIC ERIC ACID ZONE 41 SYSTEM SIM.GEM.ISO NO.501-241 ST.LU IE NU LER PLANT DNIT 2 1986 SCARY REPORT TABLES CLASS 2 Hen Oct 13 1986 PAGE 22 ITEM NO.ID EDIFICATION RNBER 120 103-221-A 20 101-241 10 , 203-246 140 i 104"221-A ITEM DESCRIPTION KE%AY WACKEIS 9 0 DEC SHXNDARY EXT RING-QNER SHELL SEXNDARY EXT.RING-'IUBESHEET CLEGS&ACKE1'45 DEB EXAM IBOC CAL INDICATIONS MEIH NO BLK tRI IN GEO OZHER MZ NDE 3.3 N/A X UP NDE 5.1 UZ 25 X UP NDE 5.1 UP-25 X MP NDE 3.3 N/A X ACCEPT (2)RCUH)H)

~~I 5 ZCNE 43 SYSTEM LPSI 2A DISCHARGE ISO NO.501-243 SF.LU IE NU:LEAR PLANT DNIT 2 1986

SUMMARY

REKRT TABLES CLASS 2.bk>n Oct 13 1986 PAGE 23 40 30 20 140 150 160 50 IDENTIFICATION NOMBER 10"-SI"417-FH-1 10"-SI-417-1-SW"1 ls 10""SI-417-1-SN-I 10"-SI-2406-660 10"-SI-417-PH-3 NO I.D.10"-SI-417-PN-1 ls ITEM DEKR IPTION PIPE lQ VALVE V-3106 PIPE IlÃG SEAM 10"x8" RED-10" PIPE SHEAR AS t=1 1/2" PIPE m VALVE V-3206 PIPE KNG SEAM 9 EW-3 PIPE-GSG SEAM NDE 3.3 NDE 3.3 NDE 3.3 NDE 3.3 NDE 3.3 NDE 3.3 NDE 3.3 N/A N/A N/A N/A N/A N/A N/A INDICATIONS tRI IN GEO OIHER X X X X X X X 2.5t'IQ BE EXAMINED 4 LOGS 2.5t'IQ BE EXAMINED ZONE 49 SYSTEM SHVIDOWN COOLING A ISO M).501-249 ST.LV IE NV LEAR PLANT UNIT 2 1986 S(MARY REPCRT TABLES CLASS 2 Ran Oct 13 1986 PAGE 24 10 40 50 20 30 60 70 10"-SI-363-EW-12 10"-SI-363-PW-904 ls 10""SI-363-ll-SW-lA 10"-SI-363-FW-12 ls 10"-SI-363-EW-904 10"-SI-363-ll-SW-lA 10"-SI-363-EW-13 ITEM~IDENI'IFICATION NO.NUMBER rIEM DESCR IPI'ION PENEIRATICN N 64'IO PIPE PIPE IlSG SEAM ELBOW-Ills SEAM PIPE-LONG SEAM PIPE'IO ELBOW ELBOW-KNG SEAM ELBOW'IO PIPE NDE 3.3 N/A NDE 3.3 N/A NDE 3.3 N/A NDE 3.3 N/A NDE 3.3 N/A M)E 3.3 N/A M)E 3.3 N/A INDICATIONS Wl IN GEO OIHER~X X X X X X X REMARKS 2.5t OF LONG SEAM 2.5t OF KNG SEAM 2.5t OF LCNG SEAM 2.5t OF GING SEAM ZONE 52 SYSTEM SHUIDCWN OQOLING B ISO NO.501-252 SF.LK:IE NlLLEAR PLANT UNIT 2 1986 SPIRY REHRT TABLES CLASS 2 Mon Oct 13 1986 PAGE 25 ITEM IDENTIFICATION NO.NDMBER 360 10"-362-4-SW-1 370 NO I.D.400 10"-362-4-SW-2 410 NO I.D.380 10-362-4-S&lA 390 NO I.D.ITEM DESCRIPTION PIPE I ELKIW PIPE IlÃG SEAM 9 SW-1 ELBOW I PIPE PIPE IZING SEAM QSW-2 ELBOW rOWS SEAM 9 SW-1 ELBOW KNG SEAM 9SW-2 NDE 3.3 N/A HDE 3.3 N/A HDE 3.3 N/A HDE 3.3 N/A HDE 3.3 N/A NDE 3.3 H/A IHDICATI(SS (BI IN GEO OILER X X X X X X ZONE 62 SYSTEM HPSI 2B ISO N).501-261 ST.LK'.IE NK'.LES PLANT UNIT 2 1986 SWARY REKRT TABLES CLASS 2 Ron Oct 13 1986 PAGE 26 nm IDENTIPICATax NO.%NER arm DESCRIPTION 50 6"-SI-213-PW-1 PIPE 10 VALVE V-3654 51 6"-SI-213-PH-1 PIPE'10 VALVE V-3654 EXAM EROC CAL INDICATIONS MEIH%)BLK FBI IN GEO OIHER VZ NDE 5.4 UP-54 X PT NDE 3.3 N/A X REPAIR WEU)1 1/2"d REAPIR WEID 1 1/2"d ZONE 63 SYSTEM HAIN STEAM 2Al ISO NO.501-263 ST.LU IE NU LEAR PLANT UNIT 2 1986 SRRPRY REKRT TABLES CLASS 2)4m Oct 13 1986 PPQE 27 ITEM IDENPIFICATI(Ã NO.NWBER CPEM DESCRIPPION EXAM EROC CAL INDICATI(NS MEIN NO BLK tRI IN GEO O'ER 10 36"-MS-52-FW-1 ll 36"-MS-52-FW-1 31 36"-MS-52-FW-lA 50 36"-HS-52-FW-lB 150 34"-MS-28"1-SW-3 51 36"-MS-52-FW-1B 140 34"-MS-28"1"SW-3 ls 141 34"-MS-28-1-SW-3 ls 180 34"-MS-28"1-SW-3B 160 34"-MS-28-1-SW-3A 181 34"-MS-28"1-SW-3B NOZZLE m ELBOW NOZZLE'IO ELBOW~IONG SEAM ELK%-IONG SEAM PIPE'IO EL83W EL'IONG SEAM PIPE-IONG SEAM PIPE-HSG SEAM ELBOW-IlSG SEAM ELK%-KNG SEAM ELBOW-IONG SEAM NDE 5.2 NDE 2.1 NDE 2.2 NDE 5.2 NDE 5.2 NDE 2.2 NDE 5.2 NDE 2.2 NDE 5.2 NDE 5.2 NDE 2,2 UP-45 N/A N/A UP-45 UP-45 N/A UP"45 N/A UP-45 UP-45 N/A INACCESSIBLE 2.5t OF IXI'EAM 2.5t OF IONG SEAM 2.5t OF IONG SEAN 2.5t OF IONG SEAN 2.5t OF KNG SEAM 2.5t OF IlXG SEAM 2.5t OF IONG SEAN ZONE 64 SYSTEM MAIN STEAM 2B1 ISO N).501-264 SF.LU IE NU"LlAR PIANO UNIT 2 1986 SVKQSY RERRT TABLES CLASS 2 hhn Oct 13 1986 PAGE 28 ITEM HO.350 310 360 361 311 IDEPPIPICATION NUMBER 34"-MS-4101-315 34"-MS-29-3-SW-1A 34"-MS-29"FW-4 3"-34"-MS-29-3-SW-lA ITEM DESCRIPTION SHEAR uzi (4)t=l 1/4" ELBOW UmG SEAM 9SW-1 ELBOW m PIPE ELBOW 10 PIPE ELBOW IONG SEAM 6SW-1 NDE 2.2 NDE 5.2 HDE 5.2 HDE 2.2 HDE 2.2 CAL INDICATIONS BIZ Qtl IN GEO OIHER N/A X UP-45 X UP-45 X N/A X N/A X ZONE 65 SYSTEM MAIN STEAM 2A (OC)ISO NO.501-265 ST.LU:IE NK:LEAR PLANT UNIT 2 1986 SENARY REKRT TABLES CLASS 2 Wn Oct 13 1986 P&E 29 ITEM NO.IDEÃPIFICATION NUMBER ITEM DESCR IPPION EXAM EROC CAL INDICATES METH NO BLK tB I IN GEO OPHER REMARKS 231 35.5"-MS-1-1-SW-1 ls PIPE-IDNG SEAM 40 35.5"-MS-1-Bf-1 ls PIPE-IlÃG SEAM 230 35.5"-MS-1-1-&/-1 ls PIPE-KNG SEAM 241: 35"~"1-FH-2 PIPE'IO VALVE (MSIV)HP NDE 2.2 N/A X UP NDE 5.2 UP-44 X UP NDE 5.2 UP-44 X MT NDE 2.1 N/A X ERP 6.6&P 6.6&P 6.6 ZCNE 78 SYSTEH SHUIIOWN COOLING 2B ISO NO.501-278 ST.QLIE NU l EAR PSYCH UNIT 2 1986 SRTCSY REKRT TABLES CLASS 2~Oct 13 1986 PAGE 30 ITEM IDEÃZIP ICATION N).NlNBER PCS'ESCRIPTION 10 12"~-14"1-SW-I CS PUMP 2B FLANGEWH)UCER I%AM PR(C CAL MEIT NO BLK RT FPL N/A INDICATIONS hRI IN GEO ONE X RBQRKS@KEPT PERKRHED BY BACKPI ZONE 82 SYSTEM LPSI PUMP 2B ISO NO.501-282 SZ.LU IE NU LSR PLANT UNIT 2 1986 STRIPY REPCRT TABLES CLASS 2 Hon Oct 13 1986 PPQE 31 ITEN IDmrre ICATION HO.NUMBER 10 2B-l-l 20 2B-1-2 40 2B-1-4 Pr04 OamrPI ION WEU)ED SUPPCRT WELDED SUP KRT HAP 1Q HdQGE WELD PT NDE 3.3 N/A PZ NDE 3.3 N/A PP NDE 3.3 N/A INDICATuXS

/RI IN GEO OIHER X X X