McGuire, Unit 1, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Seismic Aspects of Recommendation 2.3 of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
ML13190A272
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/20/2013
From: Capps S D
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13190A272 (78)


Text

Steven D. CappsDUKE Vice President ENERGY. McGuire Nuclear StationDuke EnergyMG01VP I 12700 Hagers Ferry RoadHuntersville, NC 28078o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.com SECURITY-SENSITIVE INFORMATION

-WITHHOLD UNDER 10 CFR 2.390(d)(1)

UPON REMOVAL OF ATTACHMENT 5 and 7 of ENCLOSURE 1, THIS LETTER IS UNCONTROLLED June 20, 2013 10 CFR 50.54(f)U. S. Nuclear Regulatory Commission ATTN: Document Control Desk11555 Rockville PikeRockville, MD 20852

SUBJECT:

Duke Energy Carolinas, LLC (Duke Energy)McGuire Nuclear Station (MNS), Unit 1Docket Nos. 50-369Renewed License Nos. NPF-9Response to NRC Request for Information Pursuant to Title 10 Code of FederalRegulations 50.54(f)

Regarding Seismic Aspects of Recommendation 2.3 of theNear Term Task Force Review of Insights from the Fukushima Dai-lchi Accident.

REFERENCES:

1. NRC Letter, Request for Information Pursuant to Title 10 of the Code ofFederal Regulations 50.54(f)

Regarding Recommendations 2.1, 2.3, and 9.3of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchiAccident, dated March 12, 2012, Accession No. ML12053A340

2. EPRI Report 1025286, Seismic Walkdown Guidance for Resolution ofFukushima Near-Term Task Force Recommendation 2.3: Seismic, datedJune 20, 20123. NRC Letter, Endorsement of Electric Power Research Institute (EPRI) DraftReport 1025286, "Seismic Walkdown Guidance",

dated May 31, 2012,Accession No. ML12145A529

4. Duke Energy's 180-Day Response to March 12, 2012, Request forInformation Regarding Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights for the Fukushima Dai-Ichi
Accident, dated July 9, 2012, Accession No. ML12194A028
5. Duke Energy's November 26, 2012 Seismic 2.3 response to Information Requested by NRC Letter, Request for Information Pursuant to Title 10 of theCode of Federal Regulations 50.54(o)

Regarding Recommendations 2.1, 2.3.and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchiAccident, dated March 12, 2012, Accession No. ML12361A006 A- oomwww.duke-energy.com SECURITY-SENSITIVE INFORMATION

-WITHHOLD UNDER 10 CFR 2.390(d)(1)

UPON REMOVAL OF ATTACHMENT 5 and 7 of ENCLOSURE 1, THIS LETTER IS UNCONTROLLED United States Nuclear Regulatory Commission June 20, 2013Page 2On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to DukeEnergy. On November 26, 2012, Duke Energy responded to the request and submitted the Unit1 and Unit 2 Seismic Walkdown Reports for the accessible areas of the plant. In the response, Duke Energy also committed to provide an updated report for those inaccessible areas of Unit 1by September 1, 2013. There were no inaccessible areas for Unit 2. A copy of the Unit 1 reportis attached which documents the inspection results in Enclosure

1. Attachments 1 through 6 ofthe report are unchanged, but are included for completeness.

Attachments 7 and 8 of the reportare new and reflect the inaccessible area inspection results for Unit 1.Attachment 5 and 7 of the report contain information that Duke Energy is requesting the NRCwithhold from public disclosure in accordance with the requirements of 10CFR 2.390(d)(1).

Inaccordance with NRC Regulatory Issue Summary 2005-26, an affidavit is not required for thesecurity-sensitive information withheld under 10 CFR 2.390(d)(1).

This letter contains no new regulatory commitments.

If you have any questions or require additional information, please contact George Murphy at(980) 875-5715.

I declare under the penalty of perjury that the foregoing is true and correct.

Executed onJune 20, 2013.Sincerely,

ýSteven D. Ca pEnclosure SECURITY-SENSITIVE INFORMATION

-WITHHOLD UNDER 10 CFR 2.390(d)(1)

UPON REMOVAL OF ATTACHMENT 5 and 7 of ENCLOSURE 1, THIS LETTER IS UNCONTROLLED United States Nuclear Regulatory Commission June 20, 2013Page 3xc:V.M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower245 Peachtree Center Avenue NE, Suite 1200Atlanta, Georgia 30303-1257 Eric J. Leeds, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 0-8C2A11555 Rockville PikeRockville, MD 20852-2738 J.S. Kim, Project Manager (MNS and CNS)U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 8 G9A11555 Rockville PikeRockville, MD 20852-2738 J. ZeilerNRC Senior Resident Inspector McGuire Nuclear StationJustin FolkweinAmerican Nuclear Insurers95 Glastonbury Blvd., Suite 300Glastonbury, CT 06033-4453 SECURITY-SENSITIVE INFORMATION

-WITHHOLD UNDER 10 CFR 2.390(d)(1)

UPON REMOVAL OF ATTACHMENT 5 and 7 of ENCLOSURE 1, THIS LETTER IS UNCONTROLLED United States Nuclear Regulatory Commission June 20, 2013Page 4bxc: (w/o enclosure)

R.J. Duncan (EC07H)B.C. Waldrep (EC07H)C.J. Thomas (EC05P)D.H. Llewellyn (EC09E)G.D. Robison (EC09E)M.C. Nolan (EC05P)S.D. Capps (MG01VP)C.J. Morris (MG01VP)S.M. Snider (MG01VP)H.D. Brewer ((MG01VP)

J.N. Robertson (MG02MO)G.M. Murphy (MG01RC)RGC Date File, (MG01RC)MNS Master File (MG01DM, File MC 801.01)ELL (EC05P)

SECURITY-SENSITIVE INFORMATION

-WITHHOLD UNDER 10 CFR 2.390(d)(1)

UPON REMOVAL OF ATTACHMENT 5 and 7 of ENCLOSURE 1, THIS LETTER IS UNCONTROLLED United States Nuclear Regulatory Commission June 20, 2013Page 5ENCLOSURE 1:McGuire Nuclear Station Unit I Seismic Walkdown Report Revision I

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 1 of 15Rev. 1Revision Log:Rev. 0 Initial NRC submittal dated November 26, 2012Rev. 1 Supplemental NRC submittal to address "initially" inaccessible components.

Revised pages 1-15, Added ATTACHMENTS 7 & 8.Executive SummaryThe results of the McGuire Unit 1 Fukushima Dai-ichi Near-Term Task Force (NTTF)Recommendation 2.3 Seismic Walkdowns are provided here-in.

The walkdowns were performed in accordance with Electric Power Research Institute (EPRI) Report 1025286, Seismic WalkdownGuidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic(issued June 2012). The performance of the seismic walkdowns is required in response to theNuclear Regulatory Commission's (NRC) 10CFR50.54(f) letter regarding NTTFRecommendation 2.3: Seismic.

The EPRI guidance outlined requirements for personnel qualifications, selection of walkdown components, the conduct of the walkdowns, evaluation ofpotentially adverse conditions against the plant seismic licensing basis, and reporting requirements.

The guidance further provided check lists to document the performance of theseismic walkdowns and walk-bys.

Revision 0 of the submittal report documented the walkdown results for the accessible components as of November 2012. Revision 1 of the submittal report added the walkdownresults for the previously in-accessible components.

1.0 Seismic Licensing BasisSite Characteristics:

Major Category I structures are supported on sound rock (UFSAR Sections 3.7.1.4, 3.7.1.5,3.7.1.6, 3.8.4, 3.8.5, 3.8.5.4.1).

Where zones of irregular weathering of bedrock occurred, theweathered material was excavated and fill concrete was used under foundation structures, orpiles were driven to suitable rock bearing for Category I structure (UFSAR Section 2.5.1.2).

Response Spectra:The Safe Shutdown Earthquake (SSE) for McGuire is conservatively specified to have a peakground acceleration of 0.15g horizontally and 0.10 g vertically.

The Operating Basis Earthquake (OBE) is 8/15 of the SSE at all frequencies (UFSAR 2.5.2.6, 2.5.2.11, 3.1, and MCS-1465.00 0009, section 3.3).The ground response spectra curves are enveloped for analysis and design of all Category 1building foundations on closely joined rock and slightly weathered rock and for all buildingelevations where the floor slab rests on rock or fill concrete (MCS-1465.00-00-0009, section 3.3).

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 2 of 15Rev. 1System, Structure, Component (SSC) Seismic Design:All structures, systems and components required to shut down and maintain the reactor in a safeand orderly condition or prevent the uncontrolled release of excessive amounts of radioactivity havea seismic classification of Category 1 (UFSAR 3.2.1). The McGuire design complies withRegulatory Guide 1.29 for SSC seismic design requirements.

Seismic Category I SSCs are designed to maintain their functional capability in-the event of aSSE. The seismic design of Category I SSCs is outlined in UFSAR Section 3.2 and Tables 3-1,3-2, 3-4 & 3-7. Seismic Category I SSCs are also designed to withstand the effects of theOperating Basis Earthquake without loss of capability to perform their safety functions.

Applicable seismic design codes and standards include (MCS-1465.00-00-0009, Section 3.2,UFSAR section 3.2 and Tables 3-1 through 3-7):" 10CFR50, Appendix A, General Design Criteria 2 -Design Bases for Protection AgainstNatural Phenomena

Revision 3, September 1978.* IEEE Standard 344-1971, "Recommended Practices for Seismic Qualification of Class 1EEquipment for Nuclear Power Generating Station." IEEE Standard 344-1975, "Recommended Practices for Seismic Qualification of Class IEEquipment for Nuclear Power Generating Stations.

2.0Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 3 of 15Rev. 1Personnel Qualifications The personnel involved in the McGuire NTTF Recommendation 2.3 Seismic Walkdown effortsatisfactorily met the qualification requirements of EPRI 1025286.

The personnel responsibilities and qualifications are outlined in TABLE 2-1 below. Additional Peer Review Team experience isoutlined within the Peer Review Report (ATTACHMENT 6).TABLE 2-1Walkdown Personnel Experience and Traininga)) 3 = C l0 C .2 a) = 0- (S G(1) CU L: _ WuCL d)o a)a, 3- -0 a,W)>- > -aQa 0 Q >Mark Eli, P.E. (Ares) BS/Civil Engineering 32 SWE (2)(3) XCharles M. Conselman, BS/Civil Engineering 28 SWE (2)(3) XP.E. (ARES) BCinn n2 S ()3XBryan Hanna, P.E. BS/Civil Engineering 12 SWE (2)(3) X(ARES)Kevin Rubright (ARES) BS/Civil Engineering 30 SWE74z' XHarpreet Ghuman BS/Civil Engineering 4 SWE (2) X(ARES)Paul Baughman, P.E. SQUG X(3)PArl BS/Civil Engineering

>40 SWE (2) (3)(Ares) SWE_______________

___George Bushnell, P.E. S§QUG (P(HV)BS/Mechanical Engineering

>40 SE(2) XGeorge Hermann BS/Mechanical Engineering 17 SWE (2) X(SHAW) Technology Thomas Tonden, P.E. MS Energy Engineering

>35 SWE (2) X(SHAWV) ____Karen Kuhn (SHAW) BS/Nuclear Engineering 11 SWE (' XRobert L. Keiser, P.E. BS/Civil Engineering SQUG-T1T(Duke) MS/Civil Engineering

>20 SWE (2) XBreece C. Nesbitt, P.E. BS/Civil Engineering

>40 SWE (2) X(Duke)Mike F. Langel, P.E. BS/Civil Engineering

>35 SWE (2) X X(Duke) ME/Civil Engineering ICharles N. BS/Civil Engineering 4 SWE X XCunningham, (Duke) MS/Civil Engineering Harry E. Vanpelt, P.E. BS/Nuclear Engineering, MS/Mechanical 36 X X(Duke) Engineering Phil A. Thompson N/A 37 SRO-4) X(Duke) (25 yr-)Bryan D. Meyer (Duke) BS/Mechanical Engineering

>28 SWE X X X XDrew Lyerly (Duke) BS/Civil Engineering 6 XNOTES:1)2)3)4)SQUG Seismic Capability Engineers (SCEs) have successfully completed SQUG training.

Seismic Walkdown Engineers (SWEs) have successfully completed EPRI 1025286 2 day walkdowntraining course.Senior Team Member.Prior Senior Reactor Operator (SRO).

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 4 of 15Rev. 13.0 Selection of Equipment for the SWEL-1 and SWEL-2 ListsThe McGuire Unit 1 SWEL-1 and SWEL-2 equipment selection was performed in accordance with the EPRI guidance outlined in EPRI Technical Report #1025286 (Reference MCC-1612.00-00-0001, Rev. 0).The EPRI SWEL-1 Screening Criteria

  1. 1 through #3 are as follows:1) Seismic Category I licensing bases,2) Exclude structures, penetrations, and piping systems3) Equipment must perform safety function (reactor reactivity
control, reactor coolantpressure
control, reactor coolant inventory
control, decay heat removal, containment integrity).

The EPRI screening criteria further allows major NSSS equipment insidecontainment to be excluded.

The original McGuire IPEEE Seismic Walkdown list (MCC-1535.00-00-0004, Rev. 0,ATTACHMENT

24) was used as an initial "Base-1 List" of potential SWEL-1 walkdowncomponents.

This list includes shared, Unit 1 and Unit 2 components;

however, only the sharedand Unit 1 components are considered part of the Unit 1 SWEL-1 Base-1 list. Additionally, theIPEEE list included some non-safety/non-seismic equipment, which were not considered to bepart of the Unit 1 SWEL-1 Base-1 list. The prior IPEEE list effectively represents the output ofEPRI guidance equipment Screening criteria's
  1. 1, #2 and #3. The SWEL-1 "Base-1 List" isprovided in ATTACHMENT 1.EPRI Screening criteria
  1. 4 was then used to select equipment from this "Base List." EPRIscreening criteria
  1. 4 requires a representative cross-section of the following sample selection attributes:
  • include a variety of systems,* Include variety of types of equipment,
  • Include a variety of equipment environments,
  • Include major new/replacement equipment
  • Include equipment enhancements implemented in response to prior IPEEE walkdownidentified discrepancies The McGuire Unit I SWEL-1 equipment list (ATTACHMENT
2) comprised 99 components in -22different systems.

Safety and PRA significant systems are well represented within the SWEL-1equipment selection, such as Auxiliary Feedwater (CA, SA), Emergency Service Water (RN),Essential AC Power (EDG, EPC, EPE), Vital DC Power (EPQ, EPG, EPL), Solid State Protection System (IPE), Residual Heat Removal (ND), Safety-Injection (ND, NI, NV), Closed Cooling WaterSystem (KC), control room ventilation (VC, YC), Main Steam (SM, SV), Reactor Coolant (NC),and containment spray (NS) systems.

The systems and components selected for SWEL-1support the EPRI screen #3 safety functions, which are necessary to achieve safe reactorshutdown, andlor containment isolation.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 5 of 15Rev. 1The SWEL-1 list represented equipment from each of the EPRI guidance equipment

classes, withthe exception of air compressors and motor-generator sets. McGuire does not have any SeismicCat I equipment within these two equipment classes.

The SWEL-1 lists included equipment located in -44 different plant areas/rooms locations.

The selected equipment locations represent a broad range of equipment environmental conditions (e.g. inside containment, partial outdoorexposure, electrical/mechanical penetration rooms, pipe-chases, control room, etc.). Modified, new, and/or replacement equipment comprised

>20% of the SWEL-1 list. Similarly, the SWEL-1list included some equipment which was enhanced in response to the prior IPEEE walkdowneffort.The SWEL-1 component selection further considered PRA risk significance relative to theexternal seismic event. The SWEL-1 component list included a broad sampling of components, which were identified to have a significant contribution to CDF for the external seismic event.The McGuire Unit 1 SWEL-2 spent fuel pool equipment list was developed in accordance with theEPRI guidance.

Seismic Category I structures, piping, and containment penetrations werespecifically excluded by the EPRI guidance.

The four screening criteria specified were as follows:1) Seismic Category I licensing bases,2) Spent Fuel Pool (SFP) equipment appropriate for an equipment walkdown process,3) Sample considerations represent broad population of equipment with considered sample selection attributes such as:a. represent a variety of systems,b. major new/replacement equipment,

c. variety of equipment types,d. variety of environments OR4) Equipment which could result in rapid drain down of the SFP (includes both seismicand non-seismic components and similar factors outlined in 3) above, as practical).

The SWEL-2 equipment "Base-2 List" (ATTACHMENT

3) was established based on screens #1and #2 above. Equipment was selected from the Base-2 List based on screening criteria
  1. 3above, and primarily included major equipment such as the spent fuel cooling system pumps,pump motor air handling units, and heat-exchangers.

The SWEL-2 list was further supplemented based on screening criteria

  1. 4 above, to includeequipment which could result in SFP rapid drain-down, as defined by the EPRI guidance.

TheSFP mechanical connections were further reviewed to ascertain whether they could present thepotential for rapid drain-down of the SFP in-the-event of postulated seismic event. Rapid drain-down is considered to be an uncontrolled and unlimited drain-down due to a postulated leakagefrom a mechanical piping/component interface.

The EPRI guidance provided a definition for SFPuncontrolled drain-down, which was seismic induced leakage which could drain SFP to within 10'of the top of the fuel within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Unlike the prior screening

criteria, screen #4 does notexclude non-seismic equipment.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 6 of 15Rev. 1The McGuire Unit 1 & 2 SFP relies on passive design features to limit the amount of inventory which could be inadvertently drained.

In general, the mechanical piping interfaces below the SFPnormal water level are either equipped with siphon breakers, and/or the pipe elevation does notextend more than 2-4' below normal SFP water level. The McGuire SFP is normally aligned tothe fuel transfer canal to support the Safe Shutdown Facility Standby Make-up Pump (SBMUP).The SBMUP is periodically aligned to the spent fuel pool for testing and was considered to be apotential rapid drain-down

pathway, thus some of the associated components in the flow-path were included in the SWEL-2 Rapid Drain Down list (ATTACHMENT 3). The SWEL-2 RapidDrain Down List also included some components which could pose a rapid drain down risk duringrefueling operations (e.g. reactor cavity seal, refueling canal drains, etc.). The final SWEL-2 listwas selected based on a sampling of appropriate equipment types from the Base-2 and RapidDrain Down Lists. The SWEL-2 list is provided in ATTACHMENT 4 and was comprised of 8components.

4.0 Seismic Walkdowns and Area Walk-BysDuke Energy contracted the Shaw Group / ARES Corporation team to perform the NTTF 2.3seismic walkdowns at McGuire Nuclear Station.

The McGuire Unit 1 walkdown summary report,the component Seismic Walkdown Checklists (SWC), and the Area Walk-By Checklists (AWC)are provided in ATTACHMENT

5. Duke Energy personnel subsequently completed thewalkdown checklists for the initially inaccessible components, and these are provided inATTACHMENT 7.The Seismic Walkdowns and Area Walk-bys were conducted in accordance with the EPRIguidance outlined in EPRI Technical Report #1025286 (Reference MCC-1612.00-00-0001, Rev.0). The EPRI guidance Seismic Walkdown Check-lists (SWC)s were completed for each item onthe SWEL. The EPRI guidance Area Walk-by Check-lists (AWC)s were also completed forareas/rooms associated with SWEL equipment.

The component seismic walkdown inspections were primarily focused on the identification ofpotentially degraded component anchorage conditions, and potentially adverse seismicinteractions with surrounding SSCs. For the non-line mounted components, the visualinspections assessed whether the anchorage was degraded (e.g. bent, loose, broken, missing,corroded, localized concrete cracks).

Additionally for at least 50% of the non-line mountedcomponents, the as-built field anchorage was verified to be consistent with designdocumentation.

The Area Walk-by inspections were performed for SWEL equipment areas. The area walk-bysassessed whether other surrounding equipment in the area/room (up to -35' radius aroundSWEL component or the room containing the SWEL component) had potentially degradedanchorage, or whether the potential for adverse seismic interactions were present.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 7 of 15Rev. 1If the Seismic Walkdown Engineers (SWEs) determined a potentially adverse seismic condition

existed, then the issue was entered into the corrective action program (CAP) to allow furtherengineering evaluation.

The CAP engineering evaluation determined whether the potentially adverse seismic condition was degraded, unanalyzed, or non-conforming to the design andlicensing bases107 Seismic Walkdown Checklists (SWC) were completed for the components listed on theSWEL. This total was comprised of 99 SWEL-1 components, and 8 SWEL-2 components.

Theoriginally accessible component walkdowns were performed by Shaw Group / ARES personnel.

Duke Energy personnel completed the remaining walkdowns for the "inaccessible" components which required a unit outage to complete (Refer to section 4.0). For the non-line mounted SWELequipment, an anchorage as-built verification was completed for 57% of the equipment withanchorage.

Additionally, a total of 53 (48 by Shaw/ARES personnel, and balance by Dukepersonnel)

Area Walk-by Checklists (AWC) were completed for the SWEL-1 scope, and 2 AWCwere completed for the SWEL-2 scope.The seismic walkdowns and walk-bys identified 32 "Potentially Adverse Seismic Conditions" which are outlined in TABLE 4-1. Refer to the respective TABLE NOTE(s) for the "CAPResolution" designation.

The potentially adverse seismic conditions were entered into theCorrective Action Program (CAP). Engineering evaluation was performed as warranted for thepotentially adverse seismic condition, and in all cases the engineering evaluation concluded thatthe condition was in conformance with the current licensing bases. In some cases work requestsor CAP ACTIONS were initiated as required to resolve minor issues (e.g. loose fastener, addgrout, etc.), and/or to enhance field equipment clearances.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 8 of 15Rev. 1TABLE 4-1Potentially Adverse Seismic Conditions CAP Disposition Walkdown Item Potentially Adverse Condition (See notes)1) 1EPQ-BC-EDGA:

1AEDG Battery Elevated shim height not depicted by drawing.

3Charger2) 1-EPE-TF-ELXB:

The concrete slab adjacent to two vertical supports of theKV/600 VAC equipment contains cracks.i) Cracks in the concrete floor in the vicinity of bolts i) 1for units: 1 ETB-17, 1 ETB-16, 1ETB-13, 1 ETB-11,1 ETB-6, and 1 ETB-9. HN 3440 anchors(observed) are consistent with MC-1906-04, Rev. 83) 1 ETB: 4.16 kV and calculations MCC-1535.00-00.0004.

However,Essential Power -"diameter Phillips Red Anchors are concealed Essentialwr (inaccessible) by the base C-channel by design.Switchgear ii) Spalling at corner of grout pad at end of unit ii) 1(1ETB-1).

Also grout pad height is in excess of 2"resulting in less than design overlap of angle andchannel at this location (1ETB-1, MC-1906-04, Rev. 8).4) 1-EPE-TF-ELXA:

Cracks in concrete floor near 2 of 4 anchor groups. Cracks4.16 kV Essential were within 10 x (anchor diameter) of anchor bolts. 1Power Transformer Concrete cracks: Cracks in concrete floor between R6D5) 1 EMXA: 600 VAC and R5D. Floor was coated with epoxy; therefore unable tomeasure crack width. Anchor bolt location was unable to be 1determined (see above); therefore, unable to determine distance between anchor bolt and crack in concrete floor.6) 1VGTKO062:

Wl Interaction effect: Relief valve (1VG-33) on top of tank isEDG Starting Air within 1/2" of cable tray.Tank7) 1VGTKO063:

1IA2 Interaction effect: Relief valve 1VG-34 is approximately 1"EDG Starting Air from cable tray.Tank8) 1KCTKO009:

U1 KC Interaction effect: Bottom of ladders are welded to accessSurgeCTnk K platform (independent of tank) and top of ladder is lashed to 1tank nozzles.

Potential for "event caused" flooding.

Interactions effect: Cable tray tie rod support hanger isSuction 1ND-4B: RHRF nearly tom off of the tray which reduces support of 2cantilevered portion of tray carrying actuator cables.10)1CA-56A:

MDCAP to Interaction effect: Cable tray feeding ICAPNAFPB panel 11B SG has cables resting against valve operator air manifoldCAP DISPOSITION NOTE(sl:1)2)3)4)Field configuration meets Current Licensing Bases (CLB) requirements, and no field work required.

Field configuration meets CLB requirements;

however, work request/work order/ACTION initiated toresolve minor issue, verify unknown condition, or enhance/correct field configuration.

Field configuration meets CLB requirements;

however, design drawing updated to reflect fieldconfiguration.

CLB not met, and required field modification.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 9 of 15Rev. 1TABLE 4-1Potentially Adverse Seismic Conditions CAP Disposition Walkdown Item Potentially Adverse Condition (See notes)11)Room 600, MDCAP Interaction effect: Approximately 3/4" air supply pipe to valve 1Room: AWC for has 3+ elbows and approx. 15' of pipe with no support.1 CA-56AInteraction effect:i) Valve 1 CA-36AB air connection to (black) airregulator does not have adequate clearance from i) 2vertical support member (see photo).12) Room 600, U1 ii) Discharge line from floor drain sump tank impingesMDCA Pump Room: on valve 1 WL-359 and rests on another line ii) 1Area Walk-By for approximately 5 ft. downstream.

This line also1CAPNAFPA; passes over Unit 1 Aux. shutdown panel.lCAPU0001; and iii) 1-V520 handwheel has inadequate clearance to Ul iii) 11W CAP ; ndline. Not significant.

iv) Approx. 3" pipe directly over enclosure hasthreaded connections and is hung with threaded iv) 1rods. Pipe is touching stanchion (but not attached) directly above cabinet.

Pipe may deflect and hitvertical Unistrut.

Interaction effect: Could not verify whether 1 EVDA and 131 EVDA: Vital Panel EVKA are bolted together.

Based on MCM-1314.01-34,

13) DC a 1 EVDA appears to be a discrete enclosure from 1 EVKA. 2Unclear whether interactions between enclosures wasconsidered in IPEEE review.14)701- Vital Battery Interaction effect: Abandoned eyewash supply pipe isArea A: Area Walk- buckled and kinked. It is supported by rod hangers.

Pipe is 1By for 0-EPL-BC-located over various enclosures and equipment throughout EVCA: I EVDA, etc. vital battery room.15)701- Vital Battery Interaction effect: Abandoned eyewash supply pipe isArea B AWC for 0- buckled and kinked. It is supported by rod hangers.

Pipe is 1EPL-BC-EVCB;1 located over various enclosures and equipment throughout EVDB; EVDB; etc. vital battery room.16)701- Vital Battery Interaction effect: Abandoned eyewash supply pipe isArea C AWC for 0- buckled and kinked. It is supported by rod hangers.

Pipe is 1EPL-BC-EVCC; located over various enclosures and equipment throughout EVDC, etc. vital battery room.17) 1EVDD: 125VDCVital Batter Break Interaction effect: Shims were located between block wallVital Battery Breaker adcbntPaneland cabinet.Panel18)701- Vital Battery Interaction effect: Abandoned eyewash supply pipe isArea D AWC for buckled and kinked. It is supported by rod hangers.

Pipe is 11EVDD; 1EPG-BI-located over various enclosures and equipment throughout EVID, etc. vital battery room.19)Room 705- Electrical Penetration Room: Interaction effect: Rigid ducts span between 1 EFE-LX- 1AWC for 1ETB & 1- ELXB and similar units in the room.EPE-TF-ELXB CAP DISPOSITION NOTEsW:1)2)3)4)Field configuration meets Current Ucensing Bases (CLB) requirements, and no field work required.

Field configuration meets CLB requirements;

however, work request/work order/ACTION initiated to resolveminor issue, verify unknown condition, or enhance/correct field configuration.

Field configuration meets CLB requirements;

however, design drawing updated to reflect field configuration.

CLB not met, and required field modification.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 10 of 15Rev. 1TABLE 4-1Potentially Adverse Seismic Conditions CAP Disposition Walkdown Item Potentially Adverse Condition (See notes)20) Room 730: AWC for Interaction effect: 1 KC-325 valve actuator within 1/4" of 10"1NI-178B.

diameter pipe that is suspended in a hanger that is not 1restrained vertically.

21)Room 730: VCT Interaction effect: Directly below 1NV-146 -3 feet, there is aHallway:

AWC for loose piece of pipe and a small tool that could fall during a 11NV-141A.

seismic event.Interaction effect:22)Room 730: VCT i) Valve actuator, 1NVG-137A, conduit connections are i) 2Hallway:

AWC for resting on a fixed support.1NV-141A.

ii) 6" pipe at ceiling has slipped off center of support held ii) 1by 2 spring cans, one spring can is fully-compressed, other appears loose. Valve 1 FW23 is in this line.23)1KCPU0002:

1A2 Interaction effect: Fire sprinkler line over pump in contact 1KC Pump with wire-way to pump motor.24)Room 601, U2 Interaction effect: Sump drain pipe is attached to the ceilingMDCA Pump Room: with threaded rod and could displace into pressurized tubing 1AWC for ORN7A for auxiliary feedwater pump 2CAMR0002/2BETB6 25)1 NSHX0004:

1B Notched column flanges:

Anchors are complete; however,Containment Spray multiple wide flange columns have notches in the flange IHeat Exchanger near base plate.26)1 NSHX0003:

1A Notched column flanges:

Anchors are complete; however,Containment Spray multiple wide flange columns have notches in the flange 1Heat Exchanger near base plate.27)Unit 1, Room 926- House-keeping:

Trash can was not secured / constrained.

1AWC for 1VC-IA28)1 NVPU0046:

Interaction effect: Valve 1 NV-937 has contact with pumpStandby Make-up discharge pipe, which could adversely affect the function of 1Pump the pump in a seismic event.29)1KFPU0001:

1A KF Interaction effect: end of valve stem (1 KF-2) on pump 1Pump suction valve is within -1/8" of a structural (HSS) support.30)Room 816: AWC for Interaction effect: One end of 4" cable tray that supports a1KFPU0001&2; flexible conduit to 1 MRNSV2400 (Fuel Pool Cool Pump Air 21 KFHX0003&4; Cooler B) solenoid was supported/"anchored" by something 1VAAH0031 resembling duct tape (only).31) 1B Cold Leg Instrument impulse tubing track L-bracket support not tightlyAccumulator Room: secured for 1NIIV5060.

AWC for 1NI-431B32) 1 ETB 4kV Essential Fluorescent light fixture adjacent to front of 1 EPC-BK-Switchgear SWC ETB14 had a single unsecured rod-hanger.

CAP DISPOSITION NOTE(s):1) Field configuration meets Current Licensing Bases (CLB) requirements, and no field work required.

2) Field configuration meets CLB requirements;
however, work request/work order/ACTION initiated toresolve minor issue, verify unknown condition, or enhance/correct field configuration.
3) Field configuration meets CLB requirements;
however, design drawing updated to reflect fieldconfiguration.
4) CLB not met, and required field modification.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 11 of 15Rev. 1Additionally, there were 11 SWCs which documented that portions of internal electrical cabinetanchorage was concealed in-part or entirely, and the SWCs were designated to be "unknown."

The SWC for 1ETB (4 kV Essential Switchgear) was initially specified to be "unknown" due topersonnel safety concerns, thus this component internal anchorage inspection was deferred(refer to the inaccessible component section below). The remaining 10 SWCs which weredesignated "unknown" are as follows:* 6 SWCs were associated with 125 VDC vital battery distribution centers (EVDA, EVDB)and 600 VAC Essential MCCs (1 EMXA, I EMXA-1, 1 EMXB, 1 EMXB-1) in which portions ofanchors were not accessible because they were covered by structural members or theembedded "C"-channel.

Some physical equipment demolition would be required to visuallyaccess all the anchorage.

  • 3 SWCs (EMXE 600 VAC MCC, 1A EDG Battery, 1A CA pump control panel) only a portionof the internal anchorage was visible, due to concealment by wires, wire-ways, or otherstructure.

A significant portion of the cabinet anchorage was visibly inspected (16 of 18bolts for EMXE, 10 of 12 fasteners for 1A EDG battery, 8 of 12 anchors for the 1A CAPump Control Panel). The anchors which could not be visually inspected are judged to bein acceptable condition based on the satisfactory condition of the visually inspected anchorage.

0 The SWC for the Turbine Driven Auxiliary Feedwater Pump (TDCAP) control panel theinternal anchorage was concealed by a sheet metal shroud. Therefore, it was not includedin the 50% anchorage check. This component inspection was limited to the visual ofinternal cabinet components to ensure they were secure, exterior perimeter inspection ofthe cabinet concrete, and for local seismic interaction concerns.

This equipment was retained on the SWEL to satisfy various sample selection attributes;

however, some physical equipment demolition would be required to visually access all theanchorage.

This equipment is located in a dry, mild environment and not exposed to anyphysical degradation mechanisms.

The SWCs and associated inspections are deemed tosatisfactorily meet the intent of the published EPRI walkdown guidance.

Based on the aggregate results of the seismic walkdowns, there were no significant anchorage deficiencies, nor licensing bases issues identified.

Based on the foregoing discussion, no further equipment walkdowns areplanned for these components.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 12 of 15Rev. 1INACCESSIBLE COMPONENTS:

The Unit 1 components initially deemed to be inaccessible, which required a unit shutdown inorder to complete the walk-downs are listed in TABLE 4-2. These outstanding SWC andassociated AWC were completed during the McGuire Unit 1 spring 2013 refueling outage. ASWC for 1ETB was initially partially completed in the fall of 2012, and 1ETB was re-inspected toverify internal anchorage condition and configuration.

The AWC was previously completed for1 ETB and was not re-performed.

Table 4-1 was updated based on the results of these recentwalk-downs.

TABLE 4-2Walkdown Inspections Deferred to Next Refueling Outage,nt LocationT ibEq1 Reactor Bldg. 1NC-32BReactor Coolant System Pressurizer PORVReactor Coolant System Pressurizer 1 Reactor Bldg. 1 NC-34A PORV1 Reactor Bldg. 1 NI-430A N2 Assured Supply to 1NC-34A1 Reactor Bldg. 1 NI-431 B N2 Assured Supply to 1 NC-32B1 Reactor Bldg. 1ND-1B RHR Pump Hotleg Suction Isolation 1 Reactor Bldg. 1ND-2AC RHR Pump Hotleg Suction Isolation Completed during2013 SpringRefueling outage1 1 Auxiliary Bldg. 1ETB 4Kv Essential Switchgear 5.0 Licensing Basis Evaluations As outlined in section 4.0 TABLE 4-1, a total of 32 Potentially Adverse Seismic Conditions (PASC) were identified by the Seismic Walkdowns and the Area walkby's.

The potentially adverse seismic conditions were entered into the Corrective Action Program (CAP). Engineering evaluation was performed as warranted for the potentially adverse seismic condition, and in allcases the engineering evaluation concluded that the condition was in conformance with thecurrent licensing bases. In some cases work requests or CAP ACTIONS were initiated to resolveminor issues (e.g. loose fastener, add grout, etc.), update design documents, and/or to enhancefield equipment clearances.

The potential adverse conditions and their individual Problem Investigation process (PIP) trackingnumbers are listed in the Unit 1 NTTF 2.3 Seismic Walkdown Reports (ATTACHMENTs 5 and 7).6.0 IPEEE Vulnerabilities The McGuire IPEEE NRC submittal of 6/1/94 (Reference

8) concluded that there were novulnerabilities from external events. Thus, there were no identified plant changes which wouldsignificantly reduce the risk from external events.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 13 of 15Rev. 1Table 3-3 of the 1PEEE NRC Submittal identified several enhancements to resolve minor fieldwalkdown issues (References 6, 8, ATTACHMENT 3). These enhancements are listed in TABLE6-1.TABLE 6-1IPEEE Enhancements Equipment Deficiency Identified Resolution Date Resolved* 1EDGA CompleteUnit 1 EDG battery racks were missing WO 94050272

& 94050263 12/29/94spacers.

installed missing spacers.

  • 1EDGA Complete(NAS WOs# 00326062

& 00326059) 11/21/94PIP M94-1003Unit 2 Upper Surge Tank anchor bolts Replaced bolts per WR 93034428.

(Reference 7.4)missing.

documented completeprior to 1/25/96.MCCs were noted to be in contact with

  • WO # 00316559complete prior toeach other at a corner (Re. Attach. 1 of MGMM-3870 mechanically 10/5/95Reference 7.3): fastened the MCCs together to e WO # 00316580* 1EMXB and 1EMXB-1 prevent interaction, complete prior to0 2EMXB and 2EMXB-1 10/4/95WO 94030900 cleaned and re- PIP M94-1003Auxiliary Feedwater CST anchor bolts coated fasteners.

(Reference 7.4)and nuts exhibited corrosion.

documented completeprior to 1/25/96.Various movable equipment where Guidelines were incorporated PIP M94-1003noted to be unsecured and could pose within NSD-104 for station house- (Reference 7.4)documented completea seismic interaction concern.

keeping.

prior to 1/25/96.Turbine Driven Auxiliary Feedwater MM-6664/WO 94095550 trimmed PIP M94-1003Pump control cabinet in contact with panel corner to eliminate contact (Reference 7.4)documented complete'CA' piping. and resealed

cabinet, prior to 1/25/96.MM-4118 eliminated pipe PIP M94-1003KC Heat exchanger saddle bases and interference and add grout. W/O"s (Reference 7.4)concrete curbs require grouting.
94064720, 94053337,
94065089, documented completeand 94065092 prior to 1/25/96.PIP M94-1003Grating in contact with steam vent Grating trimmed per WR 93034096 (Reference 7.4)valves in exterior doghouses.

& 93034099.

documented completeprior to 1/25/96.PIP M94-1003Arc barrier connections were not secure WO 94010441

& 94010379 (Reference 7.4)within main control boards. secured the connections.

documented completeprior to 1/25/96.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 14 of 15Rev. 17.0 Peer Review:Duke Energy contracted with the Shaw Group (Shaw) / ARES Corporation (ARES) Team toperform the NTTF 2.3 peer review for the McGuire Nuclear Station (MNS). The Peer ReviewReport for the initially accessible components is contained in ATTACHMENT

6. A supplemental Peer Review Report (ATTACHMENT
8) was performed for the initially inaccessible components, which were completed during McGuire Unit 1 spring 2013 refueling outage.The Peer Review Team consisted of three individuals (refer to Table 2-2), all of whom haveseismic engineering experience as it applies to nuclear power plants. These individuals participated in the peer review of each of the activities.

The Shaw/ARES methodology conforms to the guidance in Section 6 of EPRI 1025286.

Thepeer review covered the following:

  • The selection of the SSCs included on the Seismic Walkdown Equipment List (SWEL).* A sample of the checklists prepared for the seismic walkdowns and area walk-bys.
  • The licensing basis evaluations.
  • The decisions for entering the potentially adverse conditions in the Corrective ActionProgram (CAP) process.* The submittal report.The peer review process for the SWEL development and the seismic walkdowns consisted of thefollowing:
  • Conducting an in-process review at the plant site, including interviews with the personnel performing the activity and reviewing in-process documentation.
  • Performing an in-plant surveillance (for the walkdown activity) of a seismic walkdown andan area walk-by.* Providing in-process observations and comments to the personnel performing the activities.
  • Conducting a final review of a sample of the completed documentation.

The peer review process for the licensing basis evaluations and the decisions for enteringpotentially adverse conditions into the CAP consisted of reviewing the overall review process anda sample of the licensing basis reviews.

The peer review process for the submittal reportconsisted of reviewing the draft submittal prepared by McGuire Design Engineering for licensing review. The peer review of the licensing basis evaluations resulted in some open issues;however, those issues were addressed by updating the licensing basis evaluations documented in the CAP.The conclusion of the peer review is that the MNS NTTF 2.3 seismic walkdown effort has beenconducted in accordance with the guidance in EPRI 1025286.

Comments made during the in-process review of the SWEL development and the walkdowns have been addressed satisfactorily.

In-process comments on the final walkdown

reports, the licensing basis reviews,and the submittal have also been resolved.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal Report for Seismic Walkdowns McGuire Unit 1Page 15 of 15Rev. 1

REFERENCES:

1) MCS-1465.00-00-0009, Rev. 1, Seismic Design Bases Document2) UFSAR Sections 3.1, 3.2.1, 3.8.4, 3.8.5, Tables 3-1 through 3-73) UFSAR Section 2.5.1.2, 2.5.2 Site Geology4) UFSAR Sections 2.5.2.10, 2.5.2.11 SSE/OBE5) UFSAR Section 3.7 Seismic Design6) MCC-1612.00-00-0001, Rev.17) EPRI Report 1025286, Dated May 2012, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force (NTTF) Recommendation 2.3 (ATTACHMENT 1).8) McGuire NRC Response to GL 88-20, Individual Plant Examination of External Events (IPEEE)Submittal, dated June 1, 1994, T.C. McMeekin to NRC.9) SHAW/ARES Summary Report, Seismic Walkdown Report for Duke Energy's McGuire NuclearStation Unit 1 1457690101-R-M-00001-1, Rev. 1 (November 5, 2012).10) SHAW/ARES Summary Report, Seismic Walkdown Report for Duke Energy's McGuire NuclearStation Unit 2 1457690101-R-M-00002-1, Rev. 1 (November 5, 2\012).11) SHAW/ARES Peer Review Summary Report, "NTTF 2.3 Seismic Peer Review ReportMcGuire Nuclear Station Units 1 and 2 1457690101-R-M-00003-0.
12) MCC-1535.00-00-0003, Rev. 0, Seismic Hazard Curve Sensitivity for the McGuire IPEEE.13) MCC-1535.00-00-0004, Rev. 0, Seismic PRA/IPEEE Back-up Calculation.
14) PIP M94-1003,

'Equipment Deficiencies Identified During the 1994 IPEEE Seismic Walkdowns.

15) MCS-1108.00-00-0002, Rev. 9, "Specification for the Response Spectra and SeismicDisplacements for Category I Structure
16) 7/9/12 correspondence to NRC from Ben C. Waldrep, "Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)

Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident"

17) MCS-1108.02-00-0001, Rev. 5, "McGuire Structural Design Specification.

ATTACHMENTS:

1) SWEL-1 Base-1 List (*see note below)2) McGuire Unit 1 SWEL-1 (*see note below)3) McGuire Unit 1 SWEL-2 Base-2 List and Rapid Drain Down List (*see note below)4) McGuire Unit 1 SWEL-2 (*see note below)5) Seismic Walkdown Summary Report and Checklists

(*see note below)6) PEER Review Summary Reports (*see note below)7) Seismic Walkdown Checklists (SWCs) and Area Walkby Checklists (AWCs) for Initially Inaccessible Components

8) Supplemental PEER Review Summary Reports for Initially Inaccessible Components
  • NOTE: Attachments 1-6 were originally transmitted in submittal dated 11/26/12, and are not includedhere-in.

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 1Rev. 1SWEL-1 Base-1 List Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 2McGuire Unit 1 SWEL-1Rev. 1 Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1Rev. 1ATTACHMENT 3 -McGuire Unit 1 SWEL-2 Base-2 List andRapid Drain Down ListUnit 1 SWEL-2 "Base List".:Class of Column-Equipment#

Description System C o Bldg Elev. Room # CGrid FunctionEquipment Grid05-Horizontal 1KFPU0001 1A KF Pump KF Pump Aux Bldg 750 816 PP-52 SFP CoolingIKFPU0002 1B KF Pump KF 05-Horiontal Aux Bldg 750 816 PP-52 SFP CoolingPump II1KFHX003 1A KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1KFHX004 1B KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0030 1A KF Pump AHU VA 10-AHU Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0031 1B KF Pump AHU VA l0-AHU Aux Bldg 750 816 PP-52 SFP Cooling03-Med Voltage1ETA-13 1A KF Pump Breaker EPC Metal Clad Aux Bldg 750 803 AA-50 SFP CoolingSWGR03-Med Voltage1ETB-13 1B KF Pump Breaker EPC Metal Clad Aux Bldg 733 705 AA-50 SFP CoolingSWGR I I1RN-140A A KF Pump Ess AHU Sup RN 07-AOV Aux Bldg 750 816 PP-52 SFP CoolingIsol01-Motor Control1EMXA-F3D 1A KF Pump Motor AHU EPE Centers/Wall Aux Bldg 750 808 FF-55 SFP Coolinglv DMotor MountedContactors 01-Motor Control1ENvXB-4C 16 KF Pump Motor AHU EPE Centers/Wall Aux Bldg 750 722 FF-55 SFP CoolingMotor MountedI_ Contactors 1RN-240B 1B KF Pump Ess AHU Sup RN 07-AOV Aux Bldg 750 816 PP-52 SFP CoolingIsolUnit I SWEL-2 "RapidDraindown List"Class of Column.Equipment

  1. Description Syste Eass o Elev. Room # Grid FunctionEaulSmen R Grid1NV-842AC SBMUP Suction Isolation NV 08-MOV/SOV Rx Bldg 725 Annulus 273°/61 R SFP & Refueling Cavity Inventory SBMUP Suction Pulsation 00-Other-1 NVAC0048 Dampener (non-seismic NV (pulsation Rx Bldg 725 Annulus 320*/61 R N/ASSC) dampener)

INVPU0046 SBMUP (non-seismic SSC) NV 05-Horizontal Rx Bldg 725 Annulus 320°161 R N/APumpSBMUP Discharge Pulsation 00-Other-1NVAC0049 Dampener (non-seismic NV (pulsaton Rx Bldg 725 Annulus 320'/61 R N/ASSC) dampener)

I NVFL0047 SBMUP Discharge Filter NV 00- Other Rx Bldg 725 Annulus 320°/61 R N/A(non-seismic SSC)1 NV-849AC SBMUP Discharge Isolation NV 08-MOV/SOV Rx Bldg 725 Annulus 273*/61 R N/AReactor Cavity Seal Refueling Reactor Cavity FW 00- Othe R B n/a n/A n/a SFP & Refueling Seal __ 00 Cavity Inventory 1 FW-8, -10, -25, -26, -46, Refuling Cavity Manual Drain FW 00 -Other Rx Bldg n/a n/A n/a SFP & Refueling

-47, -76, -75 Valves Cavity Inventory Fuel Transfer Tube blind Fuel Transfer Tube Blind KE 00I- Oer Rx Bldg n/a n/A n/a SFP & Refueling flange Flange __ 00 -Other Cavity Inventory Fuel Transfer Tube Weir Fuel Transfer Tube Weir KF 00 -Other RF Bldg n/a n/A n/a SFP & Refueling Gate Gate T Cavity Inventory Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1Rev. 1ATTACHMENT 4McGuire Unit 1 SWEL-2Class of Column- Major New/Equipment

  1. Description System Bld Elev. Room # Grid Replacement Function-Equipment X -actuator SFP &INV-842AC SBMUP Suction Isolation NV 08-MOVISOV Rx Bldg 725 Annulus 273*/61 R replacement uelingEC-9992)

Cavity(EC-99992)

Inventory SBMUP Suction Pulsation Dampener 00-Other-X -replaced1 NVAC0048 (non-seismic SSC) NV (pulsation Rx Bldg 725 Annulus 320°161 R MGMM11916 N/A( dampener)

(EC 37849)05-Horizontal 1 NVPU0046 SBMUP (non-seismic SSC) NV Pump Rx Bldg 725 Annulus 320°/61 R N/A05-Horizontal X -replaced1KFPU0001 1A KF Pump KF Pump Aux Bldg 750 816 PP-52 motor SFP CoolingEC10555005-Horizontal 1KFPU0002 1B KF Pump KF Pump Aux Bldg 750 816 PP-52 SFP Cooling1KFHX0003 1A KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1KFHX0004 1B KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0031 1B KF Pump AHU VA 10-AHU Aux Bldg 750 816 QQ-52 SFP Cooling Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1Rev. 1ATTACHMENT 6PEER Review Summary Report Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 8Supplemental PEER Review Summary Reports forInitially Inaccessible Components Rev. 1 Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 1Rev. 1SWEL-1 Base-1 List 053TABLE 2MECHANICAL EQUIPMENT LIST FOR MCGUIRE UNIT I IPEEE WALKDOWN0IIIII IIICB troin components are shown In parentheses.

A detalled walkdown of these components Is notnecessary If the "B train configuration Is similar to the 'A' train.)_

_IfCA SiSMM COMPONENTSUI Lbne Included In -Press. bndry...CA SYSTEM COMPONENTS Size (n.) Seismic PRA -Integrity only Non-Safet-AOV ICA20AB 6AOV I CA27A (328) 4AOV ICA36AB 4AOV ICA48AB 4AOV 1CA52AB 4AOV ICAS6A (44B) .4AOV )CA60A (40B) 4AOV ICA64AB 4MOV ICA7AC 8MOV ICAIIA (98) 8MOV 1CA15A (18B) 6MOV ICA38B 4MOV ICA50B 4MOV 1CA54AC 4MOV ICA58A (468) 4MOV 1CA62A (42B) 4MOV 1CA66AC 4MOV ICA86A (116B) 8TURBINE DRIVEN PUMP I (INCLUDING XCONDENSATE EDUCTOR)TURBINE DRIVEN PUMP LUBE OIL HXMOTOR DRIVEN PUMP IA (IB) XWZ SUMP PUMP A (B) FROM GROUNDWATER DRAINAGE SUMP A (A)DIESEL GENERATOR AND SUPPORTING Line Included In -Press. bndry._COMPONENTS Size (in.)- Seismic PRA Integ~rity only -Non-Safety DIG IA (01) XFUEL OIL DAY TANK IA (I1B) xFUEL OIL STORAGE TANK IA (1) B_FUEL OIL BOOSTER PUMP ]A (113) XFUEL OIL FUEL TRANSFER FILTERS IA1, 1A2 X(IBI. IB2)FUEL OIL TRANSFER PUMP )A (113) _I~R-OPERATED REGULA1N(VALVE lKD94( IKD29)--J-.~ £-~ _______________

.L.L _______________

Pftgel-/

054TABLE 2 -.0DIESEL GENERATOR AND SUPPORTING 11 1in Included In Press. bndry.COMPONENTS (oant.) Size (In.) I Seismic PRA IInterihonly I Non-Safety 4. 4--; 4--I.KD D/G COOUNGWATER-HXIA (18)'UKD INTERCOOLER PUMP 1A (01)KD JACKET WATER PUMP ]A (IB)KD SURGE TANK IA (15)D/G INTERCOOLER IA 0IB)MOV ILDI08 (113) 4 XLUBE OIL INTAKE STRAINER 1A (1 B) xLUBE OIL FILTER IA (IS) XLUBE OILCOOLER IA (IB) xVD D/G BLDG. VENTILATION FANS DSF-1A. IC (1B. ID)SOLENOID VALVE IVG61 (65) 2 _ _"SOLENOID VALVE 1VG62 (66) 2.2.SOLENOID VALVE 1VG63 (6?) -2 1SOLENOID VALVE IVG64 (68) 2VG STARTING AJR TANKS A. 1,A2 (151. IB2) -_ .... XVG INTAKE AIR AFTERCOOLERS AND DRYERS 1A1. 1A2 X(OBI. 182)VG CONTROL AIR VOLUME TANK )A (18) BVG AIR COMPRESSORS A. 1A2 (113. 182) Xa-VG UNE PURIFIERS IIAI. 1A2 01311. 182B__ ____ ___GCONTROL AIR FILTER IA (IB) ., _VN AIR INTAKE SILENCER IA (1B) _ _ XVN AIR EXHAUSTSILENCER IA (1B) XWN D/G SUMP PUMPS A2. IA3 (112,1183)

XZD VACUUM BLOWER PACKAGE IA (1B) --XI Lne Included In Press. bndry.FW SYSTEM COMPONENTS Size (in.) -Sefsmlc PRA Inteardty only Non-Safety MOV IFW1A 8 -MOV IFW27A 14 _MOV IFW32B 8MOV IFW33A 2 .._MOV 1FW49B 2 -REFUELING WATER STORAGE TANK (FWSI X,~J. ___________

1~.I. J~LPage" /5-TABLE 2 -U Line Included In Press. bndr.KC SYSTEM COMPONENTS I1 Size (In.) Seismic PRA Integity only Non-Sofety

--t-I -- F-f I-fAOV IKC-57A (82)12MOV IKCIA (2B) 20 LMOV IKC3A (08D) 10MOV IKC5QA (53D) 20MOV IKC51A (54B) 4 xMOV IKC66A (818) 16MOV 1KC230A (228B) 8KC HX IA (18) XKC PUMPS WAI. IA2 (131, .12) XUNIT I KC SURGE TANK .....RHR PUMP MECH. SEAL HX IA (13)Line Included in Press. bidry. INC SYSTEM COMPONENTS

._Size (In.) Seismic PRA on Non-SfetPZR PORV INC32B 3 XPZR PORV INC34A 3 XPZR PORV INC36B 3 -xSAFETY RELIEF VLV INC 1 6SAFETY REUEF VLV INC2 6Y REUEF VLV INC3 6MOV INC31B .3MOV 1NC33A 3MOV INC35B 3Une Included in Press. bndry.ND -SYSTEM COMPONENTS Size (!D.) Seismic PRA intearily only Non-Safety AOV IND29 (14) 8 " x.. fAOV IND34 8 X #MOV INDIB 14 #MOV 1ND2AC 14 X #MOV INDI9A (413) 14MOV IND30A (15B) 8MOV IND32 (17) 2 XMOV IND33 (18) 8 XMOV IND58A8-~ .1 4-~ 4-4I,# -reaulred to function durkmcolc shutdown I.L'-I 056TABLE 2 -SAdiI Line I Included In I IPress. bnd,. I"-ND'SYSTEM COMPONENTS (cont.) Size (in.) I Seismic PRA integlily only I Nor-Safety

-FWIqMOV IND68A (67B)2IND (1S) X __ND HX )A (IB) X _Line Included in Press. bndry.NI SYSTEM COMPONENTS

-Size (in.) Selsmic PRA Intearily only Non-Safety AOV 1NI I1 XAOV 1N156 I XAOV IN157 0.75 XAOV1N.S .0.75 XAOV IN61l I XAOV IN167 -xAOV IN168 0.75 XAOV IN169 0.75 XAOV IN172 I XAOV IN178 I xAOV IN179 0.75 XAOV NI o o 0.75 x,AOV 1N190 1 XAOV 1N191 0.75 XAOV IN192 ..0.75 XAOV NII63 0.75 XAOV IN1174 (179) 0.75 XMOV IN19A (108) 4 #MOV IN154A 10 X #MOV IN165B 10 X #pMOV IN176A 10 1 1MOV 1Ni88B 10 #MOV 1NI100 Ba I XMOV INI0O3A (135B) 6 XMOV NIN15B (14413) 1.5 XMOV INII18A (15013) 4 XMOV 1N1121A (1528) 4 1 XMOV IN1136B 6MOV 1N0147A 2 XMOV IN1162A 4 1 XMOV 1NIN73A (1788) 8MOV 1NI183B 12 XMOV INI185A (18413) 18MOV 1N1332A 6ARM" A'# .- required to function during Cold shutdownPoge-4. 1~7 057TABLE 2SI I _ _Une I Included In Press, bndry. Li NI SYSTEM COMPONENTS (cont.) ! Size (in,) Seismic PRA fntegrity only J Non-Sofety

,WMOV IN1334B6Xi1INM1430A (NITROGEN BACKUP TO PZR PORVS) 0.75 xINT3RIB OMGrAENBACKUPTOPZRPORVS)f

_ 0.75 XNIPUMP JA (18) I I.,x, _,(not needed for Invento.

control f01 V SBLOCA)COLD LEG ACCUMULATORS

-X(not needed for ' SB.OCA) ...._ _Une Included In Press. bndyy. -NS SYSTEM COMPONENTS Size On.)- Seismic PRA Integrity only -Non-Sofety MOV 1NS43A (38B) 8 _SPRAY NOZZLES DOWNSTREAM OF 1NS47 (42)Line Included In Press. bndry. -WV SYSTEM COMPONENTS Size Oin.) Seismic PRA integjrity only -Non-Safety AOV 1 NV238 3 XAOV INV241 3 XMOV 1NV94AC 4MOV INV95B 4MOV INVI41A 4 XMOV 1NV1428 4' XMOV INV150B 2 XMOV 1NVI5IA 2 XMOV 1NV221A 8MOV 1NV222B 8MOV 1NV244A 3MOV INV2458 3CENTRIFUGAL CHARGING PUMP IA Q1B) XSEAL WATER HX I X ISEAL WATER INJECTION FILTER )A (18) XSEAL WATER RETURN FILTER 1 X _VOLUME CONTROL TANK I X x _(not needed for inventory control for I' SBLOCA) IREGENERATIVE HEAT EXCHANGER I ,.x X x(not needed for inventory control for I SBLOCA) .__kI Ii pI.FI Ipages, (1' TABLE 2 -I I Line Included in Press. bndry. I I_ _RN YSTEM, COMPONENTS l, Size (In.) Seismic PRA integr ty In I Non-Safety I- 1-~ I-I-wAOV IRN21A (258164AOV IRN22A (268) 6 _ _AOV 1RN68A (161B) 1.5 " ._AOV IRN89A (1908) 20AOV IRN103A (204B) 3? --AOV IRN112A (213B) 2AOV IRN114A (215B) 2 x -"AOV 1RNI17A (218B) 2AOV IRNI26A (227B) 2 XAOV IRNI30A C231D) 2AOV IRN140A (240B) 4 -xAOV IRNI66A (1708) 2AOV )RN2528 6 X -AOV IRN277B 6 XAOV IRN442 (445) 4 XMOV IRNI 42 XMOV ORN2B 36.. XMOV ORN3A 36 -xMOV ORN4AC 36 XMOV RN5B -36 xb Y MOVL0RN7A (98) -36MOV -.OP1AC 36MOV ORNI I8 36MOV ORN12AC 36MOV 0RN13A 36MOVORN14A (15B) 36 -XMOV IRN16A (OBB) 36 1 xMOV 1RN40A 10 XMOV IRN41B (43A) 10MOV 1RN42A ..10MOV IRN63B 10 XMOV 1RN64A 10 XMOV 1RN69A (1628) _ 8MOV IRN70A (171B) 8MOV 1RN73A 0174B) B XMOV IRNB6A (187B) 20MOV IRN134A (235B) 18 XMOV IRN137A (2388) 18 X _MOV ORN147AC (283AC) 36 ,.,MOV ORN148AC (284B) 36MOV ORN149A (1528) 36MOV ORNISOA (1518) 36 xMOV IRN253A 6 XMOV 1RN276A 6 XMOV 1RN279B6xSV RN296A (2978) A316- x _MOV IRN299A6xPoge,6. / q TABLE 2 -AMNEI J Line I Included In I Press. bndry. I I.Sicont)ze (In.)- fSelsmic.PRA Inteori![

only JNon-Safety I-i -W9MOV ORN3OJAC24x4MOV ORN302B 24 XRN PUMP IA (1B) XRNSTRAINERIA (0B)STANDBY NUCLEAR SERVICE WATER POND X-"Line Included In Press. bndtry.SA, SM. SV COMPONENTS

.Size (in.) Seismic PRA I Integrity only i Non-Safety AOV ISA49AB (48AB) 6STEAM STOP VALVE TO TDP -ISA3 3STEAM CONTROL VALVE TO TDP -1SA4 -3MSIV ISMIAB 34MSIV ISM3AB 34MSIV ISMSAB 34MSIV ISM7AB 34 "MSI BYPASS .V ISMWAB 3MSIBYPASSVLV ISMIOAB 3MSI BYPASS VLV ISMI IAB 3MSI BYPASS VLV ISMI2AB 3AOV ISM78 2' _ _,2, x __AOV ISMB3 2AOV ISM84 2 XAOV ISM89 2AOV ISM90 2 XAOV ISM95 2AOV ISM96 2 XAOV ISMIO .2SG lOV ISVIAB 6 X XSG PORV ISVAB 6 X XSGPORV ISV13AB 6 X XSG PORV ISVI9AB 6 X XSG SWV ISV2.1 1 XSG SRV ISV3 6 X"SG SRV ISV4 6 XSG SRV ISV5 6 XISG SRV ISV66XGSRV ISV8 L 61 ______L x_____rsc sRv ISV96X-s 1J. I Z.\.9 6Poge I a'o 060 "TABLE 2 -I I Line Included in " Press. bndcy. I ISA. SM. SV COMPONENI3 (cont.) I I Size (n.). Seismic PRA Ijinteglrlonly.I I Non-Satety; I 4-4 4 L-J 4.-I -SG SRV ISVIO6xqSGSRV 1SVI1 6_ ' XSG SRV 1SVM2 6 XSG SRV 1SV114 6 xSGSRV ISVIS .6 -xSG SRV 1SV16 6 XSGSRV ISV17 6 XSG SRV ISVI8 6 XSGSRV 1SV20 6 XSGSRV ISV21. 6 ._. XSG SRV 1SV22 6 XSGSRV ISV23 6 XSG SRV 1SV24 6 XMOV ISV25 6 _XMOV ISV26 6 XMOV ISV27 -6 , X _MOV ISV28 .6 X- i _Une Included In Press. bndry. -VA SYSTEM COMPONENTS

-f Size (in.) Seismic PRA _Integrity only/- Nco-Safety AIR-OP DAMPER 1-ABF-D-1

_ XAIR-OP DAMPER I-ABF-D-2 xAIR-OP DAMPER I-ABF-D-3

__' _ _xAIR-OP DAMPER I-ABF-D-4A (SA) _ _ _,, XAIR-OP DAMPER I-ABF-D-4B (513) _ XAUX. BLDG. FILTERED EXHAUST FAN ABFXF-1A (18) --XAUX. BLDG. RLTER UNIT ABFU-1 (2) X XRHR PUMP MOTORAHU RHR-AHU-1A (18) -_-Line Included In PRom -ndry.VC SYSTEM COMPONENTS

-# Size (in.) Seismic PRA integrity only Non-Sofety MOV lVCIA (9A) 18MOV IVC2A (10A) 18MOV JVC3B (JIB) 18 -MOV IVC4B (128) 18AIR-OP DAMPER CR-OAD-,

(5)AIR-OP DAMPER CR-OAD-3 (7) _ 'AIR-OP DAMPER CRA~OAD-3 II I- -I-J- __ I1.. I~L-only cursory review of these components reaured1L LJ.Page 8. p-/

061TABLE 2 -J I Une" Included In Press. bndry.VC SYSTEM COMPONENTS Wcont.) -_ _ Sze (in.)_ -Seismic PRA Intery on Non-Satety

  • wAIR-OP DAMPER CRA-OAD-4 MOTOR-OP DAMPER CR-D-1. (2) 1 1MOTOR-OP DAMPER CR-D-4 (3)MOTOR-OP DAMPER CR-D-5 _ ___MOTOR-OP DAMPER CRA-D-i (3)MOTOR-OP DAMPER CRA-D-2 (4) _MOTOR-OP DAMPER CRA-D-5 (6) XMOTOR-OP DAMPER CRA-D-11 (7) xMOTOR-OP DAMPER CRA-D-12 (8) XMOTOR-OP DAMPER CRA-D-13 (9) I _XMOTOR-OP DAMPER CRA-D-14 (10) _ _XMOTOR-OP DAMPER CRA-D-16 (22)MOTOR-OP DAMPER CRA-D-17 (20) "_ _-MOTOR-OP DAMPER CRA-D-19 (18)MOTOR-OP DAMPER CRA-D-21 (15) " _MOTOR-OP DAMPER CRA-D-24 (30) iMOTOR-OP DAMPER CRA-D-26 (28)MOTOR-OP DAMPER CRA-D-27 (25) ilMOTOR-OP DAMPER CRA-D-29 (23)MOTOR-OP DAMPER CRA-D-34 (33) __IMOTOR-OP DAMPER CRA-D-35 (36) ___ I___ __-LMOTOR-OP DAMPER CRA-D-35 (36)--MOTOR-OP DAMPER SGR-D-1 (2),OTOR-OP DAMPER SGR-D-3 (4) .... _MOTOR-OP DAMPER SGR-D-5 (6) _MOTOR-OP DAMPER SGR-D-7 (8) ___TRAIN A (B) CONTROL ROOM FILTER PACKAGE CRA-OAPFT-1 (2)TRAIN A (B) CONTROL ROOM FILTER PACKAGE FAN A-(B) I ITRAIN A (B) CONTROL ROOM AIR HANDUNG UNIT CR-AHU-1 (2)TRAIN A (B) CONTROL ROOM AREA AIR HANDUNG UNIT CRA-AHU-I (2)FAN UNiT BR-XF-l (2)I. I IsWIrCHGEAR ROOM AIR HANDLING UNIT SGR-AHU-IA c(1)SWITCHGEAR ROOM AIR HANDLING UNIT SGR-AHU-IC (ID)SWITCHGEAR ROOM AIR HANDLING UNIT SGR-AHU-2A (2B)SWITCHGEAR ROOM AIR HANDUNG UNIT SGR-AHU-2C (2D)_HEATER CRA-H-1 .xHEATER CRA-H-2
  • _ _ _xHEATER CRA-H-3 XHEATER CRA-H-4 .xHEATER CRA-H-5 _ _xHEATER CRA-I-I-6 (8) __XHEATER CRA-H-7 (9) XHEATER CRA-H-1 1 (10) XHEATER CRA-H-13 (12)I-xHEATER CRA-H-15 (14)X--~4-I----

4-4 1-I -only Cursonr review of these components recuiredPage\, ;?-?.

062TABLE 2 -I I.I Une I Included In I Press.bbndry.

I II VC SYSTEM COMPONENTS (cont.) -# ISize (in.) I Seismic PRA Integrity only Non-Safety HEATER CRA-H-19 (18)xHEATER CRA-H-20 (17) XHEATER CRA-H-21 (16) .XHEATER CRA-H-23 (27) XHEATER CRA-H-24 (28) XHEATER CRA-H-25 (29) XHEATER CRA-H-26 (30) XLine Included In Press bndn.YC SYSTEM COMPONENTS

--Size (in.) Seismic PRA inltearity only Non-Safety MOV iYC2A (83B) 1.25MOV IYC39B (38A) 8 X3-WAYVALVE IYC54 (113) 4 X3-WAYVALVE IYC76 (135) 5 X ,3-WAYVALVE 1YC148 (204) 2.53-WAY VALVE IYC162 (218) -2.53-WAY VALVE IYC176 (232) 2.53-WAY VALVE lVC190 (246) 2.5CONTROL ROOM AREA CHILLED WATER PUMP CRA-P-1 (2)CONTROL ROOM AREA CHILLER CRA-C- I (2ZCOMPRESSION TANK CRA-T-1 (2)I 1~ ~ ~ ~ I -4 ~ 4-4/ -only cUrSory review of these components reauiredPage Hr2X-3 063TABLE 3 -MECHANICAL EQUIPMENT LIST FOR MCGUIRE UNIT 2 IPEEE WALKDOWNI I I II-II ICB' train components are shown in oarentheses.

A detailed woikdown of these components Is notnecessary if the '8 train conflf wation is similar to the 'A' train.)4_lne_ Included In Press. bndry.CA SYSTEM COMPONENTS Size O.n.) Seismic PRA Integrity only Non-Safety AOV 2CA2DAB 6AOV 2CA27A (32B) 4AOV 2CA36AB 4AOV 2CA48AB 4AOV 2CA52AB 4AOV 2CA56A (44B) 4AOV 2CA60A (40B) 4 -AOV 2CA64AB 4MOV 2CA7AC 8MOV 2CA1 )A (9B) 8MOV 2CAI5A (188) 6MOV 2CA38B 4MOV 2CA50B 4MOV 2CA54AC .4 -.MOV 2CA58A (468) 4MOV 2CA62A (42B) 4MOV 2CA66AC 4MOV 2CA86A (1168) 8MOV 2CA161C 8 ,TURBINE DRIVEN PUMP 2 (INCLUDING XCONDENSATE EDUCTOR)TURBINE DRIVEN PUMP LUBE OIL HX "MOTOR DRIVEN PUMP 2A C2B) _ _X _WZ SUMP PUMP A (B) FROM GROUNDWATER DRAINAGE SUMP B (B)DIESEL GENERATOR AND SUPPORTING

'Line I Included In Press. bndry.COMPONENTS Size (in.) Seismic PRA -integrity on, Non-Satety D/G 2A (2B) XFUEL OIL DAY TANK 2A (2B) "xFUEL OIL STORAGE TANK 2A (2B) _FUEL OIL BOOSTER PUMP 2A (2B) XFUEL OIL FUEL TRANSFER FILTERS 2A1.2A2 x(2B1. 212)FUEL OIL TRANSFER PUMP 2A (2B)--1-4 4-4 '1.-I 4-4-I 4-4 4-4. 5.-I I-I.a --J -.4 .4 -a a -IPager p2.1-0641TABLE 3DIESEL GENERATOR AND SUPPORTING Line Included In Press. bndry. ICOMPONENTS (cont.) Size (In.) Seismic PRA i t o -NOn-Sotety w AIR-OPERATED REGULATING VALVE 21(D94I(2KD29)KD D.G COOLING WATER HX2A (2B)KD INTERCOOLER PUMP 2A (28)KD JACKET WATER PUMP 2A (2B)KD SURGE TANK 2A (23)D OG INTERCOOLER 2A (2B)MOV 2LD108 (113) 4 .xLUBE OlL*INTAKE STRAINER 2A M28) xLUBE OIL FILTER 2A (28) xLUBE OIL COOLER 2A (2B) XVD DIG BLDG. VENTRIATION FANS DSF-2A. 2C (2B,2D).SOLENOID VALVE 2VG61 (65) 2 ' -SOLENOID VALVE 2VG62 (66) -2SOLENOID VALVE 2VG63 (67) 2SOLENOID VALVE 2VG64 (68) 2 ......VG STARTING AIR TANKS 2A). 2A2 (2B]. 2B2) L___XVG INTAKE AIR AFTERCOOLERS AND DRYERS 2A1, 2A2 X(281.262)

VG CONTROL AIR VOLUME TANK 2A (28)VG AIR COMPRESSORS 2AI. 2A2 (2B, 282) XVG UNE PURIFIERS 2A1,2A2 (2B1,282)

VG CONTROL AIR FILTER 2A (28) .VN AIR INTAKE SILENCER 2A (28) XVN AIR EXHAUST SILENCER 2A (28) XWN D/G SUMP PUMPS 2A2, 2A3 (2B2.2B3)

XZD VACUUM BLOWER PACKAGE 2A (2B) XLine i Included in Press. bndry,FW SYSTEM COMPONENTS Size (in.) SelsmIc PRA integrity only Non-Safety MOV 2FW1A 8 _MOV 2FW27A 14MOV 2FW32B 8MOV 2FW33A 2MOV 2FW49B 2REFUEUNG WATER STORAGE TANK (FWST) XwPage/ X5-TABLE 3 -I _IILine Included in Press. bndry.KC SYSTEM COMPONENTS I Size On.) Seismic PRA inteciy only Non-Safety I-I. Z--I.wAOV 2KC57A (82B)12_____________________________________

--~-4. ~-4MOV 2KCIA (21) 20MOV 2KC3A (189) 10MOV 2KC50A (53B) 20MOV 2KC51A (54B) 4 XMOV 2KC56A (818) 16MOV 2KC230A (228B) 8XC HX2A (2B) xKC PUMPS2AI.2A2 (21311.22Z XUNIT 2 KC SURGE TANKRHR PUMP MECH. SEAL HX 2A (28),= Line Included in Press. bndry.NC SYSTEM COMPONENTS Size (in.) Seismic PRA Integrity onfy Non-Safety PZR PORV 2NC32B 3 XPZR PORV 2NC34A 3 xPZR PORV 2NC36B 3 X'SAFETY REUEF VLV 2NCI6urn ____________________________________ I 4-4SAFETY REUEF VIV 2NC26SAFELY REUEF VLV 2NC3 6MOV 2NC31B -3MOV 2NC33A 3MOV 2NC35B 3Line Included in Press. bndry.ND SYSTEM COMPONENTS Size (In.) Seismic PRA Integrity only Non-Safety AOV 2ND29 (14) 8 X f .....AOV 2ND34 8 X #MOV 2ND1B 14 #MOV 2NDAC 14 X #MOV 2ND19A (4B) 14MOV 2ND30A (15B) ... 8MOV 2ND32 (17) 2 1 XMOV 2ND33 (18) 8 1 -XMOV 2ND58A 8 -___ I I&I- IQOUWOd to Ifunctiof inG dwcold sfltdw1.-IPage 7-G~

001TABLE 3 -0AnbII Line II Included In I Press. bndry. IND SYSTEM COMPONENTS (cont.) Size (in.) I Seismic PRA I Lotegrt onI- Non-Safety MOV 2ND68A (671)2ND PUMP 2A (20) .X #ND HX 2A (2B) X _U Line Included In Press. bndry.NI SYSTEM COMPONENTS Size (in.) Seismic PRA interty on-y 1 No-Sofety AOV 2N150 I XAOV 2NI56 1 XAOV 2N157 0.75 XAOV 2N158 0.75 XAOV 2NI61 I 1 XAOV 2N167 1 XAOV 2N168 0.75 XAO 2N169. 075 XAOV 2N172 I xAOV 2N178 I XAOV 2N179- 0.75 1 XAOV 2NI80 0.75 XAOV 2NI84 I xAOV 2NI90 I XAOV 2NI91 0.75 XAOV 2NI92 0.75 XAOV 2NI163 0.75 XAOV 2N1174 (179) 0.75 XMOV 2N19A (101) 4 #MOV 2NI54A 10 X #MOV 2NI65B 10 X #MOV 2N176A 10 #MOV 2NI88B 10 -MOV 2NI100B 8 XMOV 2NI1O3A (135B) -6 XMOV 2NI115B (1448) is. XMOV 2NI118A (150B) 4 XMOV 2NI121A (152B) 4_ XMOV 2NI136B 6 -MOV 2NI147A 2 XMOV 2NI62A 4 XMOV 2NM173A (178B) 8MOV 2NI183B 1 12 -XMOV 2NI185A (184B) 1 18MOV 2NI332A64-4 4-1 4-4MOV 2N1333B6~ -i-.~ I-Iio -reouired to funfctkf durifla cold shLiudown 11 1LP0g9/

TABLE 3 -I IUne I Included in Rem bndry. I INI SYSTEM COMPONENTS (cont.) I I Size (in.) I SeWsmic PRA Integrity only I I-Non-Safety

',MOV 2NI334B6X2NI430A (NITROGEN BACKUP TO PZA PORVa) 0.75 X2NI431B (NITROGEN BACKUP TO PZR PORVs) 0.75 XNI PUMP 2A C2B) 1 X(not needed for Inventory control for I' SBLOCA)COLD LEG ACCUMULATORS X(not needed for " SBLOCA)aLie Included In Press. bndry.NS SYSTEM COMPONENTS Size (Vn.) Seismic PRA Integrity only Non-Safety MOV 2NS43A (38B) 8,SPRAY NOZZLES DOWNSTREAM OF 2NS47 (42)...ne .. Included In I Press. bndry.B-NV SYSTEM COMPONNF"S 517A ~

PlQAIflt=flrltv nnlvNnn-Snffntv Siz an. Se.d PR InaryolAOV 2NV2383xAOV 2NV241 3 XMOV 2NV94AC 4MOV 2NV95B 4 _MOV 2NVI41A 4 XMOV 2NV142B 4 XMOV 2NVISOB 2 XMOV 2NV151A .2 xMOV 2NV221A 8MOV 2NV2228 8 "MOV 2NV244A 3MOV 2NV245B 3CENTRIFUGAL CHARGING PUMP2A (2B) " X " -SEAL WATER HX 2 xSEAL WATER INJECTION FILTER 2A (28) X _SEAL WATER RETURN RLTER 2 xVOLUME CONTROL TANK 2 x x(not needed for Inventory control for I' SBLOCA) -REGENERATIVE HEAT EXCHANGER

_I E- x x(not needed for Inventory control for I' SBLOCA] -r----II-i -- -- 4_1 1- 4-1I I.1 1.1 L....J L..LPage/ aw 003TABLE 3 -0Ine I[ IIncluded in j.Press.

bndry.RN SYSTEM COMPONENTS Size (In.)j SeIsmic PRA Integrity onyj Non-Safety 14AOV 2RN21A (25B4AOV 2RN22A (268) 6AOV 2RN68A (1610) 1.5AOV 2RN89A (190B) 20AOV 2RNI03A (2048) 3 ?AOV 2RNI12A (2135) 2AOV 2RNI14A (2158) 2 XAOV 2RN117A (218B) .2AOV 2RN126A (227B) 2 XAOV 2RN130A (231B) 2-AOV 2RN140A (2408) 4 XAOV 2RN166A (170B) 2 1AOV 2RN252B 6 XAOV 2RN277B 6 XMOV 2RNI 42 xMOV 2RN16A (18B) 36 .XMOV 2RN40A 10 XMOV 2RN4IB (43A) 10MOV 2RN42A ..10 -MOV 2RN63B ,,10 XMOV 2RN64A 10 XMOV 2RN69A (162B) 8 .......MOV 2RN7OA (1718) 8MOV 2RN73A (174B) a 8XMOV 2RN86A (187B) .20MOV 2RN)34A (235B) 18 XMOV 2RN137A (238B) 18 XMOV 2RN253A 6 XMOV 2RN276A 6 XMOV 2RN279B 6 xMOV 2RN296A (2978) 36 XMOV 2RN299A 6 XRN PUMP 2A (2B) xRN STRAINER 2A (2B) ,,__,,STANDBY NUCLEAR SERVICE WATER POND XUne Included In Press. bndry.SA, SM. SV COMPONENTS Size (in.) Seismic PRA Infeglity only No-SafetV AOV 2WA49AB (48AB) 6STEAM STOP VALVE TOTDP -2SA333L~FAM CC~N1PflL VAI VF Tfl TflP. 9~AA2rr -.m VALVE TO MP- -.. ________

____MSIV 2SMIABa34Pagej 2-TABLE 3 -IL i Une Included in IPress. bndf, ISA, SM. SV COMPONENTS (cont.) I Size (In.) Seismic PRA Intety ony I I Non-Sofety WMS1V 2SM3AB34_IVV 2SM5A_ 34MSIV 2SM7AB 34MSI BYPASS VLV 2SM9AB 3MSI BYPASS VLV 2SM IOAB 3MSI BYPASS VLV 2SM I IAB 3 ____ ___MSI BYPASS VLV 2SMI2AB 3AOV 2SM78 2 XAOV 2SM83 2AOV 2SM84 2 XAOV 2SM89_ 2AOV 2SM90 2 X -AOV 2SM95 2Aov 2SM96 2 xAOV 2SMI01 2SG PORV 2SV7AB 6 X XSGPORV 2SV7,ABC 6 X XSG PORVI2SV13AB 6 x xSGPORV 2SV19AB 6 -X XSGSRV 2SV2 6 X_"SG SRV 2SV3 6 XSG SRV 2SV4 6 XSG SRV 2SV5 6 XSGSRV 2SV6 6 XSG SRV 2SV8 6 XSG SRV 2SV9 6 XSG SRV 2SVI0 6 XSG SRV 2SVII1 6 XSG SRV 2SV 12 6 XSG SRV 2SV14 6 xSG SRV 2SWS. , 6 XSG SRV 2SV 1 6 XSG SRV 2SV17 6 XSGSWV 2SVI8 6 XSG SRV 2SV20 6 XSG SRV 2SV21 6 X.S.G.SRV 2SV22 6 ...xSG SRV 2SV23 6 XSG.S.RV 2SV24 6 XMOV 2SV25 6xMOV 2SV26 6 XIMOV 2SV27t&X6- x- ____ --MCJV 2SV286X_________________6___

-x L.ZJPage 1 3 6 0L4TABLE 4 -LELECTRICAL EQUIPMENT LIST FOR MCGUIRE UNIT 1 IPEEE WALKDOWN_Included InAREA TERMINATION CABINETS

-' Seismic PRA Non-Sofet

_included inAUXILIARY SHUTDOWN PANEL ____Seismic PRA Non-Sot ety___Included in _SUPPORT FOR CA SYSTEM _ Seismic PRA Non-Safety 4160V AC SWITCHGEAR

]ETA (IETB) -X600V AC MCC IEMXA (IEMXB) (IEMXB-2)

I X600V AC MCC IEMXA-4 X600V AC MCC 1EMXA-5 _ X125V DC DISTRIBUTION CENTER IEVDA (ILEVDB)

X125V DC PANELBOARD IEVDA (IEVDB) IX I*120V AC PANELBOARD 1EVKA (1EVKB) & MANUAL TRANSFER SWITCH XLOCAL MOTOR-DRIVEN PUMP CONTROL PANEL XLOCAL TURBINE-DRIVEN PUMP CONTROL PANEL XESFAS TRAIN A (B) 48V DC POWER SUPPLIES

-'BATTR'Y EVCA (EVC:.B)

I!BATTERY CHARGE:R EVCA (EVCB)IIDC CIRCUIT BREAKER FOR MDP1A (MDPIB) AUTOSTART

"=INVERTER IEVIA (lEVIB) _ _ -TD PUMP RELAY HF I _I_-MFW PUMP RELAY BBA)W (BB[(B) )_I IMFW PUMP RELAY .R/IT FPTCA) (R/Tf(FPTCB))

__....MFW PUMP RELAY RWITT. (FPTCA) (R/T-I [FPTCB))RELAY R25C(A) (R25C(B))

RELAY K609A (K6098)RELAY LRA6 (LRB6)LOAD SHED RELAY LSAI (LSB1)TEST RELAY TSA2 C(SB2)ESFAS SLAVE RELAY K633A (K633B)ESFAS SLAVE RELAY K634A (K634B)ESFAS MASTER RELAY K516A (K516B)ESFAS INPUT RELAY K113A (K113B)ESFAS INPUT RELAY K114A (K(148)ESFAS INPUT RELAY K121A (KI21B)ESFAS INPUT RELAY K150A 0(150B)ESFAS INPUT RELAY X23)A (K230B), ESFAS INPUT RELAY K231A (K231B) _WEESFAS INPUT RELAY K25DA (K25MB)W5AS INPUT RELAY X255A (K(2558)

-I I Ifi 1____ 1-1 1-__ _ tPageI 3/

006TABLE 4 -" Included InSUPPORT FOR CA SYSTEM (cont.) -Selsmic PRA Non-Safet, t-.t 1--.~MW)ESFAS INPUT RELAY K331A (K331B)ESFAS INPUT RELAY K332A (1<3328)

!ESFAS INPUT RELAY K333A (K3338) _ESFAS INPUT RELAY K334A (K334B)ESFAS INPUT RELAY K407A (K407B)ESFAS INPUT RELAY K408A (K408B)ESFAS INPUT RELAY K409A (K409B)ESEAS INPUT RELAY K410A (K410B)ESFAS LOGIC MODULEA317A (A317B)D/G LOAD SEQUENCER (LOAD ACTUATE)

RELAY 2JA(RAB8 (2JA(R8S))

D/G LOAD SEQUENCER RELAY A3 (83) 1 1 ISG A LO-LO WATER LEVEL CHANNEL 1 BISTABLE

..SG A LO-LO WATER LEVEL CHANNEL I LEVEL TRANSMITTER SG A LO-LO WATER LEVEL CHANNEL 2 BISTABLE

-_ _ ISG A LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER SG A LO-LO WATER LEVEL CHANNEL 3 BISTABLE I ISG A LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG A LO-LO WATER LEVEL CHANNEL 4 BISTABLE I 'ISG A LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER SG B LO-LO WATER LEVEL CHANNEL 1 BISTABLE ISG B LO-LO WATER LEVEL CHANNEL 1 LEVEL TRANSMITTER_

SG B LO-LO WATER LEVEL CHANNEL 2 BISTABLE I_ _SG B LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTERI.

SG B LOWL WATER LEVEL CHANNEL 3 BISTABLE

_______SG B LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER R '_ " _SG B LO-LO WATER LEVEL CHANNEL 4 BISTABLE

_ __iSG B LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER_

SG C LO-LO WATER LEVEL CHANNEL I BISTABLE I ISG C LO-LO WATER LEVEL CHANNEL I LEVEL TRANSMrTTER SG C LO-LO WATER LEVEL CHANNEL 2 BISTABLE I I _ _--SG C LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER

_SG C LO-LO WATER LEVEL CHANNEL 3 BISTABLE I' I__SG C LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG C 1O-LO WATER LEVEL CHANNEL 4 BISTABLE I ISG C LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER

_SG D LO-LO WATER LEVEL CHANNEL I BISTABLE I I_SG D LO-LO WATER LEVEL CHANNEL I LEVEL TRANSMITTER SG D LO-LO WATER LEVEL CHANNEL 2 BISTABLE I ISG D LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER SG D LO-LO WATER LEVEL CHANNEL 3 BISTABLE I I_"_SG D LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG D LO-LO WATER LEVEL CHANNEL 4 BISTABLE I ISG D LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER INSTR. LOOP CONTAINING ICASV/MV0200, SV0201. & SV0202INSTR. LOOP CONTAINING CASV/MV270 (0320) & SVO27) (0321)INSTR. LOOP ICALL/P ./SVML05_2 (0480) 11 -1 1 -IINSIR. LOOP CONTAINJNG ICALL/P/SV/ML056O (0440)I IINSTPL LOOP CONTAINING ICALL/P /SVML0600 (0400)I IPage A 3 1')-

007TABLE 4 -0I I ...._I I _I IIncluded In I _ISUPPORT FOR CA SYSTEM (cont.) IH 1i I Seismic PRA Non-Salety I IIIwINSTR. LOOP CONTAINING ICALLIP ISVIML0640 (0360) II.IINSTR. LOOP CONTAINING ICAFEtPS/Fr/P 5000 (5010), PS5001 (501 1). & P55002 (5012)INSTR. LOOP CONTAINING ICAPS/PT/P 020 (5030) IIINSTR. LOOP CONTAINING ICAFE/PS/FT/P 5040. PS504,. & PS5044 .INSTR. LOOP CONTAINING ICAPSIPT/PG/P W5050 ] WINSTR. LOOP CONTAINING ICAPS/PT/P 5070 (5080)_INSTR. LOOP CONTAINING ICAFE/Fr/P 500 (5110) & FT5091 (5111)INSTR. LOOP CONTAINING ICAFEII'/P 5100 C5120) & FT5101 (5121) iINSTR. LOOP CONTAINING ICAPSMPT/P 5160INSTR. LOOP CONTAINING ICFT/P,5490

--INSTR. LOOP CONTAINING ICFLT/P 5500INSTR. LOOP CONTAINING ICFLT/P 5510 ,, i , -INSTR. LOOP CONTAINING ICFLTIP 5520INSTR. LOOP CONTAINING 1CFLT/P 5530 .... JINSTR. LOOP CONTAINING ICFLT/P5540

_ _INSTR. LOOP CONTAINING ICFLT/P 55,50 SSWINSTR. LOOP CONTAINING ICFLT/P 5560 5INSTR. LOOP CONTAINING ICFLT/P 5570 IINSTR. LOOP CONTAINING ICFLT P 5580 -INSMR. LOOP CONTAINING ICFLT/P 5590 _INSTR. LOOP CONTAINING ICFLT/P 5600-]-INSTR. LOOP CONTAINING ICFLT/P 6000 M IINSrR. LOOP CONTAINING ICFLTIP6010

_ !INSIR. LOOP CONTAINING ICFLT/P6020 6 MINSTR. LOOP CONTAINING ICFLT/P 6030 -_ -Included InSUPPORT FOR DIESEL GENERATORS

_ Seismic PRA Non-Safet 4160V AC SWITCHGEAR 1ETA (IEIB- f _ _ X600V AC LOAD CENTER lELXA (IELXB) -X600V AC LOAD CENTER IELXC (QELXD) -X600V AC LOAD CENTER IELXE (IELXF) -X600V AC MCC IEMXA (IEMXB) X600V AC MCC IEMXE x120V AC PANELBOARD IDGIA (IDGIB) X125V DC PANELBOARD IEVDA (JEVDD) x125V DC BATTERY/RACK XINVERTER X ID/G CONTROL PANELS XBATTERY IEDGA (IEDGB) AND CHARGERS

-xBATTERY IEDGA (I EDGB) INPUT & OUTPUT BREAKERS

_600/ 120V AC TRANSFORMER TO PANELBOARD IDGIA ()DG1B) I_ BREAKERDGIA-2 (DGIB-2)

I I I I ARESET RELAY ED(TRA3)

(ED(rRB3))

If_______________

.1-IrBLACKOUT RELAY DC(BOA) (DC(B08))

I Ipagey 3 0G8TABLE 4 -I I I I Included In I]SUPPORT FOR DIESEL GENERATORS (Cont.) 4 Seismic PRA Non-Sofety DEETTS=EA BDS)(BDS))

___ ____ ____f-IBWLACKOUT LOGIC RELAY EDAILRA2I (DA!lRE2I)

DEFEAT TEST RELAY FB(DTSA]

(FB(DTSB))

!.DIG START RELAY 2TRA(A) (OTRA(B))

___D/G START RELAY 2TRAI(A)

(2TRAI(B))

_DIG START RELAY 2TRB(A) (2TRB(B))

_ _ _D/G START RELAY 2TRC(A) (2TRC(B))___

DIESEL STARTING AIR RELAY RVGI(A) (RVGI(B))

DIESEL STARTING AIR RELAY RVG2(A) (RVG2(B))

DIESEL STARTING AIR RELAY RVG3(A) (RVG3(B))

DIG AUTOSTART RELAY DASR(A] (DASR(B))

l -.LOAD SHED RELAY AB(LSAI)

(AB(LSB1))

I)LOAD SHED RELAY AAMLSA2)

(AA(LSSB2)

J _LOAD SHED TIMER RELAY GC(LSAT)

(GCC.SBT))

LOGIC TIMER RELAY FD(LTMA)

(FD(LTIB))

.-LOGIC TIMER RELAY FD(.T2A)

(FD(LT2B))

RELAY AC(127ZBX)

RELAY AE(127XBX)

RELAY 3CR(A) (3CR(B))RELAY ART(A) (ART(]))RELAY DGIFRA (DGIFRB)RELAY ESX(A) (ESX(B))RELAY 2TRA(A) (2TRA(B)RELAY FCORA1I (FCLTRBII)

RELAY FC(TRAI)

(FC(Ml))RELAY HRAAA) (HRBIB8))

1 1-4-RELAY RTD(A) (RTD(B))RELAY SIAIXEA Y (SAAIX(B))

4-RELAY SIA2XGA)

(SDA2X(B))

RELAY SIA4X(A]

(SIA4X(l))

RELAY TSA3 (SB3)RESET RELAY EB[RRA] (EB[RRB])

RESTART RELAY FA[RGA) (FA[RGB])

UNDERVOLTAGE RELAY 4CA[A] (:CA(B))UNDERVOLTAGE RELAY 4DA(A) M4AOB)UNDERVOLTAGE RELAY AC(127ZAX)

(AC(127ZBX))

_..UNDERVOLTAGE RELAY AD(127YAX)

(AD(127YBX))

UNDERVOLTAGE RELAY AE(127XAX)

(AE(127XBX))

RESET SWITCH 4CC(A) (4CC(B])

._., -,_.RESET-SWITCH EG135SPEED SWITCH SIM (SIBI) ._.SPEED SWITCH S1A2 (SIB2)INSMR. LOOP CONTAINING IFDLS5040

& LS5041 (5050 & 5051)INSTR. LOOP CONTAINING ILDPG/PS5120

& PS5121/5122/5123 (5130 & 5131/5132/5133)

INSTR. LOOP CONTAINING

)LDPT/PG536 (5370)1 , ,1___INSTR. LOOP CONTAINING I VGPG/PS5040

& PG/PS5050 (5060 & 5070)INSTR. LOOP CONTAINING I VGPG/PS5080 (5090) 1 I1*-INSTR. LOOP CONTAINING 1VGPG/PSSI20

& PG/PS5i22 (5140&5142) 1 1NSTR. LOOP CONTAINING IVGPGIPS5130

& PG/PS5132 (5150 & 5152)I I-t-i..I II I£~J. ___________

1~,J.Pogea 34 TABLE 4 -S O Oi Sncluded AInSUPPORT FOR FW' SYSTEM I tSeismic-PRA1 l Non-Safel 4 -I 4-4wINSIR. LOOP CONTAINING I FWLT/P 5000M- -..- M- M___ ___INSTR. LOOP CONTAINING IFWLT/PSOIO IINSTR. LOOP CONTAINING IFWLT/P 5020 !Included InSUPPORT FOR KC SYSTEM -Seismic PRA I Non-Sofel 4160V AC SWITCHGEAR IETA (IETB) I .__X600V AC MCC IEMXA (IEMXB) X125V DC PANELBOARD 1EVDA (IEVDD) -xD/G ACCELRATED SEQUENCE RELAY 2DB[AA2)

(2DB[AB2])

D/G AUTO RESET AUXIUARY RELAY CC(TRA3X)

(CC(TRB3)I)

DIG LOAD ACTUATE RELAY 2HA(RA6)

(2HA(RB6))

_DIG LOAD SEQUENCER RELAY LSA2 (LSB2) _____,DIG LOAD SEQUENCER RELAY RA6 (RB6) IDIG LOADING TRANSIENr ADVANCE TIMER RELAY 2AD(ATAI)

(2AD(ATBI))

DIG LOADING TRANSIENT ADVANCE TIMER RELAY 2BD(ATA2)

(2BD(ATB2))

D/G LOADING TRANSIENT ADVANCE TIMER RELAY 2CD(ATA3)

(2CD(ATB3))

-_DIG LOADING TRANSIENT ADVANCE TIMER RELAY 2DD(ATA4)

(2DD(ATB4))

D/G SEQUENCE TIMER RELAY GA(ST4A)

(GA(ST4B))

D/G SEQUENCE TIMER RELAY GB(ST2A)

(GB(ST2B))

vl D/G SEQUENCE TIMER RELAY HB(ST6A)

(HB(ST6B))

DIG SEQUENCE TIMER RELAY HC(STSA]

(HC(ST58))

_DIG TEST RELAY 2FB(FSA4)

('2FB[TSB4))I ESFAS SLAVE RELAY K610A CK610B)'

ITEST RELAY TSAI (TSBI)-IINSTR. LOOP CONTAINING IKCPT/P 5490 (6500) S .-INSTR. LOOP CONTAINING IKCFE/FT/P 5530 (5540)IINSTR. LOOP CONTAINING IKCFE/FT/FS/SV/P 5670 (5680) 1"- -Included InMAIN CONTROL BOARDS --Seismic PRA Non-Safety

_____ _____ _____ ____ _____ ______________

Included In _ _ _ _SUPPORT FOR NC SYSTEM _______ Seismic PRA No4160V AC SWITCHGEAR IETA (IETB) x_' _ _X600V AC LOAD CENTER )ELXA (1ELXB) _ _X -6WV AC LOAD CENTR lLXC (ELXD) .__ __ XIfTIV AC~ M~ ~FMXC (1PM)Cfl'~

VA"110" AC MC I- EIVIX QEI--k v __125V DC PANELBOARD lEVDA (OEVDD)xh-sPage $:..5" TABLE 4 -0AnS T FR NI SM I) I Included In I -SUPPORT FOR NC SYTMN (cont.) I~~ I j Seismic PRA I ANori-Satety~

IIW ACCELERATED SEQUENCE RELAY 2CB(AAI)

(2CB(ABI))

eESFAS SLAVE RELAY K6aA (K608B)ESG AUXIUARY RELAY BD(ESGAXI)

(BD(ESGBXI))

LOAD SHED RELAY AB{LSAI]

(AB[LSBI])

I I-_."MAXIMUM SEQUENCE TIMER RELAY BEILT3A)

(BEILT3B))

RELAY 2ABSLRA4)

(2AB(LRB4))

RELAY TDC(BOA)

(DCBOB))RELAY DA(LRA2)

(DA[LRB2))

RELAY FCOTRAI)

(FCNING ISEQUENCER LOAD RELAY 2CA1RA C ) (2CA(RBI)

SEQUENCER LOAD RELAY 2DA[RA2)

(S2DASRB2))

SEQUENCER TIMER RELAY JASTRIA]

(EV )X _IB))IGT LUA ACT1 RELAY 2F AIRAA) A- B(TSB4))RELAY 2GB(TSA5)

(.2GBETSB5,

)UNDERVOLTAGE RELAY CB{127AX)R (CB(127B0)(

INSTR. LOOP CONTAINING INNCSVO320

& SVD321INSTR. LOOP CONTAINING INCSV0340

& SVO341INSTR. LOOP CONTAINING INCSVT360

& SV-3 IIncluded InSUPPORT FOR NI SYSTEM Seismic PRA o-4160V AC SWMTCHGEAR IETA (IETB) X600V AC MCC IEMXA (IEMXB-I)

X125V DC DISTRIBUTON CENTER I EVDA Q1EVDD) X -DIG LOAD ACiUATE RELAY 2FAIRA4)

(2FA(RB4)).

-RELAY DGTSA6 (DGTSB6)IRELAY LSAI (LSBI) -IINSTR, LOOP CONTAINING 1NDRD/P50030 (5120) & INDRD/P/CR56 (5070)IINSTR. LOOP CONTAINING 1NDFE/FS5040 (5050)INSTR. LOOP CONTAINING 1NDPT/PS09 (5080)INSTR. LOOP CONTAINING 1NDFE/FT5250 (5260)Included In ,SUPPORT FOR NI SYSTEM Seismic PRA No-fe4160V AC SWITCHGEAR

]ETA (IETB) X600V AC MCC I EMXA X600V AC MCC IEMXA-I X600V AC MCC IEMXB-1 X125V DC PANELBOARD 1EVDA (ED X_D/G LOAD ACTUATE RELAY 2EA(RA3)

(2EA[RB3])LOAD SEQUENCER RELAY RA3 (RB3} I l"Am-I LOA SEUECE REA ii()IIOICG RELAY ISAI (LSBI)II---- -Li i~LPagex 3(o 011TABLE 4 -0AmS F I S I I Included in ISUPPORT FOR N1 SYSTEM (cont.) I I Seismic PRA I _INot-Sofet 4--I 4--IwDIG TEST RELAY DGTSA6 (DGTSB6)LIMIT SWITCH TO MOV INfl47A _ _LIMIT SWITCH TO MOV 1NI1M5A (ON1184B)

_INSTR. LOOP CONTAINING INILT/P 5260 DINSTR. LOOP CONTAINING INILT/P 5270 -_Included inSUPPORT FOR NV SYSTEM -Seismic PRA No4160V AC SWITCHGEAR

]ETA (1ETB) X600V AC MCC IEMXA X600V AC MCC )EMXB-l x600V AC MCC lEMXB-2 I -X125V DC PANELBOARD IEVDA (IEVDD) _ XD/G AUTO RESET RELAY ED(TRA3)

(ED(TRB3))

DIG LOAD ACTUATE RELAY 2DA(RA2)

(2DA(RB2))

DIG TEST RELAY TSA2 WSAB) I I ....CONTAINMENT HIGH PRESS. CHANNEL 2 BISTABLE (ESFAS)CONTAINMENT HIGH PRESS. CHANNEL 2 TRANSMITTER (ESFAS)CONTAINMENT HIGH PRESS. CHANNEL 3 BISTABLE IESFAS) -CONTAINMENT HIGH PRESS. CHANNEL 3 TRANSMITTER (ESFAS)CONTAINMENT HIGH PRESS. CHANNEL 4 BISTABLE (ESFAS) ]-CONTAINMENT HIGH PRESS. CHANNEL 4 TRANSMITTER (ESFAS)ESFAS INPUT RELAY K131A (KI31B)ESFAS INPUT RELAY K133A (K133B)ESFAS INPUT RELAY K201A (K201B)ESFAS INPUT RELAY K217A (K271B)ESFAS INPUT RELAY K247A (K247B)ESFAS INPUT RELAY K330A (K330B)ESFAS INPUT RELAY K344A (K344B)ESFAS INPUT RELAY K417A (K4178)ESFAS INPUT WEAY K430A .(K430B)ESFAS INPUT RELAY K444A (K44,4D)ESFAS LOGIC MODULE A213A (A210B)ESFAS LOGIC MODULE A213A (A213B)WFAS LOGIC MODULE A30]8A (A308B) *ESFAS LOGI4C MODULE A313A (A313B)ESFAS LOGIC MODULE A411A (A411I1B)

ESFAS LOGIC MODULE A416A (A4168) -,ESFAS MASTER RELAY K501A (K501B) -ESFAS SLAVE RELAY K603A (K6038) _ESFAS SLAVE RELAY K607A (K6078)LOW STEAMUNE PRESSURE CHANNEL 1 BISTABLE (ESFAS) _LOW STEAMLINE PRESSURE CHANNEL I TRANSMITTER (ESFAS) _STEAMLINE PRESSURE CHANNEL 2 BISTABLE (ESFASIIM IO -TAMN PRSSR CHANNELZ 2 BITAL (E-IS I-LOW STEAMLINE PRESSURE CHANNEL 2 TRANSMITTER (ESFAS)Pcigek ~7 TABLE 4 -I I I I Included in I ISUPPORT FOR NV SYSTEM (cont.) I I J SeIsrnic PRA .I Non-SafeI I I~1* ___________

LOW STEAMLINE PRESSURE CHANNEL 4 BISTABLE (ESFASII'-4. 4.-*LOW STEAMUNE PRESSURE CHANNEL 4 1RANSMITTER (ESFAS)IPRESSURIZER LOW PRESSURE CHANNEL I BWABLE (ESFAS) I "I _PRESSURIZER LOW PRESSURE CHANNEL ) TRANSMIITER (ESFAS)PRESSURIZER LOW PRESSURE CHANNEL 2 BISTABLE (ESFAS) I IPRESSURIZER LOW PRESSURE CHANNEL 2 TRANSMITTER (ESFAS)PRESSURIZER LOW PRESSURE CHANNEL 3 BISTABLE (ESFAS] I I IPRESSURIZER LOW PRESSURE CHANNEL 3 TRANSMITTER (ESFAS)INSTR. LOOP CONTAINING INVFEFT//P 562D & 1NVFT/P 5621 iINSTR. LOOP CONTAINING INVFE/Fr/SS/P 5630 & INVFT/P 5631 -____ "-Included in _IPROCESS CONTROL CABINETS

-" Seismic PRA -Non-Sofe SUPR:O Included InSUPPORT FOR RN SYSTEM '_-_ Seismic PRA Non-Safet 4160V AC SWITCHGEAR IETA (IETB) X600V AC MCC IEMXA _ ___X600V AC MCC 1EMXB-2 ____-._X600V AC MCC 1EMXE X600V AC MCC 1EMXH X600V AC MCC 1EMXH-1 X600V AC MCC 2EMXH X125V DC DISTRIBUTION CENTER 1EVDA (IEVDD) X XD/G LOAD SEQUENCER RELAY 21A(RA7J (21A(RB7])

._D/G LOAD SEQUENCER RELAY LSAI (LSB1) _____D/G LOADING TRANSIENT ADVANCE TIMER RELAY 2ED(ATA5)

(2EDfATB5))

_D/G SEQUENCE TIMER RELAY HA(ST7A)

(HA(ST7B))

_____D/G TEST RELAY 2FB(TSA4)

(2FB(SB4))

... L__INSTR. LOOP CONTAINING 1 RNPG/PS 0 & SVO2 10. 0211.0220.

0221 !(5010 & 0250.0251.0260.0261)

_I_ __IINSTR. LOOP CONTAINING I RNPT/PS/P 5020 (5030)INSTR. LOOP CONTAINING'

)RNFE/FT/P 5040 & T5041 (5050 & 5051) IINSTR. LOOP CONTAINING I RNFE/FT/P 5220 (5230) 1 1 _INSTR. LOOP CONTAINING 1 RNFE/FT/P 5360 & P/P 5361 (5370 & 5371) _REACTOR PROTECTION SYSTEM -Non-Safetv REACTOR TRIP BREAKER A (B) -_ ___-____.U=AfrMD TiID WPM qlDA WrDAlelD A MiI................1 I. I LIIIPoge 3?

013TABLE 4 -ISUI Included In FOI IYSUPPORT FOR SM. SV SYSTEMS _:___I_ I_ I Seismic PRA I Non-SoteII II--~w&JOV AC MCC IFMXA-2I III'C4600V AC MCC IEMXB-4 __ _ _x -_ _INSTR. LOOPCONTAINING ISMSVOOl1(001 I). (0013)& LLOO10,0011

_INSTR. LOOPCONTAINNG ISMSVO30 (0031). (0033) & LL0030,0031 INSTR. LOOP CONTAINING ISMSV0O50 (005)0W3)

& w,) .005)INSTR. LOOP CONTAINING 1MSVO070 (0071)1(0073)

& LL0070, 0071 _..INSTR. LOOP CONTAINING ISMSV/LL/MLOO90 (SV/0101)

INSTR. LOOP CONTAINING ISMSV/SL./MLO]10 (SVO1O1)INSTR. LOOP CONTAINING ISMSILL/Mt.0120 (SV0121)

-INSTR. LOOP CONTAINING 1SMFE/Fr/P 5000. RCPS. FWCS .(FE/Fr/P 5010, RCPS, FWCS)INSTR. LOOP CONTAINING 1SMFE/FT/P

50. RCPS, FWCS (FE/FT/P 500, RCPS, FWCS)INSTR. LOOP CONTAINING 1SMFE/FT/P 5040. RCPS. FWCS (FE/FT/P 5050. RCPS. FWCS)INSTR: LOOP CONTAINING 1SMFE/FT/P50w.

RCPS. FWCS (FE/FT/P 5070, RCPS. FWCS)INSTR. LOOP CONTAINING ISMPT/P 5080 & RCPSINSTR. LOOP CONTAINING ISMPT/P 5090 & RCPSINSTR. LOOP CONTAINING ISMP'/P5100

& RCPSINSTR. LOOP CONTAINING 1SMPT/P 5110 & RCPSINSTR. LOOP CONTAINING 1SMPT/P 5120 & RCPSINSTR. LOOP CONTAINING ISMKI7PP5130

& RCPSINSTR. LOOP CONTAINING ISMPr/P 5140 & RCPSINSITR. LOOP CONTAINING 1SMPT/P51,50

& RCPSINUSR. LOOP CONTAINING ISMPT/P5160

& RCPSINSTR. LOOP CONTAINING ISVPT/P 5170 & RCPSINSTR. LOOP CONWAINING ISMPT/P5180

& RCPS _INSTR. LOOP CONTAINING 1SPTIP519O

& RCPSIncluded InSeismic PRA Non-Sofety SOLID STATE PROTECTION SYSTEM X IIncluded InSUPPORT FOR VA SYSTEM -f Seismic PRA Non-Safety POWER SUPPLY FOR VA SYSMEM X_ __ InCluded In,SUPPORT FOR VC SYSIEM ---Seismic PRA -Non-Safety 600V AC MCC 1EMXHI I i -. 1 .1 1.4f -ontv cursorv iev~ew. of ttme corn gonents reaukredPoge W 3q O.i,TABLE 4 -0InluedISUPPORT FOR YC SYSTEM -T SePsAi onSft4--I _________

w4160V AC SWITCHGEAR IETA (IEBIB4160V AC 2ETA (2ETB)600V AC MCC IEMXG.600V AC MCC 2E1:MXG600V AC MCC IEMXH600V AC MCC 2EMXH .i2oV AC PANELBOARD EKA (EKB)120V AC PANELBOARD KXA-only cursory review of these components re quredPoge~ 19.0 TABLE 5 -ELECTRICAL EQUIPMENT LIST FOR MCGUIRE UNIT 2 IPEEE WALKDOWN-4-4. 4.-IIncluded InAREA TERMINATION CABINETS Seismic PRA Non-Safety Included inAUXILIARY SHUIDOWN PANEL SeLmnlc PRA Noq-Safet xIncluded inSUPPORT FOR CA SYSTEM Seismic PRA _Non-Satetr 4160V AC SWITCHGEAR 2ETA (2ETB) X600V AC MCC 2EMXA (2EMXB) (2EMXB-2

_ X _' __600V AC MCC 2EMXA-4 X600V AC MCC 2EMXA-5 X _125V DC DISTRIBUTION CENTER2EVDA (2EVDB) X125V DC PANELBOARD 2EVDA (2EVDB) I x120V AC PANELBOARD 2EVKA (2EVKB)&

MANUAL TRANSFER SWITCH X -LOCAL MOTOR-DRIVEN PUMP CONTROL PANEL X , _ _LOCAL TURBINE-DRIVEN PUMP CONTROL PANEL XESFAS TRAIN A (8)48V DC POWER SUPPLIES---

-IBATTERY"CHARGER EVCA (EVC13) I.DC CIRCUIT BREAKER FOR MDP2A (MDP2B) START -,NVERfER 2EVIA (2EVIs)!II T-D PUMP RELAY HFII'MFW PUMP RELAY BB(A)'(8B(B))

,(.,.'W,,@)

I '..MFW PUMP RELAY R/TT(FPTCA)

(R/T'(FPTCB))

-'-MFW PUMP RELAY R/T'-I (FPTCA) (RITT- i (FPTCB))

_RELAY R25CCA] (R25C[B))

RELAY K609A K(6095)RELAY LRA6 (1-986)LOAD- SHED RELAY LSAI (LSBD).TEST RELAY TSA2 (I"SB2)ESFAS SLAVE RELAY K633A (K633B) _ESFAS SLAVE RELAY K634A (K634B)056)

ES.A MASTER RELAY K516A051B

!ESFAS INPUT RELAY K113A (KI13B)ESFAS INPUT RELAY K1I14A 0(KI 14B)iESFAS INPUT RELAY K121A (K1218)IESFAS INPUT RELAY K150A 0(K150B)0 ESFAS INPUT RELAY K230A 0(1230B)ESFAS INPUT RELAY K231A (K231B) _ESFAS INPUT RELAY K250A (0(250B)

_ _ELSFAS INPUT RELAY K255A _ESFAS INPUT RELAY K331A (K331B)---____________

___________________

~Pagoe% -/

016_________________TABL 5 InlddInL

_SUPPORT FOR CA SYSTEM (cont.).

_ _ SeIsmIc PRA Non-Safety WIESFAS INPUT RELAY K332A W(332B)ESFAS INPUT RELAY K333A 0(333B)ESFAD INPUT RELAY S 334A A=3UAT) A RESFAS, INPUT RELAY K407A 0(4078) ,E.SFAS INPUT RELAY K408A (1(408B)I ESFAS INPUT RELAY K409A (K4098)iESFAS INPUT RELAY K410A OU,1013)i ESFAS LOGIC MODULEEA317A (A317B) L T ED/G LOAO SEQUENCER (LOAD ACTUATEL R2LAY 2JALA_ _ (__A(RB8))

_D./G LOAD SEQUENCER RELAY A3 (133) 1 I_1SG A LO-LO WATER LEVEL CHANNEL I BISTAB..E SG A LO-LO WATER LEVEL CHANNEL I LEVEL TRANSMITTER SG A LO-LO WATER LEVEL CHANNEL 2 BISTABLE I ISG A LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER_

SG A LO-LO WATER LEVEL CHANNEL 3 BISTABLE I ISG A LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG A LO-LO WATER LEVEL CHANNEL 4 BISTABLE I ISG A LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER SG B LO-LO WATER LEVEL CHANNEL I BISTABLE N ISG B LO-.O WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER_

SG B LO-LO WATER LEVEL CHANNEL 2 BISTABLE, I,SG B LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER_

SG C LO-LO WATER LEVEL CHANNEL 3 I i[,ABLE_

_"SG B LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITR_

_SG B LO-LO WATER LEVEL CHANNEL 4 BISTABLE

_SG B LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER_

SG C LO-LO WATER LEVEL CHANNEL 3 BISTABLE I ISG C LO-LO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG C LO-LO WATER LEVEL CHANNEL 2 BISTABLE T7SG C LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSMITTER SG C LO-LO WATER LEVEL CHANNEL 3 BISTABLE I ISG C LO-.O WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG C LO-LO WATER LEVEL CHANNEL 4 BISTABLE I _1SG C LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER SG D LO-LO WATER LEVEL CHANNEL I BISTABLE I ISG D LO-LO WATER LEVEL CHANNEL I LEVEL TRANSMITTER SG D LO-LO WATER LEVEL CHANNEL 2 BISTABLE I ISG D LO-LO WATER LEVEL CHANNEL 2 LEVEL TRANSIMITER SG 0 LO-LO WATER LEVEL CHANNEL 3 BISTABLE I I"SG D LO-IO WATER LEVEL CHANNEL 3 LEVEL TRANSMITTER SG D LO-.O WATER LEVEL CHANNEL 4 BISTABLE I.ISG D LO-LO WATER LEVEL CHANNEL 4 LEVEL TRANSMITTER INS , LOOP CONTAINING 2CASV/MV020D.

SVo2. & SV202INSTR. LOOP CONTAINING 2CASV/MV0270 (0320) & SV0271 (0321)INSTR. LOOP CONTAINING 2CALL/P /SV/ML0520 (0480) jJ_.INSTR. LOOP CONTAINING 2CALL/P/SV/ML0560 (0440Im lNSTR. LOOP CONTAINING 2CALLIP ISV/ML0600 (0401) I IIIFW.INSMR. LOOP CONTAINING 2CALL/P ISVIMLO06O (0360) I IPagey 4-L2 TABLE 5 -0I I I I I I I ncludd inSUPPORT FOR CA SYSTEM (Cont.) I-_ __ _ Seismic PRA I Nlo-Sofety I II-in. .LJ...............L...I

_________________

t..iWIIjNSTR.

LOOP CONTAINING 2CAFE/PSIFT/PSO00 (5010). PS5001 (5rn11).

& PS5002 r'5012)INSTR. LOOP CONTAINING 2CAPS/PT/P50 (5030) 1- 1 1.INST. LOOP CONTAINING 2CAFErPS/F,/P5040.

P5041, P5042. &P .INSTR. LOOP CONTAINING 2CAPS/PTIPGP5D05 INSTR. LOOP CONTAINING 2CAPL/PTP 5070 (50)INSTR. LOOP CONTAINING 2CAFET/,,P 5090 (5110) & FT.91 (5l)INSTR. LOOP CONTAINNG 2CAFERFT/P 5500 (5120) & FT5. 1 (5121)INSTR. LOOP CONTAINING 2CAPSIP 51600INSTR. LOOP CONTAINING 2CRLT/P5490

.,.INSIR. LOOP CONTAINING 2CFLTIP 5500-M_ ___INSTR. LOOP CONTAINING 2CFLT/P5510 INSTR. LOOP CONTAINING 2CFLT/P5520 INST2. LOOP CONTAINING 2CMT/P 5530 -_ __-____-___

INSI-. LOOP CONTAINING 2CR.T/P 5540 -_. 'INSTR. LOOP CONTAINING 2CFLT/P 5550 -__ ____-____-

INSTR. LOOP CONTAINING 2CRT/P 56 -____- ___INSTR. LOOP CONTAINING 2CFT/P 5570INSTR. LOOP CONTAINING 2CfLT/PS58M

__ ____-___iNSTR. LOOP CONTAINING

-2CFLT/P 5590 --____ ____-___INSTR. LOOP CONTAINING 2CRTJP 5600 -__ __INSTR. LOOP CONTAINING ZCAT/P 6000 D__ ___MNSR. LOOP CONTAINING 2CFLT/P 6010 __ ____ -____-.___

INSIR. LOOP CONTAINING 2CFLT/P 6020 ___ ____-____

___INSTR. LOOP CONTAINING 2CRT/P 603 __- ___Included InSUPPORT FOR DIESEL GENERATORS

"'"Seismic PRA Non-Sofety 4160V AC SWTCHGEAR 2ETA (2ETB) X600V AC LOAD CENTER 2ELXA (2ELXB) X600V AC LOAD CENTER 2ELXC (2EIXD) X600V AC LOAD CENTER 2ELXE (2ELXF) X600V AC MCC 2EMXA (2EMX)B)

X600V AC MCC 2EMXE X120V AC PANELBOARD 2DG2A (20G2B) X125V DC PANELBOARD 2EVDA (2EVDD) X125V DC BATTERY./RACK

  • _. XINVERTER XDIG CONTROL PANELS XBATTERY 2EDGA (2EDGB) AND CHARGERS I XBATTERY 2EDGA (2EDGB) INPUT & OUTPUT BREAKERS600/12Uv AC TRANSFORMER TO 2DG2A M20G2BM.,AUTO RESET RELAY ED('RA3)

(ED(TRB3))

)i'BLACKOUT RELAY DC(BOA) CDC(BOBI)

IBLACKOUT RELAY DC(BOA) (DC(BOBI)

-'-4 4.-I 1-1 1-4lwmwBLACKOUT LOGIC RELAY DA(LRA2)

(DA(LRB2fl" IP099eX -f3 Q I aTABLE 5 -__P __I _ FI I_ I__ I I I Included In I Ion-__eSUPPORT FOR DIESEL GENERATORS (cant.) Ij___ I_____ SeI IR I ~ Nonýr--Sofet 4-4 4-4 4-4MWIDEFEAT TEST RELAY FB(DISA)

(FB(DT])vDIG START RELAY 2TRAIA (2TRA(B))

'DIG START RELAY 2TRA1(A)

(2TRA1(8)

_____ ___DIG START RELAY Z"RB(A) (2"RB(B))

D/G START RELAY 2TRC(A) (2TRC(B))

DIESEL STARTING AIR RELAY RVGI(A) (RVGI(B))

DIESEL STARTING AIR RELAY RVG2(A) (RVG2(8))

DIESEL STARTING AIR RELAY RVG3(A) (RVG3(B))

D.GAUTOSTART RELAY DASR(A) CDASR(B))

) -LOAD SHED RELAY ABISAI) (AB[LSBI))

LOAD SHED RELAY AA(LSA2)

(AA[LSB2))

....LOAD SHED TIMER RELAY GC(LSA')

(GC(L..T)

LOGIC TIMER RELAY FD(LTIA)

(FD(LTIB))

LOGIC TIMER RELAY FD(LT2A)

(FD(LT2B))

RELAY AC(127ZBX)

RELAY AE[ 27XBX)RELAY 3CR(A E (3CR(BA)RELAY D (ATRA] (A)RT)B )RELAY DGIFRA (DGIFRB)RELAY ESX{A] (ESX(}))RELAY 21RA[A (2TRA(B])

ERELAY FC(CRAI]

(FC2'IRBI))

IRELAY HRA(AA) (HRB(BB))

RELAY RTD(AG (REDLB)A

.A YRELAY S RAIXEA Y (S1AIX(BA)

Q IRELAY SIA2XTA 2 (SIA2X{B2)

RELAY SIA4XTA)

(SIA4X2B)

_ _IRELAY TSA3 (TINN) (RESEr RELAY EB[RRA) (EB[RRB])

RESTART RELAY FA[RGA) (FA{RGB))

UNDERVOLTAGE RELAY 4CA[A) (5A37))UNDERVOLTAGE RELAY 4DA(A) (4DA( P0))UNDERVOLTAGE RELAY AC[127ZAX)

(AC0927ZBX))

UNDERVOLTAGE RELAY AD&127YAXG (AD(127YBX()

UNDERVOLTAGE RELAY AE[127XAG

) (AE3527X02))

RESET SWITCH EG135SPEED SWITCH $2 A2 (S282 )SPEED SWICH $2 A2 (S32 B2) ...INSTR. LOOP CONTAINING 2FDLS5040

& LS 504 0 & 351)INSTR. LOOP CONTAINING 2LDPG/PS5120

& PS,5..121/512215123 (5130 & 51311F5132t 5133)INSTR. LOOP CONTAINING 2VGPG/PS(4

& PG/P55 (5060 & 5070)INSTR. LOOP CONTAINING 2VGPG/PSM~

(5M I- IINSTR, LOOP CONTAINING 2VGPGIPM120

&{ PG/PS5122 (5140 & 5142)__INSTR.

LOOP CONTAINING 2VGPGIPS5130

& PG/.PS5132 (5150.& 5152) ..I I I II I I I I 4.-I 4.-Iw--II I IPogqý 4 019TABLE 5 -01 Included in I _ISUPPORT FOR FW SYSTEM II_1 Seismic PRA I Non-Sofety wINSTR. LOOP CON INWG 2FWLTIP 5000INSTR. LOOP CONTAININC 2FWLTIP 5000 --- ---- ---- .4.-I 4-I J-4-- .1-.I.INSTR. LOOP CONTAINING 2FWLTIP 5010INSTR. LOOP CONTAINING 2FWLT/P 5020 =--__ included inSUPPORT FOR KC SYSTEM -Seismic PRA Non-Safet 4160V AC SWITCHGEAR 2ErA (2ETB) I I _x600V AC MCC 2EMXA (2EMXB) X125V DC PANELBOARD 2EVDA (2EVDD) -XD/G ACCELRATED SEQUENCE RELAY 2DB(AA2)

(2DB(AB2])

DIG AUTO RESET ALU)UARY RELAY CCMRA3X)

(CC )IRB.)DIG LOAD ACTUATE RELAY 2HA(RA6)

(2HA(RB6))

" -D/G LOAD SEQUENCER RELAY LSA2 (LS ,I I__DIG LOAD SEQUENCER RELAY RA6 (RB6) II___.D/G LOADING TRANSIENT ADVANCE TIMER RELAY 2AD(ATAI)

(2AD(ATBI)

_D/G LOADING TRANSIENT ADVANCE TIMER RELAY 28D(ATA2J (2BO(ATB2))

D/G LOADING TRANSIENT ADVANCE TIMER RELAY 2CD(ATA3)

(2CD(ATB3))

_D/G LOADING TRANSIENT ADVANCE TIMER RELAY 2DD(ATA4]

(2DD(ATB4))

-D/G SEQUENCE TIMER RELAY GA(ST4A)

(GA(ST4B))

D/G SEQUENCE TIMER RELAY GB(ST2A)

(GB(Si2B])

-D/G SEQUENCE TIMER RELAY HB(ST6A)

(HB(ST6B))

-D/G SEQUENCE TIMER RELAY HC(ST5A)

(1HC(STSB))

,D/G TEST' RELAY 2FB(TSA4)

(2FB(TSB4I))

L ___ESFAS SLAVE RELAY K61OA (K610B)TEST RELAY TSAI CTSBI) ._,INSITR. LOOP CONTAINING 2KCPT/P 5490 (550)INSTR. LOOP CONTAINING 2KCFE/FT/P 5530 (5540) --INSTR. LOOP CONTAINING 2KCFE/FT/FS/SVJP 5670 (5680)I- Included inMAIN CONTROL BOARDS Seismic PRA -Non-Safea X-Included In -_SUPPORT FOR NC SYSTEM _ __ Seismic PRA _.Non-Safety 4160V AC SWITCHGEAR 2ETA (2ETB) X _600V AC LOAD CENTER 2ELXA (2ELXB) -X _600V AC LOAD CENTER 2ELXC (2ELXD) -m -I_ X600V AC MCC 2EMXC (2EMXD) X~I95V flC PANFI ROARfl 9FVflA (9FVflfl~

yPANEBO-4 2ED-(.)VO ACCELERATED SEQUENCE RELAY 2CB(AAI)

(2CB(AB1))

Page% 457 020TABLE 5 -SUPPORT FOR NC SYSTEM (cont.) .Seln PRA I jNon-Soeto I'W9ESFAS SLAVE RELAY K608A (K608B)IImESG AUXILIARY RELAY BDIESGAX2)

(BD(ESG BX2)) -LOAD SHED RELAY AB(LSA2)

(AB. SB2)) I IMAXIMUM SEQUENCE TIMER RELAY BE(LT3A)

(BE(LT3B))

RELAY 2AB(LRA4)

(2AB(.RB4))

_.,RELAY DC(BOA) (DC(BOB])

RELAY DA(LRA2)

(DA(LRB2))

RELAY FCalRA2)

(FC(TRB2))

....._.SEQUENCER LOAD RELAY 2CA(RA2)

(2CA(RB2)).

SEQUENCER LOAD RELAY 2DA(RA2)

(2DACRB2])

SEQUENCER TIMER RELAY JA(ST2A)

(JA(ST28))

TEST RELAY 2FBITSA4)

(2FBCrSB4))

TEST RELAY 2GB(rSA5)

(2GB(TSB5))

UNDERVOLTAGE RELAY C8B127AX)

(CB(127BX))

INSTR. LOOP CONTAINING 2NCSVO320

& SV0321INSTR. LOOP CONTAINING 2NCSV0340

& SV0341INSTR. LOOP CONTAINING 2NCSVO360

& SV0361_ __I -Included in ,SUPPORT FOR ND SYSTEM ,-Seismic PRA -Non-Sofeft 4160V AC SWITCHGEAR 2ETA (2ElB) x600V AC MCC 2EMXA (2EMXB-1)

X _125V DC DISTRIBUTION CENTER 2EVDA (2EVDD)_

XDIG LOAD ACTUATE RELAY 2FA(RA4)

(2FA(RB4))

,RELAY DGTSA6 (DGTSB6)

___RELAY LSAI (LS82)INSTR. LOOP CONTAINING 2NDRD/P 5=00 (5120) & 2NDR/P CR5060 (5070)INSTR. LOOP CONTAINING 2NDFEIFS5040 (5050)INSTR. LOOP CONTAINING 2NDPT/P 5090 (5080)INSTR. LOOP CONTAINING 2NDFE/FT5250 (5260)___Included inSUPPORT FOR NI SYSTEM Seismic PRA Non-Safety 4160V AC SWITCHGEAR 2ETA (2ETB) .X600V AC MCC 2EMXA _ x600V AC MCC 2EMXA-1 .I_ X600V AC MCC 2EMXB-1 _ X125V DC PANELBOARD 2EVDA (2EVDD) --XD/G LOAD ACTUATE RELAY 2EA(RA3)

(2EA(RB3))

-_IDIG LOAD SEQUENCER RELAY RA3 CRB3) U-I _DIG RELAY LSA2 (LSB2)-- --- tt f-+ 1-4lqwpDG TEST RELAY DGTSA6 .(DGTSB6)

Page 04-4 021ITABLE 5 --T I V --~nInuJded In~~~-Inlue In_______

SUPPORT FOR NI SYSTEM (cont.)Seismlc PRANon-Sofetv Se-isi PR-o Sf--~ -~ ~-4 +-*wUMIT SWITCH TO MOV 2NI147ALIMIT SWITCH TO MOV 2N1185A (2NI184B) r iTINSTR. LOOP CONTAINING 2NILT/P 5260INSTR. LOOP CONTAINING 2NILT/P 5270Included InSUPPORT FOR NV SYSTEM Seismic PRA Non-Safety 4160V AC SWITCHGEAR 2ETA (2ETB) x600V AC MCC 2EMXA X600V AC MCC 2EMXB-) X600V AC MCC 2EMXB-2 X)25V DC PANELBOARD 2EVDA (2EVDD) -... XDIG AUTO RESET RELAY EDUTRA3)

(ED([RB3))

D/G LOAD ACTUATE RELAY 2DA(RA2)

(2DA(RB2))

DIG TEST RELAY TSA2 (FSAB) I ICONTAINMENT HIGH PRESS. CHANNEL 2 BISTABLE (ESFAS)CONTAINMENT HIGH PRESS. CHANNEL 2 TRANSMITTER (ESFAS)CONTAINMENTHI-GH PRESS. CHANNEL 3 BISTABLE (ESFAS) ICONTAINMENT HIGH PRESS, CHANNEL 3 TRANSMITTER (ESFAS)CONTAINMENT HIGH PRESS. CHANNEL 4 BISTABLE

[ESFAS) ICONTAINMENT HIGH PRESS. CHANNEL 4 TRANSMITTER (ESFAS)..

ESFAS INPUT RELAY KI34A (K331B)ESFAS INPUT RELAY 'Kl33A (KI33B)ESFAS INPUT RELAY K201A (K201B)ESFAS INPUT RELAY K217A (02718)ESFAS INPUT RELAY K247A (K247B)ESFAS INPUT RELAY K33DA (K330B)ESFAS INPUT RELAY K344A 0(3448)ESFAS INPUT RELAY K417A 0041713)ESFAS INPUT RELAY K430A (10308)ESFAS INPUT RELAY K444A 0(44413)ESFAS LOGIC MODULE A210A (A2101MESFAS LOGIC MODULEA213A (A21313)ESFAS LOGIC MODULE A308A (A308B)ESFAS LOGIC MODULEA313A (A313B)ESFAS LOGIC MODULEA411A (A4110)ESFAS LOGIC MODULEA416A (A416B)ESFAS MASTER RELAY K501A (K5O1B)ESFAS SLAVE RELAY K603A (K60313)

_ESWAS SLAVE RELAY K607A (K607B)LOW STEAMLINE PRESSURE CHANNEL 1 BISTABLE (ESFAS)LOW STEAMUNE PRESSURE CHANNEL 1 TRANSMITTER (ESFAS).._

-,LOW STEAMUNE PRESSURE CHANNEL 2 BISTABLE (ESFAS) _i I III-MLOW STEAMUNE PRESSURE CHANNEL 2 TRANSMITTER (ESFAS)IWLLOW STEAMUNE PRESSURE CHANNEL 4 BISTABLE (ESFAS)IPOge+ 1- 7 TABLE 5 -0II_[_I Included In=SUPPORT FOR NV SYSTEM (cont.) I I Seismic PRA I Non-Saret 1I II ILOW STELAMUNE PRESSURE CHANNEL 4 TRANSMITIER (ESFAS) jPRESSURIZER LOW PRESSURE CHANNEL I BISTABLE (ESFAS] IIPRESSURIZER LOW PRESSURE CHANNEL I TRANSMITTER (ESFAS)PRESSURIZER LOW PRESSURE CHANNEL 2 BISTABLE (ESFAS) 1 1PRESSURIZER LOW PRESSURE CHANNEL 2 TRANSMITTER (ESFAS)PRESSURIZER LOW PRESSURE CHANNEL 3 BISTABLE (ESFAS) I I .- I...PRESSURIZER LOW PRESSURE CHANNEL 3 TRANSMITTER (ESFASI.INSTR. LOOP CONTAINING 2NVFE/FTISS/P 5620 & 2NVFT/P 5621INSTR. LOOP CONTAINING 2NVFE/FTISS P 5630 & 2NVFT/P 5631-Included InPROCESS CONTROL BOARDS .Seismic PRA Non-Safety Included InSUPPORT FOR RN SYSTEM -Seismic PRA Non-Sofety 4160V AC SWITCHGEAR2ETA C2ETB) X600V AC MCC 2EMXA X600V AC MCC 2EMX(B-2

...XaýAC MCC 2EMXE ,'X60VAC MCC 2EMXH X600)V AC MCC 2EMXH-1 X600V AC MCC 2EMXH X125V DC DISTRIBUTION CENTER 2EVDA (2EVDD) .XDIG LOAD SEQUENCER RELAY 21A(RA7]

(21A[RB7])

D/G; LOAD SEQUENCER RELAY LSA2 (Ms2) I F-D/G LOADING TRANSIENT ADVANCE171MER RELAY 2ED(ATA5]

(2ED[AB]DIG SEQUENCE TIMER RELAY HA[ST7A)

),D/G TEST RELAY 2FB[TS4]

(2FB(SB4))

-IIINSTR. LOOP CONTAINING 2RNPG/P:SS=X

& SV0210. 021,l, 2]20, 0221(5010 &0250,

_ I I -- 'IIINSTR. LOOP CONXTAMNIG 2MIIPTIPS/P

=02 (SM I I)INSTR. LOOP CONTAINING 2MMFFT/P 5040 & R5041 (0505D& 6051)INSTR. LOOP CONTAINING 2RfLH:/FT/P 5220 (5230) _ .I I.INSTR. LOOP CONTAINING 2R"E/FTIP

&W6 & PTPSI(53.7,0

&.53.7 1)Mncluded inREACTOR PROTECTION SYSTEM Seismic PRA Non-Sofer TRIP BREAKER A (B)REACTOR TRIP BYPASS BREAKER A (B),mad _____________________x____

wp____________________________________________________________________

~ i~-.... £ -J. L -1 ____________________

J. -Page) LI-'

623TABLE 5 -U OTFO SVSSTM .I .Included InSUPPORT" FOR SM. svSV I II PRA I Non-Safety I I I-5 4 4--I *I.-~4."WlI60V AC MCC 2EMXA-2I I IIx600V AC MCC 2EMX"-4 i i__ x_INSTR. LOOPCONTAIMNG 2SMSV[J10 (0011).(0013)&LL0010,0011

_INSTR. LOOP CONTAINING 2SMSV0030(0031).(0033)

& LL0030.0031 INSTR. LOOP CONTAINING 2SMSVO050 (0051) (0053) & 100650. 0051 ,_INSTR. LOOP CONTAINING 2SMSVO070 (0071)1(0073)

& LL0070. 0071 _ ..INSTR. LOOP CONTAINING 2SMSV/LL/MLOO0 (SVO091)

_ _INSTR. LOOP CONTAINING 2SMSV/LL/ML0110 (SV0101)INSTR. LOOP CONTAINING 2SMSV/LL/MLOI 10 (SV0 11) .INSTR. LOOP CONTAINING 2SMSV/LL/ML0120 (5V0121) jJ_ ___INSTR. LOOP CONTAINING 2SMFE/FT/P 5000. RCPS. FWCS (FE/FT/P 5010. RCPS. FWCS)iNSTR. LOOP CONTAINING 2SMFE/FTLP 50M,0 IRCPS, FWCS (FE/F'/P 5030, RCPS, FWCS)INSTR. LOOP CONTAINING 2SMFE/FT/P 5040. RCPS. FWCS (FE/FT/P 5050. RCPS. FWCS)INSTR. LOOP CONTAINING 2SMFE/FT/P 6060. RCPS. FWCS (FE/FT/P 5070. RCPS. FWCS)INSTR. LOOP CONTAINING 2SMPT/P 5080 & RCPS _INSTR. LOOP CONTAINING 2SMPTjP 5090 & RCPS ...INSMR. LOOP CONTAINING 2SMPT/P6100

& RCPSINSTR. LOOP CONTAINING 2SMPT/P5110

& RCPSINSTR. LOOP CONTAINING 2SMPT/P5120

& RCPSINSTR. LOOP CONTAINING 2SMPI/P 5130 & RCPSINSR. LOOP COTAINING 2SMPr/P 5140 & RCPS -INSTR. LOOP CONTAINING 2SMPTb P 5150 & RCPSINSTR. LOOP CONTAINING 2SMPT/P5160

& RCPSINSIR. LOOP CONTAINING 2SMPTIP65170

& RCPS_INSTR. LOOP CONTAINING 2SMPT/P5180

& RCPS -__INSTR. LOOP CONTAINING 2SMPT/P5190

& RCPS1Included InSOLID STATE PROTECTION SYSTEM ... .,_ Seismic PRA N -r__ _xI0ePogeX 4ij opa1TABLE 6 -AhCONTAINMENT PERFORMANCE COMPONENT UST FOR MCGUIRE UNIT IIPEEE WALKDOWN

,CONTAINMENT ISOLATION VALVES Penet. alve Posit.onAND PENETRATIONS No. Valve No.. Line Size (in.) Norm] Fal Acc.UPPER COMPARTMENT PURGE INLEt I M367 I lVPIB 24 C C CUPPER COMPARTMENT PURGE INLET M367 I IVP2A 24 C C CUPPER COMPARTMENT PURGE INLET 1VP3B 24 C C CUPPER COMPARTMENT PURGE INLET M454 IVP4A 24 C C CLOWER COMPARTMENT PURGE INLET M357 1VP6B 24 C C CLOWER COMPARTMENT PURGE INLET IM357 VP7A -24 C C CQOWER COMPARTMENT PURGE INLET M456 -VP8B 24 C C CLOWER COMPARTMENT PURGE INLET M456 IVP9A 24 C C CCONTAINMENT PURGE EXHAUST M368 IVPIOA 24 C C CCONTAINMENT PURGE EXHAUST M368 IVPIIB 24 C C CCONTAINMENT PURGE EXHAUST M455 IVP12A 24 C C CCONTAINMENT PURGE EXHAUST M455 IVP13B 24 C C CCONTAINMENT PURGE M119 )VP15A -24 C C CCONTAINMEN PURGE M M19 IVP16B -24 C C CINCORE INSTR. ROOM PURGE IN M213 IVPI7A -12 C C CORE INSTR. ROOM PURGE IN 1M213 VP18B 12 C C C.ORE INSTR ROOM PURGE OUr M138 IVP19A _ 24 C C CREINSITR.

ROOM PURGE OUT M138 IVP20B 1 24 C C CCONTAINMENT AIR RELEASE M243 IVQIA _ 6 C C CCONTAINMENT AIR RELEASE I43 lVQ2B -6 C C CCONTAINMENT AIR ADDIIlON M384 IVQ5B -6 C C CCONTAINMENT AIR ADDmON M384 )VQ6A 6 C C CCONT. VENT UNITS COND. DRAINS TO DRN. TK. M221. IWL321A -6 0 A] CCONT. VENT UNITS COND. DRAINS TO DRN. TK M221 IWL322B 6 0 Al CEQUIPMENT HATCH .......UPPER CONTAINMENT PERSONNEL HATCH.. C392...LOWER CONTAINMENT PERSONNEL HATCH .C152 .......PERSONNEL AIR LOCK INFLATABLE DOOR SEALS OINCLUDING AIR SUPPLY SYSTEM)PERSONNEL AIR LOCK 208 V UNEAR ACTUATOR DOOR LATCHES600V AC MCC IEMXA600V AC MCC IEMXB I125V DC PANELBOARD 1EVDA _125V DC PANELBOARD 1EVDB125V DC PANELBOARD lEVOD _120V AC PANELBOARD IEKVA _120V AC PANELBOARD IEKVD -IPageg 5c OF,,:TABLE 6 -al-train components ore shown in parentheses.

A detailed wolkdown of these components Is notessary if the WB train configuration is similar to the 'A' train.)HWDROGEN MIIIGATION SYSTEMGLOW PLUG IGNITERS600V AC MCC IEMXA (EMX) "TRANSFORMER HMTA (HMTB)TRANSFORMER IEMXA (IEMXB)ICE BASKETS & DOORS ....Une Included InNS SYSTEM ..Size (in.) Seismic PRANS PUMP IA (1.8) -'__ XNS HX ]A (1B) "h"4160V AC,.SWTCHGEAR IIETA (IETB)w. 60aV AC MCC IEMXA (IEMXB).V DC PANELBOARD 1EVDA (1EVDD)Line Included InVX SYSTEM Size (in.) Seismic PRAAIR-OP DAMPER IRAF-D-5

(-8) ,AIR-OP DAMPER IRAF-D-6

(-9)_AIR-OP DAMPER IRAF-D-7

(-10)MOTOR-OP ISONAI(O DAMPER IRAF-D-2

(-4) _CONTAINMENT AIR RETURN FAN IA (IB) ..... X ,600V AC MCC IlEMXA (IEMXB) .........

600VAC MCC IEMXC (IEMXD).120V AC PANELBOARD IEKVA (I1KVD) _ .PRESSURE TRANSMITER I VXPT5390 (I-ci ossoc. breaker, alarm module,.&

48 dc power supply)(PRESSURE "RANSMIT"ER IVXPT5380 toncL assoc breaker, alarm module. & 48 dc power supply))PRESSURE TRANSMOrTER IVXPT5500 Uncl. assoc. breaker, alarm module. & 48 dc power supply)(PRESSURE TRANSMITTER IVXPT5490 (Mc. assoc breaker, alarm module. & 48 dc power supply))Page~ ý '

026TABLE 7 -AhCONTAINMENT PERFORMANCE COMPONENT USLT FOR MCGUIRE UNIT 21IPEEE WALKDOWN____

CONTAINMENT ISOLATION VALVES , Peneti. ' Volve PositionAND PENETRATIONS No. Valve No. Line She (in.) Norm FoR Ac.UPPER COMPARTMENT PURGE INLET " M367 2VPIB 24 " -_UPPER COMPARTMENT PURGE INLET I M3.7 2VP2A 24 C C CUPPER COMPARTMENT PURGE INLET 2VP3B 24 C C CUPPER COMPARTMENT PURGE INLET M454 2VP4A 24 C C CLOWER COMPARTMENT PURGE INLET M357 2VP6B 24 C C CLOWER COMPARTMENT PURGE INLET M357 2VP7A 24 C C CLOWER COMPARTMENT PURGE INLET M456 2VP8B 24 c C CLOWER COMPARTMENT PURGE INLET M456 2VP9A 24 C C CCONTAINMENT PURGE EXHAUST M368 2VP1OA 24 C C CCONTAINMENT PURGE EXHAUST M368 2VPlIB 24 C C CCONTAINMENT PURGE EXHAUST M455 I2VP2A 24 C C CCONTAINMENT PURGE EXHAUST M455 _ 2VP132 24 C C CCONTAINMENTPURGE.

M119 2VP15A 24 C C CCONTAINMENT PURGE M119 -2VP168 1 24 C C CINCORE INSTR. ROOM PURGE IN " M213 -2VPI7A 12- C C CCORE INSTR. ROOM PURGE IN M213 2VP18B 12 C C COE INSTR. ROOM PURGE OUT 1 M138 2VP19A 24 C C CINSTR. ROOM PURGE OUT .M138 2VP209 24 C C CCONTAINMENT AIR RELEASE M243 , 2VQ1A 6 C C CCONTAINMENT AIR RELEASE M243 2VQ2B 6 c ,CONTAINMENT AIR ADDITON M384 __2VQ_ B 6 C c__CONTAINMENT AIR ADDITION M384 _ 2VQ6A 6 C C CCONT. VENT UNITS COND. DRAINS TO DRN. TI. M221 2WL321A 6 O A CCONT. VENT UNITS COND. DRAINS TO DRN. "K. M221 2WL322B 6 0 Al- CEQUIPMENT HATCH ........

I......UPPER CONTAINMENT PERSONNEL HATCH , C392 _ ... ..._ _LOWER CONTAINMENT PERSONNEL HATCH C152PERSONNEL AIR LOCK INFLATABLE DOOR SEALS (INCLUDING AIR SUPPLY SYSTEM) I-PERSONNEL AIR LOCK 208 V LINEAR ACTUATOR DOOR LATCHES____

600V AC MCC 2EMXA _ _ ,_600V AC MCC 2EMXB125V DC PANELBOARD 2EVDA I'_I125V DC PANELBOARD 2EVDB __ .:___,I126V DC PANELBOARD 2EVDD _ _ _ _,120V AC PANELBOARD 2EKVA _____120V AC PANELBOARD 2EKVD _l_"___Paget 5 7 TABLE 7 -AhB train components ore shown in parentheses.

A detailed wolkdown of these components Is notessary if the '0' train con!lguration Is smilar to the A train.)HYDROGEN MITIGATION SYSTEMGLOW PLUG IGNITERS600V AC MCC 2EMXA (2EM.B) -_"TRANSFORMER HMTA (HMTB)TRANSFORMER 2EMXA (2EMXB)ICE BASKETS & DOORSLine Included inISNS SYSTEM Size (In. Seismic PRANS PUMP 2A (2B) XNS HX 2A (28) XS4160V AC sWI.TCHGEAR 2ETA (2ETB),600V AC MCC 2EMXA (2EMXB),- 5V DC PA.,NE.BOARD 2EVDA (2EVDD)Line Included inVX SYSTEM Size (In -Seismic PRAAIR-OP DAMPER 2RAF-D-5

(-8)AIR-OP DAMPER 2RAF-D-6

(-9) _._...._

_AIR-OP DAMPER 2RAF-D-7

(-10)MOTOR-OP ISOLATION DAMPER 2RAF-D-2 (4)_CONTAINMENT AIR RETURN FAN 2A (2B) "" X600V AC MCC 2EMXA (2EMXB) , ,R5O]V AC MCC 2EMXC (2EMXD) ...._120V AC PANELBOARD 2EKVA (2EKVD)PRESSURE TRANSMITTER 2VXPT5390 (ncL ossoc. breaker, alarm module, & 48 dc power supply)(PRESSURE TRANSMUlTER 2VXPT5380 incl. ossoc, breaker.

alarm module, & 48 dc power supply])PRESSURE TRANSMITTER 2VXPT600 (inc. ossoc. breaker, alarm module, & 48 dc p.ower supply)(PRESSURE TRANSMITTER 2VXPT5490 (IncL ossoc, breaker, alarm module, & 48 dc power supply))Pogey 53 Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 2McGuire Unit 1 SWEL-1Rev. 1 McGuire Unit I SWEL. Equipment Walkdown ScopeATTACHMENT 21 of 6Eqimn ytm Class of Bids El. Roma oin Lisedon Malor Now/ Prior IPEBEE___________

Building_

____, Rom Coun EEE Replacement Discreilancy/

Safe',Fntiy Eqipen 1 Dsoloio ~Eauismerri Grid lin unctionEhaceen 05-Horlzonata.OltO~

ICAPU0001 IA MDCAP CA Pump Aux Bldg 716 O/MDCAPmX NC-Press, DHICA-PN-AFPA MOCAP 1A Control Panel CA 20-Instrument and Aux Bldg 716 eS0/MDCAP CC-61 X NC-Press, DHControl Panel Rm1CA-PN-AFTP TDCAP Control Panel CA 20.Instrument and Wu ~g 76 60TDCA XN-PaDControl Panel Puup Blg 7 Rm CPrs.ICAPUD003 TDCAP CA Aua Bldg 710 600oTOCA X NC-Press, DH_ AP_ _T__APC Puma Pump RmICAHX0003 TDCAP Bearing Oil Cooler CA 21.Tanks/HtXs Aux Bldg 716 600iTDCA X NC-Press, DHPPump RmICA-56A MDCAP Flow Controt to 1 B SG CA 07-AOV Aus Bldg 716+8 6500/MDCAP x NC-Press, DHRm1SA-4aABC TDCAP steam supply from 1C SG SA 07-AOV Inner 76+0 InnerDoghouse X NC-Preas, DHInner Inner1SA-4gAB TDCAP steam supply from IB SG SA 07-AOV I Doohouse 767+11 Doohouse X, NC-Press.

DH1VGTKO062 1A1 EDG Starting Air Tank VG 21-TanksitMs BEG Bldg 736.5 IA OG Ar X Various1VGTK0063 1A2 EDG Starting Air Tank VG 21-Tanks/HtXs EDG Bldg 736.5 IB EDG Rm X Various1VGTK0064 1 B 1 EDG Starting Air Tank VG 21-Tanks/HtXs EDG Bldg 736.5 IA EDG Rm X Various1VGTKO065 1B2 EDG Staering Air Tank VG 21-Tanks/HtXs EDG Bldg 736.5 lB EDG Rm X Various1VG-61 EDG Serting Alr Solenoid VG 08-MOVWSOV EOG Bldg 736.5 1A EDG Rm X Various1VG-66 EDG Sartting Air Solenoid VG 08-MOV/SOV EDG Bldg 736.5 1B BDG Rm X VariouslB EDG 16 Emergency Diesel Generator Set EDG 17-Engine BOG Bldg 736Generator

.5 lB BOG Am X Various1KCTKO009 KC Surge Tank KC 21-Tanks/HtXs Aux Bldg 767 9 JJ-57 X VariousIKCHXO005 IA KC HiX KC 21-Tanks/Htxa Arx Bldg 750 KC HLXArea JJ-56 x VariousX -missingogou 1KCHX0006 1B KC HtX KC 21-Tanks/HtXs Aux Bldg 750 KC HNX Area JJ-S6 6or saddle base Variousand curbr1KCPUO0OI lA1 KC Pump KC 05-Horizontal Aum Bllg 733 UI KC GG-55 XVariousPump Pump Area McGuire Unit 1 SWEL-1 Equipment WalkdOwn ScopeATTACHMENT 22 of 6Euoet eritcSytm Class Rf Bulig Ee. Ro o iste on Major New/ Prior IPEEES Ss---------m-B .Room# Column- IPFEE Retacernet iscrepnyl Safety FunctionOddnen List Equipment Enhancemen 1KCPU.002 1A2 KC Pump KC 05-Horizontal Aun Bldg 733 U1 KCPump Pump Area GG-5 X VeaiousOpen1 KC-50A KC Aux Bldg Non-ESS Return Isot KC 0n-M.OVISOV Au" Bidg 750 General GG-57 X X (EC-75450, VariousArea replace valve)3 Aux Bldg Non-Essential Header Open1KC-53I Nolation KC 08-MOV/SOV Aux Bldg 750 General KK-55 X VariousIsolation__

AreaI NC-32B NC System Pressurizer PORV NC 07-AOV Rx Bldg Przr Cavity X NC-Press, NCInventory 1 NC-34A NC System Pressurizer PORV NC 07-AOV Rx Bldg Przr Cavity X NC-Press, NCInventory 1NDRl5060 1A ND pump dsch temp NO 1S-Temperature Amn Bldg 750+9 732 LL-51 Containment Sensor Integrity INDRD5120 1B ND HtX dischargeTemperature to ND 19-Temperature Aux Bldg 750+9 733 LL-51 Containment NC CL Sensor Integrity 1ND-1B RHR Pump Hotleg Suction Isolation ND 08-MOV/SoV Rx Bldg 745 B-C Lower BetweenContainment B & CSG D1ND-2AC RHR Pump Hotleg Suction Isolation ND 08-MOV/SOV Rx Bldg 745 B-C VL Fan B-C VL XRm Fan RmDH, NC1 ND-4B RHR FWST Suction Isolation ND 08-MOV/SOV Ann Bldg 695 P 5pechase FF-53 X Inventory.

P___e__a__

_Reactivity IND-15B ND -tX Discharge X-tie nsot ND 08-MOVISOV Aux Bldg 733+8 733 LL-52 X X ReaC__________

80-997)Reactivitv X OH. NC1ND-14 ND 1 B HtX Discharge Flow Control ND 07-AOV Aux Bldg 733+6 733 LL-52 X X Inventory.

_(EC-77860)

Reactivity X Dii, NCIND-29 ND 1A HitX Discharge Flow Control ND 07-AOV Aux Bldg 733+4 732 LL-52 X X Inventory.

-Reactivity 1NV-222B UNIT 1 NV PUMP SUCTION FROM NOH NCFWST ISOL NI t t-MOVSOV Auxo1do 7"6+2 603 JJ-52 X Inventry.

Reactivity OH, NC1NDI-X0003 1A RHR HtX ND 21.Tanks/HtXs Aux Bldg 750 732 LL-52 X Inventory, Reactivity OH, NCiNDHX0004 18 RHR HtX ND 21-TankslHtXs Aux Bldg 750 733 LL-52 X Inventory, Reactivity McGuire Unit 1 SWEL-1 Equipment Walkdown ScopeATTACHMENT 23 of 6Class of Lie on Malor Newt gioIEEEEquipment Bidn 51vSystem Eaulpml Ceuo Gri IP Replacement Dlecrepan" a----Odd IBI Egulloment Entrancemen iNPOO lA ,II Pum ND..eta upAnBd 65 51 G5 CPesNC-Press, DH,1NDPUOOO1 1A RHR Pump ND e6-Vedlcat Pump Aux Bldg 695 501 GG-54 X NC Inventory.

Reatt.1iy 1NDPU0002 IB RHR Pump ND 06-Vertcal Pump Aux Bldg 695 Sao FF-54 X NC Inventory, I I IReacWN~INIPU009 1A Med-Head NI Pump NI 05-Horizonta A.l B 7 628 G54 X NC Inventory, Pump A Reactivity 1NIPU0010 18 Me(I-Head NI Pump NI 05-Horizontal

.Bd 1 2 G5 NC Inventory.

Pum Au Blg 76 .626 GG-4 XReactivty 1NI-115B.

Med-Head NI Pump Minflow Isolation NI 08-MOVISOV Aux Bldg 716 e28 HH-54 X RH, NCX DH, NC628 H-5 X (C-996)Inventory.

1NI-1448-Med-Head NI Pump Minflow Isolation NI 08-MOVISOV Aux Bldg 716 626 GG-54 X I nHetoNy.(EC-9994)

IvnoyNC-Press Dt.INI-178B B train ND to Coldleg Isol. NI O-tMOV/SOV Aux Bldg 733+7 730 H14-52 X NC Iventory, Reactivty ND/NS Pump Containment Sump NI oB-MOVISOV Am Bldg 716 62IE1NI-185A

, Supply sot Rathole FF-53 X Various1 NI-430A N2 Assured Supply to 1 NC-34A NI 08-MOVISOV Rx Bldg 760 1A CLA X NC-Prea3PORV RoomINI-431B N2 Assured Supply to 1NC-32B -OVSOV Bldg 760 CLA X NC-PressPORV RoomINSHX0003 1A NS HtX NS 21-Tanks/HtXs Aux Bldg 733 732 LL-50 X Iontarinet Integrity 1NSHXO004 18 NS HtX NS 21-TanksIHtXs Aux Bldg 733 733 LL-50 X CotamentIntegrtyINSPU0001 1A Containment Spray Pump NS 06-Vertical Pump Aux Bldg 733 502 GG-54 X ContainmentlNVTKOO1 i CVCS Volume Control Tank NV 21-Tanks/tXs Ann Bldg 733 723 KK-50 x NC Inventory, INV-141A HI-Head NV pump VCT Suction NV (16-MOVISOV Aux Bldg 733 730 JI-50 X NC tnvtort.isolation Reactivity INV-238 Charging flow control NV 07-AOV Aux Bldg 716 629 JJ-54 X NC tivnityot, 1NVPUO0015 1A HI-Head NV Pump NV 05-Horizontal AC Bn71n2H-4 XPump Ann Bldg 716 627 HH-54 X ReaCtivety 1RNPU0007 1A RN STRAINER BACKWASHPUMPRN 05-HOrMDntN Aux Bldg 7161 Pump I600eRNSlualner RAnBB-52X -newI(EC102477)

.Various McGuire Unit 1 SWEL-1 Equipment Walkdown ScopeATTACHMENT 24 of 6Class of u Major New Prior IPEE.Eouipment Dscriton Sysm Building Elaev Room# IPEEE Rsgiuement Qaioancn lla lonList Esaome Rnhancemet 1RNPUOO 1B RN STRAINER BACKWASH 05-Horizontal Aux Bldg 716 St01/RN VaBXousPUMP Pump rainer Rm (EC102478)

X -replaced StranerRm AA-50 X (MD102029, VariousIRNST0002 1A RN Pump Suction Strainer RN 00-other AtuxBldg 716 St1rane XRrelaeStrainer Rm ~ EC 997291 _____X -replaced StrainrRm AA-60 X (MD101864, Various1RNSTOO02 1B RN Pump Suction Strainer RN 00-oter Au Bldg 716 StriRne Rm -0 X MD19.Vris EC 99729)X -oew1R-1 A RN Strainer Asuto Backwash 600RN BEX5 x nalewatar 1RN-21A 1 Valve RN 07-AOV Amx Bldg 716+4 Strainer Rm BB-52 X controls Various0RN-7A, 1J2A RN Pump SNSWP Suction various ECsORN-7A IA2A RN Pump SNSWP Suction RN 08-MOV/SOV Aux Bldg 716+3 601 BM-63 X Various1A/2A RN Essential Header SNSWP 647W0RN-149A Return RN 0m-MOV/SOV Ann Bldg 7164-4 /Rathole FF-59 X Various~ ~~X -Controls Nrsue1SM-1AB Main Steam Isolation Valve ID SG SM 07-AOV e 807+3 Outer FF-43 NSpg d NC presaure, Doghouse Doghouse UNS-g56)aeatiit 1SM-3AB Main Steam Isolation Valve IC SG SM 07-AOV laser 767+30 inner dX -conrols NC pressure.

oghouse D Doghouse F253 Reactivity 1SV-19 1A SG Main Steam PORV SM 07-AOV Outer 807+3 Outer FF-43 X NC pressure.

nDoMuhouse Doghouse Reactivity 1SV-13 1nB S Main Steam PORV SM 57-AOV Iner FF5 x X -grating In NC presaure, 1 1B MnR07 Doohouse 6730 e F-3 contact whrawse Rea(1VC-1A VC Otsd Air Intake Isol from Unit I VC 08-MOV/SOV Ama Bldg 767 926 BB-50 X VariousIVIAG-11 RN StraineracashAssedA X -new1Vt-AC-1 R r rB sA d VI 21-Tanks/HtXs Ann Bldg 733 701C CC-52 component Variousp (EC-101543) 1WL-322B Containment Venltilation Otiod CIV to WL 08-MOV/SOV Aux Bldg 716+11 B00iMOCAP CC-S2 CVUCDT Rm Integrity OVC-DO-0001 (CR Control Room Outside Press Fan Control RmOAD-1) Supply VC 07-AOV Aux Bldg 767 Venliatiaon FF-56 X VariousOAD-1)_ _ Supp_ yRmControl RmOVCFL001)1 Control Room Filter Package Fan A VC 09-Fan Ann Bldg 767 Ventilation DD-54 XVariousOAPFT-1)

RmControl Rm X -controls 0YC-CH-00O5 Control Room Area Chiller-1 VC/YC 11,-Chilrr Ann Bldg 767 Ventilation FF-56 X upgrade Various(CRA-C-1)

Rm tMD5007391 0VCAHO001 Control Rm(CRA-AHU-1)

A TrainControl Room AHU-1 VC i0-AHU Aun Blg 767 Ventiltion EE-54 XVariousRm McGuire Unit I SWEL.1 Equipment Walkdown ScopeATTACHMENT 25 of 6ElClose of E Column. Listed an uor New( Prior IPEE.Equipment Decipin yte uldtna g y. Ro Grid IPEEE Replacement Discrepancy/

Safe~ty untion0-qipe LMI Eotulament Enhancssman CX -replaced 1EPO-BC-EDGA 1A EDG Battery Charger EPO l-Batte EDGBldg 736.5 IA DG R X (NSM-12482/

Varous(1EPQBCEDGA)

Charger/inverten EC75135)1EPO-BA-EDGA 1A EDG Battery (IEPQBAO24)

EPO 15-Batteny Rack EDG Bldg 736.5 IA EDG Rm x Various1 -B ED- Battery Charger 1-Battery X -replaced I(EPQ-BE-EDBB EPO Chargerfinverter EDG Bldg 736.5 IB EDO Rm X (NSM-124821 Various(1EPBCEDGB)

C eEC75136) 1EPO-BA-EDGB 1B EDG Battery (1EPQBA024)

EPO 15-Battery Rack EDG Bldg 736.5 16 EDG Rm X X -mrssing Vadousspacers01-Motor ControlIEPE-M[X-EMXE IDGIA 600 VAC MCC (IEMXE) EDG Centers/Wall EDG Bldg 736.5 IAEDORo c VariousMountedCo.ntactors 1ETB 4.16 kV Essential Power for EPC Metal Ctad SWgR Aux Bldg 733 706 AA-50 X Various1ELX A4.10 KV/600 VAC1-EPE-TF-ELXA TransforVer EPE 04-Tfansforrie Aux Bldg 750 803 AA-50 X Various1 -EPE-TF-ELXC 4 1a nsfor VAC EPE 04-Transformer Aum Bldg 750 803 AA-50 X Various1-EPE-TP-ELXB IELXB 4.16 KV/600 VAC EPE 04-Traisaormer Aux Bldg 733 705 AA-50 X VariousP -T Transformer 01-Moor Control1EMXA 600 VAC Essential MCC EPE Centers/Wat Mounted Aux Bldg 760 808 FF-55 X VarosContactors 01-Motor Control1EMXA-1 600 VAC Essential MCC EPE Centers/Wall Ass Bldg 750 W0 FF-55 I variousMountedContactors 01-,Molor Control1EMXB 600 VAC Essential MCC EPE Centers/Was Aux Bldg 733 722 FF-55 X X -contactC Mounted w/adjacent MCC VaouContactors 01-Motar Control1EMXB-1 600 VAC Essential MCC EPE CentersWad Ass Bldg 733 722 FF-55 X X -contactMounted wladjacent MCC VarousContactors McGuire Unit 1 SWEL-1 Equipment Walkdown ScopeATTACHMENT 26 of 6Class of Listed on t Mator New/ Prior IPEEEoipe- e~rilinSystem Buidin Elov. Room# CoI"'n IPgE Relacement.

Discrepancy/

Safety FunctionEaaomst#

Declotn Gride JW EIlmtinm EnthancemnentI 1-IPE-CA-9010 SSPS Cabinet 'A' Output & Logic IIE 18-tnstrurnent conrol 767 Control Rm CC-54 X Variouscabinet Rack Complex1 -IPE-CA-9020 SSPS CablineV"'

Output & Logic IPE 1B-tnstnument Control 767 Conol Rot CC-54 X Varouscabinet R ck Complex6EPt-BI-EVIA Vital Battery inverter EPG -Battery Control 733 701 CC-56 X X -reptaced Various____-______A_____taBattery

__verter

___ Cha er/inverter Complex IMG-12522) 1EPG-BI-EVIB Vital Battery Inverter EPG Chage-Bary Coptrol 733 701 CC-56 X XG-rp532) various1EPG-BI-EVIC Vital Battery Inverter EPG 1 -Battery Cowo 733 701 CC-56 X XV- repiedChargerfInverter Complex (MG-22522)

VariousEV-Batteia C Inot 733 701 CC-S6 X X -replaced Vaous1EPG-BI-EVID Vital Battery Inverter EPG Charger/inverter Complerx (MG-22522) 02-Low Voltage1EVDA Vital Panel 125VDC Breaker Panel EPG SWGR and Cotro] 733 701 CC-56 X VariousBreaker Panels Compleex024-ow Voltage1EVDB vital Panel 125VDC Breaker Panel EPG SWGR and Control 733 701 CC-5S X VariousBreaker Panels Complex02-Low Voltage ControlIEVDC Vital Panel 125VOC Breaker Panel EPG SWGR and Col 733 701 CC-56 X Various___________________________________________

Breaker Panels Complea02-Low Voltage Contro1 EVDD Vital Panel 125VDC Breaker Panel EPG SWGR and conpl 733 701 CC-56 X VariousBreaker Panels plex14-Distribulion EVDA 12o"VDC Distribution Center EPL Panels and Control 733 701 CC-66 X VltousAutomatic ComplexTransfer Switches14-Distribution EVDB 125VDC Distribution Center EPL Panels and Control 733 701 CC-56 X VariousAutomatic ComplexTransler SwitchesX -replaced0-EPL-BA-EVCA Vital Battery EPL 15-Battery Rack Control 733 707 CC-56 X (NSM-52483

/ VariousComptex EC._47__)

X -replacedO-EPL-BA-EVCB Vital Battery EPL 16-Battery Rack Control 733 700 CC-56 X (NSM-52484/

VariousComplex ____-____O

_____X -replacedO-EPL-BC-EVCA Vital Battery Charger EPL 16-Battery Control 733 70- CC-Spa X tNdM-524a81 VarousCharger/inverter Complex ,,_ 70 , EC-66972t

__S5281 __X. replaced0-EPL-BC-EVCB Vital Battery Charger EPL 18-Bettap/

Control 733 701 CC-58 X (NSM-524891 VariousChargentlnvertar Complex IEC-66301)

Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1Rev. 1ATTACHMENT 3 -McGuire Unit 1 SWEL-2 Base-2 List andRapid Drain Down ListUnit 1 SWEL-2 "Base List".:Class of Column.Equipment Description System C Elev. Room # C FunctionEquipmen Grid05-Horizontal 1KFPU0001 1A KF Pump KF Pump Aux Bldg 750 816 PP-52 SFP Cooling1KFPU0002 1B KF Pump KF 05-Horizontal Aux Bldg 750 816 PP-52 SFP CoolingPump1KFHX003 1A KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1KFHX004 lB KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0030 1A KF Pump AHU VA 10-AHU Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0031 1B KF Pump AHU VA 10-AHU Aux Bldg 750 816 PP-52 SFP Cooling03-Med Voltage1ETA-13 1A KF Pump Breaker EPC Metal Clad Aux Bldg 750 803 AA-50 SFP CoolingSWGR I03-Med Voltage1ETB-13 1B KF Pump Breaker EPC Metal Clad Aux Bldg 733 705 AA-50 SFP CoolingSWGR1RN-140A Asol RN 07-AOV Aux Bldg 750 816 PP-52 SFP Cooling01-Motor Control1 EMXA-F3D 1A KF Pump Motor AHU EPE Centers/Wall Aux Bldg 750 808 FF-55 SFP CoolingMotor MountedContactors 01-Motor Control1EMXB-4C 1B KF Pump Motor AHU EPE Centers/Wall Aux Bldg 750 722 FF-55 SFP CoolingMotor MountedContactors 1 RN-240B 1B KF Pump Ess AHU Sup RN 07-AOV Aux Bldg 750 816 PP-52 SFP CoolingIsolUnit I SWEL-2 "RapidDraindown List"Class of Column-Equipment

  1. Description System Bldg Elev. Room .u FunctionEauipmen GridSFP & Refueling 1 NV-842AC SBMUP Suction Isolation NV o8-MoviSov Rx Bldg 725 Annulus 273*/61 R C nentCavity Inventory SBMUP Suction Pulsation 00-Other-1NVAC0048 Dampener (non-seismic NV (pulsation Rx Bldg 725 Annulus 320-/61 R N/ASSC) dampener) 1 NVPU0046 SBMUP (non-seismic SSC) NV 05-Horizontal Rx Bldg 725 Annulus 320°/61 R N/APumpSBMUP Discharge Pulsation 00-Other-1NVAC0049 Dampener (non-seismic NV (pulsation Rx Bldg 725 Annulus 320°/61 R N/ASSC) dampener)

I1 NVFLOO47 SBMUP Discharge Filter NV 00- Other Rx Bldg 725 Annulus 320/61 R N/A(non-seismic SSC) I1NV-849AC SBMUP Discharge Isolation NV 08-MOV/SOV Rx Bldg 725 Annulus 273°/61 R N/AReactor Cavity Seal Refueling Reactor Cavity FW 00 -Other Rx Bldg n/a n/A n/a SFP & Refueling Seal Cavity Inventory 1 FW-8, -10, -25, -26, -46, Refuling Cavity Manual Drain FW 00 -Other RxBldg n/a n/A n/a SFP & Refueling

-47,-76,

-75 Valves II_ _ _Cavity Inventory Fuel Transfer Tube blind Fuel Transfer Tube Blind KF 00 -Other Rx Bldg nla n/A n/a SFP & Refueling flange Flange Cavity Inventory Fuel Transfer Tube Weir Fuel Transfer Tube Weir KF 00 -Other Rx Bldg nla n/A n/a SFP & Refueling Gate Gate Cavity Inventory Fukushima Near-Term Task Force (NTTF) Recommendation 2.3:NRC Submittal report for Seismic Walk-downs McGuire Unit 1ATTACHMENT 4McGuire Unit 1 SWEL-2Rev. IClass of Column- Major New/Eguinment

  1. Description System BId Elev. Room Grid Replacement Function-Equipment SEP &X -actuator Rful1NV-842AC SBMUP Suction Isolation NV 08-MOV/SOV Rx Bldg 725 Annulus 273°/61 R replacement Refueling Cavity(EC-99992)

Inventory SBMUP Suction Pulsation Dampener 00-Other-X -replaced1NVAC0048 (non-seismic SSC) NV (pulsation Rx Bldg 725 Annulus 320°/61 R MGMM11916 N/Adampener)

(EC 37849)05-Horizontal 1NVPU0046 SBMUP (non-seismic SSC) NV Pump Rx Bldg 725 Annulus 320°/61 R N/APump05-Horizontal X -replaced1 KFPU0001 1A KF Pump KF Pump Aux Bldg 750 816 PP-52 motor SFP CoolingEC10555005-Horizontal 1KFPUO0O2 1B KF Pump KF Pump Aux Bldg 750 816 PP-52 SFP Cooling1KFHX00O3 1A KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1KFHX0004 1B KF HtX KF 21-Tanks/HtXs Aux Bldg 750 816 PP-52 SFP Cooling1VAAH0031 1B KF PumpAAHU VA 10-AHU AuxBldg 750 816 QQ-52 SFP Cooling