ML13289A230
From kanterella
Revision as of 21:55, 3 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Similar Documents at Sequoyah | |
---|---|
Category:Environmental Report
MONTHYEARML23019A3432023-01-19019 January 2023
[Table view]NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2022 ML21028A5252021-01-28028 January 2021 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2020 ML18116A2872018-04-26026 April 2018 Annual Radioactive Effluent Release Report for 2017 Monitoring Period ML17346A1502017-12-12012 December 2017 Annual Non-Radiological Environmental Operating Report - 2017 ML15351A4132015-12-11011 December 2015 Annual Non-Radiological Environmental Operating Report CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 32014-05-27027 May 2014 Documents for the Environmental Review of License Renewal Application - Env 3 ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML13289A2562013-12-31031 December 2013 6.a.iv.3.7 SQN 2010 ML13289A2482013-10-28028 October 2013 6.a.iii.l.a SQN Fukushima DG, Diesel Pumps/Tow Truck List, Docketed Letter ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1662013-07-30030 July 2013 Excel File Containing Velocity Measurements Recorded at Nine Locations on July 30-31, 2003 ML1316805732013-06-12012 June 2013 Tennessee Valley Authority - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report for May 2013 ML13289A0922013-05-31031 May 2013 Estimation of River Flow at Sequoyah Nuclear Plant for NPDES Thermal Compliance U.S. NRC RAI 1.b.i May, 2013 ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal ML13127A0042013-05-0202 May 2013 Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant (SQN) - NPDES Permit No. TN0026450 - Application for Renewal. Part 2 of 3 ML13289A1652013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013 ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1742013-02-11011 February 2013 NPDES Permit No. TN0026459 - Annual Water Withdrawal Updated ML13289A1972013-02-11011 February 2013 1.e.iii.2.10, Sequoyah Nuclear Plant (Sqn), Annual Water Withdrawal Updates for 2013, NPDES Permit No. TN0026450-Discharge Monitoring Report (DMR) for January 2013 ML13289A1732013-02-0101 February 2013 NPDES Permit No. TN0026450 - Annual Water Withdrawal Update ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0082013-01-0707 January 2013 License Renewal Application, Attachment a, Part 6 of 8 ML13024A0122013-01-0707 January 2013 License Renewal Application, Part 2 of 8 2023-01-19 Category:Letter MONTHYEARML24032A0202024-01-31031 January 2024
[Table view]NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML13289A230&oldid=799705"