|
---|
Category:Environmental Report
MONTHYEARML23019A3432023-01-19019 January 2023 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2022 ML21028A5252021-01-28028 January 2021 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2020 ML18116A2872018-04-26026 April 2018 Annual Radioactive Effluent Release Report for 2017 Monitoring Period ML17346A1502017-12-12012 December 2017 Annual Non-Radiological Environmental Operating Report - 2017 ML15351A4132015-12-11011 December 2015 Annual Non-Radiological Environmental Operating Report CNL-14-085, Documents for the Environmental Review of License Renewal Application - Env 32014-05-27027 May 2014 Documents for the Environmental Review of License Renewal Application - Env 3 ML14118A3812014-04-16016 April 2014 Annual Radiological Environmental Operating Report ML13289A2562013-12-31031 December 2013 6.a.iv.3.7 SQN 2010 ML13289A2482013-10-28028 October 2013 6.a.iii.l.a SQN Fukushima DG, Diesel Pumps/Tow Truck List, Docketed Letter ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1662013-07-30030 July 2013 Excel File Containing Velocity Measurements Recorded at Nine Locations on July 30-31, 2003 ML1316805732013-06-12012 June 2013 Tennessee Valley Authority - Sequoyah Nuclear Plant - NPDES Permit No. TN0026450 - Discharge Monitoring Report for May 2013 ML13289A0922013-05-31031 May 2013 Estimation of River Flow at Sequoyah Nuclear Plant for NPDES Thermal Compliance U.S. NRC RAI 1.b.i May, 2013 ML13289A2272013-05-13013 May 2013 6.a.ii.14 SQN Hours of Operation Annual Air Report 2012 ML13289A0942013-05-0202 May 2013 Plan (SQN) NPDES Permit No. TN0026450 - Application for Renewal ML13127A0042013-05-0202 May 2013 Tennessee Valley Authority (TVA) - Sequoyah Nuclear Plant (SQN) - NPDES Permit No. TN0026450 - Application for Renewal. Part 2 of 3 ML13289A1652013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011, April 2013 ML13289A0952013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1002013-04-30030 April 2013 WR2013-1-45-152, Study to Confirm the Calibration of the Numerical Model for the Thermal Discharge from Sequoyah Nuclear Plant as Required by NPDES Permit No. TN0026450 of March 2011. ML13289A1742013-02-11011 February 2013 NPDES Permit No. TN0026459 - Annual Water Withdrawal Updated ML13289A1972013-02-11011 February 2013 1.e.iii.2.10, Sequoyah Nuclear Plant (Sqn), Annual Water Withdrawal Updates for 2013, NPDES Permit No. TN0026450-Discharge Monitoring Report (DMR) for January 2013 ML13289A1732013-02-0101 February 2013 NPDES Permit No. TN0026450 - Annual Water Withdrawal Update ML13024A0072013-01-0707 January 2013 License Renewal Application, Part 5 of 8 ML13024A0082013-01-0707 January 2013 License Renewal Application, Attachment a, Part 6 of 8 ML13024A0122013-01-0707 January 2013 License Renewal Application, Part 2 of 8 2023-01-19
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARCNL-24-041, Enclosure 6: SQN Hourly Met 2004-20132024-08-28028 August 2024 Enclosure 6: SQN Hourly Met 2004-2013 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML22327A1412022-11-22022 November 2022 10 CFR 50.46 Annual and 30-Day Report of Changes in Peak Cladding Temperatures (PCT) ML20322A1462020-11-25025 November 2020 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi Accident CNL-20-076, Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01)2020-09-23023 September 2020 Response to Request for Additional Information Re Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) ML20164A1442020-06-0303 June 2020 Memorandum from David Lochbaum 2.206 Petition - Review of TVA Employee Concerns Program CNL-17-141, Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status2017-12-28028 December 2017 Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15240A1342015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR50.54 Information Request - Flood Causing Mechanism Reevaluation ML15238B6562015-09-0303 September 2015 Public Table ML15254A5092015-08-11011 August 2015 Revised ITS Conversion Change Tables ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)2013-11-0404 November 2013 Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13298A0302013-09-20020 September 2013 SQN List of Potential Sources of Ghg Emissions Due to Refrigerant Leaks Submitted on Cd Attached to Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.3 ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A1012013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2007 ML13289A1112013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2008 ML13289A1122013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2009 ML13289A1132013-09-20020 September 2013 Enclosuchart on Temperature 2010 ML13289A1142013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2011 ML13289A1152013-09-20020 September 2013 Enclosure 1: Chart on Temperature 2012 ML13289A1162013-09-20020 September 2013 Enclosure 1: Chart on Temperture 2013 ML13289A1172013-09-20020 September 2013 Enclosugraphics and Charts on Years 2007 Through 2013 ML13289A1182013-09-20020 September 2013 Enclosugraphics and Charts on Diffuser Discharge Temperature for Years 2007 Through 2012 ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML11339A0782011-12-13013 December 2011 G20110262/EDATS: OEDO-2011-0269 - Acknowledgment Letter Regarding 2.206 Petition of April 13, 2011 from Paul Gunter to Immediately Suspend OLs of GE BWR Mark I Units ML0919404632009-09-0404 September 2009 Enclosure 1 Summary of Conference Calls with Tennessee Valley Authority Regarding Decommission Funding Assurance ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists 2024-08-28
[Table view] Category:Spreadsheet File
MONTHYEARML19324F0012019-11-20020 November 2019 POV Inspection Workbook ML14177A7602014-06-19019 June 2014 FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014 ML13289A1252013-09-20020 September 2013 Enclosuflows & Stage 2010 ML13289A0962013-09-20020 September 2013 Enclosuriver Temperature, 2007-2013 - Daily Max TUS_Comp_24-hr ML13289A0992013-09-20020 September 2013 Enclosudata and Chart on Drybulb Temperature (F) ML13289A1192013-09-20020 September 2013 Enclosuflows & Stage 2007 ML13289A1202013-09-20020 September 2013 Enclosuflows & Stage 2008 ML13289A1212013-09-20020 September 2013 Enclosutemps 2009 ML13289A1222013-09-20020 September 2013 Enclosutemps 2010 ML13289A1232013-09-20020 September 2013 Enclosutemps 2011 ML13289A1242013-09-20020 September 2013 Enclosuflows & Stage 2009 ML13289A1262013-09-20020 September 2013 Enclosuflows & Stage 2011 ML13289A1272013-09-20020 September 2013 Enclosuflows & Stage 2012 ML13289A1282013-09-20020 September 2013 Enclosuflows & Stage 2013 ML13289A1292013-09-20020 September 2013 Enclosutemps 2007 ML13289A1302013-09-20020 September 2013 Enclosutemps 2008 ML13289A1322013-09-20020 September 2013 Enclosutemps 2012 ML13289A1332013-09-20020 September 2013 Enclosutemps 2013 ML13289A1362013-09-20020 September 2013 Enclosuchart on Missing Record from 2000 Through 2003 2019-11-20
[Table view] |
Text
100 Q_WBH_1-hr_avg Q_APH_1-hr-avg 90 Q O1H_1-hr_avg Q_ g Q_CHH_1-hr_avg 80 70 60 50 40 Discharge (1000 D 0 cfs) 30 20 10 0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2013
686 Top of gates 685.44 HWEL_CHH_Inst 685 684 683 Guide curve 682 681 680 679 678 Water Surfac ce elevation (fee et mean sea lev vel) 677 676 675 674 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2013
Parameter Location Definition Hourly average total release from Watts Bar Dam on the Tennessee River into Q_WBH_1-hr_avg TRM_529.9 Chickamauga Reservoir.
Hourly average total release from Apalachia Dam on the Hiwassee River. The Q_APH_1-hr-avg HRM_66.0 Hiwassee River empties into Chickamauga Reservoir.
Hourly average total release from Ocoee 1 Dam on the Ocoee River. The Ocoee River Q_O1H_1-hr_avg ORM_11.9 empties into the Hiwassee River downstream of Apalachia Dam.
Hourly average total release from Chickamauga Dam (i.e., out or Chickamauga Q_CHH_1-hr_avg TRM_471.0 Reservoir) on the Tennessee River into Nickajack Reservoir.
Instantaneous headwater elevation at Chickamauga Dam, recorded at the end of the HWEL_CHH_Inst TRM_471.0 hour0 days <br />0 hours <br />0 weeks <br />0 months <br />.
Units cfs cfs cfs cfs feet msl
Julian Gridlines Jan 0 -100000 0 685.44 Top of gates Jan 31 31 -100000 20 685.44 Top of gates Feb 31 100000 Feb 28 59 100000 Julian Lower Band Guide Curve Upper Band Mar 59 -100000 0 675.0 676.0 677.0 Mar 31 90 -100000 90 675.0 676.0 677.0 Apr 90 100000 96 678.0 679.0 679.5 Apr 30 120 100000 134 681.5 682.3 682.5 May 120 -100000 246 681.5 682.3 682.5 May 31 151 -100000 272 680.5 681.0 681.5 Jun 151 100000 334 675.0 676.0 677.0 Jun 30 181 100000 365 675.0 676.0 677.0 Jul 181 -100000 Jul 31 212 -100000 Aug 212 100000 Aug 31 243 100000 Sep 243 -100000 Sep 30 273 -100000 Oct 273 100000 Oct 31 304 100000 Nov 304 -100000 Nov 30 334 -100000 Dec 334 100000 Dec 31 365 100000