ML15062A087

From kanterella
Revision as of 03:33, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting
ML15062A087
Person / Time
Site: Pilgrim
Issue date: 03/04/2015
From: Raymond McKinley
NRC/RGN-I/DRP/PB5
To:
McKinley R R
References
MN 15-003
Download: ML15062A087 (4)


Text

MN No.15-003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING

March 4, 2015

Licensee: Entergy Nuclear Operations, Inc. (Entergy)

Facility: Pilgrim Nuclear Power Station

Docket No: 50-293

Date/Time: Wednesday, March 18, 2015 6:30 p.m. to 9:00 p.m.

Location: Radisson Hotel Plymouth Harbor Grand Ballroom 180 Water St.

Plymouth, MA 02360

Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with Entergy to discuss the NRC's assessment of sa fety performance at the Pilgrim Nuclear Power Station for 2014, as described in the annual assessment letter dated March 4, 2015, and to discuss the results of the Inspection Procedure (IP) 95002 supplemental inspection completed on December 12, 2014. The meeting will include a discussion of any new or existing programs that are designed to maintain or improve Entergy's current performance. Following the meeting with Entergy, the NRC will have a separate session to respond to questions on specific performance issues and results from the IP 95002 inspection at the plant and our role in ensuring safe plant operations. The agenda is enclosed.

NRC Attendees: D. Dorman, Regional Administrator, Region I H. Nieh, Director, Division of Reactor Projects R. McKinley, Chief, Projects Branch 5, Division of Reactor Projects J. Noggle, Chief, Plant Support Branch 2, Division of Reactor Safety W. Schmidt, Senior Risk Analyst, Division of Reactor Safety J. McHale, Associate Director, Japan Lessons Learned Division E. Miller, Acting Senior Resident Inspector J. Grieves, Senior Resident Inspector - IP 95002 Team Leader B. Scrabeck, Resident Inspector

Public Participation: This is a Category 1 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Raymond R. McKinley, Chief, Projects Branch 5 610-337-5150

E-mail: Raymond.McKinley@nrc.gov

2 The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2014 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML15057A041. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html

. Additional information relative to the NRC' s annual assessment process and the safety performance of Pilgrim Nuclear Power Station, can be found on the NRC's website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html

, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/ Raymond R. McKinley, Chief Projects Branch 5 Division of Reactor Projects

Enclosure:

Agenda

cc w/encl: Distribution via ListServ

ML15062A087 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME JDeBoer/JPD RMcKinley/RRM DATE 02/26/15 02/26/15

Enclosure Agenda NRC's Annual Assessment Meeting and IP 95002 Inspection Results Pilgrim Nuclear Power Station March 18, 2014 6:30 p.m. - 9:00 p.m.

Radisson Hotel Plymouth Harbor Mayflower Room 180 Water St Plymouth, MA 02360 Formal Meeting Introduction Discussion of Pilgrim Nuclear Powe r Station's performance in 2014 and IP 95002 Inspection Results ................................................................................... (30 minutes)

Discussion of Pilgrim Nuclear Power Stati on's new or existing pr ograms that are designed to maintain or improve Entergy's current performance-------. ... (30 minutes)

Break ....................................................................................................................... (

10 minutes)

NRC to address public questions ............................................................................. (7 5 minutes)

Closing Remarks ........................................................................................................ (5 min utes)