ML070920459

From kanterella
Jump to navigation Jump to search
Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006
ML070920459
Person / Time
Site: Pilgrim
Issue date: 03/30/2007
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To:
Powell R, RI/DRP/610-337-6967
References
MN 07-012
Download: ML070920459 (6)


Text

MN No.07-012 March 30, 2007 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No. 50-293 Date/Time: April 17, 2007 at 6:00 p.m.

Location: Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360

Purpose:

To discuss NRCs assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2006.

Attendees:

NRC: J. Clifford, Deputy Director, Division of Reactor Projects, Region I R. Powell, Chief, Projects Branch 5, Division of Reactor Projects W. Raymond, Senior Resident Inspector, Pilgrim C. Welch, Resident Inspector, Pilgrim Licensee: K. Bronson, Site Vice President R. Smith, General Manager Plant Operations S. Bethay, Safety Assessment Director B. Sullivan, Nuclear Engineering Director Public Participation: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Entergys performance at Pilgrim and the role of the agency in ensuring safe plant operations.

Members of the public may provide questions or particular topics of interest for discussion in advance of the meeting to the meeting contact.

NRCs assessment letter can be found in ADAMS with Accession Number ML070610612. The NRC slides for the meeting can be accessed with Accession Number ML071010265. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Vermont Yankee can be found on the NRC Web Site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Raymond Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known to the meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 13, 2007, via telephone to the NRC meeting contact.

Approved by: /RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President M. Balduzzi, Senior Vice President, Northeastern Regional Operations C. Schwarz, Vice-President, Operations Support S. J. Bethay, Director, Nuclear Safety Assurance O. Limpias, Vice President, Engineering J. F. McCann, Director, Licensing C. D. Faison, Manager, Licensing R. Patch, Director of Oversight, Entergy Nuclear Operations, Inc.

B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.

T. C. McCullough, Assistant General Counsel S. Lousteau, Treasury Department, Entergy Services, Inc.

Director, Radiation Control Program, Commonwealth of Massachusetts C. White, RRPT, CHP, Radiological Health, Vermont Department of Health The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources

3 J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant W. Meinert, Nuclear Engineer J. Muckerheide, MEMA and Commonwealth of Massachusetts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety

Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station April 17, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Review of Reactor Oversight Process and National Summary of Plant Performance . . . . . NRC Discussion of Pilgrim Station Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Licensee Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public

Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station April 17, 2007 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Review of Reactor Oversight Process and National Summary of Plant Performance . . . . . . . . . . . . . . . . . . . . . . . NRC Discussion of Pilgrim Station Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Licensee Response and Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Entergy Closing Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC Break . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (5 minutes)

NRC to address public questions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NRC/Members of the Public Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA J. Lamb, RI OEDO R. Powell, DRP T. Walker, DRP J. Kim, PM, NRR J. Boska, NRR J. Lubinski, NRR W. Raymond, DRP, Senior Resident Inspector C. Welch, DRP, Resident Inspector A. Ford, DRP, Resident OA Region I Docket Room (with concurrences)

Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Document Name: C:\MyFiles\Copies\Pilgrim 2007 Annual Assessment Meeting Notice_1.wpd SUNSI Review Complete: TEW (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME TWalker RPowell DATE 03/30/07 03/30/07 OFFICIAL RECORD COPY ML070920459