Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations
ML090680785
Person / Time
Site: Pilgrim
Issue date: 03/09/2009
From: Mel Gray
Reactor Projects Branch 2
To:
gray mel
References
09-006
Download: ML090680785 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 20, 2009 No. 09-006A U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Plant Docket No. 50-293 Date and Time: March 26, 2009 from 6:00 p.m. to 9:30 p.m.

Location: Hilton Garden Inn 4 Home Depot Dr.

Plymouth, MA 02360

Purpose:

To discuss the NRCs assessment of the safety performance of the Pilgrim Nuclear Power Plant for calendar year 2008 and the role of the agency in ensuring safe plant operations.

Attendees:

NRC: M. Gray, Chief, Projects Branch 2, Region I M. Schneider, Senior Resident Inspector B. Smith, Resident Inspector A. Rosebrook, Senior Project Engineer Entergy: Kevin Bronson, Pilgrim Site Vice President Bob Smith, Pilgrim General Manager, Plant Operations Steve Bethay, Pilgrim NSA Director Brian Sullivan, Pilgrim Engineering Director Public Participation*: The Pilgrim Annual Assessment Meeting is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the business portion, before the meeting is adjourned. Several NRC representatives will also be available for an information session prior to the Annual Assessment Meeting with Entergy. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.

2 The NRCs Annual Assessment Letter for the Pilgrim Nuclear Power Plant can be located in ADAMS with Accession Number ML090630507. The material for the information session and the NRC presentation is located in ADAMS with Accession Number ML090690698. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Mel Gray, Chief, Projects Branch 2 (610) 337-5209 E-mail: Mel.Gray@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 24, 2009, via telephone to the NRC meeting contact.

Approved by:

/RA/ Original Signed By:

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects cc w/ encl:

Vice President, Operations, Entergy Nuclear Operations Senior Vice President, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety & Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Director, Radiation Control Program, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts

3 Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network W. Meinert, Nuclear Engineer J. Giarrusso, MEMA, SLO Commonwealth of Massachusetts, Secretary of Public Safety M. Lampert, Director Pilgrim Watch R. Chin, Duxbury Nuclear Advisory Committee

Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station March 26, 2009 6:00 - 9:30 pm Information Session NRC Staff Available to meet individually with members of the public 6:00pm - 7:00pm Formal Meeting 7:00 pm - 8:00 pm Introduction .............................................................................................. NRC (5 minutes)

Review of Reactor Oversight Process ....................................................... NRC (5 minutes)

Discussion of Pilgrim Nuclear Power Station Performance ..................... NRC (15 minutes)

Entergys Response and Remarks ..................................................... Entergy (25 minutes)

Closing Remarks........................................................................................ NRC (5 minutes)

Short Break .........................................................................................................(5 minutes)

Question and Answer Session 8:00 pm - 9:30 pm NRC to address public questions ........................ NRC/Members of the Public (as needed)

Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station March 26, 2009 6:00 - 9:30 pm Information Session NRC Staff Available to meet individually with members of the public 6:00pm - 7:00pm Formal Meeting 7:00 pm - 8:00 pm Introduction .............................................................................................. NRC (5 minutes)

Review of Reactor Oversight Process ....................................................... NRC (5 minutes)

Discussion of Pilgrim Nuclear Power Station Performance ..................... NRC (15 minutes)

Entergys Response and Remarks ..................................................... Entergy (25 minutes)

Closing Remarks........................................................................................ NRC (5 minutes)

Short Break .........................................................................................................(5 minutes)

Question and Answer Session 8:00 pm - 9:30 pm NRC to address public questions ........................ NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA D.Roberts, DRS M Gray, DRP M. Dapas, DRA E. Cobey, DRS A. Rosebrook, DRP S. Campbell, RI OEDO D. Screnci, PAO B. Bickett, DRP J. Lubinski, NRR N. Sheehan, PAO M. Schneider, DRP, Senior Resident Inspector M. Kowal, NRR N. McNamara, SLO A. Ford, Resident OA J. Kim, PM, NRR D. Tifft, SLO Regional Administrator Secretary, RI J. Boska, NRR DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences) Region I Receptionist PMNS DOCUMENT NAME: S:\ROP-9 EOC Review\Branch 5\Pilgrim AA Mtg Notice.doc SUNSI Review Complete: mkg (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public. ML090680785 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ARosebrook/mkg for MGray/mkg DATE 03/20/09 03/ 20/09 OFFICIAL RECORD COPY