Meeting with Entergy Nuclear Generation Company (Pilgrim) Re Results of NRCs Assessment of the Safety Performance at the Pilgrim Nuclear Power Station for the Period April 1, 2001 Through December 31, 2001
ML020730187
Person / Time
Site: Pilgrim
Issue date: 03/14/2002
From: Anderson C
Division Reactor Projects I
To:
Shared Package
ML020730200 List:
References
MN-02-015
Download: ML020730187 (4)


Text

March 14, 2002 U.S. NUCLEAR REGULATORY COMMISSION REGION I No.02-015 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Entergy Nuclear Generation Company Facility:

Pilgrim Nuclear Power Station Docket No.

50-293 Time and Date:

1:00 p.m. on March 28, 2002 Location:

John Carver Inn - Carver Meeting Room 25 Summer Street Plymouth, MA 02360

Purpose:

The NRC staff and Entergy management will discuss the results of NRC's assessment of the safety performance at the Pilgrim Nuclear Power Station for the period April 1, 2001 through December 31, 2001. The NRC staff will also provide an overview of the NRC's Reactor Oversight Process.

NRC Attendees:

C. Anderson, Chief, Projects Branch 5, Region I R. Arrighi, Acting Senior Resident Inspector, Pilgrim W. Raymond, Senior Resident Inspector, Pilgrim J. Linville, Chief, Electrical Branch, Region I T. Tate, Licensing Project Manager, Office of Nuclear Reactor Regulation Licensee Attendees: R. Bellamy, Site Vice President - Pilgrim C. Dugger, Vice President - Operations P. Dietrich, General Manager Plant Operations W. Riggs, Director, Nuclear Assessment S. Bethay, Director, Nuclear Engineering NOTE: This meeting is open to the public for observation. The NRC staff will be available at the end of the meeting to answer questions from the public. The NRC encourages public participation by observation of this annual safety performance assessment meeting and by providing questions and comments to the NRC staff following the meeting either in person or in writing. Comments can be sent to Clifford J. Anderson, Chief, Reactor Projects Branch 5, Division of Reactor Projects at the following address:

US Nuclear Regulatory Commission - Region I 475 Allendale Road King of Prussia, PA 19406-9866

2 Information relative to this annual safety performance assessment meeting can be found at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/PILG/pilg_chart.html.

Attendance by additional NRC personnel should be made known by March 21, 2002, via telephone call to Mr. Clifford Anderson at (610) 337-5227. Handicapped persons requiring assistance to attend or participate in the meeting shall make their requests known no later than two business days prior to the meeting.

/RA/

Approved by: ____________________________

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

3 Distribution w/encl:

R. Bellamy, Site Vice President C. Anderson, DRP R. Summers, DRP NRC Resident Inspector R. Junod, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

Commonwealth of Massachusetts, SLO Designee

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

W. Kane, Deputy Executive Director for Reactor Programs, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

D. Matthews, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement J. Zwolinski, Director, Division of Licensing Project Management T. Bergman, RI EDO Coordinator, OEDO E. Adensam, Project Directorate I-1 (PD1/2), NRR T. Tate, Project Manager, NRR R. Pulsifer, NRR (Backup)

W. Lanning, DRS R. Crlenjak, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA R. Arrighi, Acting SRI - Pilgrim W. Raymond, SRI - Pilgrim G. Matakas, ORA PMNS NRCWEB OEMAIL OEWEB DOCUMENT NAME: G:\\BRANCH5\\MEETINGS\\PILGEOCMTGNOTICE.3-28-02.WPD After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME RSummers/CA for CAnderson/CA DATE 03/14/02 03/14/02 OFFICIAL RECORD COPY